SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 37 PAGES
TXANG
01 20 00.00 20 SD-01 Preconstruction Submittals
1.3 GSchedule of Prices
02 41 00 SD-01 Preconstruction Submittals
1.9 GExisting Conditions
SD-07 Certificates
1.2.1 GDemolition Plan
1.6 GNotification
02 42 51 SD-01 Preconstruction Submittals
1.4.2 GProposed Dust-Control Measures
1.4.2 GProposed Packing And
Transportation Measures
1.4.4 GSchedule of Carpet Reclamation
Activities
1.4.3 GCarpet Reclamation Agency
Records
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.5 GQuality Control Plan
1.6.7 GLaboratory Accreditation
SD-02 Shop Drawings
1.6.2.1 GReinforcing Steel
SD-03 Product Data
2.3.7Joint Sealants
2.3.6Joint Filler
2.3.1Cementitious Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 37 PAGES
03 30 00 2.3.5Vapor Retarder and/or Vapor
Barrier
2.2.3Concrete Curing Materials
2.4Reinforcement
2.3.4Admixtures
2.1.1Waterstops
SD-05 Design Data
2.2.1 GMix Design
SD-06 Test Reports
1.6.1.1 GConcrete Mix Design
1.6.4.1Fly Ash
2.3.3Aggregates
3.10.2.1Tolerance Report
3.13.2.3 GCompressive Strength Tests
Air Content
3.13.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.4.1Reinforcing Bars
1.6.3.2Material Safety Data Sheets
SD-08 Manufacturer’s Instructions
2.2.3Curing Compound
04 20 00 SD-02 Shop Drawings
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 37 PAGES
04 20 00 1.5.2 GCold Weather Procedures
2.2.2 GClay Brick
2.2.3.2.1 GCement
2.4.1.1 GCementitious Materials
2.6.7 GInsulation
SD-04 Samples
2.2.2 GClay Brick
2.2.3.2 GConcrete Masonry Units (CMU)
2.4.1.3 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
2.6.7 GInsulation
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
SD-06 Test Reports
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.3Prism Tests
SD-07 Certificates
2.2.2Clay Brick
2.2.3.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 37 PAGES
04 20 00 2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
2.6.7Insulation
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
05 12 00 SD-02 Shop Drawings
1.4.1 GFabrication Drawings
SD-03 Product Data
2.5.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
SD-06 Test Reports
2.5.2Class B Coating
2.3Bolts, Nuts, and Washers
3.6.2.1Direct Tension Indicator Washer
Inspection Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
1.4.2.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
05 40 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 37 PAGES
05 40 00 1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
06 41 16.00 10 SD-02 Shop Drawings
2.11Shop Drawings
3.1Installation
SD-03 Product Data
2.1Wood Materials
2.10Wood Finishes
2.11.7.3Finish Schedule
1.5.2Certification
SD-04 Samples
2.3Plastic Laminates
2.7Cabinet Hardware
SD-07 Certificates
1.5Quality Assurance
2.10Laminate Clad Casework
3.1Laminate Clad Casework
06 61 16 SD-02 Shop Drawings
3.1 GInstallation
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 37 PAGES
06 61 16 2.1Solid polymer material
1.5.1Qualifications
2.3Fabrications
1.5.2Certification
1.5.2VOC Content
SD-04 Samples
2.1 GMaterial
2.3.5 GCounter and Vanity Tops
SD-06 Test Reports
2.1Solid polymer material
SD-07 Certificates
2.3Fabrications
1.5.1Qualifications
SD-10 Operation and Maintenance
Data
3.2Clean-up
07 14 00 SD-03 Product Data
2.1Fluid-applied membrane
2.2Membrane primer
2.8Elastomeric sheet
2.10Flexible foam-backed elastomeric sheet
3.3Solvent
3.4.1Moisture meter
2.11Protection board
2.7Bond breaker
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 37 PAGES
