This is an invitation for bid (IFB) to construct two Access Control Points at Fort Indiantown Gap in Pennsylvania. The requirement includes perimeter fencing around 25% of the base. Gate structures will provide threat control and traffic inspection, including canopies, a Visitor Control Center, vehicle inspection areas, a Gatehouse, and ID Check Stations. Active and passive protection systems combined with roadway layouts will properly calm traffic and inspect incoming vehicles. Ballistic protection, security cameras, speed detectors, remote controlled barriers, signaling, and communications equipment is also required. The period of performance is 490 calendar days from notice to proceed. The project magnitude is between $10-25 million. The IFB is set aside for small businesses with a NAICS code of 237310 and size standard of $39.5 million. A site visit will be held on August 10, 2021. The IFB includes three base line items and six alternate bid items, with item #0009 being the highest priority additive. The contract will be awarded to the offeror with the lowest aggregate amount for the base items plus or minus priority additive items up to available funds.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Sign In W912KC21B0002.pdf | ||
| OF 1419 Bid Abstract W912KC21B0002 signed.pdf | ||
| W912KC21B00020002 Amendment 0002.pdf | ||
| Attach 14 0a-506_Addendum.pdf | ||
| Attach 15 3A-402_Addendum.pdf | ||
| Attach 13 Preaward RFIs W912KC21B0002.pdf | ||
| W912KC21B0002_0001 Amendment 1.pdf | ||
| Attch 6_Deletions of Funcks Utility Lines 1C_128_129 (1).pdf | ||
| Attch 8 ACP East Geotech Report.pdf | ||
| Attch 9_SF24.pdf | ||
| Attch 1_ACP Specifications_Vol1_DIV-1_10-28-20.pdf | ||
| Attch 11_SF25A.pdf | ||
| Attch 3 ACP Specifications_Vol3_FTIG_ACP.pdf | ||
| IFB W912KC21B0002.pdf | ||
| Attch 12 Addendum FTIG ACPs.pdf | ||
| Attch 10_SF25.pdf | ||
| Attch 7_FTIG_WestACP_Geotech.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Main Access Control Point
Fort Indiantown Gap, Pennsylvania
NGB Project No. 420502 CENAB Project No. 464121
Specification Volume 1 of 2
Final Design 2 November 2020
1917 S. 67th Street Omaha, NE 68106
Phone 402.399.1000 Fax 402.399.4979
11/2/2020
Access Control Points FTINDIANTOWN
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 05 00 JOB CONDITIONS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
DI VI SI ON 03 - CONCRETE
03 11 13.00 10 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00.00 10 CONCRETE ACCESSORIES
03 20 00.00 10 CONCRETE REINFORCING
03 30 00.00 10 CAST-IN-PLACE CONCRETE
03 35 00.00 10 CONCRETE FINISHING
03 39 00.00 10 CONCRETE CURING
DI VI SI ON 04 - MASONRY
04 20 00 UNIT MASONRY
DI VI SI ON 05 - METALS
05 12 00 STRUCTURAL STEEL
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 42 50 PRE-ENGINEERED COLD-FORMED TRUSSES
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
PROJECT TABLE OF CONTENTS Page 1
07 22 00 ROOF AND DECK INSULATION
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 14 00 WOOD DOORS
08 34 02 BULLET-RESISTANT COMPONENTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
08 71 00.01 HARDWARE SET DEFINITIONS
08 81 00 GLAZING
DI VI SI ON 09 - FI NI SHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 90 00 PAINTS AND COATINGS
DI VI SI ON 10 - SPECI ALTI ES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 14 53 TRAFFIC SIGNAGE
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DI VI SI ON 12 - FURNI SHI NGS
12 21 00 WINDOW BLINDS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 34 19 PRE-ENGINEERED METAL CANOPY SYSTEMS
13 34 23 PREENGINEERED GUARD BOOTH STRUCTURES
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
PROJECT TABLE OF CONTENTS Page 2
CONTROL SYSTEMS
23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL
23 11 25 FACILITY GAS PIPING
23 23 00 REFRIGERANT PIPING
DI VI SI ON 26 - ELECTRI CAL
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 32 14.00 10 NATURAL GAS-GENERATOR SET, STATIONARY 15-300 KW, STANDBY
APPLICATIONS
26 32 33.00 10 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA
CAPACITY
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 20 BASE COURSE
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS
32 15 00 AGGREGATE SURFACING
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
32 93 00 EXTERIOR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERS
33 34 00 FORCE MAINS SEWER
33 40 00 STORM DRAINAGE UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 71 01 OVERHEAD TRANSMISSION AND DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DI VI SI ON 34 - TRANSPORTATI ON
34 71 13.19 TRAFFIC SIGNALS AND CRASH RATED ACTIVE VEHICLE BARRIERS
PROJECT TABLE OF CONTENTS Page 3
AND CONTROLS
34 72 00.00 PASSIVE BOLLARD AND CABLE-BASED PASSIVE VEHICLE BARRIERS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SECTION 02 41 00
DEMOLITION
05/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 145 (1991; R 2012) Standard Specification for Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes
AASHTO T 180 (2017) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.2 PROJECT DESCRIPTION
1.2.1 Demolition/Deconstruction Plan
Prepare a Demolition Plan and submit proposed salvage, demolition, and removal procedures for approval before work is started. Include in the plan procedures for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a disconnection schedule of utility services, a detailed description of methods and equipment to be used for each operation and of the sequence of operations.
