About this file

Vehicle Maintenance Specifications Volume II

View the file

Other files

File Type Posted
25_00_00_Integrated_Automation.pdf PDF
VM_Shop_Addendum_5.pdf PDF
W912KC-15-B-0001-0005.pdf PDF
W912KC-15-B-0001-0004.pdf PDF
G001_Addendum4.pdf PDF
C505_Addendum4.pdf PDF
VM_Shop_Addendum_4.pdf PDF
W912KC-15-B-0001-0003.pdf PDF
W912KC-15-B-0001-0002.pdf PDF
VM_Shop_Addendum_3.pdf PDF
W912KC-15-B-0001-0001.pdf PDF
VM_Shop_Redesign_Scope_Reduction_Items.pdf PDF
02_41_00_Building_Demolition.pdf PDF
VM_Shop_Addendum_2.pdf PDF
G001_Addendum1.pdf PDF
VM_Shop_Full_Size_Drawings.pdf PDF
VM_Shop_Specifications_Volume_I.pdf PDF
W912KC-B-0001.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pennsylvania Air National Guard, 193d RSG Project No. LKLW959716

CONSOLIDATE VEHICLE MAINTENANCE FUNCTION 5/1/2015

VOLUME II - TABLE OF CONTENTS

NOTE: This Project Manual is arranged in the nationally recognized Construction Specification Institute Format (CSI). However, only the applicable Sections of certain Divisions are included which results in the section numbering not being consecutive.

DIVISION 21 – FIRE SUPPRESSION

21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION

21 13 00 FIRE SUPPRESSION SPRINKLER SYSTEMS

DIVISION 22 – PLUMBING

22 11 13 FACILITY WATER DISTRIBUTION

22 13 16 SANITARY WASTE AND VENT PIPING

22 30 00 PLUMBING FIXTURES AND EQUIPMENT

DIVISION 23 – HEATING VENTILATION AND AIR CONDITIONING

23 05 00 BASIC MECHANICAL MATERIALS AND METHODS

23 05 29 HANGERS AND SUPPORTS

23 05 63 MECHANICAL IDENTIFICATION

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 MECHANICAL INSULATION

23 09 33 ELECTRIC AND ELECTRONIC CONTROL SYSTEMS

23 11 23 FACILITY NATURAL GAS PIPING

23 30 00 HVAC AIR DISTRIBUTION

23 34 00 HVAC FANS

23 54 00 FURNACES

23 73 00 INDOOR CENTRAL STATION AIR HANDLING UNITS

23 82 29 ELECTRIC HEATERS

DIVISION 25 – INTEGRATED AUTOMATION

25 90 00 SEQUENCE OF OPERATION

DIVISION 26 – ELECTRICAL

26 05 00 COMMON WORK RESULTS FOR ELECTRICAL

26 05 03 EQUIPMENT WIRING CONNECTIONS

26 05 13 MEDIUM VOLTAGE CABLES

26 05 19 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES

26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

26 05 28 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

26 05 33.13 CONDUITS FOR ELECTRICAL SYSTEMS

26 05 33.23 BOXES FOR ELECTRICAL SYSTEMS

26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS

26 05 63 ACCEPTANCE TESTING OF ELECTRICAL SYSTEMS

26 12 19 PAD MOUNTED TRANSFORMERS

26 24 16 PANELBOARDS

26 24 19 ENCLOSED CONTROLLERS

26 27 26 WIRING DEVICES

26 28 16.13 LOW-VOLTAGE ENCLOSED SWITCHES

26 28 16.19 LOW-VOLTAGE ENCLOSED CIRCUIT BREAKERS

26 41 13 LIGHTNING PROTECTION FOR STRUCTURES

26 43 13 SURGE PROTECTIVE DEVICES FOR LOW-VOLTAGE ELECTRICAL

POWER CIRCUITS

26 50 00 LIGHTING

VOLUME II - TABLE OF CONTENTS TOC - 1

DIVISION 27 – COMMUNICATIONS

27 00 00 COMMUNICATIONS

27 51 16 PUBLIC ADDRESS SYSTEM

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 31 00 FIRE DETECTION AND ALARM

DIVISION 31 – EARTHWORK

31 10 00 SITE CLEARING

31 20 00 EARTHWORK (UNCLASSIFIED)

31 22 00 GRADING

31 22 19 FINISH GRADING

31 23 33 TRENCHING FOR SITE UTILITIES

31 25 00 EROSION AND SEDIMENT CONTROL

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 12 16 ASPHALT PAVING

32 31 00 CHAIN LINK FENCES AND GATES

32 91 19 TOPSOIL

32 92 00 SEEDING AND SOIL SUPPLEMENTS

DIVISION 33 – UTILITIES

33 11 16 SITE WATER DISTRIBUTION PIPING

33 13 00 DISINFECTION OF WATER DISTRIBUTION SYSTEM

33 31 00 SITE SANITARY UTILITY SEWERAGE PIPING

33 40 00 STORM DRAINAGE

33 49 13 MANHOLES, FRAMES, AND COVERS

33 51 00 NATURAL GAS DISTRIBUTION

33 71 19 ELECTRICAL UNDERGROUND DUCTS AND MANHOLES

33 71 73 ELECTRICAL UTILITY SERVICES

DIVISION 41 – MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 19.13 MONORAIL AND HOIST

VOLUME II - TABLE OF CONTENTS TOC - 2

SECTION 21 05 00

COMMON WORK RESULTS FOR FIRE SUPPRESSION

PART 1 GENERAL

1.01 SUMMARY

A. Section Includes:

1. Specialty Valves

2. Fire Protection Piping Underground

3. Fire Protection Piping Above Ground

B. Sprinkler Systems¨ Conforming to NFPA 13 Standards

C. Related Sections:

1. Trenching: Section 31 23 33.

2. Concrete: Section 03 30 00

3. Painting: 09 90 00

4. Fire Suppression Sprinkler Systems: Section 21 13 00.

5. Hangers and Supports: Section 23 05 29.

6. Testing, Adjusting, and Balancing: Section 23 05 93.

1.02 REFERENCES

A. American National Standards Institute (ANSI):

1. ANSI A21.4; Cement-Mortar Lining for Ductile-Iron and Gray-Iron Pipe and

Fittings for Water.

2. ANSI A21.10; Ductile-Iron and Gray-Iron Fittings, 3 through 48 in, for

Water and Other Liquids.

3. ANSI A21.11; Rubber Gasket Joints for Ductile-Iron and Gray-Iron

Pressure Pipe and Fittings.

