Attch 8 ACP East Geotech Report.pdf

PDF 5 MB Posted

Attached to
Construct Access Control Points Fort Indiantown Gap Federal contract opportunity
Solicitation number
W912KC21B0002
Issued by
Department of the Army Pennsylvania Army National Guard

About this file

This invitation for bid solicits proposals to construct two Access Control Points at Fort Indiantown Gap in Pennsylvania. The requirement includes constructing gate structures with canopies, a Visitor Control Center, vehicle inspection areas, gatehouses, ID check stations, and perimeter fencing around 25% of the base. Active and passive security systems must also be provided, such as ballistic protection, security cameras, barriers, and communications equipment. This is a 100% small business set-aside with a NAICS code of 237310 and size standard of $39.5 million. The period of performance is 490 calendar days from notice to proceed. The project value is estimated between $10-25 million. A mandatory site visit will be held on August 10, 2021 and questions must be submitted in writing via amendment. The contract will be awarded to the lowest bid that can fulfill designated additive alternates within available funds as announced at bid opening.

View the file

Other files for this federal contract opportunity

Other files attached to Construct Access Control Points Fort Indiantown Gap, newest first.
File Type Posted
Bid Opening Sign In W912KC21B0002.pdf PDF
OF 1419 Bid Abstract W912KC21B0002 signed.pdf PDF
W912KC21B00020002 Amendment 0002.pdf PDF
Attach 15 3A-402_Addendum.pdf PDF
Attach 14 0a-506_Addendum.pdf PDF
Attach 13 Preaward RFIs W912KC21B0002.pdf PDF
W912KC21B0002_0001 Amendment 1.pdf PDF
Attch 6_Deletions of Funcks Utility Lines 1C_128_129 (1).pdf PDF
Attch 9_SF24.pdf PDF
Attch 2_ACP Specifications_Vol2_FTIG_ACP.pdf PDF
Attch 1_ACP Specifications_Vol1_DIV-1_10-28-20.pdf PDF
Attch 12 Addendum FTIG ACPs.pdf PDF
Attch 11_SF25A.pdf PDF
Attch 3 ACP Specifications_Vol3_FTIG_ACP.pdf PDF
IFB W912KC21B0002.pdf PDF
Attch 10_SF25.pdf PDF
Attch 7_FTIG_WestACP_Geotech.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix D Photographs

East Access Control Point Project Phase I Bog Turtle Habitat Survey Report

Quarterm aster Road

Quarterm aster Road

Lackaw anna Street

O'Neil Street

Hawkins Road

Spruce Street

Coulter Road Hawkins Road

1st Street

A Stree t

UNT to Qureg Run

Q ureg Run

0 rrr rrr

S.R. 4020 (Fisher Avenue)

2 1

Wetland A

Wetland B

Wetland C

Wetland D

Wetland E

Wetland F

Figure 4 Phase 1 Bog Turtle Habitat Survey

East Access Control Point Project Fort Indiantown Gap, Lebanon County, Pennsylvania

\\a dm ch fs

1\ da ta \G

IS

\P ro je ct s\

P

\G

IS

\M

X D

\T E

\F ig

4_ P ha se

IS

ur ve y_

B T.

m xd

J an ua ry

2, a gr ov e

Imagery Source: USDA FSA NAIP. Aerial Data: 5/22/2015Imagery Source: USDA FSA NAIP. Aerial Data: 5/22/2015 0 150

Feet

Project Study Area

300-Foot Bog Turtle Buffer Stream

· Photograph LocationApproximate Wetland

Proposed filter sock location due to existing impervious surface

Proposed Supersilt fence and protective fence location

Proposed filter sock location due to existing impervious surface

Fort Indian Town Gap 100% Design Submittal East Access Control Point June 8, 2018 Contract # W912DR-17-D-0014/W912DR17F0416

Appendix D– Geotechnical Report & Pavement Design

Calculations

File details come from the government source that posted it. Updated .