Coordinate with Waste Management Plan. Provide procedures for safe conduct of the work in accordance with EM 385-1-1 . Plan shall be approved by Contracting Officer prior to work beginning.
1.2.2 General Requirements
Do not begin demolition or deconstruction until authorization is received from the Contracting Officer. Remove rubbish and debris from the project site; do not allow accumulations . In the interest of occupational safety and health, perform the work in accordance with EM 385-1-1 , Section 23, Demolition, and other applicable Sections. If asbestos is encountered during demolition, notify Contracting Officer immediately.
1.3 ITEMS TO REMAIN IN PLACE
Take necessary precautions to avoid damage to existing items to remain in place, to be reused, or to remain the property of the Government. Repair
SECTION 02 41 00 Page 1 or replace damaged items as approved by the Contracting Officer.
Coordinate the work of this section with all other work indicated.
Construct and maintain shoring, bracing, and supports as required. Ensure that structural elements are not overloaded. Increase structural supports or add new supports as may be required as a result of any cutting, removal, deconstruction, or demolition work performed under this contract. Do not overload pavements to remain. Provide new supports and reinforcement for existing construction weakened by demolition, deconstruction, or removal work. Repairs, reinforcement, or structural replacement require approval by the Contracting Officer prior to performing such work.
1.3.1 Existing Construction Limits and Protection
Do not disturb existing construction beyond the extent indicated or necessary for installation of new construction. Provide temporary shoring and bracing for support of building components to prevent settlement or other movement. Provide protective measures to control accumulation and migration of dust and dirt in all work areas. Remove dust, dirt, and debris from work areas daily.
1.3.2 Weather Protection
For portions of the building to remain, protect building interior and materials and equipment from the weather at all times. Where removal of existing roofing is necessary to accomplish work, have materials and workmen ready to provide adequate and temporary covering of exposed areas.
1.3.3 Trees
Protect trees within the project site which might be damaged during demolition or deconstruction, and which are indicated to be left in place, by a 6 foot high fence. Erect and secure fence a minimum of 5 feet from the trunk of individual trees or follow the outer perimeter of branches or clumps of trees. Replace any tree designated to remain that is damaged during the work under this contract with like-kind or as approved by the Contracting Officer.
1.3.4 Utility Service
Maintain existing utilities indicated to stay in service and protect against damage during demolition and deconstruction operations. Prior to start of work, utilities serving each area of alteration or removal will be shut off by the Government and disconnected and sealed by the Contractor
1.3.5 Facilities
Protect electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. Floors, roofs, walls, columns, pilasters, and other structural components that are designed and constructed to stand without lateral support or shoring, and are determined to be in stable condition, must remain standing without additional bracing, shoring, or lateral support until demolished or deconstructed, unless directed otherwise by the Contracting Officer.
Ensure that no elements determined to be unstable are left unsupported and place and secure bracing, shoring, or lateral supports as may be required
SECTION 02 41 00 Page 2 as a result of any cutting, removal, deconstruction, or demolition work performed under this contract.
1.4 BURNING
The use of burning at the project site for the disposal of refuse and debris will not be permitted . Where burning is permitted, adhere to federal, state, and local regulations.
1.5 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Demolition Plan; G, AO Existing Conditions
SD-07 Certificates
1.6 QUALITY ASSURANCE
1.6.1 Dust and Debris Control
Prevent the spread of dust and debris and avoid the creation of a nuisance or hazard in the surrounding area. Do not use water if it results in hazardous or objectionable conditions such as, but not limited to, ice, flooding, or pollution. Vacuum and dust the work area as needed.
1.7 PROTECTION
1.7.1 Traffic Control Signs
a. Where pedestrian and driver safety is endangered in the area of removal work, use traffic barricades with flashing lights. Anchor barricades in a manner to prevent displacement by wind. Notify the Contracting Officer prior to beginning such work.
1.8 RELOCATIONS
Perform the removal and reinstallation of relocated items as indicated with workmen skilled in the trades involved. Repair or replace items to be relocated which are damaged by the Contractor with new undamaged items as approved by the Contracting Officer.
1.9 EXISTING CONDITIONS
Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the Contracting Officer showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be
SECTION 02 41 00 Page 3 acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work. It is the Contractor's responsibility to verify and document all required outages which will be required during the course of work, and to note these outages on the record document. Submit survey results.
