147th Attack Wing FWJH162337 Ellington Field JRB, Houston, TX Alter B1191 for RPA Conversion

Page 1 of 5 6 Feb 2018

STATEMENT OF WORK:

A. Renovate B1191 to accommodate the upgrade of the weapons systems. Renovations to the existing facility utilizing conventional design and construction methods to accommodate the mission of the facility. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1- 200-02, High Performance and Sustainable Building Requirements. The facility should be compatible with applicable DoD, Air Force and base design standards. In addition, local materials and construction techniques shall be used where cost effective. This project will comply with DoD antiterrorism/force protection requirements per UFC. Special Construction Requirements: Renovate building to include space reconfiguration complete with new walls and wall, floor, and ceiling finishes, HVAC, fire suppression, plumbing, electrical, and communications systems modification and reconfiguration. Provide facility built to ICD 705 standards. Add Turnstiles, concrete sidewalk, concrete pad and fill in roll up garage door wall.

See Combined Set (Design Drawings) and Volume 1 & 2 (Specifications) attached.

PART 1 GENERAL:

1.1. All work performed under this contract must be in accordance with the general conditions and technical specifications provided.

1.2. DESIGN STANDARDS, CODES AND CRITERIA: As required, but not limited to:

The design shall comply with the base specific General Design Guidelines and the Architectural Compatibility Guidelines of that base.

Specific codes, standards and criteria referenced throughout this Statement of Work (SOW).

Where there is a conflict between the SOW and building codes, the most stringent shall apply.

When codes are in conflict, the most stringent shall apply. This list is not intended to be a complete list. All work shall be designed and constructed to meet all state and federal codes, standards and laws.

The Contractor shall also follow all current national and state codes, regulations and specifications involving civil, architectural, interior design, structural, mechanical, electrical, and environmental disciplines which are applicable to the engineering design and construction industry, including OSHA Safety and Health Standards.

Use of the most current versions of the National Fire Codes and Life Safety Codes, published by the National Fire Protection Association (NFPA), and the International Building Code (IBC).

In case of conflict between code requirements, the most stringent criteria shall apply.

Page 2 of 5 6 Feb 2018

GENERAL: The purpose of the project is to renovate building 1191 utilizing conventional design and construction methods to accommodate the mission of the facility.

A. ATTACHMENTS

1. Combined Set (Drawings)

2. Volume 1 (Specifications)

3. Volume 2 (Specifications)

1.5 LICENSING AND CERTIFICATION

A. The contractor shall employ certified personnel and / or sub contractors with appropriate licenses and will provide their credentials to COR at the pre-construction conference.

B. Contractor will ensure that all personnel (all tiers Sub-Contractors included) are available to attend AT Level I Awareness Training.

C. Citizenship Requirements:

1. General Construction: U.S. Citizens or U.S. Persons (an individual who has been lawfully admitted for permanent residence as defined in 8 U.S.C. 1 10l (a) (20)) will be utilized for the unclassified work conducted during Construction of the internal open framing phase.

2. Finished Construction: U.S. Citizens or U.S. Persons (an individual who has been lawfully admitted for permanent residence as defined in 8 U.S.C. 1 10l (a) (20)) will be utilized for the work conducted during the .finishing phase and during any phase where work infrastructure to support the classified mission and/or operations.

3. Spin Dial Combination Locks Installation: U.S. citizens from U.S. Companies/firms will be utilized for the installation and maintenance of all spin dial combination locks within the facility. Foreign nationals WILL NOT be utilized in the installation and testing of the locks.

4. All contractors and subcontractors will provide all workers name to the Special Security Office to be vetted at least 30 days prior to being allowed on the construction site. The prime contractor will provide the following employee information either in hard copy or electronically using an excel spreadsheet.

Either format should have the appropriate privacy act warnings and electronic files must be encrypted or password protected.

a. Full first, middle and last name to include any aliases.

b. Date of birth and place of birth.

c. Full social security number.

d. State identification or driver's license number to include state of issue.

e. If not a U.S. citizen, nationality and Immigration and

Naturalization Service number.

f. Declare any felony convictions or pending court appearances on felony charges. Declare any misdemeanor convictions involved crimes of violence or drug use.

g. Declare any foreign continuous or routine contacts, to include

Page 3 of 5 6 Feb 2018 name of foreign person, country and citizenship.

1.6 QUALITY ASSURANCE

A. The facility shall pass and be regulatory compliant with all environmental laws for Federal, State, and Local criteria.

