Performance_Work_Statement__MDARNG_Industrial_Hygiene_Services.pdf

PDF 282 KB Posted

Attached to
Environmental Health and Safety Industrial Hygiene Services for Maryland Army National Guard (MDARNG) Maintenance Facilities
Solicitation number
W912K6-26-Q1C42
Issued by

About this file

This is a Performance Work Statement (PWS) for Environmental Health and Safety Industrial Hygiene Services for Maryland Army National Guard (MDARNG) Maintenance Facilities.

The contractor shall provide comprehensive industrial hygiene surveys at MDARNG maintenance facilities including Army Aviation Support Facilities (AASF), Combined Support Maintenance Shops (CSMS), and Field Maintenance Shops (FMS) for a Base Year of 12 months plus four optional 12-month extension years. All fieldwork and reporting must be performed by an ABIH Certified Industrial Hygienist (CIH) in good standing. The contractor must allocate two full days of on-site work at each of the nine target facilities listed in Attachment 8, with surveys covering process evaluations, ventilation system assessments (paint spray booths at 100±20 fpm, welding hoods at ≥100 fpm, vehicle tailpipe slots at ≥150 fpm), personal noise dosimetry on at least ten maintenance employees per facility, lighting measurements, physical facility condition assessments, indoor air quality evaluations, and ergonomic assessments. Dosimeters must be calibrated with pre- and post-test drift not exceeding ±0.5 dBA and configured to Army/ACGIH criteria (85 dBA criterion level, 80 dBA threshold, 3 dB exchange rate). Draft reports must be submitted within four weeks of survey completion and final reports within two weeks of receiving government comments. All reports must include administrative details, executive conclusions, comprehensive process evaluations with Risk Assessment Codes, noise dosimetry printouts with statistical calculations, and photographs of deficiencies. The contractor must establish a Quality Control Plan, comply with AT Level 1 training requirements, maintain PII security protocols, and immediately notify the NGB Region Northeast IH Office of imminent hazards. Air sampling and surface wipe sampling are excluded from scope. Payment is withheld until all deliverables are formally accepted by the Government.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Environmental Health and Safety Industrial Hygiene Services for Maryland Army National Guard (MDARNG) Maintenance Facilities

1.0 General Information

1.1 Objective

The purpose of this contract is to anticipate, recognize, evaluate, and control potential health hazards at Maryland Army National Guard (MDARNG) Maintenance Facilities. The surveys will establish or update workplace baselines to document civilian and military employees' exposure histories and provide actionable recommendations for hazard control.

1.2 Background

In accordance with the Occupational Safety and Health (OSH) Act of 1970 (29 CFR 1960), DODI 6055.01, and AR 385–10, all areas and operations of each workplace must be inspected at least annually by qualified safety and occupational health personnel. An American Board of Industrial Hygiene (ABIH) Certified Industrial Hygienist (CIH) is classified as qualified safety and health personnel to fulfill these mandates.

1.3 Period of Performance

The Period of Performance (PoP) shall be one (1) Base Year of twelve (12) months, plus four (4) consecutive twelve-month Option Years, to be exercised at the discretion of the Government.

1.4 Place of Performance / Description of Facilities

Services will be performed at MDARNG maintenance facilities, which typically perform the following activities:

Army Aviation Support Facility (AASF): Performs backup Aviation Unit Maintenance (AVUM) and limited Aviation Intermediate Maintenance (AVIM), including direct support.

Combined Support Maintenance Shop (CSMS): Provides field and sustainment-level maintenance for all vehicles and equipment (excluding those serviced at MATES or other authorized CSMS sites).

Field Maintenance Shop (FMS): Performs field-level maintenance on vehicles and equipment for supported units.

A detailed list of the specific MDARNG target facilities is provided in Attachment 8.

2.0 Contractor Personnel & Qualifications

2.1 Personnel Qualifications

All on-site fieldwork and report writing must be performed by an ABIH Certified Industrial Hygienist (CIH) in good standing. The CIH must be highly proficient in the anticipation, recognition, evaluation, and control of physical, chemical, biological, and ergonomic workplace stressors. The National Guard Bureau (NGB) Region Northeast IH Office reserves the right to request a change in personnel due to performance, conflict, or lack of demonstrated experience.

2.2 Contractor Requirements & Conduct

Punctuality: The contractor shall arrive on schedule to prepare and conduct all IH surveys.