PART 2 PRODUCTS
2.1 FILL MATERIAL
a. Comply with excavating, backfilling, and compacting procedures for soils used as backfill material to fill basements, voids, depressions or excavations resulting from demolition or deconstruction of structures.
b. Fill material shall conform to the definition of satisfactory soil material as defined in AASHTO M 145, Soil Classification Groups A-1, A-2-4, A-2-5 and A-3. In addition, fill material shall be free from roots and other organic matter, trash, debris, frozen materials, and stones larger than 2 inches in any dimension.
c. Proposed fill material must be sampled and tested by an approved soil testing laboratory, as follows:
Soil classification AASHTO M 145
Moisture-density relations AASHTO T 180 , Method B or D
PART 3 EXECUTION
3.1 EXISTING FACILITIES TO BE REMOVED
Inspect and evaluate existing structures onsite for reuse. Existing construction scheduled to be removed for reuse shall be disassembled.
Dismantled and removed materials are to be separated, set aside, and prepared as specified, and stored or delivered to a collection point for reuse, remanufacture, recycling, or other disposal, as specified.
Materials shall be designated for reuse onsite whenever possible.
3.1.1 Utilities and Related Equipment
3.1.1.1 General Requirements
Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by the Contracting Officer. Do not interrupt existing utilities serving facilities occupied and used by the Government except when approved in writing and then only after temporary utility services have been approved and provided. Do not begin demolition or deconstruction work until all utility disconnections have been made.
Shut off and cap utilities for future use, as indicated.
3.1.1.2 Disconnecting Existing Utilities
Remove existing utilities and terminate in a manner conforming to the
SECTION 02 41 00 Page 4 nationally recognized code covering the specific utility and approved by the Contracting Officer. When utility lines are encountered but are not indicated on the drawings, notify the Contracting Officer prior to further work in that area. Remove meters and related equipment and deliver to a location in accordance with instructions of the Contracting Officer.
3.1.2 Chain Link Fencing
Remove chain link fencing, gates and other related salvaged items scheduled for removal and transport to designated areas. Remove gates as whole units. Cut chain link fabric to 25 foot lengths and store in rolls off the ground.
3.1.3 Paving and Slabs
Remove concrete and asphaltic concrete paving and slabs including aggregate base as indicated to a depth of at least 5 inches below new finish grade or as indicated on the drawings. Provide neat sawcuts at limits of pavement removal as indicated. Pavement and slabs designated to be recycled and utilized in this project shall be moved, ground and stored as directed by the Contracting Officer. Pavement and slabs not to be used in this project shall be removed from the Installation at Contractor's expense.
3.2 CONCURRENT EARTH-MOVING OPERATIONS
Do not begin excavation, filling, and other earth-moving operations that are sequential to demolition work in areas occupied by structures to be demolished or deconstructed until all demolition in the area has been completed and debris removed. Fill holes, open basements and other hazardous openings.
3.3 DISPOSITION OF MATERIAL
3.3.1 Title to Materials
Except for salvaged items specified in related Sections, and for materials or equipment scheduled for salvage, all materials and equipment removed and not reused or salvaged, shall become the property of the Contractor and shall be removed from Government property. Title to materials resulting from demolition, and materials and equipment to be removed, is vested in the Contractor upon approval by the Contracting Officer of the Contractor's demolition, deconstruction, and removal procedures, and authorization by the Contracting Officer to begin demolition and deconstruction. The Government will not be responsible for the condition or loss of, or damage to, such property after contract award. Showing for sale or selling materials and equipment on site is prohibited.
3.3.2 Reuse of Materials and Equipment
Remove and store materials indicated on the plans to be reused or relocated to prevent damage, and reinstall as the work progresses.
3.3.3 Salvaged Materials and Equipment
Remove materials and equipment that are indicated on the plans to be removed by the Contractor and that are to remain the property of the Government, and deliver to a storage site , as directed.
SECTION 02 41 00 Page 5
a. Salvage items and material to the maximum extent possible.
b. Store all materials salvaged for the Contractor as approved by the Contracting Officer and remove from Government property before completion of the contract. On site sales of salvaged material is prohibited.
c. Remove salvaged items to remain the property of the Government in a manner to prevent damage, and packed or crated to protect the items from damage while in storage or during shipment. Items damaged during removal or storage must be repaired or replaced to match existing items. Properly identify the contents of containers.
3.3.4 Unsalvageable and Non-Recyclable Material
Dispose of unsalvageable and non-recyclable noncombustible material off the site.
3.4 CLEANUP
Remove debris and rubbish from basement and similar excavations. Remove and transport the debris in a manner that prevents spillage on streets or adjacent areas. Apply local regulations regarding hauling and disposal.
3.5 DISPOSAL OF REMOVED MATERIALS
3.5.1 Regulation of Removed Materials
Dispose of debris, rubbish, scrap, and other nonsalvageable materials resulting from removal operations with all applicable federal, state and local regulations as contractually specified in the Waste Management Plan .
Storage of removed materials on the project site is prohibited.
3.5.2 Burning on Government Property
Burning of materials removed from demolished and deconstructed structures will not be permitted on Government property .
3.5.3 Removal to Spoil Areas on Government Property
Transport noncombustible materials removed from demolition and deconstruction structures to designated spoil areas on Government property.
3.5.4 Removal from Government Property
Transport waste materials removed from demolished and deconstructed structures, except waste soil, from Government property for legal disposal. Dispose of waste soil as directed.
