PWS Generator Amendment II
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q A_1.pdf | ||
| PWS_Repair_Generator.pdf | ||
| PWS_Snorkel_Repair.pdf | ||
| PWS_Install_130_ton_chiller_3.pdf | ||
| PWS_Repair_Generator.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
th
Wing SECTION 01000
Nashville, Tennessee Performance Work Statement
BKTZ152015 Amendment II
PERFORMANCE WORK STATEMENT
GENERATOR REPAIR BLDG 757
PROJECT # BKTZ 152015
BERRY FIELD, NASHVILLE, TENNESSEE
GENERAL
The work covered by this Performance Work Statement (PWS) consists of furnishing all labor, equipment, and materials to repair generator at bldg. 757. The work location is the 118th Wing, Nashville, Tennessee. Contractor shall be fully responsible for compliance with all base, local, state, and federal environmental/occupational safety laws, rules and regulations that apply. The contractor shall follow life and safety codes, and take necessary actions to avoid conditions which may be hazardous to the health and safety of base personnel. The Contractor is responsible for all permits associated with the project.
1.1 PERFORMANCE PERIOD
The performance period for this project is 3 calendar days.
1.2 PROJECT DESCRIPTION
1. Repair Katolight 500kw generator model 500FRV4 at bldg. 757, See attached
GENERATOR OPERATING LOG
A. Scope of Work: The contractor will install in accordance with manufactures specifications:
i. Control board DGC500. Quantity (1)
ii. Fan belt set 96263. Quantity (1)
iii. Alternator belt set 96314. Quantity (1)
iv. Tensioner pulley. Quantity (1)
v. Fan hub assembly. Quantity (1)
vi. The contractor will remove all fuel and dispose of it off site. The contractor will clean the fuel tank. The government will be responsible for refilling the fuel tank. The disposal and cleaning method will be approved by the Contracting Officer Representative.
vii. The contractor will test the generator after repairs are complete and ensure proper operation.
viii. The contractor will remove all work related debris and dispose of it off the property.
Wing SECTION 01000
BKTZ152015 Amendment II
ix. All work will be performed in accordance with all Local, State and
Federal codes.
1.3 REFERENCES
1.3.1 In general, all technical specifications are provided within the Construction Documents however, in the event any project element is not covered in the specifications provided, the contractor should refer to the Specification Hierarchy for direction related to the element.
1.4 SPECIFICATION HIERARCHY
1.4.1 The specification hierarchy is the collection of technical specification to be used for all projects. The contractor should refer to the specifications provided in the Construction
Documents first before moving to the next technical specification listed in the specification hierarchy. The hierarchy is listed in the order of precedence (i.e. “A” supersedes “B”, “B” supersedes “C”, etc.). The hierarchy is as follows:
1. Specifications provided with Construction Documents.
2. Base Standard Specifications.
3. MATOC Default Specifications.
4. AIA Master Spec Specifications.
PART 2
Deliverable Schedule
The contractor deliverable has one time period with one acceptable threshold for that deliverable.
Deliverable Time Period Deliverable Threshold
Lines i, ii, iii, iv, v End of 1 day COMPLETE
Lines vi, vii, viii End of 2 days COMPLETE
Wing SECTION 01000
BKTZ152015 Amendment II
'End of Performance Work Statement’