Construct Billeting Office Federal contract opportunity
Solicitation number
W912L7-18-B-7001
Issued by
Department of the Army Tennessee Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Construct Billeting Office, newest first.
File Type Posted
Abstract_of_offers_18B7001_signed.pdf PDF
W912L718B7001_Amendment_4.pdf PDF
Addendum_AT_FP_Drawing.pdf PDF
W912L718B7001_Amendment_3.pdf PDF
W912L718B7001_Amendment_2.pdf PDF
Specifications_Amendment_1.zip ZIP file
Preproposal_minutes_W912L718B7001.pdf PDF
Site_Visit_Slides_20_Apr_2018.pdf PDF
Sign_in_Sheet.pdf PDF
W912L718B7001_8_Apr_2018.pdf PDF
JA-Brand_Name_Simplex.pdf PDF
Specifications.zip ZIP file
21-17007_134th_Billeting_Office_-_Alcoa,_TN.pdf PDF
Drawings.zip ZIP file
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F7X3187324AW01 PSXE132005

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REASON FOR AMENDMENT: To incorporate questions and answ ers 1-7 and specificaiton sections 05120, 01037, 04810, 08120, 08461, and 12492. Bid due date and time has not been changed.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Apr-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912L7-18-B-7001

X 9B. DATED (SEE ITEM 11)

08-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Apr-2018

CODE

134TH TN AIR NATIONAL GUARD

134 MSC CONTRACTING OFFICE - WAWF W912L7

240 BRISCOE DRIVE

LOUISVILLE TN 37777-6227

W912L7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912L7-18-B-7001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

QUESTION AND ANSWERS 1-7

1. Question: There is no section in files for storefront. It is shown in table of contents but there is no section of details for 08120.

1. Answer: Yes, 08120 Aluminum Doors and Frames is attached.

2. Question: Is this project LEED certified?

2. Answer: No. The project shall not be registered with the U.S. Green Building Council under the 2009version (LEED v3) and shall not obtain USGBC LEED recognition.

3. Question: Specification section 04810 Unit Masonry Assemblies is listed in the index, however it is not in the spec. book. Will you be providing prior to the bid date?

3. Answer: Yes, 04810 Unit Masonry Assemblies is attached.

4. Question: Specification section 05500 Structural Steel is not listed in the index nor is it provided in the spec.

book. Will you be providing prior to the bid date?

4. Answer: Yes, 05120 Structural Steel is attached.

5. Question: What materials on this project need blast load requirements?

5. Answer: The exterior doors and windows as indicated by the “AFTP” designation in the schedules and specification sections 08110 – Steel Doors and Frames (posted with original solicitation), 08120 – Aluminum Doors & Frames, and 08461 – Automatic Sliding Doors. 08120 and 08461 specifications are attached.

6. Question: Do you know if this project requires 3rd party commissioning? It only mentions Cx in the specs 4 times, but no information about how the Cx agent is hired.

6. Answer: No, this project does not require 3rd party commissioning.

7. Question: Please clarify if window shades are required and if so, please provide specifications for them. Drawing A9.1 shows a window shade yet there is no specification section for window shades.

7. Answer: Yes they are. Reference the Room Finish Key schedule on sheet A9.2. Please see specification section 12492 – Window Shade as attached.

(End of Summary of Changes)