Vehicle Maintenance Addition Section 02 41 00 Building Demolition
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pennsylvania Air National Guard, 193d RSG Project No. LKLW959716
CONSOLIDATE VEHICLE MAINTENANCE FUNCTION 5/1/2015
BUILDING DEMOLITION 02 41 00 - 1
SECTION 02 41 00
BUILDING DEMOLITION
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Building demolition including removal of hazardous materials and toxic substances.
1.02 RELATED REQUIREMENTS
A. Section 01 10 00 - Summary: Limitations on Contractor's use of site and premises.
B. Section 01 10 00 - Summary: Description of items to be salvaged or removed for re-use by Contractor.
C. Section 01 50 00 - Temporary Facilities and Controls: Site fences, security, protective barriers, and waste removal.
D. Section 01 60 00 - Product Requirements: Handling and storage of items removed for salvage and relocation.
E. Section 01 70 00 - Execution and Closeout Requirements: Project conditions;
protection of bench marks, survey control points, and existing construction to remain; reinstallation of removed products; temporary bracing and shoring.
F. Section 31 22 00 - Grading: Topsoil removal.
1.03 REFERENCE STANDARDS
A. 29 CFR 1926 - U.S. Occupational Safety and Health Standards; current edition.
B. NFPA 241 - Standard for Safeguarding Construction, Alteration, and Demolition Operations; 2013.
1.04 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Site Plan: Showing:
1. Vegetation to be protected.
2. Areas for temporary construction and field offices.
3. Areas for temporary and permanent placement of removed materials.
BUILDING DEMOLITION 02 41 00 - 2
C. Demolition Plan: Submit demolition plan as specified by OSHA and local authorities.
1. Indicate extent of demolition, removal sequence, bracing and shoring, and location and construction of barricades and fences.
2. Identify demolition firm and submit qualifications.
3. Include a summary of safety procedures.
1.05 QUALITY ASSURANCE
A. Demolition Firm Qualifications: Company specializing in the type of work required.
1. Minimum of three years of documented experience.
PART 2 PRODUCTS
2.01 MATERIALS
A. Fill Material: As specified in Section 31 22 00 - Grading.
PART 3 EXECUTION
3.01 SCOPE
A. Remove the entire building designated Building 1-48.
B. Within area of new construction, remove foundation walls and footings to a minimum of 600 mm (2 feet) below finished grade.
C. Outside area of new construction, remove foundation walls and footings to a minimum of 600 mm (2 feet) below finished grade.
D. Remove concrete slabs on grade as indicated on drawings.
E. Remove other items indicated, for salvage and relocation.
3.02 GENERAL PROCEDURES AND PROJECT CONDITIONS
A. Comply with other requirements specified in Section 01 70 00.
B. Comply with applicable codes and regulations for demolition operations and safety of adjacent structures and the public.
1. Obtain required permits.
2. Comply with applicable requirements of NFPA 241.
3. Use of explosives is not permitted.
4. Take precautions to prevent catastrophic or uncontrolled collapse of structures to be removed; do not allow worker or public access within range of potential collapse of unstable structures.
5. Provide, erect, and maintain temporary barriers and security devices.
BUILDING DEMOLITION 02 41 00 - 3
6. Use physical barriers to prevent access to areas that could be hazardous to workers or the public.
7. Conduct operations to minimize effects on and interference with adjacent structures and occupants.
8. Do not close or obstruct roadways or sidewalks without permission.
9. Conduct operations to minimize obstruction of public and private entrances and exits; do not obstruct required exits at any time; protect persons using entrances and exits from removal operations.
C. Do not begin removal until receipt of notification to proceed from Contracting Officer.
D. Do not begin removal until built elements to be salvaged or relocated have been removed.
E. Protect existing structures and other elements that are not to be removed.
1. Provide bracing and shoring.
2. Prevent movement or settlement of adjacent structures.
3. Stop work immediately if adjacent structures appear to be in danger.
F. Minimize production of dust due to demolition operations; do not use water if that will result in ice, flooding, sedimentation of public waterways or storm sewers, or other pollution.
G. Hazardous Materials: Comply with 29 CFR 1926 and state and local regulations.
H. Perform demolition in a manner that maximizes salvage and recycling of materials.
1. Dismantle existing construction and separate materials.
2. Set aside reusable, recyclable, and salvageable materials; store and deliver to collection point or point of reuse.
3.03 DEBRIS AND WASTE REMOVAL
A. Remove debris, junk, and trash from site.
B. Leave site in clean condition, ready for subsequent work.
C. Clean up spillage and wind-blown debris from public and private lands.
END OF SECTION