3.6 REUSE OF SALVAGED ITEMS
Recondition salvaged materials and equipment designated for reuse before installation. Replace items damaged during removal and salvage operations or restore them as necessary to usable condition.
-- End of Section --
SECTION 02 41 00 Page 6
SECTION 03 11 13.00 10
STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
05/14
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI 301 (2016) Specifications for Structural Concrete
ACI 347R (2014; Errata 1 2017) Guide to Formwork for Concrete
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Form Materials
Dovetail Anchor Slots; G, AE
1.3 QUALITY ASSURANCE
Provide Sample Panels of sufficient size to contain joints and not less than 6 feet long and 4 feet wide. The panels shall be of typical wall thickness and constructed containing the full allocation of reinforcing steel that will be used in the structure, with the forming system that duplicates in every detail the one that will be used in construction of the structure. Use the same concrete mixture proportion and materials, the same placement techniques and equipment, and the same finishing techniques and timing that are planned for the structure. Construction of a finish SF-3.0 will not be permitted until sample panels have been approved. Protect sample panels from construction operations in a manner to protect approved finish, and are not to be removed until all surface finish SF-3.0 concrete has been accepted. After shop drawings have been reviewed, submit sample panels for a surface finish SF-3.0 with applied architectural treatment; build panels on the project site where directed.
SECTION 03 11 13.00 10 Page 1
1.4 DELIVERY, STORAGE, AND HANDLING
Store fiber voids above ground level in a dry location. Keep fiber voids dry until installed and overlaid with concrete.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
The design, engineering, and construction of the formwork is the responsibility of the Contractor. Design formwork in accordance with methodology of ACI 347R for anticipated loads, lateral pressures, and stresses, and capable of withstanding the pressures resulting from placement and vibration of concrete. Comply with the tolerances specified in Section 03 30 00.00 10 CAST-IN-PLACE CONCRETE , paragraph CONSTRUCTION TOLERANCES. However, for surfaces with an ACI Class A surface designation, limit the allowable deflection for facing material between studs, for studs between walers and walers between bracing to 0.0025 times the span. Design the formwork as a complete system with consideration given to the effects of cementitious materials and mixture additives such as fly ash, cement type, plasticizers, accelerators, retarders, air entrainment, and others. Monitor the adequacy of formwork design and construction prior to and during concrete placement as part of the Contractor's approved Quality Control Plan.
2.2 FORM MATERIALS
Submit manufacturer's data, including literature describing form materials, accessories, and form releasing agents.
2.2.1 Formwork
Comply with ACI 301 Section 2. Provide for surfaces not exposed to public view a surface finish SF-1.0. Provide for surfaces exposed to public view a surface finish SF-3.0. Patch holes and defects in accordance with ACI 301 . Submit form removal schedule indicating element and minimum length of time for form removal.
2.3 Dovetail Anchor Slots
Hot dip galvanized steel sheet, not less than 0.0336 inch thick, with bent tab anchors. Temporarily fill or cover face opening of slots to prevent intrusion of concrete or debris. See section 03 30 00.00 10 CAST-IN-PLACE CONCRETE and 04 20 00 UNIT MASONRY for additional information.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Formwork
Comply with ACI 301 Section 2 with surface tolerances in accordance with
ACI 117 .
3.2 INSPECTION
Inspect forms and embedded items in sufficient time prior to each concrete placement to certify to the Contracting Officer that they are ready to
SECTION 03 11 13.00 10 Page 2 receive concrete. Report the results of each inspection in writing.
Submit field inspection reports for concrete forms and embedded items.
SECTION 03 11 13.00 10 Page 3
THIS PAGE INTENTIONALLY LEFT BLANK
SECTION 03 11 13.00 10 Page 4
SECTION 03 15 00.00 10
CONCRETE ACCESSORIES
05/14
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C919 (2012; R 2017) Standard Practice for Use of Sealants in Acoustical Applications
ASTM C920 (2018) Standard Specification for Elastomeric Joint Sealants
ASTM D1751 (2004; E 2013; R 2013) Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Nonextruding and Resilient Bituminous Types)
ASTM D1752 (2004a; R 2013) Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion
ASTM D2628 (1991; R 2016) Standard Specification for Preformed Polychloroprene Elastomeric Joint Seals for Concrete Pavements
ASTM D2835 (1989; R 2017) Standard Specification for Lubricant for Installation of Preformed Compression Seals in Concrete Pavements
ASTM D5249 (2010; R 2016) Standard Specification for Backer Material for Use with Cold-and Hot-Applied Joint Sealants in Portland-Cement Concrete and Asphalt Joints
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Preformed Expansion Joint Filler; G, AE
SECTION 03 15 00.00 10 Page 1
Sealant
SD-04 Samples
Field-Molded Type
SD-07 Certificates
Preformed Expansion Joint Filler Sealant
1.3 DELIVERY, STORAGE, AND HANDLING
Protect material delivered and placed in storage off the ground from moisture, dirt, and other contaminants. Deliver sealants in the manufacturer's original unopened containers. Remove sealants from the site whose shelf life has expired.
