About this file

This invitation for bid solicits construction services for two Access Control Points at Fort Indiantown Gap in Pennsylvania. Requirements include constructing gate structures with canopies, a Visitor Control Center, vehicle inspection areas, gatehouses, ID check stations, as well as perimeter fencing around 25% of the base. Security systems such as ballistic protection, cameras, barriers, and communications equipment are also required. The performance period is 490 calendar days from notice to proceed. The contract value is estimated between $10-25 million. This solicitation is set aside for small businesses with a NAICS code of 237310 and size standard of $39.5 million. A mandatory site visit will be held on August 10, 2021. The solicitation contains three base line items and six additive line items, and the contract will be awarded to the lowest bidder based on the aggregate of the base items plus the highest priority additives within available funds.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

C O

M M

S S

S S

S S

S S

S S

S S

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

B

I

D

D

L

E

D

R

O H

P

O H

P

O H

P

O H

P

O H

P

O H

P

O H

P

O H

P

O H

P

B M

P P

P P

P P

X

X

S

I

G

N

L T

L T

R B

F

W C

A P

R B

F

F

F

F

F

F

C

C C

C

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

F

F

F

F

C

C

C

C

C

F

F

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

F

M

F

M

F

M

F

P

V

C

30+00

22 LF

24" HDPE

C

B

SD

CB19

S D

L

F

H D

P E

D

H

P

E

SD

OS11

C

B

SD

CB15

S

D

P

E

C

B

SD CB18

S

D

S

D

P

S

D

P

F

M

FM

FT02

FM FT01

E X

P

V C

C

B

SD

CB14

37 LF 24" HDPE

SD

CB16

P

SD

FES CV01

70+00

C

675 LF 6" PERF

PVC SUBDRAIN

168 LF 6" PERF

PVC SUBDRAIN

6" PERF PVC

SUBDRAIN

S

D

S

D

D

SD

JB17

P

C

B

W

W

W

W

W

W

D

I P

I

P

7 LF 8" DIP

B

I

D

D

I

V

E

F I S

H E

R

A

S

R

ALGN: SW CULVERT 1

SW BASIN 1

ALGN: SS FORCEMAIN

ALGN: SW BASIN 1

ALGN: SW BASIN 1

ENDWALL

ENDWALL

ENDWALL

ALGN: DW MAINLINE 3

W

W

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

T

N

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

U

A

M

Y

C

O R

E

N G

I N

E E

R S

H D

R

E

N G

I N

E E

R I N

G

I N

C

S

T

H

S

T R

E E

T

O

M A

H A

N

E

B A

L T

I M

O R

E

D

I S

T R

I C

T

O C

T

A N

S I

D

F O

D I A

N T

O W

N

G

A P

P

A

M A

C

E S

S

C

O N

T R

O L

P

O I N

T

P R

O J E

FINAL DESIGN

J B

C S

C H

J S

F

M A

G

T

E

U

T I L I T

Y

P

L A

N

O

F

1C-128 c:\pwworking\central01\d0478269\10078599-FIGW-1C-128.dwg

31 October 2019 2:53 PM Brandt, Jill C.

1. SEE DRAINAGE PROFILES ON 1C-205 THROUGH 1C-209.

2. SEE SANITARY SEWER PROFILES ON 1C-210 THROUGH

1C-212.

3. SEE WATER MAIN PROFILES ON 1C-213 THROUGH 1C-215.

GENERAL NOTES

LEGEND

SD

STORM DRAINAGE

FM

SEWER FORCEMAIN

SANITARY SEWER

WATER MAIN

CB

SS

W

CATCH BASIN

STORM MANHOLE/JUNCTION BOX

FLARED END SECTION

THRUST BLOCK

S

SANITARY MANHOLE

REDUCER

CO

D

ARV

GAS MAIN (CLIN 0003)G

FIRE HYDRANT

COUPLER/RESTRAINED JOINT

AIR RELEASE VALVE

VALVE

CLEANOUT

ENDWALL

INLET/OUTLET PROTECTION

PAVEMENT SUBDRAIN

SD

A1

MAIN GATE UTILITY PLAN (AREA 1)

SCALE: 1" = 30' (FULL SIZE)

30' 60'0

N

1C-128

1C-129

1C-130

1C-132

1C-131

KEY MAP

MATCHLINE - SEE SHEET 1C-129

SHEET KEYNOTES

1. FORCE MAIN TO BE FIELD LOCATED. APPROXIMATE TIE-IN

LOCATION OUTSIDE FISHER AND INSPECTION ROAD

GRADING LIMITS. CUT, CAP, AND ABANDON EXISTING

FORCE MAIN EAST TO BEGINNING OF DEMOLITION.

2. MAINTAIN MINIMUM 0.5 FT CLEARANCE.

3. FIELD VERIFY EXISTING SIZE, TYPE, AND LOCATION.

4. COVER GREATER THAN 42 IN. MAINTAIN NEGATIVE SLOPE

TO CONNECTION INVERT ELEVATION AT SD CB 40.

5. WATER MAIN TO BE FIELD LOCATED. APPROXIMATE TIE-IN

LOCATION AT EAST EDGE OF BIDDLE DRIVE. CUT, CAP AND

ABANDON EXISTING WATER MAIN EAST TO THE BEGINNING

OF DEMOLITION.

AutoCAD SHX Text c-josaufle Polygon c-josaufle Text Box c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Polygon c-josaufle Text Box Sanitary Forcemain and 8" water line shown this page not in contract

M M

C O

M M

COMM

COMM

COMM

COMM

COMM

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

G

G

E

E

E

E

E

E

E

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

C

O

M

M

S S

S S

S S

W

W

W

W

W

W

W

FISHER AVE (SR 934)

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O H

P

O H

P

OHP

OHP

OHP

OHP

W

W

W

U

G

P

U

G

P

U

G

P

S

S

S

S

PP

PP

PP

PP

X X

X X X X

X

X

X

X

X

X

X

X

LP

WM

E

X

P

V

C

C

C

F

F

F

F

C

C

C

C

C

C

C

C

C

C

C

C

C

C

F

F

F

F

F

F

F

F

F

F

F

F

F

S

D

S

D

S

D

S

D

S

D

S

D

S

D

SD

SD

SD

SD

SD

S D

>S

D

S

D

S

D

S

D

S

D

S

D

S

D

S D

S

D

S

D

S

D

S

D

S

D

S

D

S

D

FH01

S

SS

MH01

S

S

SS

MH03

S

S

S

S

S

S

S

S

S

S

C

CO

SS CO06

42 L F 4

P

V C

SS CO01

CO

SS

CO02

C

102 LF 4" PVC

CO

SS CO04

CO

SS

CO05

P

V C

17 LF 4" PVC

10+00

11+00

12+00 13+00

40+00

35+00

36+00

37+00

CO

C

B

SD CB12

CB

SD CB22

C

B

SD CB25

S

D

P

P

E

40+00

40+50

50+00

30+00

31+00

P

P

ARV

P

174 LF 8" DIP

SS

MH02

C

CB

SD CB21

S

D

P

R

C

P

SD

CB11

12 LF

24" HDPE

P

CO

SS

CO03 144 LF 4" PVC

F

M

F

M

F

M

F

M

F

M

FM

FM

FM

FM

FM

FT04

220 LF 4" PVC

50+00

70+00

70+50

60+00

FH02

FH03

C

B

SD

CB23

S

D

P

20+00

22+00

CB

SD

CB13

24" HDPE

30+00

8 LF

4" HDPE

C

O

DS

CO41

40+00

C

O

DS

CO11

C

O

DS CO12

10+00

9 LF 4" HDPE

P

E

25 LF 6" HDPE

20+00

21+00

25+0026+0027+00

CO

DS CO21

CO

DS CO22

100 LF 6" HDPE

P

E

CO

DS CO23

202 LF 6" HDPE

7 LF 4" HDPE

5 LF

4" HDPE

5 LF

4" HDPE

5 LF

4"

HDPE

5 LF

4" HDPE

33+00

34+00

DS CO31

66 LF

6" HDPE

15 LF 4" HDPE

15 LF, 4" HDPE

CO

DS CO32

112 LF 6" HDPE

2 LF

4" HDPE

3 LF

4" HDPE

2 LF

4" HDPE

3 LF

4" HDPE

2 LF

4" HDPE

CO

DS CO33

CO

DS CO34

73 LF 6" HDPE

7 LF 6" HDPE

5 LF 4" HDPE

5 LF 4" HDPE

G G G G G G G G

30+00

C

O

SS

CO07

C

80+00

10+00

11+00

12+00

13+00

20+00

30+00

40+00

D

I P

9 LF 6" DIP

12 LF 6" DIP

P

11 LF 8" DIP

L

F

D

IP

C

U

40 LF 2" CU

61 LF 2" PE

17 LF 2" PE

P

E

10+00

12+00 13+00

14+00

52 LF 1" PE

66 LF 8" DIP

27 LF 8" DIP

22 LF 8" DIP

P

49 LF 8" DIP

16 LF 8" DIP

D

I P

81 LF 2" PE 152 LF 2" PE

30 LF 2" PE

10 LF 2" PE

W W W W W

W

W

W

W

W

W

W

W

S

S

36+00

5 LF 4" HDPE

D

IP

G

G

G

W

W

C

CO

FM

FT03

P

V

C

C

1010 LF 6" PERF

PVC SUBDRAIN

6" PERF PVC

SUBDRAIN

OBSV PORT

6" PERF PVC

SUBDRAIN

OBSV PORT

255 LF 6" PERF

PVC SUBDRAIN

730 LF 6" PERF

PVC SUBDRAIN

32 LF 6" DIP

5 LF

4" HDPE

P

E

C

B

10+00

S

D

S

D

S

D

S

D

S

D

>S D

S D

SD

SD

SD

SD

SD

S D

S

D

S

D

S

D

S

D

W

W

15 LF 8" DIP

ALGN: SW DOWNSPOUT 2-A

ALGN: SW DOWNSPOUT 2-B

ALGN: SW BASIN 2-B

ALGN: SW

BASIN 2-A

ALGN: SW BASIN 1

ALGN: SW DOWNSPOUT 3-B

BEGIN ALGN: SW

DOWNSPOUT 3-C

ALGN: SS FORCEMAIN

ALGN: SS MAINLINE

ALGN: DW MAINLINE 2

BEGIN ALGN:

SW DOWNSPOUT 4

ALGN: DW MAINLINE 1

BEGIN ALGN: SW DOWNSPOUT 1

ALGN: NG MAINLINE

BEGIN ALGN: DW

SERVICE VISITOR CENTER

BEGIN ALGN: NG

SERVICE VISITOR CENTER

ALGN: SS MAINLINE

ALGN: SS SERVICE

GATEHOUSE

ALGN: DW MAINLINE 1

ALGN: DW HYDRANT 3

ALGN: NG SERVICE GATEHOUSE

ALGN: DW SERVICE GATEHOUSE

ALGN: DW HYDRANT 2

BEGIN ALGN: DW SERVICE

SEARCH OFFICE

ALGN: NG SERVICE

SEARCH OFFICE

(CLIN 0007)

ALGN: SS SERVICE SEARCH OFFICE

BEGIN ALGN: SW

DOWNSPOUT 3-A

ALGN: DW MAINLINE 3

S O

L I C

I T

A T

I O

N

N

O

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

M A

R K

S I Z

E

S U

B M

I T

T E

D

B

Y

D A

T E

C O

N T

R A

C H

E C

K E

D

B

Y

D R

A W

N

B

Y

I S

S U

E

D

A T

E

SHEET ID

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

US Army Corps of Engineers

M

Y

C

O R

E

N G

I N

E E

R S

H D

R

E

N G

I N

E E

R I N

G

I N

C

S

T

H

S

T R

E E

T

O

M A

H A

N

E

B A

L T

I M

O R

E

D

I S

T R

I C

T

O C

T

A N

S I

D

F O

D I A

N T

O W

N

G

A P

P

A

M A

C

E S

S

C

O N

T R

O L

P

O I N

T

P R

O J E

FINAL DESIGN

J B

C S

C H

J S

F

M A

G

T

E

U

T I L I T

Y

P

L A

N

O

F

1C-129 c:\pwworking\central01\d0478269\10078599-FIGW-1C-128.dwg

31 October 2019 2:53 PM Brandt, Jill C.

1. SEE DRAINAGE PROFILES ON 1C-205 THROUGH 1C-209.

2. SEE SANITARY SEWER PROFILES ON 1C-210 THROUGH

1C-212.

3. SEE WATER MAIN PROFILES ON 1C-213 THROUGH 1C-215.

GENERAL NOTES

MATCHLINE - SEE SHEET 1C-130

LEGEND

SD

STORM DRAINAGE

FM

SEWER FORCEMAIN

SANITARY SEWER

WATER MAIN

CB

SS

W

CATCH BASIN

STORM MANHOLE/JUNCTION BOX

FLARED END SECTION

THRUST BLOCK

S

SANITARY MANHOLE

REDUCER

CO

D

ARV

GAS MAIN (CLIN 0003)G

FIRE HYDRANT

COUPLER/RESTRAINED JOINT

AIR RELEASE VALVE

VALVE

CLEANOUT

ENDWALL

INLET/OUTLET PROTECTION

PAVEMENT SUBDRAIN

SD

1C-128

1C-129

1C-130

1C-132

1C-131

KEY MAP

A1

MAIN GATE UTILITY PLAN (AREA 2)

SCALE: 1" = 30' (FULL SIZE)

30' 60'0

N

M A

T C

H L

I N

E

S

E

M A

T C

H L

I N

E

S

E

M A

T C

H L

I N

E

S

E

SHEET KEYNOTES

1. FORCE MAIN TO BE FIELD LOCATED, DURING DEMOLITION,

TO SOUTH SIDE OF TROOPER ST. MATCH TIE-IN LOCATION

TO FORCE MAIN REMOVAL LIMITS. CUT, CAP, AND

ABANDON EXISTING FORCE MAIN.

2. MAINTAIN MINIMUM 0.5 FT CLEARANCE.

3. FIELD VERIFY EXISTING SIZE, TYPE, AND LOCATION.

4. COVER GREATER THAN 42 IN. MAINTAIN NEGATIVE SLOPE

TO CONNECTION INVERT ELEVATION AT SD CB 40.

5. BASE BID: STUB AND CAP AT NG MAINLINE.

CLIN 0007: PROVIDE NG SERVICE TO SEARCH OFFICE.

6. BASE BID: STUB AND CAP 4" hpde AT SW DOWNSPOUNT 3-A.

c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box SS Forcemain not in contract; allow for future connection at terminus c-josaufle Polygon c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box X c-josaufle Text Box This portion 8" water not in contract; allow for future connection at tee c-josaufle Polygon c-josaufle Line