About this file

Solicitation

View the file

Other files

File Type Posted
SK-S1.pdf PDF
W912L7-10-B-0002-0002.pdf PDF
W912L7-10-B-0002-0001 addendum1.pdf PDF
SK-E1.pdf PDF
UFC Threat Assessment Checklist.pdf PDF
Pre-bid Slides ce Fire Station.ppt PPT presentation
Pre Bid Meeting and Site Visit Roster —
W912L7-10-B-0002-0001.pdf PDF
BCE Fire Station Drawings.zip ZIP file
BCE Fire Station Specifcations.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Contract for Project PYKL009136: Base Civil Engineering Maintenance and Training Facilities, Civil Engineering Building, Covered Storage, Fire Station Renovation and Additions in Memphis, Tennessee; Solicitation number is W912L7-10-B-0002 located at the Tennessee Air National Guard 164th Airlif t w in in Memphis, Tennessee. Work shall be performed in accordance w ith (IAW) the plans and specif ications.

This project is set aside for small businesses. The North American Industry Classif ication System (NAICS) Code is 236220 and the Small Business size Standard is $33.5 Million in average annual receipts for the past three years. Construction project magnitude is betw een $5,000,000 and $10,000,000. Persons intending to submit a bid are strongly encouraged to attend the Pre-Bid Conference and site visit. See Section 00100 for location and date. All documents for this solicitation w ill be posted at w w w .fbo.gov to include plans and specif ications.

Contractors should check the w ebsites frequently for updates to the solicitation.

X

TERRI A. HOVER 615-313-2658

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

27-Jul-2010

(RFP)

(IFB)

CALL:

Civil Engineering Maintenance and Fire Station Renovations

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________730 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

USPFO FOR TENNESSEE W912L7

PURCHASING & CONTRACTING

PO BOX 41502

NASHVILLE TN 37204-1502

W912L7

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

PYKL009136

8. ADDRESS OFFER TO (If Other Than Item 7)

615-313-2659FAX:TEL: 615-313-2650 TEL: FAX:

W912L7-10-B-0002 76

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912L7-10-B-0002

Section 00010 - Solicitation Contract Form

SECTION 0010

TABLE OF CONTENTS

SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK

SECTION 00010 - BID SCHEDULE, NOTES

SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS

SECTION 00700 - CONTRACT CLAUSES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

ATTACHMENT 1 – PLANS AND SPECIFICATIONS Project #PYKL009136 ATTACHMENT 2 – WAGE DETERMINATION: TN100118 04/16/2010 TN118, Modification 2 – SCHEDULE OF MATERIAL SUBMITTALS – List of Material Submittals can be found on www.fbo.gov

SECTION 00010 NOTES

NOTES

* Note that as of 01 January 2005, offerors are now required to use Online Representations and Certifications (ORCA), and to update them annually. The website for ORCA is http://orca.bpn.gov. This is in addition to filling in the Representations & Certifications in Section 00600.

1. A complete bid package must contain the following:

(a) Offer, Standard Form (SF) 1442, Section 00010 Line Items

(b) Section 00600, Representations and Certifications, completed in their entirety,

(c) A valid Bid Bond. Standard Form 24.

(d) In addition, the offeror must have entered current and complete data within the past year in Online

Representations and Certifications (ORCA), is http://orca.bpn.gov.

(e) When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102.

One copy of the SF1442 is required to have an original signature.

(f) All amendments to the solicitation must be acknowledged.

(g) Mark the front of the envelope with the following: “BID No. W912L7-10-B-0002”, and the Name and

Address of Bidder. See Block 13A of SF 1442 for required number of copies.

2. All questions and requests for information regarding this Invitation For Bids (IFB) must be received NOT LATER THAN close of business September 1, 2010, in order to minimize the need to extend the bid opening date.

Questions shall be emailed to both terri.hover@us.army.mil and paul.david.reagan@us.army.mil . See Section 00100 for more information.

3. Offeror’s attention is invited to the insurance requirement contained in this solicitation (Contract Clause FAR 52.228-5). Certification of the required coverage for the prime contractor shall be furnished prior to beginning work on this contract, and the Contracting Officer may request evidence of the required insurance at any time during the life the contract.