PART 2 PRODUCTS
2.1 PREFORMED EXPANSION JOINT FILLER
Use preformed expansion joint filler material conforming to ASTM D1751 or ASTM D1752, Type I, or resin impregnated fiberboard conforming to the physical requirements of ASTM D1752. Submit certified manufacturer's test reports for premolded expansion joint filler strips, compression seals and lubricant to verify compliance with applicable specification . Unless otherwise indicated, filler material must be 1/2 inch thick and of a width applicable for the joint formed. Backer material, when required, must conform to ASTM D5249. Expansion joint filler conforming to ASTM D1751 shall not be used for interior work.
2.2 SEALANT
Joint sealant conforming to the following:
2.2.1 Preformed Polychloroprene Elastomeric Type
ASTM D2628.
2.2.2 Lubricant for Preformed Compression Seals
ASTM D2835.
2.2.3 Field-Molded Type
ASTM C920. Use Type M, Grade P or NS, Class 25, Use T NT sealant for horizontal joints. Type M, Grade NS, Class 25, Use NT for vertical joints.
Use polyethylene tape, coated paper, metal foil or similar type materials as bond breaker. The back-up material must be compressible, non-shrink, nonreactive with sealant, and non-absorptive material type such as extruded butyl or polychloroprene rubber. Submit 1 gallon of field-molded sealant and 1 quart of primer (when primer is recommended by the sealant manufacturer) identified to indicate manufacturer, type of material, quantity, and shipment or lot represented.
SECTION 03 15 00.00 10 Page 2
2.3 TESTS, INSPECTIONS, AND VERIFICATIONS
2.3.1 Materials Tests
2.3.1.1 Field-Molded Sealants
Test samples of sealant and primer, when use of primer is recommended by the manufacturer, as required in paragraph FIELD-MOLDED TYPE, by and at the expense of the Government for compliance with paragraph FIELD-MOLDED
TYPE.
PART 3 EXECUTION
3.1 INSTALLATION
Provide joint locations and details, including materials and methods of installation of joint fillers, as specified and indicated. In no case may any fixed metal be continuous through an expansion or contraction joint.
3.1.1 Contraction Joints
Contraction joints shall be constructed by cutting the concrete with a saw after concrete has set. Joint depth and width in accordance with the drawings.
3.1.1.1 Sawed Joints
Saw joints early enough to prevent uncontrolled cracking in the slab, but late enough that this can be accomplished without appreciable spalling.
Start cutting as soon as the concrete has hardened sufficiently to prevent raveling of the edges of the saw cut. Complete cutting before shrinkage stresses become sufficient to produce cracking. Use concrete sawing machines that are adequate in number and power, and with sufficient replacement blades to complete the sawing at the required rate. Cut joints to true alignment and in sequence of concrete placement. Remove sludge and cutting debris. Form reservoir for joint sealant.
3.1.1.2 Bond Breaker
Coat joints requiring a bond breaker with curing compound or with bituminous paint. Protect waterstops during application of bond breaking material to prevent them from being coated.
3.1.2 Expansion Joints
Use preformed expansion joint filler in expansion and isolation joints in slabs around columns and between slabs on grade and vertical surfaces where indicated. Extend the filler to the full slab depth, unless otherwise indicated. Neatly finish the edges of the joint with an edging tool of 1/8 inch radius, except where a resilient floor surface will be applied. Where the joint is to receive a sealant, install the filler strips at the proper level below the finished floor with a slightly tapered, dressed and oiled wood strip temporarily secured to the top to form a recess to the size shown on the drawings. Remove the wood strip after the concrete has set. Contractor may opt to use a removable expansion filler cap designed and fabricated for this purpose in lieu of the wood strip. Thoroughly clean the groove of laitance, curing compound, foreign materials, protrusions of hardened concrete, and any dust. If blowing out the groove use oil-free compressed air.
SECTION 03 15 00.00 10 Page 3
3.1.3 Joint Sealant
Fill sawed contraction joints and expansion joints in slabs with joint sealant, unless otherwise shown. Joint surfaces must be clean, dry, and free of oil or other foreign material which would adversely affect the bond between sealant and concrete. Apply joint sealant as recommended by the manufacturer of the sealant.
3.1.3.1 Joints With Preformed Compression Seals
Install compression seals with equipment capable of installing joint seals to the prescribed depth without cutting, nicking, twisting, or otherwise distorting or damaging the seal or concrete and with no more than 5 percent stretching of the seal. Cover the sides of the joint and, if necessary, the sides of the compression seal with a coating of lubricant.
Coat butt joints with liberal applications of lubricant.
3.1.3.2 Joints With Field-Molded Sealant
Do not seal joints when the sealant material, ambient air, or concrete temperature is less than 40 degrees F. When the sealants are meant to reduce the sound transmission characteristics of interior walls, ceilings, and floors follow the guidance provided in ASTM C919. Coat joints requiring a bond breaker with curing compound or with bituminous paint.
Install bond breaker and back-up material where required. Prime joints and fill flush with joint sealant in accordance with the manufacturer's recommendations.
