PWS_Snorkel_Repair.pdf

PDF 140 KB Posted

Attached to
Multi-Project: Chiller replacement, Generator repair and Snorkel Lift Repair
Solicitation number
W912L7-15-Q-1112
Issued by

About this file

PWS Snorkel Repair

View the file

Other files

File Type Posted
PWS_Repair_Generator_Amendment_II.pdf PDF
Q A_1.pdf PDF
PWS_Repair_Generator.pdf PDF
PWS_Install_130_ton_chiller_3.pdf PDF
PWS_Repair_Generator.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

th

Wing SECTION 01000

Nashville, Tennessee Performance Work Statement

06 June 2015

PERFORMANCE WORK STATEMENT

REPAIR SKORKEL 100’ MAN LIFT MODEL TB100J

BERRY FIELD, NASHVILLE, TENNESSEE

GENERAL

The work covered by this Performance Work Statement (PWS) consists of furnishing all labor, equipment, and materials to repair Snorkel 100’ man lift model TB100J. The work location is the

118th Wing, Nashville, Tennessee. Contractor shall be fully responsible for compliance with all base, local, state, and federal environmental/occupational safety laws, rules and regulations that apply. The contractor shall follow life and safety codes, and take necessary actions to avoid conditions which may be hazardous to the health and safety of base personnel. The Contractor is responsible for all permits associated with the project.

1.1 PERFORMANCE PERIOD

The performance period for this project is 2 calendar days.

1.2 PROJECT DESCRIPTION

A. Scope of Work: Contractor will perform all work as described herein. Work includes but is not limited to:

i. The contractor will furnishing all labor, equipment, and materials to repair

Snorkel 100’ man lift model TB100J.

ii. The contractor will install angle sensor kit part number 0191948 in accordance with manufactures specifications.

iii. The contractor will install seal kits in accordance with manufactures specifications.

iv. The contractor will repair basket cylinder fading issue in accordance with manufactures specifications.

v. The contractor will test and calibrate all equipment in accordance with manufactures specifications to ensure proper operation.

vi. All materials, parts and testing specifications will be approved by the

COR.

th

Wing SECTION 01000

Nashville, Tennessee Performance Work Statement

06 June 2015

vii. The contractor will remove all work related debris and dispose of it off the property.

viii. All work will be performed in accordance with all Local, State and

Federal codes.

PART 2

Deliverable Schedule

The contractor deliverable has one time period with one acceptable threshold for that deliverable.

Deliverable Time Period Deliverable Threshold

50% End of 1 days All repairs complete

100% End of day 2 All testing complete

'End of Performance Work Statement’