4. Reference Contract Clause 252.236-7008, CONTRACT PRICES – BIDDING SCHEDULES (DEC 1991). The prices shown in the Bidding Schedule must reflect ALL costs involved in performing the work, as described in the plans and specifications.

5. The term “Bidding Schedule” shall also be construed to mean “Offer Schedule” or “Schedule”. The terms “bid” and “offer”, and “bidder” and “offeror” shall be construed as having the same meaning in this solicitation and resulting contract.

6. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: www.fbo.gov. For security reasons, all potential offerors, plan rooms and printing companies are required to register in the Central Contractor Registration (CCR), http://www.ccr.gov, and the Federal Business Opportunities (FedBizOpps) website, https://www.fbo.gov in order to view or download the plans or drawings from the web site.

A link to this site can be found under Plans at the solicitation website.

7. Facsimile transmission of bid is not authorized.

Reference DFARS Provision 252.236-7006, Cost Limitation There is a $ 5 Million to $10 Million limitation on Project Number PYKL009136 Base Civil Engineering Maintenance and Training Facilities, Civil Engineering Building, Covered Storage, Fire Station Renovation and Additions in Memphis, Tennessee.

CLINS 0004-0009 are additive bid items and shown in the order of priority. Items shall be sequentially added to determine apparent low bidder in accordance with the procedure described in DFARS Provision 252.236-7007, Additive or Deductive Items, in Section 00100. After determination of apparent low bidder the Government may award any combination of line items.

Significant Liquidated Damages (see FAR Clause 52.211-12, Liquidated Damages - Construction) apply for exceeding.