B. See Specifications, Volume 1, General Conditions

1.7 SUBMITTALS:

See Submittal REGSTER in volume 1 Specifications.

1.9 WARRANTY:

A. System including all equipment and devices shall have a minimum of a 1 year full Materials and Labor Warranty.

PART 2 PRODUCTS:

2.1 EQUIPMENT:

A. Any reference to a particular make and model are being used for example only. An equivalent or equal will be accepted for all items under this contract. These shall be approved by the COR during the submittal process.

PART 3 EXECUTION

3.1 INSTALLATION

A. Equipment and materials shall be installed in an approved manner and in accordance with equipment manufacturers’ installation requirements.

3.2 FIELD QUALITY CONTROL

A. See section Quality Control of the General Conditions.

B. Personnel Conduct:

i. All employees shall comply with the conduct requirements in effect at the construction/work site. An acceptable standard of conduct and dress shall prevail at the construction site at all times. Shirts shall be worn at all times.

The USG reserves the right to exclude or remove from the site any personnel whom the USG deems careless, uncooperative, or whose continued presence on the work site is deemed by the USG to be contrary to the public interest.

ii. The contractor shall maintain satisfactory standards of employee conduct, appearance, integrity and shall be responsible for taking such disciplinary

Page 4 of 5 6 Feb 2018 action with respect to employees as may be necessary. Each contractor employee will adhere to standards of conduct that reflect credit on themselves, their employer and the USG. Construction security personnel will, at all times, be courteous when dealing with visitors to the construction site.

iii. The contractor shall inform its employees that the USG does not tolerate any harassing behavior or horseplay at any times. Any contractor employee who is found to be culpable in incidents of harassment shall be immediately escorted from the premises and denied further access. The contractor shall emphasize to its employees that the USG's policy on harassment may be stricter than the policy the contractor would otherwise impose. Exclusion under the circumstances described in this clause shall not relieve the contractor from full performance of the requirements of this contract, nor will it provide the basis for any claims against the USG.

iv. The contractor is responsible for notifying the SSM of any terminations of employees, removal from the work site, or any other circumstances that would deem the employee to no longer have the need to access the work site within 24 hours to include the cause. If the SSM deems removal of a worker to be needed, they will escort the worker to the contractor’s trailer and notify the contractor of the situation.

C. Prohibited Items:

i. No photographic and/or video recording devices shall be permitted on the construction site without the express written permission of the SSM. This prohibition includes all personally owned cell phones, personal digital assistants (PDA), Blackberry, personally owned laptops/tablets, cameras and similar devices. Persons having a need for photographic support will coordinate their request through t h e S p e c i a l S e c u r i t y O f f i c e prior to admitting on-site.

ii. Drugs, narcotics, barbiturates, marijuana, controlled substances, drug paraphernalia and alcohol are prohibited. Medicines are approved for use if they are prescribed by a U.S. medical practitioner or are approved as over-the-counter by the U.S. Food and Drug Administration (FDA).

iii. Ammunition or other explosives which include a gun and similar tool ammunition are allowed with prior notification to the SSM and CAG before entering the construction site. Equipment shall be transported , stored, handled and used in accordance with industry best practices , state or federal laws and codes and (list construction company) instructions (whichever is the most restrictive) .

iv. Any firearm, instrument, or mechanism capable of firing a projectile to include

BB or pellet (C02 and air) guns. Any replicas and realistic looking toy weapons to include starter guns. Any dagger, dirk switchblade, butterfly

Page 5 of 5 6 Feb 2018 knife, stiletto, or any other unusually dangerous instrument capable of inflicting cutting, stabbing, or tearing wounds. Pocket knives under three and one half inches are authorized. Not authorized are brass or iron knuckles defined as any instrument that consists of finger rings or guards made of a hard substance that is designed, made, or adapted for the purpose of inflicting injury by striking any person. Items specifically designed or modified as an offensive weapon, such as modified baseball bats, ax handles, clubs, or chains are not authorized. Martial arts instruments including, but not limited to, nunchakus, throwing stars, and tonfas are not authorized nor are items specifically designed as defensive weapons, such as chemical defensive sprays (mace), pepper spray, stun guns, and tasers or any type of explosives, fireworks, or flares.

v. Any person found with any prohibited items on the construction site shall have the item(s) seized and with the possibility of being destroyed with no liability to be incurred by U.S. Government or its contractors. The individual will be immediately removed from the construction site to include possibly being arrested and denied access to the construction site thereafter.