PWS Snorkel Repair
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS_Repair_Generator_Amendment_II.pdf | ||
| Q A_1.pdf | ||
| PWS_Repair_Generator.pdf | ||
| PWS_Install_130_ton_chiller_3.pdf | ||
| PWS_Repair_Generator.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
th
Wing SECTION 01000
Nashville, Tennessee Performance Work Statement
06 June 2015
PERFORMANCE WORK STATEMENT
REPAIR SKORKEL 100’ MAN LIFT MODEL TB100J
BERRY FIELD, NASHVILLE, TENNESSEE
GENERAL
The work covered by this Performance Work Statement (PWS) consists of furnishing all labor, equipment, and materials to repair Snorkel 100’ man lift model TB100J. The work location is the
118th Wing, Nashville, Tennessee. Contractor shall be fully responsible for compliance with all base, local, state, and federal environmental/occupational safety laws, rules and regulations that apply. The contractor shall follow life and safety codes, and take necessary actions to avoid conditions which may be hazardous to the health and safety of base personnel. The Contractor is responsible for all permits associated with the project.
1.1 PERFORMANCE PERIOD
The performance period for this project is 2 calendar days.
1.2 PROJECT DESCRIPTION
A. Scope of Work: Contractor will perform all work as described herein. Work includes but is not limited to:
i. The contractor will furnishing all labor, equipment, and materials to repair
Snorkel 100’ man lift model TB100J.
ii. The contractor will install angle sensor kit part number 0191948 in accordance with manufactures specifications.
iii. The contractor will install seal kits in accordance with manufactures specifications.
iv. The contractor will repair basket cylinder fading issue in accordance with manufactures specifications.
v. The contractor will test and calibrate all equipment in accordance with manufactures specifications to ensure proper operation.
vi. All materials, parts and testing specifications will be approved by the
COR.
th
Wing SECTION 01000
Nashville, Tennessee Performance Work Statement
06 June 2015
vii. The contractor will remove all work related debris and dispose of it off the property.
viii. All work will be performed in accordance with all Local, State and
Federal codes.
PART 2
Deliverable Schedule
The contractor deliverable has one time period with one acceptable threshold for that deliverable.
Deliverable Time Period Deliverable Threshold
50% End of 1 days All repairs complete
100% End of day 2 All testing complete
'End of Performance Work Statement’