VM_Shop_Redesign_Scope_Reduction_Items.pdf

PDF 21 KB Posted

Attached to
Construction of a 6085 square foot single-story addition, site work, utilities, and demolition of existing building on site.
Solicitation number
W912KC-15-B-0001
Issued by

About this file

Vehicle Maintenance Redesign Scope Reduction Items

View the file

Other files

File Type Posted
25_00_00_Integrated_Automation.pdf PDF
VM_Shop_Addendum_5.pdf PDF
W912KC-15-B-0001-0005.pdf PDF
W912KC-15-B-0001-0004.pdf PDF
G001_Addendum4.pdf PDF
C505_Addendum4.pdf PDF
VM_Shop_Addendum_4.pdf PDF
W912KC-15-B-0001-0003.pdf PDF
W912KC-15-B-0001-0002.pdf PDF
VM_Shop_Addendum_3.pdf PDF
W912KC-15-B-0001-0001.pdf PDF
02_41_00_Building_Demolition.pdf PDF
VM_Shop_Addendum_2.pdf PDF
G001_Addendum1.pdf PDF
VM_Shop_Full_Size_Drawings.pdf PDF
VM_Shop_Specifications_Volume_II.pdf PDF
VM_Shop_Specifications_Volume_I.pdf PDF
W912KC-B-0001.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LKLW959716

Consolidate Vehicle Maintenance Function

Redesign Scope Reduction Items

Civil

‐ Reduced drive aisle and land excavation east of addition ‐ Reduce concrete pads at exterior overhead doors from 15’ length to 10’ length

Architectural

‐ Reduction in overall PEB volume ‐ Reduction from 12” to 8” CMIU at exterior walls ‐ In office area replace masonry walls with light gage partitions ‐ Reduction in Fuel Vehicle Bay area and overhead door size ‐ Removal of all translucent panels from project ‐ Removal of ceiling in Administration area ‐ Removal of full height masonry wall on south façade of shop addition ‐ Removal of high end finishes in office areas

Structural

‐ Removal of steel joists and concrete deck over office area ‐ Reduced amount of miscellaneous steel required for project

Mechanical

‐ Removal of radiant heating system ‐ Remove energy recovery unit and replace with direct fired heating and ventilating unit ‐ Delete the building automation system and replace with local unit controls

Plumbing

‐ No change

Fire Protection

‐ Fire suppression of existing building 1-44 as Bid Option

Electrical

‐ Removal of floor boxes ‐ Surface mounted boxes and conduits at all masonry locations