Vendor_questions_4.docx
DOCX document 16 KB Posted
- Attached to
- Wyoming National Guard MATOC
- Solicitation number
- W912L3-13-R-0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 13-R-0001-0003.pdf | ||
| Vendor_questions_3.docx | DOCX document | |
| 13-R-0001-0002.pdf | ||
| Vendor_questions_2.docx | DOCX document | |
| MATOC_Pre-Proposal_Sign_in_sheet.pdf | ||
| MATOC_Preproposal_Conference_FY_13.pptx | PPTX presentation | |
| Vendor_questions_1.docx | DOCX document | |
| Amendment_1.pdf | ||
| A-11_MATOC_Exhibits_A_D_F_G__Feb_2013_R_1.docx | DOCX document | |
| A-10_Synopsis__MATOC_Oct_12_WY.docx | DOCX document | |
| A-11_MATOC_Exhibits_A_D_F_G__Feb_2013_R_1.docx | DOCX document | |
| Vendor_questions_1.docx | DOCX document | |
| MATOC__EXHIBIT_E__Oct__2012_WY_New.docx | DOCX document | |
| A-11_MATOC_Exhibits_A_D_F_G__Feb_2013_R_1.docx | DOCX document | |
| Prototypical_Proj-B55_100__Specs.pdf | ||
| Prototypical_Proj_-B55_100__Half_Size_Dwgs.pdf | ||
| W912L3-13-R-0001_WY_MATOC.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Horizontal Disciplines and Civil Site Work seem to be similar categories. Please define Horizontal Disciplines.
| 2. | Ref.. Specification Section 07552-1, 1.01, A.1.:"Repair approximately 500 SF of damaged wood deck..." |
| a. Sheet A-3, Note C calls for "removal of..plywood roof decking...per detail 5/A-4 | |
| b. Sheet A-5, Note A calls for "Remove...plywood decking..." |
Question: Please clarify if Base Bid should include removal of ALL roof decking per notes and detail 5/A-4, or removal of 500 SF damaged wood deck per spec section 07552?
3. The specification lists multiple stucco systems and encapsulating methods. What system should be bid to infill the two deleted doorways and what system should be bid for encapsulating the existing stucco on the building? Please clarify these items for us.
4. 02080-1 2.01 indicates an asbestos report at the end of the section. 02085-1 1.01.B does as well. No asbestos report appears to have been given. Please provide.
5. 02095-1 1.01.B describes a summary of materials to be removed. Please provide.
6. 07552-1 1.01.A.1 tells us to remove approx. 500 SF of damaged deck. Plans indicate removing all of the deck. Please confirm which is correct.
7. 08515-2 2.02.A references white painted factory finish while 08515-4 2.07.A says Dark Bronze Anodized. Please confirm which is correct.
8. The bid option note on T-1 seems to indicate sunshades should be included in the base bid and a deductive option should be provided to omit them. On the proposal form it appears to be an additive option. Please clarify if the sunshades should be in the base bid.
Answer to Question 1. The separation between Civil site work and Horizontal disciplines it the top of subgrade. Civil site work is below top of subgrade (i.e. underground utilities, drainage, etc). Horizontal discipline above top of subgrade (i.e. pavements, side walk, etc).
Answer to question 2. Base bid should include the 500 SF of damaged wood deck per spec section.
Answer to question 3. The specs allow latitude for the contractor to select a system which they have confidence in for warranty.
Answer to question 4. Asbestos report is not available. Assume building has been cleared.
Answer to question 5. Assume building has been cleared of lead.
Answer to question 6. Base bid should include the 500 SF of damaged wood deck per spec section.
Answer to question 7. Use 0815-4 2.07 Dark Bronze.
Answer to question 8. Sun shade to be included in base bid.