About this file

Amendment 0001

View the file

Other files

File Type Posted
25_00_00_Integrated_Automation.pdf PDF
VM_Shop_Addendum_5.pdf PDF
W912KC-15-B-0001-0005.pdf PDF
W912KC-15-B-0001-0004.pdf PDF
G001_Addendum4.pdf PDF
C505_Addendum4.pdf PDF
VM_Shop_Addendum_4.pdf PDF
W912KC-15-B-0001-0003.pdf PDF
W912KC-15-B-0001-0002.pdf PDF
VM_Shop_Addendum_3.pdf PDF
VM_Shop_Redesign_Scope_Reduction_Items.pdf PDF
02_41_00_Building_Demolition.pdf PDF
VM_Shop_Addendum_2.pdf PDF
G001_Addendum1.pdf PDF
VM_Shop_Full_Size_Drawings.pdf PDF
VM_Shop_Specifications_Volume_II.pdf PDF
VM_Shop_Specifications_Volume_I.pdf PDF
W912KC-B-0001.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F7AG0A5135A002

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. This Amendment is being generated to issue Addendum 3 and Q&A doucment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Aug-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912KC-15-B-0001

X 9B. DATED (SEE ITEM 11)

29-Jul-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Aug-2015

CODE

USPFO FOR PENNSYLVANIA

ATTENTION: DEPT OF MILITARY AND VETERANS AFF

: P & C, RM#242,

FORT INDIANTOWN GAP PA 17003-5003

W912KC 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912KC-15-B-0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

Q&A

Questions & Answers for RFP W912KC-15-B-0001 Dated: 25 August 2015

Q – “Stone is labeled around the building on sheet C101 but there is no way to determine the extent of the stone required. Please provide a plan that clearly indicates the extend of stone required.

A – Stone is to be placed in all areas re-graded (disturbed) within the fence line and drives outside the fence line. See C102 and C103 for potential grading limits.

Q – “Stone” is labeled around the building on sheet C101 but there is no detail or description of the stone. Please provide a detail or description that shows the required thickness and type of stone.

A – All new stone areas and disturbed existing stone areas to be covered with 8” 2A aggregate.

Q – Are all windows part of Additive Bid Item #2?

A – Yes, all windows are Window Type “W1” Q – Is the entire sprinkler system for the new additional and existing building as show on FP101 part of Additive Bid Item #7?

A – No. Sprinkler system for both new addition and existing building is a base bid item.

Q – Are liner panels required for this building?

A – Yes, Liner panels were specifically requested by the Government.

Q – C 507 underground basin details call for the stone to be wrapped in Geotextile Fabric. Is there a more specific specification or will any geotextile fabric do?

A – Geotextile should be Class 4, Type A.

Q – Storm sewer profile C 302 shows CB-5 as proposed. Plan view C 102 & C 507 shows CB-5 as existing. Please clarify.

A – Assume CB-5 is existing Q – CB-10 on profile C 302 Top 426.30 invert 419.70. CB-10 on detail C 507 top

426.40 Invert 420.40. Please clarify.

A – Top = 426.30, Inv = 419.70

W912KC-15-B-0001

Q – The erosion control plan looks as though it was designed to include option 6.

Will the 18” filter fence be required in this area if option 6 is not used?

A – Plan was approved for the entire potential project. The contractor will only be responsible to install any necessary measures to control erosion within the final work area.

Q – Civil dwg. C 101 has “STONE” labeled several places. Other than the details for the underground detention basins, that show 8” of 2A cover over the basins, I don’t see a detail for stone anywhere else. Also Bid option #6 is the same and looks like STONE on the 2:1 slope. Can this be clarified with a detail (type, depth etc.) and the limits of the areas that require “STONE” A – All new stone areas and disturbed existing stone areas to be covered with 8” 2A aggregate. Stone is to be placed in all re-graded areas (disturbed) within the fence line and drives outside the fence line. See C102 and C103 for potential grading limits.

Q – New 6” water main is to connect to existing water main. What size and type of pipe is the existing water main?

A – Based on available information the existing water line appears to be 12” cast iron line.

Q – Would you please confirm the due date and time for response for FBO – Y Construction of a 6085 square foot single-story addition, site work, utilities and demolition of existing building on site. FBO website says September 8, 2015 and the SF 1440 says September 1, 2015. If the due date is indeed September 1, 2015 can we3 respectfully request and extension of September 8, 2016 and should response be mailed or e-mailed.

A – The SF 1442 is the official solicitation and the date of the bid opening is September 1, 2015 @ 1030 am. The bid opening for this project will not be extended. This is a public bid opening and bids shall be hand carried or mailed overnight. All packages shall be received prior to 10:30 a. otherwise they will be deemed late and will not be opened.

(End of Summary of Changes)