07 14 00 SD-11 Closeout Submittals
1.6Warranty
3.6Information Card
3.5Instructions To Government
Personnel
07 21 13 SD-03 Product Data
2.1 GBlock or board insulation
2.2Pressure sensitive tape
2.3Accessories
1.3Certification
SD-08 Manufacturer’s Instructions
2.1Block or Board Insulation
2.3.1Adhesive
07 21 16 SD-03 Product Data
2.1Blanket insulation
2.2Pressure sensitive tape
2.3Accessories
1.3Certification
SD-08 Manufacturer’s Instructions
3.2.1Insulation
07 81 00 SD-03 Product Data
3.3 GFireproofing Material
SD-04 Samples
2.1 GSpray-Applied Fireproofing
SD-06 Test Reports
1.2.2 GFire Resistance Rating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 37 PAGES
07 81 00 3.6 GField Tests
1.2.3 GEvaluation Reports
SD-07 Certificates
1.4.1 GInstaller Qualifications
3.1 GSurface Preparation Report
3.5.2 GManufacturer's Inspection Report
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.4.2Inspector Qualifications
2.1Firestopping Materials
1.4.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1Sealants
2.2Primers
2.3Bond breakers
2.4Backstops
SD-07 Certificates
3.3.6Sealant
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.6 GFrames
2.6 GFrames
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 37 PAGES
08 11 13 SD-03 Product Data
2.1 GDoors
2.6 GFrames
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
2.2Accessories
2.3.7Water-resistant sealer
1.6warranty
2.1.2 GSound transmission class rating
1.3Certification
1.4Local/Regional Materials
SD-04 Samples
2.1Doors
2.3.6.2 GDoor finish colors
SD-06 Test Reports
2.4Cycle-slam
2.4Hinge loading resistance
08 41 13 SD-01 Preconstruction Submittals
1.4.1 GSample Warranty
1.4.1 GListing of Product Installations
SD-02 Shop Drawings
1.4.1 GInstallation Drawings
1.4.1 GFabrication Drawings
1.4.1 GDoors, Windows and Frames;
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 37 PAGES
08 41 13 SD-03 Product Data
1.4.1 GManufacturer's Catalog Data
SD-04 Samples
1.4.1 GFinish and Color Samples
SD-06 Test Reports
1.4.1 GCertified Test Reports
SD-07 Certificates
3.4 GManufacturer's Product Warranty
08 71 00 SD-02 Shop Drawings
1.3 GHardware schedule
2.2.5Keying system
SD-03 Product Data
2.2 GHardware items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
1.3 GHardware Schedule
SD-11 Closeout Submittals
1.4Key Bitting
08 81 00 SD-03 Product Data
1.7.1Insulating Glass
1.3Glazing Accessories
1.6.1Local/Regional Materials
SD-04 Samples
1.7.1Insulating Glass
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 37 PAGES
08 81 00 2.3.4Tape
2.3.1.1Sealant
SD-07 Certificates
1.7.1Insulating Glass
SD-08 Manufacturer’s Instructions
2.3Setting and sealing materials
3.2Glass setting
SD-11 Closeout Submittals
1.6.1Local/Regional Materials
08 91 00 SD-02 Shop Drawings
1.4Wall louvers
1.5Wall louvers
SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.4 GWall louvers
1.5 GWall louvers
09 22 00 SD-02 Shop Drawings
2.1 GMetal support systems
09 29 00 SD-03 Product Data
2.1.3Glass Mat Water-Resistant
Gypsum Tile Backing Board
2.1.6Accessories
1.3Certification
2.1.1Gypsum Board
2.1.4Joint Treatment Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 37 PAGES
09 29 00 1.6.1Local/Regional Materials
SD-07 Certificates
2.1 GAsbestos Free Materials
SD-08 Manufacturer’s Instructions
2.1Material Safety Data Sheets
SD-10 Operation and Maintenance
Data
2.1Manufacturer maintenance instructions
3.6Waste Management
SD-11 Closeout Submittals
1.6.1Local/Regional Materials
2.1.1Gypsum Board
09 30 13 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-03 Product Data