End of Section 00010 word document

ATTACHMENT 1

PLANS AND SPECIFICATIONS FOR Project Number PYKL009136

DIVOO GENERAL INFORMATION

DIV 01 GENERAL REQUIREMENTS

DIV02 SITE WORK

DIV03 CONCRETE

DIV04 MASONRY

DIV05 METALS

DIV06 WOODS & PLASTICS

DIV07 THERMAL AND MOISTURE PROTECTION

DIV08 DOORS & WINDOWS

DIV09 FINISHES

DIV 10 SPECIALTIES

DIV 11 EQUIPMENT

DIV 12 FURNISHINGS

DIV 13 SPECIAL CONSTRUCTION

DIV 14 CONVEYING SYSTEMS

VOL II VOLUME II TABLE OF CONTENTS

DIV 15 MECHANICAL

DIV 16 ELECTRICAL

CE-GO.01 COVER SHEET

CE-GO.02 INDEX SHEET

CE-GO.03 SITE USE PLAN

CE-GO.04 CONSTRUCTION PHASING PLAN

CE-G1.01 FIRST FLOOR LIFE SAFETY PLAN

CE-G1.02 SECOND FLOOR LIFE SAFETY PLAN

CE-C1.01 SITE DEMOLITION PLAN

CE-C1.02 STORM WATER POLLUTION PREVENTION PLAN

CE-C1.03 SITE PLAN

CE-C1.04 SITE GRADING & DRAINAGE PLAN

CE-C1.05 PAVEMENT LAYOUT PLAN

CE-C1.06 SITE DETAILS

CE-C1.07 CONCRETE PAVEMENT JOINT DETAILS

CE-C1.08 SITE UTILITY PLAN

CE-C1.09 UTILITY DETAILS

CE-A2.01 FIRST FLOOR PLAN

CE-A2.02 SECOND FLOOR PLAN

CE-A2.03 ROOF PLAN

CE-A2.04 ROOF DETAILS

CE-A3.01 FIRST FLOOR REFLECTED CEILING PLAN

CE-A3.02 SECOND FLOOR REFLECTED CEILING PLAN

CE-A4.01 EXTERIOR ELEVATIONS

CE-A4.02 BUILDING SECTIONS

CE-A5.01 WALL SECTIONS

CE-A5.02 WALL SECTIONS

CE-A5.03 WALL SECTIONS

CE-A5.04 SECTIONS AND DETAILS

CE-A5.10 PLAN DETAILS

CE-A5.11 PLAN ELEVATION DETAILS & SECTIONS BID OPTION #4

CE-A5.30 DOOR AND WINDOW SCHEDULES

CE-A5.31 WINDOW DETAILS

CE-A5.32 DOOR DETAILS

CE-A5.33 DOOR DETAILS

CE-A5.40 ENLARGED PLANS

CE-A7.01 INTERIOR ELEVATIONS

CE-A8.01 CASEWORK SECTION AND DETAILS

CE-11.01 FIRST FLOOR FINISH PLAN

CE-11.02 SECOND FLOOR FINISH PLAN

CE-11.10 FIRST FLOOR FURNITURE PLAN

CE-11.12 SECOND FLOOR FURNITURE PLAN

CE-12.01 SIGNAGE TYPES

CE-12.02 FIRST FLOOR SIGNAGE PLAN CE-12.03 SECOND FLOOR SIGNAGE PLAN

CE-SO.01 GENERAL NOTES & TYPICAL DETAILS

CE-S1.01 TYP DETAILS & SCHEDULES

CE-S2.10 FOUNDATION & FIRST FLOOR PLAN

CE-S2.20 SECOND FLOOR & LOW ROOF FRAMING PLAN

CE-S2.30 HIGH ROOF FRAMING PLAN

CE-S3.01 FOUNDATION DETAILS

CE-S3.02 FOUNDATION DETAILS

CE-S3.03 ENLARGED STAIR PLANS & DETAILS

CE-S3.04 ENLARGED ELEVATOR PLANS & SECTIONS

CE-S4.01 FLOOR FRAMING DETAILS

CE-S5.01 ROOF FRAMING DETAILS

CE-S5.02 ROOF TRUSS DETAILS

CE-MO.01 GENERAL NOTES AND MECHANICAL LEGEND

CE-M2.11 HVAC DUCTWORK - FIRST AND SECOND FLORO PLAN

CE-M2.21 HVAC PIPING FIRST AND SECOND FLOOR PLANS

CE-M4.01 ENLARGED MECHANICAL ROOM PLAN

CE-M5.01 HVAC CONTROL DIAGRAMS

CE-M6.01 MECHANICAL DETAILS

CE-M6.02 SEISMIC DETAILS

CE-M7.01 MECHANICAL SCHEDULES

CE-P2.01 FIRST FLOOR PLUMBING SANITARY PLAN

CE-P2.02 FIRST FLOOR PLUMBING WATER PLAN

CE-P4.01 PLUMBING DETAILS

CE-P6.01 PLUMBING DWV RISER

CE-EO.01 ELECTRICAL LEGEND AND ABBREVIATIONS

CE-EO.02 ELECTRICAL SITE PLAN

CE-E2.10 FIRST FLOOR LIGHTING PLAN

CE-E2.11 FIRST FLOOR POWER PLAN

CE-E2.12 FIRST FLOOR SPECIAL SYSTEMS PLAN

CE-E2.13 SPECIAL SYSTEMS PLANS

CE-E2.14 FIRST FLOOR GROUNDING PLAN

CE-E3.01 LIGHTING FIXTURE SCHEDULE

CE-E3.02 PANELBOARD SCHEDULES SHEET TITLE

CE-E4.01 POWER ONE-LINE DIAGRAM

CE-E4.02 SPECIAL SYSTEMS RISER DIAGRAMS

CE-E5.01 GROUNDING DETAILS

CE-E5.02 MISCELLANEOUS ELECTRICAL SHEET TITLE

CE-E5.03 MISCELLANEOUS ELECTRICAL DETAILS

CE-FA2.10 FIRST FLOOR FIRE ALARM PLAN

