LKLW959716
Consolidate Vehicle Maintenance Function
Redesign Scope Reduction Items
Civil
‐ Reduced drive aisle and land excavation east of addition ‐ Reduce concrete pads at exterior overhead doors from 15’ length to 10’ length
Architectural
‐ Reduction in overall PEB volume ‐ Reduction from 12” to 8” CMIU at exterior walls ‐ In office area replace masonry walls with light gage partitions ‐ Reduction in Fuel Vehicle Bay area and overhead door size ‐ Removal of all translucent panels from project ‐ Removal of ceiling in Administration area ‐ Removal of full height masonry wall on south façade of shop addition ‐ Removal of high end finishes in office areas
Structural
‐ Removal of steel joists and concrete deck over office area ‐ Reduced amount of miscellaneous steel required for project
Mechanical
‐ Removal of radiant heating system ‐ Remove energy recovery unit and replace with direct fired heating and ventilating unit ‐ Delete the building automation system and replace with local unit controls
Plumbing
‐ No change
Fire Protection
‐ Fire suppression of existing building 1-44 as Bid Option
Electrical
‐ Removal of floor boxes ‐ Surface mounted boxes and conduits at all masonry locations