4. ANSI A21.50; Thickness Design of Ductile-Iron Pipe.

5. ANSI A21.51; Ductile-Iron Pipe, Centrifugally Cast, in Metal Molds or

Sand-Lined Molds for Water or Other Liquids.

6. ANSI B16.1; Cast Iron Pipe Flanges and Flanged Fittings, Class 25, 125, 250 and 800.

7. ANSI B16.4; Cast Iron Threaded Fittings Class 125 and 250 lb.

8. ANSI B16.21; Nonmetallic Flat Gaskets for Pipe Flanges.

9. ANSI B18.2.1; Square and Hex Bolts and Screws Inch Series Including

Hex Cap Screws, and Lag Screws.

10. ANSI B18.2.2; Square and Hex Nuts.

B. American Society for Testing and Materials (ASTM):

1. ASTM A 47; Specification for Malleable Iron Castings.

2. ASTM A 53; Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-

Coated Welded and Seamless.

3. ASTM A 135; Specification for Electrical Resistance Welded Steel Pipe

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 1

4. ASTM A 183; Specification for Heat-Treated Carbon Steel Track Bolts and Nuts.

5. ASTM A 126; Specification for Gray Iron Castings for Valves, Flanges and Pipe Fittings.

6. ASTM A 307; Specification for Carbon Steel Externally Threaded Standard Fasteners.

7. ASTM A 500; Standard Specification for cold-formed welded and seamless carbon steel structural tubing in rounds and shapes.

8. ASTM A 536; Specification for Ductile Iron Castings.

9. ASTM A 795; Specification for Black and Hot-Dipped Zinc-Coated

(Galvanized) Welded and Seamless Steel Pipe for Fire Protection Use.

10. ASTM B 62; Specification for Composition Bronze or Ounce Metal

Castings.

11. ASTM D 2000; Classification for Rubber Products in Automotive

Applications.

12. American Water Works Association (AWWA).

13. Factory Mutual (FM) Approvals shall govern the quality and performance of certain Products as specified herein.

C. The National Fire Protection Association (NFPA):

1. NFPA No. 13: (Latest Edition) Standard for the Installation of Sprinkler

Systems.

2. NFPA No. 24 (Latest Edition) Standard for Installation of Private Fire

Service Mains and Their Appurtenances.

3. NFPA No. 30, Flammable and combustible liquids code.

4. NFPA No. 101 Life Safety Code.

D. Underwriters' Laboratories, Inc. (UL)

1. UL 262 Gate Valves For Fire Protection Service.

2. UL 312 Check Valves For Fire Protection Service.

E. American Society of Sanitary Engineering, Standards:

1. ASSE 1015; Performance Requirements for Double Check Backflow

Prevention Assemblies and Double Check Fire Protection Backflow.

1.03 SUBMITTALS

A. Product Data: Submittals required for the following items:

1. Pipe Specialties

2. Valves.

3. Mechanical Pipe Couplings.

4. Pipe and Fittings.

B. Shop Drawings:

1. Plans: Installation layouts; indicating pipe sizes and internal dynameters, pipe materials and valve locations and sizes.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 2

2. Elevations: Riser diagrams; indicate pipe materials, pipe sizes and valve locations and sizes.

3. Details and Schedules: Indicating the following:

a. Jointing methods and piping connections

b. Floor and wall penetrations

c. Mounting and support details

C. Operation and Maintenance Manual

1. Include the following:

a. Product data

b. Product installation instructions

c. Maintenance requirements

d. Spare parts lists

e. Copies of the “Contractors Material and Test Certificates”

f. Copy of NFPA No. 24: Standard for the Inspection, Testing and

Maintenance of Water Based Fire Protection Systems

1.04 QUALITY ASSURANCE

A. Manufacturers’ Qualifications: Minimum three (3) years of documented experience producing products of the types specified in this section.

B. Installer Qualifications:

1. The fire protection system installer performing the fire protection system work of this project shall be an acceptable, qualified installer of the types specified, with a minimum of five (5) years of documented experience.

2. Such installer shall submit evidence of such acceptability in the Submittals submission.

C. The contractor shall install and test the fire protection systems in accordance with the latest editions of the following Standards:

1. NFPA No. 13: Installation of Sprinkler Systems.

2. NFPA No. 30: Flammable and Combustible Liquids Code.

3. NFPA No. 101 Life Safety Code.

D. The contractor shall provide fire protection products in accordance with UL Standards; provide UL label on each product.

E. The contractor shall provide fire protection products and installations in accordance with Factory Mutual (FM) Standards.

F. All products shall be listed for fire protection service.

1. Submit completed and signed copies of “Contractors Material and Test

Certificates” the Contracting Officer.

G. The fire protection systems shall be in conformance with all Federal, State, and Local requirements.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 3

H. Hydraulic Design Information Sign: Contractor shall identify a hydraulically designed sprinkler system with a permanently marked weatherproof metal or rigid plastic sign secured with corrosion resistant wire or chain. Sign shall be placed at the alarm valve or deluge valve supplying the corresponding hydraulically designed area. The sign shall include the following information:

1. Location of the design area or areas

2. Discharge densities over the design area or areas

3. Required flow and residual pressure demand at the base of the riser

4. Occupancy classification or commodity classification and maximum storage height and configuration

5. Hose stream demand included in addition to the sprinkler demand

1.05 SEQUENCING/SCHEDULING

A. Interferences: Proposed locations and relationship of work under this Section of Specifications shall be coordinated with the proposed locations and relationship of work of other trades.

B. The Contract Drawings do not show the locations of branch lines. The Contractor shall be responsible for modifying the work with offsets, bends or other fittings to avoid minor interferences and structural obstruction. Such modifications shall be accomplished at no additional cost to the Contracting Officer.

C. In cases where interferences develop which may required necessary relocation of other trades work, the Contracting Officer shall decide, which work is to be relocated regardless of which was proposed to be or actually installed first.

1.06 DELIVERY, STORAGE AND HANDLING

A. Packing, Shipping, Handling and Unloading:

1. Provide temporary protective coating on cast iron and steel valves.

2. Provide temporary end closures on fittings.

3. Pack valves in shipping containers with labels in place.

B. Storage and Protection:

1. Store valves in shipping containers until installation.

2. Maintain temporary end closures on fittings in place until installation.

PART 2 PRODUCTS

2.01 SPECIALTY VALVES

A. Acceptable Manufacturers (Test and Drain Valve):

1. Guardian Fire Equipment

2. Potter – Roemer

3. Or Approved Equal

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 4

B. Test and Drain Valve: Designed to test water flow through the sprinkler system. Brass body, three-position ball valve (Off – Test – Drain), integral site glass, ½-inch restricted orifice for test position, FM approved. Model 9250

C. Acceptable Manufacturers (Hose End Gate Valve):

1. Standard Fire Equipment Division Zurn Company; No. 281 with No. 130-2-

1/2 x 1-1/2 inch Reducer and No. 126 Cap/Chain.

2. Kennedy Valve Manufacturing Co., Inc.

3. Jenkins Corporation.

4. Or Approved Equal

D. Hose End Gate Valve: Solid cast brass construction, UL Listed and FM Approved 175 pound cold water non-shock, non-rising stem and inside screw with solid wedge disc; rough brass finish.

E. Acceptable Manufacturers (Swing Check Valve):

1. Viking Corporation; Model D-1.

2. ITT Grinnell Corporation.

3. Stockham.

4. Or Approved Equal

F. Swing Check Valve (At Siamese Fitting): Ductile iron with EPDM rubber faced, Teflon coated steel clapper; UL Listed and FM Approved, 250 pound cold water working pressure designed for vertical or horizontal installation, grounded or flanged inlet and outlet.

G. Acceptable Manufacturers (Backflow Preventer):

1. Watts Regulator Company

2. Zurn-Wilkins

3. Or Approved Equal

H. Backflow Preventer (Fire Protection): Double check valve 2-1/2-inch to 10-inch): Flanged type, FDA approved epoxy coated, cast iron body construction, double check valve design, bronze check seats and bronze ball valve test cocks. Unit suitable for continuous operating pressure of 175 psi and operating temperatures up to 110 degrees F.; Series 709 OS&Y-S

1. Equipped with bronze strainer, FM/UL resilient seated OS&Y gate valves and ball type test cocks. Can be installed horizontally or vertically.

2. Approved under ASSE Standard 1015.

2.02 FIRE PROTECTION PIPING SYSTEM, UNDERGROUND OUTSIDE

STRUCTURE AND UNDER ON-GRADE STRUCTURE SLAB.

A. Service Requirements:

1. Fire Protection Service: Maximum operating temperature of 100 degrees

F and a maximum operating pressure of 100 psig or pressure and temperature available at the main.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 5

2. Fire Protection Loop: Maximum operating temperature of 100 degrees F and a maximum operating pressure of 100 psig or pressure and temperature available at the main.

B. Pipe: Cement Lined Ductile Cast Iron Class 50 ANSI A21.50, ANSI A21.51 and ANSI A21.4.; 3-inch and larger.

1. Joints: Push-On Gasket ANSI A21.11, or Mechanical Gasket ANSI

A21.11. (Mixture of joint types not acceptable.)

2. Fittings: Cement Lined Gray Iron or Ductile Iron Class 250 ANSI A21.10 and ANSI A21.4, Push-On Gasket or Mechanical Gasket.

3. Gaskets: Styrene Butadiene Rubber (approx. 85 durometer hard.) ANSI

A21.11.

4. Bolts: Carbon Steel Hex Bolts and Nuts ASTM A 307 Grade B and ANSI

B18.2.1 and ANSI B18.2.2.

2.03 FIRE PROTECTION PIPING, ABOVE GRADE INSIDE STRUCTURE

A. Service Requirements:

B. Wet-pipe and Pre-Action System: Maximum operating temperature of 100 degrees F. and a maximum operating pressure of 100 psig.

C. Inspectors Test Connection: Maximum operating temperature of 100 degrees F and a maximum operating pressure of 100 psig.

D. Pipe: Black Steel ASTM A 53, Schedule 40, nominal size 2-inch and smaller.

UL listed for fire sprinkler applications with rated working pressure of 300 psi.

1. Joints: Threaded.

2. Nipples: Same as Pipe.

3. Fittings: Black Cast Iron 125 lb. Standard ANSI B16.4, UL Listed.

4. Thread Lubricant: Graphite/Oil Compound or Polytetrafluoroethylene

(PTFE) Tape. On Male Threads ONLY.

E. Valves and Accessories

1. Acceptable Manufacturers:

a. Nibco

b. Apollo

c. Watts

d. Or Approved Equal

2. Gate Valves: Meeting UL 262, working pressure 175 pis

a. Valve Identification: Bearing UL label or marking verifying compliance to UL 262; manufacturer’s name and valve working pressure rating marked on valve.

b. Construction: Bronze body, bronze trim and solid wedge, rising stem, handwheel inside screw, threaded ends.

3. Check Valves: Meeting UL312, working pressure 175 psi.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 6

a. Valve Identification: Bearing UL label or marking verifying compliance to UL312; manufacturer’s name and valve working pressure rating marked on valve body.

b. Construction: Bronze body, bronze trim, bronze swing disc, rubber seat, threaded ends for steel or iron pipe connections, ends prepared for sloder jointing to copper tubing or pipe.

4. Drain Valve: Working pressure 175 psi.

a. Valve Identification: Bearing UL label or marking; manufacturer’s name and valve working pressure rating marked on valve body.

b. Construction: Bronze body, screw-in bonnet, integral seat, threaded ends.

F. Pipe: Black Steel ASTM A 53, Schedule 40, UL listed for fire sprinkler applications, with rated working pressure of 300 psi, nominal size 2 ½-inches up to 4-inches.

1. Joints: Threaded.

2. Nipples: Same as Pipe except Schedule 80.

3. Fittings: Black Cast Iron 125 lb. Standard ANSI B16.4, UL Listed.

4. Flanges and Flanged Fittings: Class 125 Cast Iron ANSI B16.1, UL

Listed.

5. Gaskets: 1/8 in. Thick Cloth-inserted Rubber (Non-Metallic) ANSI B16.21.

6. Bolts: Carbon Steel Hex Bolts and Nuts ASTM A 307 Grade B and ANSI

B18.2.1 and ANSI B18.2.2.

7. Thread Lubricant: Graphite/Oil Compound or

Polytetrafluoroethylene (PTFE) Tape. On Male Threads ONLY.

G. Valves and Accessories:

1. Acceptable Manufacturers:

a. Nibco

b. Apollo

c. Watts

d. Or Approved Equal

2. Gate Valves: Meeting UL 262, working pressure 175 psi

a. Valve Identification: Bearing UL label or marking verifying compliance to UL 262; manufacturer’s name and valve working pressure rating.

b. Construction: Iron body, bronze trim, rising stem pre-grooved for tamper switch; handwheel; OS&Y; solid rubber covered bronze or cast iron double wedge; threaded or grooved ends for indicated pipe connections.

3. Check Valves: Meeting UL 312, working pressure 175 psi.

a. Valve Identification: Bearing UL label or marking verifying compliance to UL 312; manufacturer’s name and valve working pressure rating.

b. Construction: Iron body, bronze trim, swing check, replaceable rubber disc and seat; automatic ball check; flanged ends for indicated pipe connections.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 7

PART 3 EXECUTION

3.01 PREPARATION

A. Field Measurement: The Drawings are in general indicative of the Work, with symbols and notations for clarity. However, the Drawings are not an exact representation of all conditions involved, therefore, layout piping to suit actual field measurements.

1. No extra compensation will be made for Work due to difference between indicated and actual dimensions.

2. Submit to the Contracting Officer for approval, details of proposed departures necessitated by field conditions or other causes.

B. Interferences: Layout piping systems to compensate for structural interferences, to preserve headroom, and not to interfere with openings, passageways and equipment. Do not install piping with joints and fittings over motors, switchboards, panels, or similar electrical apparatus.

3.02 PERFORMANCE

A. Perform sprinkler piping system installation in conformance with the requirements of NFPA No. 13 as directly appropriate to the work.

B. Perform underground fire line installations in conformance with the requirements of NFPA No. 24 as directly appropriate to the work.

3.03 INSTALLATION

A. The sprinkler system piping is to be provided with sway bracing.

B. General Requirements: The schematic drawings do not necessarily indicate every piping size or alignment. Provide the required pipe sizes, fittings, adapters, etc. as required to construct complete piping systems.

1. Install piping concealed in those areas of the structures having hung ceilings and exposed in all other areas, except where indicated otherwise on the Drawings.

2. Clean piping prior to installation and following installation to prepare for painting. Keep open ends of piping and pipe attachment openings on equipment capped or plugged until actual connections.

3. Construct pipe runs from full lengths of pipe using short sections only for runs of less than full pipe length. Make changes in directions of pipe runs with fittings only.

4. Cut pipe accurately to measurements established in the field and assemble in place without springing, forcing, excessive cutting or weakening of the structure.

5. Install unions and flanges in accessible locations and whether indicated or not, install union adjacent to equipment and wherever removal of equipment for repair or replacement is required.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 8

6. Provide reducing fittings where reduction in pipe sizes is necessary.

Bushings will not be accepted.

7. Install gate valves as indicated on the drawings and as required by NFPA No. 13.

8. Provide tamper switches on all valves associated with the fire suppression system.

9. Pipe Supports Installation: Place and support piping runs as specified in Section 23 05 29.

C. Exposed Piping: Install exposed piping parallel or perpendicular to the lines of the building structure and to compensate for structural interferences, to preserce headroom, and not to interfere with openings, passageways and equipment.

1. Install piping a sufficient distance from other work to permit clearance of not less than one inch between the piping or insulated piping and adjacent work.

2. Install piping as close as possible to walls, overhead construction, columns, and similar to facilitate insulating work and removal of piping later.

3. Paint exposed sprinkler piping red; refer to Section 09 90 00.

D. Buried Piping: Perform earthwork involving trenching for buried pipe runs as specified in Section 31 23 33.

1. Keep trenches dewatered until pipe joints have been made and concrete bedding and blocking, if any, have hardened. Under no circumstances lay pipe in water or on subgrade containing frost.

2. Rest each section of pipe on pipe bedding for the full length of its barrel, with recesses excavated for pipe bells so joints can easily be made.

Backfill recesses with bedding material immediately following pipe joining operations.

3. Lay pipe proceeding upgrade true to line and grades given. Lay bell and spigot pipe with bell end upgrade.

4. Take up and relay pipe that is not laid true to required alignment or grade or has its joints disturbed after laying. No deviations from the required line and grade permitted, except with approval of the Contracting Officer.

5. Reaction or Thrust Backing: Install on underground lines at trees, plugs, caps and changes in direction.

a. Use 3000 lb. (Class B) concrete placed between solid undisturbed earth and fittings to be anchored. Perform concrete work as specified in Section 03 30 00.

b. Area bearing on pipe and on the ground shall be approximately nine square feet each.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 9

3.04 PIPE JOINING

A. General Requirements: Exercise care when making pipe joints and make joints in accordance with the pipe material manufacturer's recommendations and the following additional requirements.

1. In each instance of pipe joining, those portions of pipes involved must be absolutely clean just prior to assembly.

2. If a joint is extremely difficult to assemble or is not completely sealed, disassemble the joint and correct the difficulty if possible. Remake the joint using new materials when necessary.

B. Ferrous Metal Piping Joints: Cut pipe ends square, deburr and ream to size of original bore.

1. Threaded: Cut threads to standard gauge depth and length and clean threads free of oil and cuttings. Provide thread lubricant as specified to aid in joint lubrication and sealing in joining operation.

2. Flanged: Face accurately, install gaskets and draw up square and tight to ensure full gasket flow and seal.

C. Ductile Cast Iron Pipe Joints:

1. Push-On Joints: Properly seat sealing gasket, evenly and sufficiently lubricate the spigot end of pipe, and fully enter joint until joint line is visible.

Make deflection, if required, only after the joint has been assembled properly.

3.05 FIELD QUALITY CONTROL

A. General Requirements: Conduct tests specified under Piping System Specifications so that each piping system installed in the Project is tested to the Contracting Officer's satisfaction.

1. Flush entire system in accordance with NFPA 13.

2. Provide tools, materials (including clean water), apparatus and instruments necessary for piping system testing.

3. Conduct tests of every kind in the presence of and to the satisfaction of the Contracting Officer.

4. Free piping systems of trapped air for tests involving water.

5. Perform tests involving water in the test only when there is no danger of water freezing during the test time period, and in accordance with NFPA No. 13 and NFPA 24.

6. Repair and Retest: When a piping system fails to meet test requirements specified herein, conform to the following:

a. Determine source or sources of leakage.

b. Repair or replace defective material, and if a result of improper workmanship, correct such.

c. Conduct additional tests to demonstrate that piping system meets specified test requirements.

d. Perform repair and retest work at no increase in Contract Price.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 10

7. Accuracy Proof: Furnish acceptable proof to the Contracting Officer that testing apparatus, pressure gauges, etc. have been recently checked and calibrated, as applicable, prior to use on this Project.

8. Notification: Give the Contracting Officer a minimum of three days advance notice of the times when piping system acceptance testing will be conducted.

END OF SECTION

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 05 00 - 11

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 21 13 00

FIRE SUPPRESSION SPRINKLER SYSTEMS

PART 1 GENERAL

1.01 SUMMARY

A. Section Includes:

1. Piping System Specialties

2. Sprinkler Heads and Accessories

3. Alarm Valve Stations

4. Alarm Devices

5. Fire Department Connections

B. Related Sections:

1. Paints and Coatings: Section 09 90 00.

2. Common Work Results for Fire Suppression: Section 21 05 00

3. Hangers and Supports: Section 23 05 29.

4. Mechanical Identification: Section 23 05 63.

1.02 SYSTEM DESCRIPTION

A. Sprinkler System to conform to the following criteria:

1. Coverage for entire building with the exception of the attic space.

2. Design system hydraulically to NFPA 13.

3. System performance to achieve hazard classifications as noted on the

Drawings.

1.03 REFERENCES

A. Factory Mutual (FM) Approvals shall govern the quality and performance of certain Products as specified herein.

B. The National Fire Protection Association (NFPA):

1. NFPA No. 13: (Latest Edition) Standard for the Installation of Sprinkler

Systems.

2. NFPA No. 24 (Latest Edition) Standard for Installation of Private Fire

Service Mains and Their Appurtenances.

3. NFPA 101 Life Safety Code.

C. Underwriters' Laboratories, Inc. (UL) Listings or Labels shall govern the quality and performance of certain Products as specified herein.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 1

1.04 SUBMITTALS

A. A registered professional engineer licensed to practice fire protection engineering Commonwealth of Pennsylvania must stamp the shop drawings prior to submitting the fire extinguishing system shop drawings.

B. Product Data: Submittals required for the following items:

1. Piping System Specialties.

2. Sprinkler Heads and Accessories.

3. Alarm Valve Station

4. Alarm Devices.

5. Fire Department Connections.

C. Product Data: Submit manufacturers catalog data sheet indicating rough-in sizes, finishes and accessories.

D. Submit copies, to the Contracting Officer, of Working Plans as may be required by the approving authority having jurisdiction before the fire protection system work is performed.

E. Prepare copies of Contractor's Materials and Test Certificate for the approving authorities, and the Contracting Officer. Submit for approval along with the Submittals in order to obtain prior approval to actual use.

F. Operation and Maintenance Manual:

1. Include the following:

a. Product Data Sheets

b. Product Installation Instructions

c. Maintenance Requirements

d. Spare Parts List

e. Contractor's Materials and Test Certificate

f. System Inspection Data

1.05 QUALITY ASSURANCE

A. Plans and Calculations: Construction drawings and calculations must be prepared by an individual that has obtained National Institute for Certification in Engineering Technologies (NICET), Automatic Sprinkler Systems, Level III certified or Special Hazards Suppression systems, Level IV certification in accordance with the applicable NFPA code.

B. Approval Requirement: Contractor shall submit Working Plans for approval to the Contracting Officer.

C. Installer Qualifications:

1. The fire protection system installer performing the fire protection system work of this Project shall be an acceptable, qualified installer of the fire

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 2

protection system products manufacturer, with a minimum of five (5) years of documented experience.

2. Such installer shall submit evidence of such acceptability in the Submittals submission.

D. The contractor shall provide fire protection products in accordance with UL Standards; provide UL label on each product.

E. The contractor shall provide fire protection products and installations in accordance with Factory Mutual (FM) Standards.

F. All products shall be listed for fire protection service.

G. The fire protection systems shall be in conformance with all Federal, State, and Local requirements.

H. Perform Work in accordance with:

1. Sprinkler Systems: NFPA 13.

I. Design fire suppression system under direct supervision of Professional Engineer experienced in design of this Work and licensed in State of Pennsylvania.

1.06 SEQUENCING/SCHEDULING

A. The Contractor shall coordinate the work with the Local Fire Department regarding the type of fire hose connections required for the fire department fire fighting equipment and the final location of the fire department connection.

B. Interferences: Proposed locations and relationship of work under this Section of Specifications shall be coordinated with the proposed locations and relationship of work of other trades.

C. The Contract Drawings do not show the locations of branch lines. The Contractor shall be responsible for modifying the work with offsets, bends or other fittings to avoid minor interferences and structural obstruction. Such modifications shall be accomplished at no additional cost to the Contracting Officer.

D. In cases where interferences develop which may required necessary relocation of other trades work, the Contracting Officer shall decide, which work is to be relocated regardless of which was proposed to be or actually installed first.

1.07 STORAGE AND PROTECTION

A. Store all components in shipping containers until time of installation.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 3

B. Protect all components from damage and weather.

1.08 DESIGN CRITERIA:

A. Hydraulically design automatic wet pipe and pre-action sprinkler systems based on design criteria indicated on the drawings.

B. Hose stream allowance is to be a minimum of 250 gpm.

PART 2 PRODUCTS

2.01 PIPING SYSTEM SPECIALTIES

A. Smooth Bore Outlet and Nipple: Cast brass or bronze construction; 175-pound sprinkler system fitting.

B. Ball Drip: Cast brass or bronze body, brass ball; automatic acting closing at approximately 7 to 10 psi. Rough brass finish.

2.02 SPRINKLER HEADS AND ACCESSORIES

A. Acceptable Manufacturers (Sprinkler Heads):

1. Viking Corporation.

2. Gem Sprinkler Co.

3. Star Sprinkler, Inc.

4. Or Approved Equal

B. Sprinkler Heads (Upright): UL Listed, quick response, bronze body construction, brass deflector, glass bulb, ordinary temperature classification of 155 degrees F, nominal 5.6 K-factor, ½-inch orifice, maximum 175 psi, natural brass finish; Model M Microfast.

C. Sprinkler Heads (Concealed Pendent): UL Listed, quick response, fusible link assembly, stainless steel fusible link lever, brass cover plate assembly, ordinary temperature classification of 165 degrees F, nominal 5.6 K-factor, ½-inch orifice, maximum 175 psi, painted white; Model B-2 Mirage.

D. Sprinkler Heads (Sidewall): Light hazard use only, UL Listed, quick response, bronze body construction, copper deflector, glass bulb, ordinary temperature classification of 155 degrees F, nominal 5.6 K-factor, ½-inch orifice, maximum 175 psi, chrome finish; Model M Microfast.

E. Acceptable Manufacturers (Reserve Sprinkler Cabinet and Sprinkler Guards):

1. Viking Corporation.

2. GEM Sprinkler Co.

3. Or Approved Equal

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 4

F. Reserve Sprinkler Cabinet: Cabinet construction shall conform to NFPA requirements and shall have storage capacity in accordance with NFPA No.

13 for storing spare sprinkler heads of each type installed plus a sprinkler head wrench.

G. Sprinkler Guards: For use with standard and large orifice, standard and quick response, upright and pendant style sprinklers. UL listed and FM approved.

Hard steel wire cage designed to encase and protect sprinkler, clear chromate over zinc plating. Model D-1

2.03 ALARM VALVE STATION

A. Acceptable Manufacturers:

1. Viking Corporation

2. ITT Grinnell

3. Victaulic

4. Or Approved Equal

2.04 WET TYPE ALARM VALVE STATION

A. An assembly of equipment and devices incorporating a main clapper type check valve and trim with accessories. Valve designed for operation on a variable pressure operation water supply and for horizontal or vertical installation with flanged or groove inlet and outlet; Model J-1.

B. Alarm Check Valve: Designed for 250 psi. water working pressure. Ductile iron body with bolted hand-hole, Teflon coated hot rolled steel clapper with stainless steel accessories and EPDM rubber face. Valve housing tapped for inlet and outlet pressure gauges, alarm devices and main system drain.

C. Alarm Check Valve Trim: All trim components listed for 250 psi working pressure. All piping ¾-inch or less not provided shall be galvanized steel.

Provide manufacturers standard trim package including the following:

1. Inlet and outlet pressure gauges with drain ports.

2. Alarm shut-off valve

3. Alarm test valve

4. Drain valve

5. All necessary piping, pipe nipples and fittings.

D. Retard Chamber: Ductile iron body, cast iron bushings, painted red.

Designed to compensate for variable water pressure surges or water hammer;

Model C-1.

E. Water Motor Gong (Alarm Portion of Alarm Valve Assembly): UL listed, FM approved, rated to 175 psi water working pressure. System shall include water motor alarm with inlet and outlet tapping, drive shaft, inlet strainer, closure plate and red painted exterior gong; Model F-1.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 5

F. Alarm Pressure Switch (Provide at the Alarm Valve Retard Chamber): UL listed, FM approved, adjustable between 4 and 20 psi, NEMA-4 rated, die-cast cover with red finish. Switch shall provide a signal to the fire alarm panel when the sprinkler system activates. Dual (SPDT) snap action switches, maximum system minimum service pressure rating of 250 psi, tamper resistant, ½-inch NPT male pressure connection; Model Alarm Pressure Switch.

2.05 ALARM DEVICES

A. Acceptable Manufacturers (Supervisory Tamper Switch):

1. Potter Electric Signal Co., ITT Grinnell Corporation

2. Guardian Fire Equipment, Inc.

3. Or Approved Equal

B. Supervisory (Tamper) Switch:

1. UL listed, FM approved, red baked enamel cover, j-bolt mounting, two single-pole double-throw microswitches, 120 volts. Coordinate installation with Electrical Contractor. Use with OS&Y valves. Figure 6220

C. Supervisory (Tamper) Switch:

1. UL listed, FM approved, red baked enamel, tamperproof cover with collar and mounting bracket; one single pole, single throw microswitch, 120V.

Coordinate installation with Electrical Contractor. Use with rising stem valves. Figure 6221

D. Acceptable Manufacturers (Flow Switch):

1. Potter Electric Signal Co., ITT Grinnell Corporation

2. Guardian Fire Equipment, Inc.

3. Or Approved Equal

E. Flow Switch:

1. UL listed, FM approved, red, tamper proof switch housing with flow paddle, adjustable pneumatic retard setting from 0 to 20 seconds, two single-pole, double-throw microswitches, 120 volts. Model 6200 Series

2.06 FIRE DEPARTMENT CONNECTIONS

A. Acceptable Manufacturers:

1. Guardian Fire Equipment, Inc.

2. Elkhart Brass Manufacturing Co., Inc.

3. Potter Roemer.

4. Or Approved Equal.

B. Flush Design: Design for a minimum of 250 gpm. flow per 2 ½-inch inlet, UL/FM. Cast brass body. Female hose thread swivel inlets, plugs with chains.

Two-way or three-way inlet: angle or straight pattern with integral drop clapper inlets and female NPT outlets; back, bottom or top outlet; Series 6000.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 6

C. Identification for Fire Department Connections: Cast brass construction and raised lettering. Round design. Lettering “AUTO SPRINKLER”. 6400 Series

PART 3 EXECUTION

A. Each detector shall be tested in accordance with the manufacturers recommended procedures, and test values recorded.

3.02 PERFORMANCE

A. Perform hydrant flow test prior to the submission of shop drawings. Coordinate test requirements with water company. Perform test in the presence of the water company and /or the local authority.

B. Installation Instructions: Install those Products, as specified previously under PART 2 and not specifically covered for installation herein under PART 3, in strict accordance with manufacturer's installation instructions and at locations indicated on the Drawings.

C. Provide and install all electrical wiring and conduit for a complete installation.

D. Perform sprinkler system installations in conformance with the requirements of NFPA No. 13, as directly appropriate to the work.

E. Perform underground fire line installations and components in conformance with the requirements of NFPA No. 24, as directly appropriate to the work.

F. Coordinate the installation of the fire department connection with the local fire department. Verify hose thread and style.

G. Install tamper switches on all valves associated with the fire suppression systems.

H. Test all fire suppression systems in accordance with NFPA 13 requirements.

I. Smoke detectors are to be provided and installed in adequate quantities to meet NFPA 72 requirements for sensor spacing.

3.03 INSTALLATION

A. Install fire protection piping in accordance with Section 21 05 00- Common Work Results for Fire Suppression

1. Provide UL and FM approved pipe hangers for piping system support.

Pipe hangers as specified in Section 23 05 29.

B. All system wiring shall be furnished and installed by the contractor.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 7

C. Coordinate location of sensor and equipment with the work of other trades to ensure access to the devices for maintenance.

D. All wiring shall be installed in electrical metallic tubing or conduit, and must be installed and kept separate from all other building wiring.

1. Refer to Division 26 specifications for wire and conduit material requirements.

3.04 PAINTING

A. Piping system shall be made free from grease, oil, rust, and scale, and shall be made ready for the application of paint. Painting shall be accomplished as specified in Section 09 90 00, Painting. Sprinkler head shall not be painted.

B. Exposed sprinkler piping - red except in office areas and open ceiling spaces which shall match surrounding ceiling color.

COMMON WORK RESULTS FOR FIRE SUPPRESSION 21 13 00 - 8

SECTION 22 11 13

FACILITY WATER DISTRIBUTION

PART 1 GENERAL

1.01 SUMMARY

A. Section Includes:

1. Domestic water piping, below grade.

2. Domestic water piping, above grade.

3. Unions and flanges.

4. Valves.

5. Hose bibbs.

6. Hydrants.

7. Gauges

8. Backflow preventers.

9. Water hammer arrestors.

10. Water Meter

B. Related Sections:

1. Section 07 84 00 - Firestopping

2. Section 09 90 00 - Paints and Coatings

3. Section 23 05 29 – Hangers and Supports

4. Section 23 05 63 - Mechanical Identification

5. Section 23 07 00 - Mechanical Insulation

6. Section 25 00 00 – Integrated Automation

1.02 REFERENCES

A. American National Standards Institute:

1. ANSI Z21.22 - Relief Valves for Hot Water Supply Systems.

B. American Society of Mechanical Engineers:

1. ASME B16.18 - Cast Copper Alloy Solder Joint Pressure Fittings.

2. ASME B16.22 - Wrought Copper and Copper Alloy Solder Joint Pressure

Fittings.

3. ASME B16.26 - Cast Copper Alloy Fittings for Flared Copper Tubes.

4. ASME B31.9 - Building Services Piping.

5. ASME B40.1 - Gauges - Pressure Indicating Dial Type - Elastic Element.

6. ASME Section VIII - Boiler and Pressure Vessel Code - Pressure Vessels.

7. ASME Section IX - Boiler and Pressure Vessel Code - Welding and

Brazing Qualifications.

C. American Society of Sanitary Engineering:

1. ASSE 1010 - Performance Requirements for Water Hammer Arresters.

2. ASSE 1011 - Performance Requirements for Hose Connection Vacuum

Breakers.

FACILITY WATER DISTRIBUTION 22 11 13 - 1

3. ASSE 1012 - Performance Requirements for Backflow Preventer with Intermediate Atmospheric Vent.

4. ASSE 1019 - Performance Requirements for Vacuum Breaker Wall Hydrants, Freeze Resistant, Automatic Draining Type.

D. ASTM International:

1. ASTM B32 - Standard Specification for Solder Metal.

2. ASTM B42 - Standard Specification for Seamless Copper Pipe, Standard

Sizes.

3. ASTM B88 - Standard Specification for Seamless Copper Water Tube.

4. ASTM B584 - Standard Specification for Copper Alloy Sand Castings for

General Applications.

5. ASTM E1 - Standard Specification for ASTM Thermometers.

6. ASTM E77 - Standard Test Method for Inspection and Verification of

Thermometers.

E. American Welding Society:

1. AWS A5.8 - Specification for Filler Metals for Brazing and Braze Welding.

F. American Water Works Association:

1. AWWA M6 - Water Meters - Selection, Installation, Testing, and

Maintenance.

G. Manufacturers Standardization Society of the Valve and Fittings Industry:

1. MSS SP 80 - Bronze Gate, Globe, Angle and Check Valves.

2. MSS SP 110 - Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends.

H. Plumbing and Drainage Institute:

1. PDI WH201 - Water Hammer Arrester Standard.

1.03 SUBMITTALS

A. Product Data:

1. Piping: Submit data on pipe materials, fittings, and accessories. Submit manufacturer's catalog information.

2. Valves: Submit manufacturers catalog information with valve data and ratings for each service.

3. Hangers and Supports: Submit manufacturers catalog information including load capacity.

4. Domestic Water Specialties: Submit manufacturers catalog information, component sizes, rough-in requirements, service sizes, and finishes.

5. Pumps: Submit pump type, capacity, certified pump curves showing pump performance characteristics with pump and system operating point plotted.

Include NPSH curve when applicable. Include electrical characteristics and connection requirements.

FACILITY WATER DISTRIBUTION 22 11 13 - 2

B. Manufacturer's Installation Instructions: Submit installation instructions for pumps, valves, and accessories.

C. Manufacturer's Certificate: Certify products meet or exceed specified requirements.

1.04 CLOSEOUT SUBMITTALS

A. Project Record Documents: Record actual locations of valves and equipment.

B. Operation and Maintenance Data: Submit spare parts list, exploded assembly views and recommended maintenance intervals.

1.05 QUALIFICATIONS

A. Manufacturer: Company specializing in manufacturing products specified in this section with minimum three years experience.

B. Installer: Company specializing in performing Work of this section with minimum three years experience.

1.06 DELIVERY, STORAGE, AND HANDLING

A. Accept valves and equipment on site in shipping containers with labeling in place. Inspect for damage.

B. Provide temporary protective coating on cast iron and steel valves.

C. Provide temporary end caps and closures on piping and fittings. Maintain in place until installation.

D. Protect piping systems from entry of foreign materials by temporary covers, completing sections of the Work, and isolating parts of completed system.

1.07 ENVIRONMENTAL REQUIREMENTS

A. Do not install underground piping when bedding is wet or frozen.

1.08 FIELD MEASUREMENTS

A. Verify field measurements prior to fabrication.

PART 2 PRODUCTS

2.01 DOMESTIC WATER PIPING, BELOW GRADE

A. Copper Tubing: ASTM B88, Type K, annealed.

1. Fittings: Cast copper, ASME B16.18 or wrought copper, ASME B16.22

2. Joints: Compression connection or Brazed, AWS A5.8 BCuP.

FACILITY WATER DISTRIBUTION 22 11 13 - 3

2.02 DOMESTIC WATER PIPING, ABOVE GRADE

A. Copper Tubing: ASTM B88, Type L, hard drawn.

1. Fittings: ASME B16.18, cast copper alloy or ASME B16.22, wrought copper and bronze.

2. Joints: Solder, lead free, ASTM B32, 95-5 tin-antimony, or tin and silver, with melting range 430 to 535 degrees F.

2.03 UNIONS AND FLANGES

A. Unions for Pipe 2 inches and Smaller:

1. Copper Piping: Class 150, bronze unions with soldered.

2. Dielectric Connections: Union with galvanized or plated steel threaded end, copper solder end, water impervious isolation barrier.

2.04 BALL VALVES

A. Manufacturers:

1. NIBCO, Inc. Model T-585-70.

2. Crane Valve, North America Model

3. Hammond Valve Model.

4. Milwaukee Valve Company

5. Stockham Valves & Fittings

6. Or Approved Equal

B. 2 inches and Smaller: MSS SP 110, 600 psi WOG, two piece bronze body, chrome plated brass ball, full port, teflon seats, blow-out proof stem, solder or threaded ends lever handle.

2.05 CALIBRATED BALANCE VALVE

A. Manufacturers:

1. Bell & Gossett; Circuit Setter Plus, Model CB

2. Apollo

3. Nibco

4. Or Approved Equal

B. ½ inch and Smaller: capable of performing flow metering, flow balancing and positive shut-off with no drip seats. Integral valve run-out ports, balance position indicator, travel stop indicator and drain fitting. Solder end connections.

C. Bronze body, brass ball with TFE seat rings

2.06 GAUGES

A. Manufacturers:

1. H. O. Trerice.

FACILITY WATER DISTRIBUTION 22 11 13 - 4

2. Marsh Instrument.

3. Taylor Instrument.

4. Or Approved Equal

B. Thermometers: Adjustable angle type, front blue appearing mercury tube type in 9 inch cast aluminum case with powder coating and one piece clear acrylic front window and separable brass thermowell. Model No. BX9

1. Scale in black figures on white background. Scale graduated so as to show system design point temperature at midpoint of scale.

2. Blue colored organic fluid shall be used in lieu of mercury.

C. Pressure Gauges: 4 ½-inch diameter dial with cast aluminum case, stainless steel friction type ring and glass window. 300 stainless steel rotary type movement, stainless steel bushing; Model No. 500X.

1. Scale in black figures on white background. Scale shall indicate zero to 1-

1/2 times the working pressure in the system in which gauge is installed.

Micrometer adjustable type pointer. +/- 0.50 scale range accuracy. ASME B40.1, Grade 2A.

2. Needle Valve: Brass body, seat and stem. Teflon packing and brass handle, 2000 PSI operating pressure and 300° F. maximum operating temperature; Type FFG- No. 735.

2.07 HOSE BIBBS

A. Manufacturers:

1. Nibco

2. Apollo

3. Woodford Mfg. Co.

4. Or Approved Equal

B. Interior: Bronze or brass, replaceable hexagonal disc, hose thread spout, with metal hand wheel handle. Provide with vacuum breaker in conforming to

ASSE 1011.

2.08 HYDRANTS

A. Manufacturers:

1. Zurn Industries, Inc. Z-1321-PB

2. Josam Manufacturing Co.

3. Wade.

4. Or Approved Equal

B. Wall Hydrant (exterior): ASSE 1019; non-freeze, self-draining type, copper casing, all bronze interior parts with polished bronze wall plate hose thread spout, locks shield and removable key, and integral vacuum breaker, ceramic disk cartridge.

FACILITY WATER DISTRIBUTION 22 11 13 - 5

2.09 WATER METER

A. Manufacturers:

1. Neptune Technology Group.

2. Hersey Products Inc.

3. Or Approved Equal

B. Domestic Service: Magnetic drive, low torque registration positive displacement cold water meter of the nutating disc principle. The meter performance and materials to comply with AWWA C700 standards and ANSI/NSF 61 certified, designed to be compatible with available remote readout systems; Model T-10.

1. Meter Case: Corrosion resistant EnviroBrass II construction meeting

ANSI/NSF61 Certification. Screwed or flanged ends.

2. Measuring Chamber: Polymer construction, floating chamber design.

3. Register Gear Train: Polymer composition.

4. Register: Impact resistant register, low flow leak detection, in-line serviceability tamper-proof seal pin. Brass cover and glass lens. Pulse output for University control system.

5. Characteristics:

a. Maximum Operating Water Pressure: 150 psi.

b. Maximum Operating Water Temperature: 80 degrees F.

c. Maximum Rating: 100 U.S. gpm.

d. Environmental Operating Conditions: 33 degrees F. to 149 degrees F.

2.10 WATER HAMMER ARRESTORS

A. Manufacturers:

1. Zurn

2. PPP Inc

3. Or Approved Equal

B. ASSE 1010; stainless steel or copper construction, bellows or piston type sized in accordance with PDI WH-201.

C. Pre-charged suitable for operation in temperature range 34 to 250 degrees F and maximum 150 psi working pressure.

2.11 BACKFLOW PREVENTERS

A. Manufacturers:

1. Watts Regulator Company; Series 007QT-S.

2. Zurn-Wilkins.

3. Apollo

4. Or Approved Equal

B. Double check valve (1/2 to 2 inch): Threaded bronze inlet and outlet connections. Bronze body construction, double check valve design. Assembly

FACILITY WATER DISTRIBUTION 22 11 13 - 6

consists of positive seating check modules with replaceable seats and discs and ball type test cocks. ASSE 1013. Full port, bronze ball valves and bronze strainer.

PART 3 EXECUTION

3.01 EXAMINATION

A. Verify excavations are to required grade, dry, and not over-excavated.

3.02 PREPARATION

A. Ream pipe and tube ends. Remove burrs.

B. Remove scale and dirt, on inside and outside, before assembly.

3.03 INSTALLATION - THERMOMETERS AND GAGES

A. Install one pressure gage for each pump, locate taps before strainers and on suction and discharge of pump; pipe to gage.

B. Install gage taps in piping

C. Install pressure gages with pulsation dampers. Provide needle valve or ball valve to isolate each gage.

D. Install thermometers in piping systems in sockets in short couplings. Enlarge pipes smaller than 2-1/2 inches for installation of thermometer sockets. Allow clearance from insulation.

E. Provide instruments with scale ranges selected according to service with largest appropriate scale.

F. Install gages and thermometers in locations where they are easily read from normal operating level. Install vertical to 45 degrees off vertical.

G. Adjust gages and thermometers to final angle, clean windows and lenses, and calibrate to zero.

3.04 INSTALLATION - HANGERS AND SUPPORTS

A. Install hangers and supports in accordance with Section 23 05 29.

3.05 INSTALLATION - ABOVE GROUND PIPING

A. Install non-conducting dielectric connections wherever jointing dissimilar metals.

FACILITY WATER DISTRIBUTION 22 11 13 - 7

B. Route piping in orderly manner and maintain gradient. Route parallel and perpendicular to walls.

C. Install piping to maintain headroom without interfering with use of space or taking more space than necessary.

D. Group piping whenever practical at common elevations.

E. Slope piping and arrange systems to drain at low points.

F. Provide clearance in hangers and from structure and other equipment for installation of insulation and access to valves and fittings. Refer to Section 23 05 29.

G. Where pipe support members are welded to structural building framing, scrape, brush clean, and apply one coat of zinc rich primer to welding.

H. Provide support for utility meters in accordance with manufacturers requirements.

I. Prepare exposed, unfinished pipe, fittings, supports, and accessories ready for finish painting. Refer to Section 09 90 00.