CE-FA4.01 FIRE ALARM RISER DIAGRAM

CE-FP2.01 FIRST FLOOR FIRE PROTECTION SPRINKLER PLAN

CE-FP4.01 FIRE PROTECTION DETAILS AND SEISMIC BRACING

FS-GO.01 COVER SHEET

FS-GO.02 INDEX SHEET

FS-GO.04 CONSTRUCTION PHASING PLAN

FS-G1.01 FIRST FLOOR LIFE SAFETY PLAN

FS-C1.01 SITE DEMOLITION PLAN

FS-C1.02 STORM WATER POLLUTION PREVENTION PLAN

FS-C1.03 SITE PLAN

FS-C1.04 SITE GRADING & DRAINAGE PLAN

FS-C1.05 SITE UTILITY PLAN

FS-C1.06 SITE & UTILITY DETAILS

FS-A1.02 SELECTIVE DEMOLITION PLAN

FS-A2.01 FIRST FLOOR PLAN

FS-A2.02 ROOF PLAN

FS-A2.03 ROOF DETAILS

FS-A3.01 FIRST FLOOR REFLECTED CEILING PLAN

FS-A4.01 EXTERIOR ELEVATIONS

FS-A4.02 BUILDING SECTIONS

FS-A5.01 WALL SECTIONS

FS-A5.02 WALL SECTIONS

FS-A5.10 INTERIOR DETAILS

FS-A5.30 DOOR AND WINDOW SCHEDULES

FS-A5.31 WINDOW DETAILS

FS-A5.32 DOOR DETAILS

FS-A5.40 ENLARGED PLANS

FS-A7.01 INTERIOR ELEVATIONS

FS-A8.01 CASEWORK SECTIONS AND DETAILS

FS-11.01 FIRST FLOOR FINISH PLAN

FS-12.01 SIGNAGE TYPES

FS-12.02 FIRST FLOOR SIGNAGE PLAN

FS-SO.01 GENERAL NOTES & TYPICAL DETAILS

FS-S1.01 TYPICAL DETAILS & SCHEDULES

FS-S2.10 FOUNDATION & FLOOR PLAN

FS-S2.20 ROOF FRAMING PLAN

FS-S3.01 FOUNDATION DETAILS

FS-S3.02 FOUNDATION DETAILS

FS-S4.01 ROOF FRAMING DETAILS

FS-S4.02 ROOF TRUSS DETAILS

FS-MO.01 GENERAL NOTES AND MECHANICAL LEGEND

FS-M2.11 HVAC DUCTWORK - FLOOR PLAN

FS-M2.21 HVAC PIPING - FLOOR PLAN

FS-M4.01 ENLARGED MECHANICAL ROOM PLANS

FS-M5.01 HVAC CONTROL DIAGRAMS

FS-M6.01 MECHANICAL DETAILS

FS-M6.02 SEISMIC DETAILS

FS-M7.01 MECHANICAL SCHEDULES

FS-P2.01 FIRST FLOOR PLUMBING SANITARY

FS-P2.02 FIRST FLOOR PLUMBING WATER

FS-P4.01 PLUMBING DETAILS

FS-P6.01 PLUMBING DETAILS

FS-EO.01 ELECTRICAL LEGEND AND ABBREVIATIONS

FS-E1.01 ELECTRICAL DEMOLITION PLAN

FS-E2.10 LIGHTING PLAN

FS-E2.11 POWER PLAN

FS-E2.12 SPECIAL SYSTEM PLAN

FS-E2.13 SPECIAL SYSTEMS PLAN

FS-E2.14 GROUNDING PLAN

FS-E3.01 LIGHTING FIXTURE SCHEDULE

FS-E4.02 SPECIAL SYSTEMS RISER DIAGRAMS

FS-E5.01 GROUNDING DETAILS

FS-E5.02 FIXTURE TYPES

FS-E5.03 MISCELLANEOUS ELECTRICAL DETAILS

FS-FA2.10 FIRE ALARM PLAN

FS-FA4.10 FIRE ALARM RISER DIAGRAM

FS-FP2.01 FIRST FLOOR FIRE PROTECTION SHEET TITLE

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Dollars, U.S.

Base Civil Engineering Maintenance

FFP

Base Civil Engineering Maintenance and Training Facility See all Plans and Specifications for this project as listed in ATTACHMENT 1 – PLANS AND SPECIFICATIONS Project #PYKL009136 FOB: Destination

NET AMT

0002 1 Dollars, Covered Storage Building

See all Plans and Specifications for this project as listed in ATTACHMENT 1 – PLANS AND SPECIFICATIONS Project #PYKL009136

0003 1 Dollars, Fire Station Renovation and Expansion

See all Plans and Specifications for this project as listed in ATTACHMENT 1 – PLANS AND SPECIFICATIONS Project #PYKL009136

0004 1 Dollars, Aditiove Bid Item Number One (1)

Add South Patio and Screen Wall Add exterior paved patio area and exterior masonry screen wall immediately adjacent to the south exit of Break Area #112.

Refer to sheet CE-A5.11.

0005 1 Dollars, Additive Bid Item Number Two (2)

Add Operable Partition to Room 207 Add operable partition in Training Classroom #207 of Base Civil Engineering building. Refer to Section 10651 and Reflected Ceiling Plan, sheet CE-A3.02.