1.4.1Local/Regional Materials
2.1 GTile
2.2 GSetting-Bed
2.4 GMortar, Grout, and Adhesive
SD-04 Samples
2.1 GTile
2.1 GAccessories
2.1 GTransition Strips
2.5 GTransition Strips
2.4 GGrout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 37 PAGES
09 30 13 SD-07 Certificates
2.1Tile
2.4Mortar, Grout, and Adhesive
SD-08 Manufacturer’s Instructions
3.7Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2 GInstallation
SD-11 Closeout Submittals
1.4.1Local/Regional Materials
2.1Tile
2.4Adhesives
09 51 00 SD-02 Shop Drawings
1.2Approved Detail Drawings
SD-04 Samples
2.1Acoustical Units
SD-06 Test Reports
1.2.1Ceiling Attenuation Class and
Test
SD-07 Certificates
2.1Acoustical Units
09 65 00 SD-02 Shop Drawings
2.8 GResilient Flooring and
Accessories
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 37 PAGES
09 65 00 2.8 GResilient Flooring and
Accessories
2.4Adhesives
2.1Vinyl Composition Tile
2.2Wall Base
SD-04 Samples
2.8 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance
Data
2.8 GResilient Flooring and
Accessories
09 66 23 SD-02 Shop Drawings
1.2 GApproved Detail Drawings
2.5 GStrips
2.5.2 GControl Joint Strips
SD-03 Product Data
2.2Resin
3.2Mixing, Proportioning, and
Installation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 37 PAGES
09 66 23 3.3Cleaning and Sealing
1.4.2Certification
SD-04 Samples
1.2Resinous Terrazzo Flooring
SD-07 Certificates
Conductive Resinous Terrazzo
Flooring
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
SD-03 Product Data
2.1 GCarpet
2.1.4Physical Characteristics
1.2.1Local/Regional Materials
SD-04 Samples
2.1 GCarpet
SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SD-07 Certificates
2.1Carpet
1.5Regulatory Requirements
SD-08 Manufacturer’s Instructions
3.1Surface Preparation
3.4Installation
SD-10 Operation and Maintenance
Data
2.1 GCarpet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 37 PAGES
09 68 00 3.5 GCleaning and Protection
09 69 13 SD-02 Shop Drawings
1.5 GDetailed Installation Drawings
SD-03 Product Data
1.2Access Flooring System
SD-04 Samples
2.1Floor Panels
1.7Finish Flooring
2.2Panel Support System
1.6.1Accessories
SD-05 Design Data
1.2Compliance with ICC-ES AC300
SD-06 Test Reports
2.3Factory Tests
3.2.2Electrical Resistance
3.2Field Tests
SD-07 Certificates
1.2Access Flooring System
09 90 00 SD-02 Shop Drawings
3.6Piping identification
3.6stencil
SD-03 Product Data
1.4.2Certification
1.9.1Local/Regional Materials
2.1Materials
2.1 GCoating
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 37 PAGES
09 90 00 2.1Manufacturer's Technical Data
Sheets
SD-04 Samples
1.10 GColor
SD-07 Certificates
1.3Applicator's qualifications
1.4.1.2 GQualification Testing
SD-08 Manufacturer’s Instructions
3.2.1Application instructions
3.4.2Mixing
1.7.2Manufacturer's Material Safety
Data Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
10 14 00.20 SD-02 Shop Drawings
1.4.2 GDetail Drawings
SD-03 Product Data
3.1 GInstallation
1.6 GWarranty
SD-04 Samples
1.4.1 GInterior Signage
SD-10 Operation and Maintenance
Data
3.1 GApproved Manufacturer's
Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 37 PAGES
10 14 00.20 3.1.2 GProtection and Cleaning
10 21 13 SD-02 Shop Drawings
1.2Fabrication Drawings
SD-03 Product Data
1.2Cleaning and Maintenance
Instructions
2.6Colors And Finishes
2.1.1Galvanized Steel Sheet
2.1.2Sound-Deadening Cores
2.1.3Anchoring Devices and Fasteners
2.1.5Hardware and Fittings
2.1.4Brackets
2.1.6Door Hardware
1.2.1.1Local/Regional Materials
Documentation
1.2.1.2Environmental Data
2.2.1Toilet Enclosures
2.2.2Urinal Screens
2.4Pilaster Shoes
SD-04 Samples
2.6 GColors and Finishes
2.1.5Hardware and Fittings
2.1.3Anchoring Devices and Fasteners
SD-07 Certificates
1.7Warranty
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 37 PAGES
10 21 13 1.2.1.1Local/Regional Materials
Documentation
2.2.1Toilet Enclosures
2.2.2Urinal Screens
2.4Pilaster Shoes
10 28 13 SD-03 Product Data
2.1.2 GFinishes
2.2 GAccessory Items
SD-04 Samples
2.1.2 GFinishes
2.2 GAccessory Items
SD-07 Certificates
2.2Accessory Items
SD-10 Operation and Maintenance
Data
2.2.8 GElectric Hand Dryer
10 44 16 SD-01 Preconstruction Submittals
2.1Manufacturer's Data
SD-02 Shop Drawings
2.1Fire Extinguishers
1.3.1Accessories
Part 2Cabinets
1.3.1Wall Brackets
SD-03 Product Data
2.1Fire Extinguishers
1.3.1Accessories
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 37 PAGES
10 44 16 Part 2Cabinets
1.3.1Wall Brackets
3.2.1Replacement Parts
SD-04 Samples
1.3.1Fire Extinguisher
1.3.1Cabinet
1.3.1Wall Brackets
1.3.1Accessories
SD-07 Certificates
2.1Fire Extinguishers
2.1Manufacturer's Warranty with
Inspection Tag
21 13 13.00 10 SD-02 Shop Drawings
1.4.3 GShop Drawings
3.8As-Built Drawings
SD-03 Product Data
1.4.1Fire Protection Related
Submittals
2.3 GMaterials and Equipment
1.6Spare Parts
3.7Preliminary Tests
3.8Final Acceptance Test
3.9Onsite Training
1.4.1 GFire Protection Specialist
1.4.2 GSprinkler System Installer
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 37 PAGES
21 13 13.00 10 1.2.1.3 GHydraulic Calculations
SD-06 Test Reports
3.7Preliminary Test Report
3.8Final Acceptance Test Report
SD-07 Certificates
3.3Inspection by Fire Protection
Specialist
SD-10 Operation and Maintenance
Data
3.9Operating and Maintenance
Manuals
22 00 00 SD-02 Shop Drawings
3.7.1Plumbing System
SD-03 Product Data
2.3.3Fixtures
2.5Flush valve water closets
2.6Flush valve urinals
2.7Countertop lavatories
2.8Kitchen sinks
3.3.3Service sinks
2.9 GDrinking-water coolers
2.13 GWater heaters
3.7.1Plumbing System
SD-06 Test Reports
3.7Tests, Flushing and Disinfection
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 37 PAGES
22 00 00 1.3Materials and Equipment
2.1.1Bolts
SD-10 Operation and Maintenance
Data
3.7.1 GPlumbing System
23 00 00 SD-03 Product Data
2.8.1.1Metallic Flexible Duct
2.8.1.2Insulated Nonmetallic Flexible
Duct Runouts
2.8.1.2Duct Connectors
2.8.2 GDuct Access Doors
2.8.3Fire Dampers
2.8.4 GManual Balancing Dampers
2.8.6Sound Attenuation Equipment
2.8.6.1Acoustical Duct Liner
2.8.7.1Diffusers
2.8.7.2Registers and Grilles
2.8.8Louvers
2.9.1.1In-Line Centrifugal Fans
2.9.1.2Panel Type Power Wall
Ventilators
2.10 GEnergy Recovery Ventilators
1.4.5Test Procedures
GDiagrams
SD-06 Test Reports
3.11 GPerformance Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 37 PAGES
23 00 00 3.9 GDamper Acceptance Test
SD-08 Manufacturer’s Instructions
3.3Manufacturer's Installation
Instructions
3.13.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.13.1 GOperation and Maintenance
Manuals
2.8.3 GFire Dampers
2.8.4 GManual Balancing Dampers
2.9.1.1 GIn-Line Centrifugal Fans
2.9.1.2 GPanel Type Power Wall
Ventilators
2.10 GEnergy Recovery Ventilators
23 03 00.00 20 SD-11 Closeout Submittals
SEnergy Efficient Equipment for
Motors
SReduce Volatile Organic
Compounds (VOC)
23 05 48.00 40 SD-03 Product Data
1.2 GEquipment and Performance
Data
2.2.5 GIsolators
23 05 93 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 37 PAGES
23 05 93 1.3.2 GRecords of Existing Conditions
1.3.2 GRecords of Existing Conditions
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.5.4.1 GTAB Design Review Report
1.7.1.1 GTAB Design Review Report
1.5.7.1 GTAB Firm
1.2 GTAB Team Assistants
1.2 GTAB Team Engineer
1.5.7.2 GTAB Specialist
1.2 GTAB Team Field Leader
SD-02 Shop Drawings
1.3.2 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.6 GTAB Procedures
1.5.6 GCalibration
1.3.2 GSystems Readiness Check
1.5.8 GTAB Execution
GTAB Verification
SD-06 Test Reports
1.5.4.2 GPrerequisite HVAC Work
Checkout List
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 37 PAGES
23 05 93 1.5.4.2 GPrerequisite HVAC Work
Checkout List
1.7.1 GPrerequisite HVAC Work
Checkout List
1.7.1 GPrerequisite HVAC Work
Checkout List
3.6 GProportional Balancing
GSeason 1
GTAB Report for Season 1
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
GSubmittal and Work Schedule
1.5.4.2 GTAB Pre-Field Engineering
Report
1.7.1.2 GTAB Pre-Field Engineering
Report
1.5.5 GInstrument Calibration
Certificates
GProcedures Summary
3.6 GProportional Balancing
1.5.7.1 GTAB Firm
1.3.2 GDesign Review Report
GAdvanced Notice for TAB Field
Work
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 37 PAGES
23 05 93 1.5.4.2 GPrerequisite HVAC Work Check
Out List
1.7.1 GPrerequisite HVAC Work Check
Out List
23 07 00 SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
23 09 23.13 20 SD-02 Shop Drawings
1.3.1.1 GControl System Drawings Title
Sheet
1.3.1.2 GList of I/O Points
1.3.1.3 GControl System Components List
1.3.1.4 GControl System Schematics
1.3.1.5 GHVAC Equipment Electrical
Ladder Diagrams
1.3.1.6 GComponent Wiring Diagrams
1.3.1.7 GTerminal Strip Diagrams
1.3.1.8 GBACnet Communication
Architecture Schematic
SD-03 Product Data
2.1.2 GDirect Digital Controllers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 37 PAGES
23 09 23.13 20 2.1.2.12 GBACnet Gateways
2.2 GSensors and Input Hardware
2.3 GOutput Hardware
2.4.2 GSurge and Transient Protection
2.5 GIndicators
SD-05 Design Data
3.4.2 GPerformance Verification Testing
Plan
3.4.4 GPre-Performance Verification
Testing Checklist
SD-06 Test Reports
3.4.11 GPerformance Verification Testing
Report
SD-09 Manufacturer’s Field
Reports
3.4.1 GPre-PVT Checklist
SD-10 Operation and Maintenance
Data
1.3 GBACnet Direct Digital Control
Systems
3.3 GControls System Operators
Manuals
SD-11 Closeout Submittals
3.5.1 GTraining Documentation
23 81 23.00 20 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 37 PAGES
23 81 23.00 20 2.2 GComputer room air conditioning units
2.4.2 GSpace temperature control
system drawings
2.2.4Filters
Refrigerants
SD-08 Manufacturer’s Instructions
3.1.2Installation Manual for Each Type of CRACU
SD-10 Operation and Maintenance
Data
2.2 GComputer Room Air Conditioning
Units
23 82 02.00 10 SD-02 Shop Drawings
1.4Drawings
SD-03 Product Data
2.1Materials and Equipment
1.6Spare Parts
3.4Posted Instructions
3.1Verification of Dimensions
2.6.1.1Coil Corrosion Protection
3.6System Performance Tests
3.4 GDemonstrations
SD-06 Test Reports
3.5 GRefrigerant Tests, Charging, and
Start-Up
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 37 PAGES
23 82 02.00 10 3.6 GSystem Performance Tests
SD-07 Certificates
2.1Materials and Equipment
2.1.1Service Organization
SD-10 Operation and Maintenance
Data
3.4 GOperation and Maintenance
Manuals
26 20 00 SD-02 Shop Drawings
2.11 GPanelboards
2.3 GCable trays
2.23 GWireways
SD-03 Product Data
2.10Receptacles
2.11.3 GCircuit breakers
2.9 GSwitches
2.12 GEnclosed circuit breakers
2.14 GMotor controllers
2.17.1 GCATV outlets
2.18.2 GGrounding Busbar
2.24 GSurge protective devices
SD-06 Test Reports
3.5.2 G600-volt wiring test
3.5.5 GGrounding system test
3.5.3 GTransformer tests
3.5.4 GGround-fault receptacle test
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 37 PAGES
26 20 00 SD-09 Manufacturer’s Field
Reports
2.26.1Transformer factory tests
SD-10 Operation and Maintenance
Data
1.5.1 GElectrical Systems
26 51 00 SD-02 Shop Drawings
1.5.1 GLuminaire Drawings
1.5.2 GOccupancy/Vacancy Sensor
Coverage Layout
SD-03 Product Data
2.2 GLuminaires
2.4 GLight Sources
2.3 GDrivers, Ballasts and Generators
1.6.1 GLED Luminaire Warranty
1.5.4 GLuminaire Design Data
2.5.3.2 GVacancy Sensors
2.5.2 GDimming Controllers (Dimmers)
2.5.4 GLighting Contactor
2.8 GPower Hook Luminaire Hangers
2.6.1 GExit Signs
2.6.2 GLED Emergency Drivers
2.5.3.1 GOccupancy Sensors
SD-06 Test Reports
1.5.5 GLED Luminaire - IES LM-79 Test
Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 37 PAGES
26 51 00 1.5.6 GLED Light Source - IES LM-80
Test Report
1.5.7 GLED Light Source - IES TM-21
Test Report
1.5.8 GOccupancy/Vacancy Sensor
Verification Tests
1.5.11.3 GEnergy Efficiency
SD-07 Certificates
1.6.1.1 GLuminaire Useful Life Certificate
1.5.3 GLED Driver and Dimming Switch
Compatibility Certificate
27 10 00 SD-02 Shop Drawings
1.6.1.1 GTelecommunications drawings
1.6.1.2 GTelecommunications Space
Drawings
SD-03 Product Data
2.3 GTelecommunications cabling
2.4.4 GPatch panels
2.5 GTelecommunications
outlet/connector assemblies
2.4.2 GEquipment support frame
1.10.3 GSpare Parts
SD-06 Test Reports
3.5.1 GTelecommunications cabling
testing
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 37 PAGES
27 10 00 1.6.2.1 GTelecommunications Contractor
1.6.2.2 GKey Personnel
1.6.2.3 GManufacturer Qualifications
1.6.3 GTest plan
SD-09 Manufacturer’s Field
Reports
2.12.1 GFactory reel tests
SD-10 Operation and Maintenance
Data
1.10.1 GTelecommunications cabling and
pathway system
SD-11 Closeout Submittals
1.10.2 GRecord Documentation
28 31 76 SD-02 Shop Drawings
2.1.2 GNameplates
GInstructions
3.2.1 GWiring Diagrams
1.2.1 GSystem Layout
2.3 GSystem Operation
2.18 GNotification Appliances
2.15 GAmplifiers
SD-03 Product Data
1.6 GTechnical Data And Computer
Software
2.17 GManual Stations
2.12.1 GBatteries
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 37 PAGES
28 31 76 2.12.2 GBattery Chargers
2.10 GSmoke Sensors
2.18 GNotification Appliances
2.7 GAddressable Interface Devices
2.15 GAmplifiers
SD-05 Design Data
GBattery Calculations
2.12.1.2 GBattery Power
2.12.2 GBattery Chargers
GVoltage Drop Calculations
SD-06 Test Reports
3.5Field Quality Control
3.5.1Testing Procedures
2.10.4Smoke Sensor Testing
SD-07 Certificates
1.7.1.4Installer
3.5.2.2Formal Inspection and Tests
3.5.2.3Final Testing
SD-09 Manufacturer’s Field
Reports
2.3System Operation
1.7.2.2Fire Alarm/Mass Notification
System
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 37 PAGES
28 31 76 3.7Operation and Maintenance
(O&M) Instructions
3.6Instruction of Government
Employees
SD-11 Closeout Submittals
3.5.2.4As-Built Drawings
31 00 00 SD-01 Preconstruction Submittals
3.3 GShoring
SD-03 Product Data
3.7 GUtilization of Excavated Materials
32 01 19 SD-03 Product Data
3.1.2.3 GManufacturer's
Recommendations
3.1Equipment
SD-04 Samples
1.3.1 GMaterials
32 11 23 SD-03 Product Data
2.1Plant, Equipment, and Tools
SD-06 Test Reports
1.4 GSampling and Testing
1.4.2.4 GField Density Tests
32 13 13.06 SD-03 Product Data
2.1.6 GCuring Materials
2.1.4 GAdmixtures
2.1.5.1 GDowel
2.1.1 GCementitious Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 37 PAGES
32 13 13.06 2.1.3 GAggregate
SD-04 Samples
1.5.5Field-Constructed Mockup
SD-05 Design Data
2.3 GMix Design
SD-06 Test Reports
2.1.3 GAggregate
3.7.2 GConcrete Slump Tests
3.7.4 GAir Content Tests
3.7.3 GFlexural Strength Tests
2.1.1 GCementitious Materials
SD-07 Certificates
1.5.1 GReady-mixed Concrete Plant
1.5.4 GBatch Tickets
2.1.1 GCementitious Materials
SD-11 Closeout Submittals
2.1.1 GCementitious Materials
32 16 13 SD-03 Product Data
2.1Concrete
SD-06 Test Reports
3.6Field Quality Control
32 31 13 SD-02 Shop Drawings
2.1 GFence Assembly
3.2.2.1 GLocation of Gate, Corner, End, and Pull Posts
2.1 GGate Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 37 PAGES
32 31 13 2.2.15 GGate Hardware and Accessories
Part 3 GErection/Installation Drawings
SD-03 Product Data
2.1 GFence Assembly
2.1 GGate Assembly
2.2.15 GGate Hardware and Accessories
2.3.1 GZinc Coating
GAluminum Alloy Coating
2.2.1 GFabric
2.2.10 GStretcher Bars
2.3.3 GConcrete
SD-04 Samples
2.2.1 GFabric
2.2.2 GPosts
2.2.2 GBraces
2.2.3 GLine Posts
2.2.5 GSleeves
2.2.6 GTop Rail
2.2.8 GBottom Rail
2.3.2 GTension Wire
2.2.10 GStretcher Bars
2.2.13 GGate Posts
2.2.15 GGate Hardware and Accessories
2.2.17 GWire Ties
SD-07 Certificates
1.3.1Certificates of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 37 PAGES
32 31 13 SD-08 Manufacturer’s Instructions
2.1Fence Assembly
2.1Gate Assembly
2.1Hardware Assembly
2.1Accessories
SD-11 Closeout Submittals
3.3 SRecycled Material Content
32 92 19 SD-03 Product Data
2.5.3Wood Cellulose Fiber Mulch
2.4Fertilizer
SD-06 Test Reports
2.2.3Topsoil Composition Tests
SD-07 Certificates
2.1seed
33 40 00 SD-03 Product Data
3.3Placing Pipe
SD-04 Samples
2.1Pipe for Culverts and Storm
Drains
SD-07 Certificates
2.1.2Resin Certification
3.6Pipeline Testing
2.4Hydrostatic Test on Watertight
Joints
3.5.5Determination of Density
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
| 01. Specifications Volume 1 of 2 79 |
| 01. Specifications Volume 1 of 2 80 |
| 01. Specifications Volume 1 of 2 81 |
| 01. Specifications Volume 1 of 2 82 |
| 01. Specifications Volume 1 of 2 83 |
| 01. Specifications Volume 1 of 2 84 |
| 01. Specifications Volume 1 of 2 85 |
| 01. Specifications Volume 1 of 2 86 |
| 01. Specifications Volume 1 of 2 87 |
| 01. Specifications Volume 1 of 2 88 |
| 01. Specifications Volume 1 of 2 89 |
| 01. Specifications Volume 1 of 2 90 |
| 01. Specifications Volume 1 of 2 91 |
| 01. Specifications Volume 1 of 2 92 |
| 01. Specifications Volume 1 of 2 93 |
| 01. Specifications Volume 1 of 2 94 |
| 01. Specifications Volume 1 of 2 95 |
| 01. Specifications Volume 1 of 2 96 |
| 01. Specifications Volume 1 of 2 97 |
| 01. Specifications Volume 1 of 2 98 |
| 01. Specifications Volume 1 of 2 99 |
| 01. Specifications Volume 1 of 2 100 |
| 01. Specifications Volume 1 of 2 101 |
| 01. Specifications Volume 1 of 2 102 |
| 01. Specifications Volume 1 of 2 103 |
| 01. Specifications Volume 1 of 2 104 |
| 01. Specifications Volume 1 of 2 105 |
| 01. Specifications Volume 1 of 2 106 |
| 01. Specifications Volume 1 of 2 107 |
| 01. Specifications Volume 1 of 2 108 |
| 01. Specifications Volume 1 of 2 109 |
| 01. Specifications Volume 1 of 2 110 |
| 01. Specifications Volume 1 of 2 111 |
| 01. Specifications Volume 1 of 2 112 |
| 01. Specifications Volume 1 of 2 113 |
| 01. Specifications Volume 1 of 2 114 |
| 01. Specifications Volume 1 of 2 115 |