Professional Appearance & Hygiene: Contractor personnel must maintain a highly professional appearance, wear appropriate protective clothing suitable for industrial maintenance environments (no shorts, skirts, or sleeveless garments), and maintain high standards of personal hygiene. Clothing must be clean, neat, and free of offensive or derogatory graphics/text.

Safety & Health Compliance: The contractor must abide by all federal, state, and local laws and regulations governing workplace safety and health programs.

Complete Disclosure: The contractor must fully disclose any past incidents, felony or misdemeanor charges (excluding minor traffic violations), and malpractice/liability claims involving their staff or subcontractors. The ARNG IH representative will evaluate disclosures for contract suitability.

Unacceptable Skills / Misconduct: The Government reserves the right to assess services on-site. If any contractor employee is deemed unsatisfactory, unfit for duty, or causes a disruption to the workforce, the COR may demand their immediate removal from the facility.

Litigation Cooperation: In the event of litigation or investigation of a liability claim, the contractor must cooperate fully with Government authorities and provide all requested documentation.

Confidentiality: The contractor shall treat all gathered information as limited privileged communication. No information regarding ARNG facilities, operations, or personnel may be released to external entities without prior written approval from the COR.

2.3 Conflict of Interest (COI)

The contractor shall not introduce or market any new services without prior approval of the COR.

No data gathered under this contract may be used for research, study, grants, or publications without prior written consent from the Contracting Officer (KO).

The contractor shall not bill any individual worksite or employee for services rendered.

Contractor employees shall not maintain employment with the US Government if such employment creates a conflict of interest.

2.4 Security & Installation Access

Installation Access: Contractor personnel shall comply with all local installation security, fire, traffic, and access guidelines. Vehicles are subject to search. Unscheduled gate closures may occur and do not warrant extra compensation.

Identification: Contractor personnel must display visible company identification badges (showing company name, employee name, and the word "Contractor") at all times and declare their contractor status in all communications (including email signatures).

CAC Requirements: A Common Access Card (CAC) is not authorized or required for the performance of this contract.

Antiterrorism (AT) Level 1 Training: All contractor employees requiring access to Army installations must complete AT Level 1 Awareness Training (available at http://jko.jten.mil) prior to gaining access. Certificates of completion must be submitted to the COR within 15 calendar days of contract award or prior to on-site work.

Information Security & PII: The contractor shall protect all Personally Identifiable Information (PII) in accordance with DFARS 224.103 and DoD directives. Under no circumstances shall social security numbers or birth dates be collected or recorded in any report or database.

3.0 Scope of Work & Specific Tasks

The Contractor shall provide all personnel, calibrated equipment, and materials required to conduct baseline, annual, and special environmental health and safety industrial hygiene surveys and to prepare comprehensive reports. The contractor must allocate two (2) full days of field work at each maintenance facility listed in Attachment 8.

3.1 Scheduling and Coordination

The contractor must obtain MDARNG Safety and Occupational Health (SOH) POC details from the ARNG Region Northeast IH Office. The contractor must coordinate survey dates with local facility POCs and the SOH POC in advance. If a listed facility has closed or consolidated, the contractor must contact the Northeast IH Office immediately for assignment of an alternate facility.

3.2 Evaluation of Processes

Using professional judgment, the contractor must evaluate all potentially hazardous operations (planned, active, or historical). Typical operations are listed in Attachment 2. Each process evaluation must include:

1. Process Description: Detail the basic tasks, area location, chemical/physical hazards, number of personnel exposed (on survey date vs. total assigned), duration, and frequency (e.g., hours/day, times/week).

2. Engineering & Administrative Controls: Document and evaluate existing controls. Provide an evaluation of local exhaust ventilation systems (detailed below).

3. Personal Protective Equipment (PPE): Detail appropriate PPE requirements, evaluate current PPE availability, and document actual employee compliance.

3.3 Ventilation System Evaluation

Evaluate the effectiveness of all general and local exhaust ventilation systems even if they are not in active use during the survey. Note any inoperable or damaged systems.

Quantitative Performance Metrics:

Paint Spray Booths: Verify that average cross-sectional face velocity is maintained at 100 ± 20 feet per minute (fpm) in accordance with OSHA 29 CFR 1910.94 Table G-10 and ACGIH recommendations.

Local Exhaust / Welding Hoods: Verify a minimum capture or face velocity of ≥ 100 fpm.

Vehicle Tailpipe Slots/Hoses: Verify capture velocities achieve a minimum slot velocity of ≥ 150 fpm or duct transport velocity of ≥ 2,000 fpm.

Use smoke tubes or cool-burning smoke candles to analyze airflow patterns in spray paint and abrasive blasting booths. Describe these patterns and identify dead zones or eddies in the report.

Identify any potential for clean air intake contamination by recirculated exhaust.

3.4 Noise Dosimetry

Conduct personal noise dosimetry on at least ten (10) maintenance employees per facility who are most likely to experience high noise exposures.

Dosimeters must be worn and log data for a minimum of 75% of the standard workday (e.g., minimum 6 hours of an 8-hour shift).

Standard Parameters: Set dosimeters to Army/ACGIH criteria in accordance with DA PAM 40- 501:

Exchange Rate: 3 dB

Criterion Level: 85 dBA

Threshold Level: 80 dBA

Calibration Metrics: Field calibrate all dosimeters before and after each daily sampling run. The pre- and post-test calibration drift must not exceed ± 0.5 dBA. Samples exceeding this limit are invalid and must be repeated.

Present individual results as an 8-hour Time-Weighted Average (TWA-8). If six (6) or more dosimetry results are collected for a Similar Exposure Group (SEG), calculate the Occupational

Exposure Group (OEG) Upper Tolerance Limit (UTL) using the methodologies outlined in Attachment 6.

Complete a DA Form 4700 for each monitored employee (following the examples in Attachment 7).

Exclusion: Noise dosimetry shall NOT be performed on State Employees or Contractor Employees.

3.5 Lighting & Illumination

Measure lighting levels in representative work areas. Report all measurements in footcandles (fc).

Evaluate task-specific lighting (e.g., portable vehicle maintenance lights) and compare findings against the following IESNA/UFC 3-530-01 standard minimum metric targets:

General Maintenance / Hangar Bays: ≥ 30 fc

Active Mechanical Work/Workbenches: ≥ 50 fc

Precision Component Repair / Soldering: ≥ 100 fc

Egress Paths, Storage, and Corridors: ≥ 5 fc

3.6 Physical Condition of Facility & Personnel Concerns

Lead-Based Paint: Document the condition and location of damaged, peeling, or chipping paint.

Provide actionable recommendations to notify the Facilities Management Office (FMO) for testing/remediation.

Asbestos-Containing Material (ACM): Perform a visual inspection for suspect ACM. Note condition, location, and estimated quantities. Warn the FMO immediately of damaged, friable asbestos.

Water Damage & Mold: Document visible mold, water staining, and identify potential water incursion sources.

Indoor Air Quality (IAQ): Conduct employee interviews to identify IAQ concerns. Measure and evaluate IAQ and thermal comfort metrics against ASHRAE 62.1 and ASHRAE 55-2013 standards:

Carbon Dioxide (CO2): < 1,000 ppm (or ≤ 700 ppm above concurrent outdoor ambient levels).

Carbon Monoxide (CO): < 9 ppm.

Relative Humidity (RH): Maintain comfortable baseline range of 30% to 60%.

Temperature: Maintain ranges of 68°F to 76°F (Winter) and 73°F to 79°F (Summer).

Ergonomic Assessments: Provide initial ergonomic evaluations for tasks involving repetitive motions, heavy lifting, prolonged standing, or awkward postures. Recommend adjustments, anti-fatigue mats, or assistive lift devices.

Housekeeping & Hygiene: Assess facility housekeeping, chemical storage, food/beverage hygiene, and prevent cross-contamination into administrative spaces.

3.7 Safety Data Sheet (SDS) & Chemical Review

Review the chemical inventories and SDSs available on-site. Create a consolidated product inventory detailing chemical hazards, products with published Occupational Exposure Limits (OELs), and their associated operational processes.

3.8 Photographic Documentation

Provide clear, labeled photographs of all noted deficiencies, damaged engineering controls, or structural hazards within the report.

3.9 Equipment Requirements

The contractor must provide all necessary, currently calibrated industrial hygiene equipment. Calibration must be valid on the date of the survey. The required minimum equipment inventory is detailed in Attachment 3.

3.10 Excluded Services

Air sampling and surface wipe sampling are strictly excluded from the scope of these surveys.

4.0 Deliverables & Reporting

4.1 Urgent Hazard Notification

If an imminent danger is identified during a survey (such as severe chemical overexposures, highly friable suspect ACM, or critical PPE failures that classify as Risk Assessment Code 1 or 2):

4. Immediate action: Alert the on-site facility supervisor or safety representative immediately.

5. Notification: Notify the NGB Region Northeast IH Office and the MDARNG SOH POC by phone or email within 24 hours.

6. Written Summary: Provide an electronic summary of findings, recommendations, and immediate corrective actions within one (1) week of the observation.

4.2 Draft and Final Reports

Draft Reports: Submit an electronic draft report, complete field notes, and DA Form 4700s for each facility within four (4) weeks of the respective survey date. Submit reports individually; do not delay drafts until all facility surveys are complete. Send to the Regional Industrial Hygienist: Jayson Allan (jayson.r.allan.civ@army.mil).

Final Reports: Submit the finalized electronic report (PDF format) within two (2) weeks of receiving government comments. Address and incorporate all comments.

File Naming Convention: All files must be named using the format:

State_Facility_City_MM_YYYY (e.g., MD_CSMS_Havre_de_Grace_05_2026).

4.3 Report Structure Requirements

Each final report must contain:

7. Administrative Details: Survey date, facility address, and facility POC. (No PII: exclude SSNs and birth dates).

8. Table of Contents

9. Executive Conclusion: A concise, 1-to-2 paragraph summary of the survey findings.

10. Process Evaluations: Comprehensive write-ups for each process as defined in Section 3.2.

11. Appendices:

Noise dosimetry printouts and statistical calculations.

Applicable references used (utilize current publication dates).

A comprehensive summary table matching every finding to an actionable recommendation, including assigned Risk Assessment Codes (RACs) for health, safety, noise, and ergonomics, backed by specific standard citations.

12. Separate Deliverables:

One legible copy of raw field notes.

Completed DA Form 4700 noise exposure forms for each monitored employee.

5.0 Quality Assurance & Payment

5.1 Quality Control Plan (QCP)

The contractor shall establish and maintain a written Quality Control Plan (QCP) to ensure services conform to PWS requirements. The QCP must identify procedures to prevent and correct defective services. Any modifications to the QCP must be approved in writing by the Contracting Officer (KO).

5.2 Quality Assurance Surveillance Plan (QASP)

The Government will evaluate the contractor's performance using a Quality Assurance Surveillance Plan (QASP). The QASP defines performance standards, acceptable quality levels, surveillance frequency, and government audit methodologies.

Technical Exhibit 1: Performance Requirements Summary (PRS)

Performance Objective

Performance Standard / Metric

Acceptable Quality Level

(AQL)

Method of Surveillance

Draft Report Timeliness

Submit comprehensive draft reports within 28 calendar days of survey completion.

≥ 95% on-time delivery

COR tracking of electronic receipt dates.

Final Report Quality & Accuracy

Final reports must address and resolve 100% of government comments with no critical data gaps.

100% compliance NGB Region Northeast IH Office review and validation.

Field Work Execution

Conduct surveys utilizing a qualified ABIH CIH for a full two (2) days at each facility.

100% compliance Sign-in sheets, visitor logs, and daily field note verification.

Equipment Calibration

All equipment used must be currently calibrated with field drift for noise dosimeters ≤ ± 0.5 dBA.

100% compliance Review of pre/post calibration logs in appendices.

Safety and Security Standards

100% compliance with AT Level 1 training and PII security protocols.

Zero breaches or violations

Verify training certificates and check reports for PII leakage.

5.3 Recognized Federal Holidays

On-site work is not permitted on recognized US federal holidays. Holidays falling on a Saturday are observed on the Friday before; holidays falling on a Sunday are observed on the following Monday:

New Year’s Day (Jan 1)

Martin Luther King, Jr.’s Birthday

Presidents' Day

Memorial Day

Independence Day (July 4)

Labor Day

Columbus Day

Veterans Day (Nov 11)

Thanksgiving Day

Christmas Day (Dec 25)

5.4 Payment Schedule

Invoices shall be processed for payment only after final, comprehensive reports for the respective facilities are completed, submitted, and formally accepted by the Government. Final contract payment will be withheld until all deliverables have been accepted.

6.0 Definitions and Acronyms

6.1 Definitions

Contractor: A supplier or vendor awarded a contract to provide specific supplies or services to the government.

Contracting Officer (KO): A person with authority to enter into, administer, and/or terminate contracts on behalf of the government. The only individual who can legally bind the government.

Contracting Officer's Representative (COR): An employee of the U.S. Government designated in writing by the KO to monitor contractor performance. Holds no authority to modify contract terms, conditions, or funding.

Defective Service: A service output that does not meet the performance standards associated with the Performance Work Statement.

Deliverable: Anything that can be physically or electronically delivered, including survey notes, data, or reports.

Similar Exposure Group (SEG): A group of workers having the same general exposure profile for the agent being evaluated because of the similarity and frequency of the tasks they perform.

6.2 Acronyms

AASF: Army Aviation Support Facility

ABIH: American Board of Industrial Hygiene

ACGIH: American Conference of Governmental Industrial Hygienists

ACM: Asbestos-Containing Material

AR: Army Regulation

AT: Antiterrorism

CAC: Common Access Card

CFR: Code of Federal Regulations

CIH: Certified Industrial Hygienist

COR: Contracting Officer's Representative

CSMS: Combined Support Maintenance Shop

DA PAM: Department of the Army Pamphlet

EPC: Effect Probability Category

FMS: Field Maintenance Shop

HHSC: Health Hazard Severity Code

IAQ: Indoor Air Quality

IH: Industrial Hygiene

KO: Contracting Officer

OEG: Occupational Exposure Group

OEL: Occupational Exposure Limit

OSH: Occupational Safety and Health

PII: Personally Identifiable Information

PWS: Performance Work Statement

QASP: Quality Assurance Surveillance Plan

QCP: Quality Control Plan

RAC: Risk Assessment Code

SDS: Safety Data Sheet

SOH: Safety and Occupational Health

TWA: Time-Weighted Average

UTL: Upper Tolerance Limit

Attachments

13. Regulations and Standards

14. Typical Operations at ARNG Maintenance Facilities

15. Required Industrial Hygiene Equipment and Supplies

16. Example of Operation Description Format for Report

17. Risk Assessment Codes for Health and Safety

18. Risk Assessment Codes for Noise

19. DA Form 4700 - Completed Noise Exposure Record Examples

20. Target Facility List

Attachment 1: Regulations and Standards

21. OSHA Standard 29 CFR 1910: General Industry Standards. http://www.osha.gov/comp-links.html

22. DODI 6055.01: DoD Occupational Safety and Health (OSH) Program.

http://www.dtic.mil/whs/directives/corres/pdf/605501p.pdf

23. AR 11-34: The Army Respiratory Protection Program.

http://armypubs.army.mil/epubs/pdf/r11_34.pdf

24. AR 40-5: Medical Services, Preventive Medicine. http://armypubs.army.mil/epubs/pdf/R40_5.pdf

25. AR 385-10: The Army Safety Program. http://armypubs.army.mil/epubs/pdf/r385_10.pdf

26. DA PAM 40-501: Medical Services, Army Hearing Program.

http://armypubs.army.mil/epubs/pdf/P40_501.pdf

27. DA PAM 40-11: Preventive Medicine. http://armypubs.army.mil/epubs/pdf/p40_11.pdf

28. DA PAM 40-503: Medical Services, The Army Industrial Hygiene Program.

http://armypubs.army.mil/epubs/pdf/P40_503.PDF

29. UFC 3-410-01FA: Heating, Ventilating, and Air Conditioning Systems.

http://www.wbdg.org/ccb/DOD/UFC/ufc_3_410_01.pdf

30. ACGIH: Threshold Limit Values (TLVs) and Biological Exposure Indices (BEIs), Current Edition.

31. ACGIH: Industrial Ventilation – A Manual of Recommended Practice for Design, Current Edition.

32. ANSI/ISEA Z358.1-2009: Emergency Eyewash and Shower Equipment.

33. ANSI/ASHRAE 55-2013: Thermal Environmental Conditions for Human Occupancy.

34. ANSI/ASHRAE 62.1-2016: Ventilation for Acceptable Indoor Air Quality.

35. IESNA: The Lighting Handbook, Current Edition.

36. OSHA Instruction Letter 02-02-058: Lead Exposure in Construction, Dec 13, 1993.

37. OSHA Standard Interpretation: Clarification of "as free as practicable" and lead contamination under 29 CFR 1926.62, Jan 13, 2003.

Attachment 2: Typical Operations at ARNG Maintenance Facilities

Facility Type Typical Operational Processes (Not Exhaustive)

CSMS / FMS • Vehicle and Equipment Maintenance, Inspection, and Repair

• Battery Charging and Maintenance

• Brake Pad Replacement

• Solvent Use and Parts Washing

• Vehicle Idling

• Welding, Grinding, and Cutting Metals

• Machining

• Spray Painting (Aerosol Can and/or Compressed Air Application)

• Canvas and Vinyl Repair

• Woodworking and Crate Construction

• Flammable and Combustible Materials Storage

• Warehousing and Storage

• Electronics Repair and Soldering

• Weapons Storage, Repair, and Test Firing

• Night Vision Device (NVD) Repair and Nitrogen Purging

AASF • Rotary Aircraft Maintenance, Inspection, and Repair

• Confined Space Entry – Fuel Cells, Tail Boom

• Battery Charging and Maintenance

• Solvent Use and Parts Washing

• Welding, Grinding, and Cutting Metals

• Machining

• Spray Painting (Aerosol Can and/or Compressed Air Application)

• Aviation Life Support Equipment (ALSE) Canvas and Vinyl Repair

• Flammable and Combustible Materials Storage

• Warehousing and Storage

• Electronics Repair and Soldering

• Aircraft Blade Repairs (solvents, epoxy, isocyanates)

• Engine Test

Attachment 3: Required Industrial Hygiene Equipment and Supplies

Equipment Capability Purpose Minimum Quantity

Air Velocity Meter Air velocity in feet per minute (fpm)

Evaluate ventilation face velocity on paint booths, welding hoods, slot hoods, vehicle tailpipe exhaust, etc.

1 per survey team

Indoor Air Quality Meter

Carbon Monoxide, Carbon Dioxide, Percent Relative Humidity, Temperature

Measure indoor air quality and comfort parameters.

1 per survey team

Light Meter Footcandles (fc) Measure general and task illumination levels.

1 per survey team

Noise Dosimeters Datalogging compliant with both OSHA and Army/ACGIH criteria

Conduct personal 8-hour TWA noise sampling on maintenance personnel.

10 per survey team

Noise Dosimeter Calibrator

Tone Generator compatible with selected dosimeter model

Field calibrate noise dosimeters before and after each survey day.

1 per survey team

Smoke Candles / Tubes

Cool-burning, flameless, spark-free smoke generator

Track and evaluate airflow patterns in spray paint and media blasting booths.

1 per booth

Tape Measure Standard US measurements

Measure physical duct diameters, hood faces, and booth dimensions.

1 per survey team

Attachment 4: Sample Process Description

CSMS Spray Painting Operation The Paint Shop contains a large downdraft booth and is located adjacent to the vehicle maintenance bays in the “E” Wing of the CSMS. The dimensions of the booth are approximately 17.5' W x 40' L x 12.5' H.

Vehicle-sized swing-hinge doors are installed at each end of the booth, and four personnel egress doors are approximately 3’ W x 7’ H. Two full-time painters are assigned and report that at current workloads, they are required to paint for a duration of approximately four hours, 2 to 3 days per week.

Exhaust Ventilation: The average cross-sectional air velocity in large paint booths is recommended by OSHA 29 CFR 1910.94 Table G-10 to be between 75 and 125 feet per minute (fpm). The paint booth at the CSMS has an average cross-sectional velocity of 64 fpm, which does not meet the standard. Airflow is unevenly distributed across the booth. Smoke testing demonstrated that the ventilation system is only moderately effective at clear air replacement. Recommendation: The system should be serviced, balanced, and the filters replaced. Regular servicing and lubrication of belts and moving parts will extend the life of the equipment and ensure effective performance.

Booth Pressure: The booth relative to the adjacent workspace is under a slight negative pressure.

The ACGIH Ventilation Manual, Paragraph 13.75, notes that maintaining the paint booth under slight negative pressure reduces the potential of toxic paint vapors escaping the booth into adjacent work areas.

Pressure Gauge (Manometer): Manometers are installed on the booth supply and exhaust filter banks to show the pressure drop as required by OSHA 29 CFR 1910.94(c)(7)(iii)[b]. On the survey date, the manometers needed fluid, required zeroing, and were not marked with clear high/low operating indicators.

Sound Pressure Levels: A sound level meter was used to measure noise levels in the booth during spray painting. All levels were below the Army criterion threshold of 85 dBA and are presented in Appendix X.

Personal Protective Equipment (PPE): Personnel donned disposable coveralls (Tyvek), chemical-resistant gloves, and supplied-air respirators.

Emergency Equipment: An emergency eyewash and shower unit is provided adjacent to the paint mixing area. The unit was documented as inspected weekly and provided tepid flushing fluid as recommended by ANSI/ISEA Z358.1-2009.

Attachment 5: Deriving Risk Assessment Codes (RACs)

1. Determine Health Hazard Severity Code (HHSC)

The HHSC reflects the magnitude of exposure and medical effects from chronic exposure. Total the points from (a) and (b) below, then determine the HHSC from (c).

a. Exposure Points

Alternate Exposure Route (AER) Possible?

95th Percentile <10% of OEL

95th Percentile between 10% and 50% of OEL

95th Percentile between 50% and 100% of OEL

95th Percentile >OEL

No 0 Points 3 Points 5 Points 7 Points

Yes 1 - 2 Points 4 Points 6 Points 9 Points

AER includes skin absorption or ingestion. OEL refers to OSHA PEL or ACGIH TLV.

b. Medical Effects Points

Condition Description Points

No medical effect (e.g., nuisance noise, nuisance odor) 0

Temporary reversible illness requiring supportive treatment (e.g., eye irritation, sore throat)

1 - 2

Temporary reversible illness with a variable but limited period of disability (e.g., metal fume fever)

3 - 4

Permanent, non-severe illness or loss of capacity (e.g., permanent hearing loss)

5 - 6

Permanent, severe, disabling, irreversible illness or death (e.g., asbestosis, lung cancer)

7 - 8

c. HHSC Determination

Total Points (Exposure + Medical Effects) HHSC

13 - 17 I (Critical)

9 - 12 II (Serious)

5 - 8 III (Moderate)

0 - 4 IV (Minor)

2. Determine Effect Probability Category (EPC)

The EPC is based on the duration/frequency of exposure and the number of exposed workers.

a. Duration and Frequency Points (Add duration points and frequency points, divide by 2, and round

UP)

Points Exposure Duration Exposure Frequency

8 >8 hours/day Daily

7 6 - 8 hours/day 2 - 3 times/week

6 4 - 6 hours/day Weekly

5 2 - 4 hours/day 2 - 3 times/month

4 1 - 2 hours/day Monthly

3 30 - 60 minutes/day Quarterly or 2 - 3 times/year

2 15 - 30 minutes/day Annually

1 0 - 15 minutes/day Less than annually

b. Number of Exposed Personnel Points

Number of Exposed Workers Points

< 5 1 - 2

5 - 9 3 - 4

10 - 49 5 - 6

> 49 7 - 8

c. EPC Determination

Total Points (Duration/Frequency + Worker Points)

EPC

13 - 17 A

9 - 12 B

5 - 8 C

0 - 4 D

3. Determine the Chronic Hazard RAC Matrix

HHSC EPC: A EPC: B EPC: C EPC: D

I RAC 1 RAC 1 RAC 2 RAC 3

II RAC 1 RAC 2 RAC 3 RAC 4

III RAC 2 RAC 3 RAC 4 RAC 5

IV RAC 3 RAC 4 RAC 5 RAC 5

RAC Descriptors: 1 = Critical, 2 = Serious, 3 = Moderate, 4 = Minor, 5 = Negligible.

4. Deriving RACs for Safety Hazards

Combine Hazard Severity and Accident Probability using the matrix below:

a. Accident Probability Code

Code Description

A Likely to occur immediately

B Probably will occur in time

C Possible to occur in time

D Unlikely to occur

b. Hazard Severity Code

Code Description

I Death, permanent total disability, or loss of facility/asset

II Permanent partial disability, temporary total disability > 3 months, or major property damage

III Lost-workday injury, compensable injury, or minor property damage

IV Minimal threat to personnel or property, minor first-aid standard violation

c. Safety RAC Matrix

Hazard Severity Probability: A Probability: B Probability: C Probability: D

I RAC 1 RAC 1 RAC 2 RAC 3

II RAC 1 RAC 2 RAC 3 RAC 4

III RAC 2 RAC 3 RAC 4 RAC 5

IV RAC 3 RAC 4 RAC 5 RAC 5

Attachment 6: Determining the Noise Risk Assessment Code (RAC)

To assign a noise RAC for employee notifications on DA Form 4700:

38. Group Personnel: Define Similar Exposure Groups (SEGs) / Occupational Exposure Groups (OEGs) (e.g., Aircraft Mechanics, Ground Support, Machinists).

39. Calculate Statistical UTL: For SEGs/OEGs with six (6) or more personal dosimetry samples, calculate the Upper Tolerance Limit (UTL) (95% confidence level, 95th percentile). If the SEG contains fewer than 6 workers, use individual TWA-8 results.

40. Assign RAC: Determine the RAC based on the simplified table below:

Exposure Result (Individual TWA or SEG UTL)

< 10 Workers in SEG/OEG 10 or more Workers in SEG/OEG

< 82 dBA RAC 4 (Minor) RAC 3 (Moderate)

≥ 82 dBA RAC 3 (Moderate) RAC 2 (Serious)

Attachment 7: Noise Exposure DA 4700 Medical Record Examples

Example 1: Individual TWA Above Standard (Enrollment Required)

MEDICAL RECORD – SUPPLEMENTAL MEDICAL DATA (Ref: AR 40-66 / Proponent: OTSG)

REPORT TITLE: WORKERS' OCCUPATIONAL NOISE DOSIMETRY DATA RECORD

PATIENT IDENTIFICATION:

NAME: Doe, J.

SSN: XXX-XX-XXXX

FACILITY: AASF 2 Rochester, NY JOB DESCRIPTION/SERIES: Avionics SAMPLING DATE: 28 November 2018

EXPOSURE DATA:

OEG: Test Pilot Employee TWA: 89.1 dBA OEG UTL: N/A (Sample size of 1 is too small for statistical calculations; personal TWA used) Assigned RAC: 2

HEARING CONSERVATION NOTIFICATION:

Your 8-hour Time-Weighted Average (TWA) noise exposure was measured at 89.1 dBA, which exceeds the Army 85 dBA Action Level. You are required by DA Hearing Conservation Policy (DA PAM 40-

501) to:

1. Be enrolled and maintained in the NYARNG Hearing Conservation Program.

2. Wear approved hearing protection (earplugs or earmuffs) in areas with noise levels >= 85 dBA. Dual protection (both plugs and muffs) is required in areas exceeding 103 dBA.

3. Comply with all posted noise hazard warning signs.

PREPARED BY: Jayson Allan, Regional Industrial Hygienist (NGB-IH) DATE: 1 October 2019

Example 2: Individual TWA Below Standard (Historical Inclusion Recommended)

MEDICAL RECORD – SUPPLEMENTAL MEDICAL DATA (Ref: AR 40-66 / Proponent: OTSG)

REPORT TITLE: WORKERS' OCCUPATIONAL NOISE DOSIMETRY DATA RECORD

PATIENT IDENTIFICATION:

NAME: Smith, J.

SSN: XXX-XX-XXXX

FACILITY: AASF 2 Rochester, NY JOB DESCRIPTION/SERIES: Avionics

SAMPLING DATE: 28 November 2018

EXPOSURE DATA:

OEG: Avionics Employee TWA: 68.9 dBA OEG UTL: N/A (Sample size of 2 is too small for statistical calculations; personal TWA used) Assigned RAC: 3

HEARING CONSERVATION NOTIFICATION:

Your 8-hour TWA noise exposure on the survey date was measured at 68.9 dBA, which is below the 85 dBA Action Level. However, historical data indicates that avionics personnel in this facility are routinely exposed to noise levels exceeding 85 dBA. It is strongly recommended that you remain enrolled in the NYARNG Hearing Conservation Program and continue to wear appropriate hearing protection during noise-hazardous operations.

PREPARED BY: Jayson Allan, Regional Industrial Hygienist (NGB-IH) DATE: 1 October 2019

Attachment 8: Target Facility List

Facility Type Facility Name Address City, Zip Code

AASF William Baxter AASF Bldg E-4081 and others, APG Edgewood

21010-5401

CSMS CSMS (New Building) Box 1, 333 Old Bay Lane, Havre de Grace

21078

FMS Wachter Maintenance Fac. (FMS 1)

5525 Rue Saint Lo Drive, Reisterstown

21136

FMS FMS 02 1218 North Point Rd., Dundalk 21222

FMS FMS 04 926 Booth Street, Salisbury 21801

FMS FMS 05 BLDG E4306, Otto & Nike Rds, Edgewood

21010-5420

FMS FMS 06 9900 Surratts Road, Cheltenham 20623-1324

FMS FMS 07 18500 Roxbury Road, Hagerstown 21740

FMS FMS 08 8601 Odell Road, Laurel 20708

FMS FMS 09 1100 Brown Avenue, Cumberland 21502

File details come from the government source that posted it. Updated .