3.2 CONSTRUCTION JOINTS
Treat construction joints coinciding with expansion and contraction joints as expansion or contraction joints as applicable.
SECTION 03 15 00.00 10 Page 4
SECTION 03 20 00.00 10
CONCRETE REINFORCING
05/14
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI 318 (2014; Errata 1-2 2014; Errata 3-5 2015;
Errata 6 2016; Errata 7-9 2017) Building Code Requirements for Structural Concrete (ACI 318-14) and Commentary (ACI 318R-14)
ACI SP-66 (2004) ACI Detailing Manual
AMERICAN WELDING SOCIETY (AWS)
AWS D1.4/D1.4M (2011) Structural Welding Code - Reinforcing Steel
ASTM INTERNATIONAL (ASTM)
ASTM A1064/A1064M (2017) Standard Specification for Carbon-Steel Wire and Welded Wire Reinforcement, Plain and Deformed, for Concrete
ASTM A184/A184M (2017) Standard Specification for Welded Deformed Steel Bar Mats for Concrete Reinforcement
ASTM A53/A53M (2018) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A615/A615M (2016) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM A706/A706M (2016) Standard Specification for Low-Alloy Steel Deformed and Plain Bars for Concrete Reinforcement
CONCRETE REINFORCING STEEL INSTITUTE (CRSI)
CRSI 10MSP (2009; 28th Ed; Errata) Manual of Standard
SECTION 03 20 00.00 10 Page 1
Practice
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Reinforcement; G, AE
SD-03 Product Data
Mechanical Butt-Splices; G, AE Reinforcing Steel
SD-06 Test Reports
Tests, Inspections, and Verifications; G, AO
SD-07 Certificates
Reinforcing Steel Qualified Welders
1.3 QUALITY ASSURANCE
1.3.1 Welding Qualifications
Welders are required to be qualified in accordance with AWS D1.4/D1.4M .
Perform qualification test at the worksite and notify the Contracting Officer 24 hours prior to conducting tests. Special welding procedures and welders qualified by others may be accepted as permitted by AWS D1.4/D1.4M . Submit a list of qualified welders names.
1.4 DELIVERY, STORAGE, AND HANDLING
Store reinforcement and accessories off the ground on platforms, skids, or other supports.
PART 2 PRODUCTS
2.1 DOWELS
Provide dowels conforming to ASTM A615/A615M , Grade 60, Grade 80. Plain steel bars, cut true to length with ends square and free of burrs. Steel pipe conforming to ASTM A53/A53M, Schedule 80, may be used as dowels provided the ends are closed with metal or plastic inserts or with mortar.
2.2 FABRICATED BAR MATS
Fabricated bar mats conforming to ASTM A184/A184M .
SECTION 03 20 00.00 10 Page 2
2.3 REINFORCING STEEL
Reinforcing steel of deformed bars conforming to ASTM A615/A615M , or ASTM A706/A706M grades and sizes as indicated. Cold drawn wire used for spiral reinforcement must conform to ASTM A1064/A1064M .
Submit certified copies of mill reports attesting that the reinforcing steel furnished contains no less than 25 percent recycled scrap steel and meets the requirements specified herein, prior to the installation of reinforcing steel.
2.3.1 Mechanical Butt-Splices
Mechanical butt splices must be an approved exothermic, threaded coupling, swaged sleeve or other positive connecting type, and develop 125 percent of the specified minimum yield tensile strength of the spliced bars or of the smaller bar in transition splices. In addition to this strength requirement, the additional deformation of number 14 and smaller bars due to slippage or other movement within the splice sleeve cannot exceed (unit strain)( 0.015 inches unit strain 0.0015 inches/inch) beyond the elongation of an unspliced bar based upon a 10 inch gage length spanning the extremities of the sleeve at a stress of 30,000 psi. The additional deformation of number 18 bars must not exceed(unit strain) 0.03 inches (unit strain 0.003 inches/inch) beyond the elongation of an unspliced bar based upon a 10 inch gage length spanning the extremities of the sleeve at a stress of 30,000 psi. Determine the amount of the additional deformation from the stress-strain curves of the unspliced and spliced bars tested as required in paragraph QUALIFICATION OF BUTT-SPLICING PROCEDURE for qualification of the butt-splicing procedure.
2.4 WIRE TIES
Use wire ties that are 16 gauge or heavier black annealed steel wire.
2.5 SUPPORTS
Design bar supports for formed surfaces in accordance with CRSI 10MSP and fabricate of steel or precast concrete blocks. Provide precast concrete blocks with wire ties and not less than 4 inches square when supporting reinforcement on ground. Precast concrete block must have compressive strength equal to that of the surrounding concrete. Coat steel supports for coated or galvanized bars with electrically compatible material for a distance of at least 2 inches beyond the point of contact with the bar.
Where concrete formed surfaces will be exposed to weather or where surfaces are to be painted, use galvanized, plastic protected or stainless steel supports within 1/2 inch of concrete surface. Concrete supports used in concrete exposed to view must have the same color and texture as the finish surface. For slabs on grade supports use precast concrete blocks, plastic coated steel fabricated with bearing plates, or specifically designed wire-fabric supports fabricated of plastic.