0006 1 Dollars, Additive Bid Item Number Three (3)

Add (ECM) Motors Provide electronic commutation type motors (ECM) for MAU-1 through MAU-9 as referenced in Section 15725-Modular Indoor Air Handling Units, Paragraph 2.05 – Motors, of the project manual in lieu of base bid requirement for variable frequency drive type motors (VFD)

0007 1 Dollars, Additive Bid Item Number Four (4)

Add Moroized Doors Provide motorized overhead sectional doors in lieu of non-motorized at doors 105, 107, 109. 115, 122A, & 122B on the north façade of the Civil Engineering Building. Refer to Sheet No.CE-E2.11 for power requirements, CE-A5.30-Door & Frame Schedule, and Section 08361

0008 1 Dollars, Additive Bid Item Number Five (5)

Add Alternative Handrail?Guardrail at Stairs number one (1) and two (2) Provide handrail/guardrail substitute throughout the entire area of Stair #1 and Stair #2 in lieu of base bid requirements. Refer to detail #9, #10, #11 and #12 on sheet CE- A4.02 for information on the alternative handrail/guardrail system.

0009 1 Dollars, Additive Bid Item Number Six (6)

Add internal light shelves at window frames Add interior light shelves at metal framed curtain wall window systems as indicated in detail #1 & #2 sheet CE-A3.01 and detail #1 Sheet CE-A3.02. Refer to Section 08910 of the project manual for technical requirements.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

0003 N/A N/A N/A N/A

0004 N/A N/A N/A N/A

0005 N/A N/A N/A N/A

0006 N/A N/A N/A N/A

0007 N/A N/A N/A N/A

0008 N/A N/A N/A N/A

0009 N/A N/A N/A N/A

Section 00100 - Bidding Schedule/Instructions to Bidders

SECTION 00100

INSTRUCTIONS FOR TAILORING ARE IN THE FOOTNOTES DELETE FOOTNOTES AND PAGE

NUMBERS (FOOTER) PRIOR TO INSERTING INTO SPS.

Section 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

1. SCOPE:

1.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled W912L7-10- B-0002 entitled Base Civil Engineering Maintenance and Training Facilities, Civil Engineering Building, Covered Storage, Fire Station Renovation and Additions in Memphis, Tennessee Project Number PYKL009136 at 164th Airlift Wing Airbase located at the International Airport for the Tennessee Air Guard, Memphis Tennessee.

1.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.

1.3. Bidders are advised that funds are currently unavailable for this project and contract award shall be contingent on funds becoming available.

1.4. This solicitation is set-aside 100% for small businesses.

2. NOTICE OF PRE-BID CONFERENCE AND SITE VISIT:

2.1. A pre-bid conference is to be held on August 18, 2010 at 1:00 pm local time for the purposes of briefing on the proposal requirements and discussing how to answer questions regarding this solicitation. This conference will be held at 2884 Starlifter Lane Memphis, Tennessee 38118. Interested Contractors are highly encouraged to attend the pre-proposal conference. The site visit will be held following the conference.

2.2 Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to MAJ Ron Hawkins and Robert Poole at the following addresses:

Ronald.Hawkins@ang.af.mil and Robert.Poole@ang.af.mil. You will require the following information for registration: POC phone number: (901) 291-7216

Firm Name and Telephone Number Visitor’s Name and Social Security Number Drivers License, (registration and insurance for vehicle for actual site visit) Citizenship

2.3 This information must be provided in advance, not later than two (2 ) business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.

2.4 Visitors must pick up their passes at the Installation’s Main Entry Gate prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers License,

(3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.

2.5 Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.

2.6 A record of the conference shall be made and furnished to all prospective offerors via posting to our web site at www.fbo.gov . The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.

3. CLAUSES:

3.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.

3.2. Clauses and provisions in this document may not appear in consecutive order.

4. REMOVAL OF SECTIONS AT TIME OF AWARD:

Sections 00100 and 00600 will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.

5. DISPOSITION OF UNSUCCESSFUL BIDS:

In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful bids. The Government will destroy extra copies of unsuccessful bids. No destruction certificate will be provided.

6. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:

6.1 A Submit all questions on the Exhibit F, Proposal Inquiry Format by email to the contracting office at the address show below.

Subject Line: Reference No. W912L7-10-R-0008 Email: terri.hover@us.army.mil and paul.david.reagan@us.army.mil

6.2 Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.

6.3 The Contracting Officer reserves the right to address questions received after the date of question(s) submission, prior to solicitation closing, with those offers deemed responsive and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN September 1, 2010 and will be posted not later than two working days prior to closing. OFFERORS ARE

STRONGLY ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.

6.4 Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to our web site at: www.fbo.gov

6.5 Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.

6.6 For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (FedBizOpps.gov or fbo.gov) system. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. FedBizOpps registration requires the following information:

6.7 1) Central Contractor Registration (CCR) Marketing Partner Identification Number (MPIN) 2) DUNS Number and CAGE Code3) Telephone Number 4) E-Mail Address. Registration instructions can be found on the FedBizOpps website at https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf. Reference paragraph 4.4 of the Vendor Guide for instructions to retrieve the specification and drawing documents for this project.

Bidders/offerors who have registered with FedBizOpps must access the data for this solicitation by way of the link below. Bidders/Offerors cannot log into the FedBizOpps home page and search for data.

7. AMENDMENTS PRIOR TO DATE SET FOR OPENING OF BIDS:

The right is reserved, as the interest of the Government may require, to revise or amend the solicitation, specifications and/or drawings, prior to and/or after the date set for opening of bids, as necessary. Such changes, if any, will be announced by an amendment or amendments to this Invitation for Bids. All information relating to this IFB, including pertinent changes/amendments and other information applicable prior to the date set for receipt of bids will be posted on the following website: www.fbo.gov . Though every effort will be made to provide email notification when a change is posted, such notification is NOT guaranteed and should not be expected. Offerors are strongly cautioned to check this site frequently and to “refresh” their web page to ensure they have the latest information.

8. BIDS/INVITATIONS:

8.1 A bid repository is provided for hand carried bids and is located at 3041 Sidco Drive, Nashville, Tennessee 37204. Hand carried bids must be deposited in the repository prior to the time established for opening of bids. Bidders are cautioned that they will be required to sign-in and obtain a visitor’s pass to enter the facility and should allow time to accomplish this. Late receipt of bids due to post entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304.

8.2. The bid opening will occur on September 7, 2010 at 1:00 p.m. local time at the Hugh B. Mott Building Suite 410, Nashville, TN 37204. All interested offerors and their major subcontractors are encouraged to attend the bid opening.

8.3. Visitors must pick up their passes at the Installations Main Entry Gate prior to arrival. To obtain a one day vehicle pass, you will be required to present the following information: (1) Vehicle Registration, (2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable.

Personnel at the gate are required to confirm the purpose of your visit by phone call to the Contracting Office.

Contracting Office will use the project Plan Holders List located at www.fbo.gov to verify your entry request.

None of the above information furnished by you and protected under the Privacy Act shall be released unless permitted by law and/or you have consented to such.

9. WAGE DETERMINATION:

9.1 Davis Bacon Wage Rates are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are TN100118 04/16/2010 TN118, Modification 2.

In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of this solicitation, it is the offeror’s responsibility to insure the most recent determination is used in preparing the proposal. An Amendment will not be issued prior to closing to change Wage Determination dates and/or numbers. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404-5(c)(4) will apply.

9.2 Applicable wage rates can be found at http://www.access.gpo.gov/davisbacon/allstates.html

10.. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS:

This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.

11. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES:

1.1. It has been determined that all temporary utilities shall be the responsibility of the contractor. The contractor will pay all charges (hook up fees, metering, monthly usage, etc.) resulting from temporary utilities. The offerors will take this into consideration when computing its offer. (FAR Clause 52.236-14, Availability and Use of Utility Services.

CLAUSES INCORPORATED BY REFERENCE

52.214-3 Amendments To Invitations For Bids DEC 1989 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids MAR 1997 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2004 52.222-5 Davis-Bacon Act--Secondary Site of the Work JUL 2005 252.236-7008 Contract Prices-Bidding Schedules DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

12.5% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is [Contracting Officer shall insert description of the geographical areas where the contract is to be performed, giving the State, county, and city].

