Q A_1.pdf
PDF 188 KB Posted
- Solicitation number
- W912L7-15-Q-1112
About this file
Question and Answer Doc 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS_Repair_Generator_Amendment_II.pdf | ||
| PWS_Repair_Generator.pdf | ||
| PWS_Snorkel_Repair.pdf | ||
| PWS_Install_130_ton_chiller_3.pdf | ||
| PWS_Repair_Generator.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ W912L7-15-Q-1112 (Question and Answer 1)
Q. Who is the current controls company for the chiller being replace?
A. Automated Logic.
Q. It was noted at the site visit that appox. 350-400 gallons of fuel was contaminated in the generator at building 757. Would filtering the fuel or draining the tank be priced as an option to the repair bid?
A. Not an option. The contractor will remove and dispose of the contaminated fuel. The contactor will clean the fuel tank. The government will replace the fuel.