Provide bar supports complying with the requirements of ACI SP-66 .
Provide plastic-coated wire, stainless steel or precast concrete supports for bars in concrete with formed surfaces exposed to view or to be painted. Use wedge-shaped precast concrete supports, not larger than 3-1/2 by 3-1/2 inches, of thickness equal to that indicated for concrete cover and with an embedded hooked tie-wire for anchorage. Bar supports used in precast concrete with formed surfaces exposed to view must be the same quality, texture and color as the finish surfaces.
SECTION 03 20 00.00 10 Page 3
2.6 TESTS, INSPECTIONS, AND VERIFICATIONS
Perform material tests, specified and required by applicable standards, by an approved laboratory and certified to demonstrate that the materials are in conformance with the specifications. Perform and certify tests, inspections, and verifications and certify. Submit certified tests reports of reinforcement steel showing that the steel complies with the applicable specifications for each steel shipment and identified with specific lots prior to placement. Submit three copies of the heat analyses for each lot of steel furnished certifying that the steel conforms to the heat analyses.
PART 3 EXECUTION
3.1 REINFORCEMENT
Fabricate and place reinforcement steel and accessories as specified, as indicated, and as shown on approved shop drawings. Fabrication and placement details of steel and accessories not specified or shown must be in accordance with ACI SP-66 and ACI 318 . Cold bend reinforcement unless otherwise authorized. Bending may be accomplished in the field or at the mill. Do not bend bars after embedment in concrete. Place safety caps on all exposed ends of vertical concrete reinforcement bars that pose a danger to life safety. Face wire tie ends away from the forms. Submit detail drawings showing reinforcing steel placement, schedules, sizes, grades, and splicing and bending details. Show support details including types, sizes and spacing.
3.1.1 Placement
Reinforcement must be free from loose rust and scale, dirt, oil, or other deleterious coating that could reduce bond with the concrete. Place reinforcement in accordance with ACI 318 at locations indicated plus or minus one bar diameter. Do not continue reinforcement through expansion joints and place as indicated through construction or contraction joints.
Cover with concrete coverage as indicated or as required by ACI 318 . If bars are moved more than one bar diameter to avoid interference with other reinforcement, conduits or embedded items, the resulting arrangement of bars, including additional bars required to meet structural requirements, requires approval before concrete is placed.
3.1.2 Placing Tolerances
Conform bar spacing and concrete cover to ACI 117 .
3.1.3 Splicing
Conform splices of reinforcement to ACI 318 and make only as required or indicated. Bars may be spliced at alternate or additional locations at no additional cost to the Government subject to approval. Splicing must be by lapping or by mechanical butt connection; except that lap splices must not be used for bars larger than No. 11 unless otherwise indicated.
3.1.3.1 Lap Splices
Place lapped bars in contact and securely tied or spaced transversely apart to permit the embedment of the entire surface of each bar in concrete. Do not space lapped bars farther apart than 1/5 the required
SECTION 03 20 00.00 10 Page 4 length of lap or 6 inches.
3.1.3.2 Butt-Splices
Use butt-splices only where shown or authorized. Make butt-splices by a method which develops splices suitable for tension, compression and stress reversal applications. Butt-splices must develop 90 percent of the specified minimum ultimate tensile strength of the smallest bar of each splice. Clean bars of all oil, grease, dirt, rust, scale and other foreign substances and flame dry before splicing.
3.1.3.2.1 Welded Butt Splices
Fabricate welded butt splices in accordance with AWS D1.4/D1.4M .
3.1.3.2.2 Mechanical Butt-Splices
Fabricate mechanical butt-splices in accordance with the mechanical splicing device manufacturer's recommendations. Bars to be spliced by a mechanical butt-splicing process may be sawed, sheared or flame cut provided the ends of sheared bars are reshaped after shearing and all slag is removed from the ends of flame cut bars by chipping and wire brushing prior to splicing. Clean surfaces to be enclosed within a splice sleeve or coupling by wire brushing or other approved method prior to splicing.
Make splices using manufacturer's standard jigs, clamps, ignition devices and other required accessories. Longitudinally stagger tension splices of number 14 or smaller bar a minimum of 5 feet or as otherwise indicated so that no more than half of the bars are spliced at any one section.
Longitudinally stagger tension splices of number 18 bars a minimum of 5 feet so that no more than 1/3 of the bars are spliced at any one section.
3.2 DOWEL INSTALLATION
Install dowels in slabs on grade at locations indicated and at right angles to joint being doweled. Accurately position and align dowels parallel to the finished concrete surface before concrete placement.
Rigidly support dowels during concrete placement. Coat one end of dowels with a bond breaker.
Install plate dowels according to the manufacturer's recommendations.
3.3 FIELD TESTS AND INSPECTIONS
3.3.1 Identification of Splices
Establish and maintain an approved method of identification of all field butt-splices which will indicate the splicer and the number assigned each splice made by the splicer.
3.3.2 Examining, Testing, and Correcting
Perform the following during the butt-splicing operations as specified and as directed:
3.3.2.1 Visual Examination
Visually examine all welded splices as required by AWS D1.4/D1.4M .