52.225-9 BUY AMERICAN ACT—CONSTRUCTION MATERIALS (FEB 2009)

(a) Definitions. As used in this clause--

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is--

(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.

Component means an article, material, or supply incorporated directly into a construction material.

Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site.

Materials purchased directly by the Government are supplies, not construction material.

Cost of components means--

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.

Domestic construction material means--

(1) An unmanufactured construction material mined or produced in the United States;

(2) A construction material manufactured in the United States, if--

(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or

(ii) The construction material is a COTS item.

Foreign construction material means a construction material other than a domestic construction material.

United States means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.

(2) This requirement does not apply to the construction material or components listed by the Government as follows:

NONE

(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that

(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;

(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or

(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.

(c) Request for determination of inapplicability of the Buy American Act. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--

(A) A description of the foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of delivery or availability;

(F) Location of the construction project;

(G) Name and address of the proposed supplier; and

(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.

(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.

(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).

(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.

(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.

(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.

(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) \1\ Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).

List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.

Include other applicable supporting information.

(End of clause)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

USPFO for Tennessee Purchaseing and Contracting Office 3041 Sidco Drive Nashville, TN 37204 Attn: Supervisory Contract Specialist

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Specific information regarding the Site Visit is located in paragraph 1.2 of Section 00100 Notes.

52.237-1 SITE VISIT (APR 1984)

Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

www.fbo.gov

(End of provision

52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)

Portions of this solicitation are altered as follows:

Changes or additions are written in Red text or bolded.

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (DFARS) (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

252.211-7002 AVAILABILITY FOR EXAMINATION OF SPECIFICATIONS, STANDARDS, PLANS,

DRAWINGS, DATA ITEM DESCRIPTIONS, AND OTHER PERTINENT DOCUMENTS (DEC. 1991)

The specifications, standards, plans, drawings, data item descriptions, and other pertinent documents cited in this solicitation are not available for distribution but may be examined at the following location:

www.fbo.gov (Insert complete address)

252.236-7007 ADDITIVE OR DEDUCTIVE ITEMS. (DEC 1991)

(a) The low offeror and the items to be awarded shall be determined as follows --

(1) Prior to the opening of bids, the Government will determine the amount of funds available for the project.

(2) The low offeror shall be the Offeror that --

(i) Is otherwise eligible for award; and

(ii) Offers the lowest aggregate amount for the first or base bid item, plus or minus (in the order stated in the list of priorities in the bid schedule) those additive or deductive items that provide the most features within the funds determined available.

(3) The Contracting Officer shall evaluate all bids on the basis of the same additive or deductive items.

(i) If adding another item from the bid schedule list of priorities would make the award exceed the available funds for all offerors, the Contracting Officer will skip that item and go to the next item from the bid schedule of priorities;

and

(ii) Add that next item if an award may be made that includes that item and is within the available funds.

(b) The Contracting Officer will use the list of priorities in the bid schedule only to determine the low offeror. After determining the low offeror, an award may be made on any combination of items if --

(1) It is in the best interest of the Government;

(2) Funds are available at the time of award; and

(3) The low offeror's price for the combination to be awarded is less than the price offered by any other responsive, responsible offeror.

(c) "Example." The amount available is $100,000. Offeror A's base bid and four additives (in the order stated in the list of priorities in the bid Schedule) are $85,000, $10,000, $8,000, $6,000, and $4,000. Offeror B's base bid and four additives are $80,000, $16,000, $9,000, $7,000, and $4,000. Offeror A is the low offeror. The aggregate amount of offeror A's bid for purposes of award would be $99,000, which includes a base bid plus the first and fourth additives. The second and third additives were skipped because each of them would cause the aggregate bid to exceed $100,000.

Section 00600 - Representations & Certifications

252.209-7001 Disclosure of Ownership or Control by the Government of a

Terrorist Country

JAN 2009

252.209-7001 Disclosure of Ownership or Control by the Government of a Terrorist Country

JAN 2009

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2009)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is -------------- [insert NAICS code]. 236220

(2) The small business size standard is --------------100% small business

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is $33.5Millon in average ammual receipts for the past three years.

(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

(X_) Paragraph (d) applies.

(__) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in ORCA are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $100,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the clause at 52.204-7, Central Contractor Registration.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business).This provision applies to solicitations that--

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vi) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(vii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .