MATOC__EXHIBIT_E__Oct__2012_WY_New.docx

DOCX document 25 KB Posted

Attached to
Wyoming National Guard MATOC
Solicitation number
W912L3-13-R-0001
Issued by

View the file

Other files

File Type Posted
Vendor_questions_4.docx DOCX document
13-R-0001-0003.pdf PDF
Vendor_questions_3.docx DOCX document
13-R-0001-0002.pdf PDF
Vendor_questions_2.docx DOCX document
MATOC_Pre-Proposal_Sign_in_sheet.pdf PDF
MATOC_Preproposal_Conference_FY_13.pptx PPTX presentation
Vendor_questions_1.docx DOCX document
Amendment_1.pdf PDF
A-11_MATOC_Exhibits_A_D_F_G__Feb_2013_R_1.docx DOCX document
A-10_Synopsis__MATOC_Oct_12_WY.docx DOCX document
A-11_MATOC_Exhibits_A_D_F_G__Feb_2013_R_1.docx DOCX document
Vendor_questions_1.docx DOCX document
A-11_MATOC_Exhibits_A_D_F_G__Feb_2013_R_1.docx DOCX document
Prototypical_Proj-B55_100__Specs.pdf PDF
Prototypical_Proj_-B55_100__Half_Size_Dwgs.pdf PDF
W912L3-13-R-0001_WY_MATOC.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IDIQ MATOC RFP W912L3-13-R-0001

EXHIBIT E PROTOTYPICAL PROJECT

NOTICE OF PROPOSED PROJECT, SOLICITATION

PROJECT TITLE AND NO.: Wyoming MATOC Prototypical Project

PROJECT DESCRIPTION: Building 55 Renovation All work shall be in strict accordance with the Plans/drawings dated 06APR12 and Specifications dated 12APR12 JFTB Building 55 Renovations and Basic Contract General requirements See Section 00800

MAGNITUDE OF PROJECT $500,000 - $1,000,000.

PERFORMANCE PERIOD: 150 Days, after receipt of Notice to Proceed

SITE VISIT: A site visit will Not be conducted in conjunction with the MATOC pre-proposal meeting. Contractor shall consider for location Air National Guard Base, Cheyenne, WY unless only requesting Camp Guernsey, WY, then propose for that location.

PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds, and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.

PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx

WAGE DETERMINATION: Currently, General Decision Number WY20100030 Modification No. 4 dated 20APR12 for Larmie is applicable to this task order. Rates can be found at http://www.wdol.gov/wdol/scafiles/davisbacon/WY.html . However, the current prevailing Wage Determination will be incorporated at time of award. In the event the current prevailing Wage Determination is changed by the Department of Labor after the closing date of this solicitation, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. This does not constitute and shall not be construed as discussions if award without discussions is contemplated.

PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP.

The Following Provisions/Clauses if marked [X] are applicable to this task order

[ ] Availability of funds (FAR Clause 52.232-18) Funds are not presently available for this procurement.

[ ] Contract Clause 52.211-12 LIQUIDATED DAMAGES If applicable , the following amounts will be applicable to this TASK ORDER ($ .

[ X ] Contract Clause 52.246-21 Warranty of Construction, is applicable to this task order.

[ X] 52.204-10 REPORTING: Executive Compensation and First Tier Subcontract Awards (Jul 2010) Is applicable to this order. The following are the codes needed to accomplish the reporting TAS_________, Agency_____________

[ ] Alternate proposal. The government at its option will accept and evaluate alternate proposals; however offerors must also price the project as specified. Alternate proposals should include enough detail for the Government to understand the alternate as well as its benefits. Costs and or credits shall be listed separately. Offerors who do not provide alternate proposals may not be notified in the event the government elects to accept an alternate proposal from another offeror.

[ ] DFARS 252.236-7006 COST LIMITATION (JAN 1997)

(a) Certain items in this solicitation are subject to statutory cost limitations. The limitations are stated in the Schedule.

(b) An offer which does not state separate prices for the items identified in the Schedule as subject to a cost limitation may be considered nonresponsive.

(c) Prices stated in offers for items subject to cost limitations shall include an appropriate apportionment of all costs, direct and indirect, overhead, and profit.

(d) Offers may be rejected which—

(1) Are materially unbalanced for the purpose of bringing items within cost limitations; or

(2) Exceed the cost limitations, unless the limitations have been waived by the Government prior to award.

[ ] PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY. (September 2002) This special contract clause IS APPLICABLE TO THIS TASK ORDER.

[ X ] FAR 52.217-5 Evaluation of Options applies to this solicitation

[ ] FAR 52.217-7 Option for Increased Quantity- Separately Priced Line Item applies to award when option(s) not taken at time of award. The Government reserves the right to award option individual line items at time of basic line item award or after award, but not later than 30 days after initial award. Performance period upon award of options will not be extended.

EXHIBIT E MATOC PROPOSAL FORM

Include this form completed with your proposal

PROJECT NO. 060432

WY MATOC PROTOTYPICAL

PROJECT DESCRIPTION: Project provides for the furnishing of all plant, labor, material, equipment, appliances and supervision necessary to complete Building 55 Renovations in accordance with the Plans/drawings dated 06 APR 12 and Specifications dated 12APR12 and the basic contract general requirements. This project is for a Firm Fixed Task Order.

Item Number Description Quantity Unit Amount

0001 Building 55 Renovations JOB Lump Sum $_____________

0002 OPTION Manufactured Aluminum JOB Lump Sum $_____________ Sun Shades

Location being proposed

[ ] Air National Guard Base, Cheyenne, WY

[ ] Camp Guernsey, WY

Reminder: Although this is a prototypical project and not being awarded offerors are cautioned to propose as if it were being awarded as proposed as a firm fixed price task order. Include all applicable costs.

SIGNATURE: COMPANY NAME

Name and title of person authorized to sign

File details come from the government source that posted it. Updated .