Respliced connections resulting from correction of visual defects may be examined by non-destructive testing at the option of the Contracting
SECTION 03 20 00.00 10 Page 5
Officer as specified in paragraph SUPPLEMENTAL EXAMINATION. Visually examine exothermic mechanical butt-splices to determine if the filler metal is clearly visible at the tap holes and completely fills the sleeves at both ends except for spaces of not more than 3/8 inch occupied by packing.
3.3.2.2 Tension Tests
Perform tensions tests to 90 percent of the minimum specified ultimate tensile strength of the spliced bars or to destruction on one test specimen made in the field for every 25 splices made. Test specimens must be made by the splicers engaged in the work, using the approved splicing procedure and the same size bars placed in the same relative position, and under the same conditions as those in the groups represented by the specimens. Furnish stress-strain curves for each butt-splice tested.
3.3.2.3 Correction of Deficiencies
Do not embed splice in concrete until satisfactory results of visual examination and the required tests or examinations have been obtained.
Remove all splices having visible defects or represented by test specimens which do not satisfy the tests or examinations. If any of the tension test specimens fail to meet the strength requirements or deformation limitations cut out two production splices from the same lot represented by the test specimens which failed and tension test. If both of the retests pass the strength requirements and deformation limitations all of the splices in the lot will be accepted. If one or both of the retests fail to meet the strength requirements or deformation limitations all of the splices in the lot will be rejected. Cut off the bars of rejected splices outside the splice zone of weld metal, filler metal contact, coupling or sleeve. Finish the cut ends as specified, resplice and reinspect the joints.
3.3.2.4 Supplemental Examination
The Contracting Officer may require additional or supplemental non-destructive testing and/or tension test of any completed splice. For costs of such examinations and tests see paragraph UNIT PRICES.
SECTION 03 20 00.00 10 Page 6
SECTION 03 30 00.00 10
CAST-IN-PLACE CONCRETE
05/14
PART 1 GENERAL
1.1 LUMP SUM CONTRACT
Under this type of contract, concrete items will be paid for by lump sum and will not be measured. The work covered by these items consists of furnishing all concrete materials, reinforcement, miscellaneous embedded materials, and equipment, and performing all labor for the forming, manufacture, transporting, placing, finishing, curing, and protection of concrete in these structures.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)
ACI 117 (2010; Errata 2011) Specifications for Tolerances for Concrete Construction and Materials and Commentary
ACI 121R (2008) Guide for Concrete Construction Quality Systems in Conformance with ISO
ACI 211.1 (1991; R 2009) Standard Practice for Selecting Proportions for Normal, Heavyweight and Mass Concrete
ACI 214R (2011) Evaluation of Strength Test Results of Concrete
ACI 301 (2016) Specifications for Structural Concrete
ACI 304.2R (2017) Guide to Placing Concrete by Pumping Methods
ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete
ACI 305.1 (2014) Specification for Hot Weather Concreting
ACI 306.1 (1990; R 2002) Standard Specification for Cold Weather Concreting
ACI 309R (2005) Guide for Consolidation of Concrete
ACI 318 (2014; Errata 1-2 2014; Errata 3-5 2015;
SECTION 03 30 00.00 10 Page 1
Errata 6 2016; Errata 7-9 2017) Building Code Requirements for Structural Concrete (ACI 318-14) and Commentary (ACI 318R-14)
ACI SP-15 (2011) Field Reference Manual: Standard Specifications for Structural Concrete ACI 301-05 with Selected ACI References
ASTM INTERNATIONAL (ASTM)
ASTM C1017/C1017M (2013; E 2015) Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete
ASTM C1064/C1064M (2017) Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
ASTM C1077 (2017) Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation
ASTM C1107/C1107M (2014a) Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink)
ASTM C1260 (2014) Standard Test Method for Potential Alkali Reactivity of Aggregates (Mortar-Bar Method)
ASTM C136/C136M (2014) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates
ASTM C143/C143M (2015) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C150/C150M (2018) Standard Specification for Portland Cement
ASTM C1567 (2013) Standard Test Method for Potential Alkali-Silica Reactivity of Combinations of Cementitious Materials and Aggregate (Accelerated Mortar-Bar Method)
ASTM C1602/C1602M (2012) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete
ASTM C172/C172M (2017) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C192/C192M (2016a) Standard Practice for Making and Curing Concrete Test Specimens in the Laboratory
ASTM C231/C231M (2017a) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
SECTION 03 30 00.00 10 Page 2
ASTM C260/C260M (2010a; R 2016) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C309 (2011) Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete
ASTM C31/C31M (2018b) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C311/C311M (2017) Standard Test Methods for Sampling and Testing Fly Ash or Natural Pozzolans for Use in Portland-Cement Concrete
ASTM C33/C33M (2016) Standard Specification for Concrete Aggregates
ASTM C39/C39M (2017b) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C42/C42M (2013) Standard Test Method for Obtaining and Testing Drilled Cores and Sawed Beams of Concrete
ASTM C494/C494M (2017) Standard Specification…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .