FBO-Role_Player_Annex_C_updated_20170202.pdf

PDF 244 KB Posted

Attached to
Role Player and Rubble Pile Reset Support for Oregon Army National Guard Special Focus Exercise
Solicitation number
W912JV-17-Q-2001
Issued by

About this file

Annex C updated

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Annex – C

WA HRF / OR CERFP CTE #2 and EXEVAL

Task 1.1, Provide training support for WA HRF / OR CERFP CTE and EXEVAL

Event: WA HRF / OR CERFP CTE #2 and EXEVAL

Location: Camp Rilea, OR

Event Dates: 04-08 June 2017

WA CTE #2

4 June 2017 (0800-1630) – WA CTE #2, Day 1 (Sunday)

25 mannequins with water proof laminated injury cards for rubble pile and water decontaminations operations. (Camp Rilea)

Type III IMT for check-in and Operational Period (OP) Brief (Camp Rilea) o Incident Command (IC) role players (one shift of 5 personnel: IC, Operations Section Chief, Logistics Section Chief, Planning Section Chief and Safety Officer) o Area Command Staff (AC) role players (one shift of 5 personnel: AC, Operations Section Chief, Logistics Section Chief, Planning Section Chief and Safety Officer)

5 June 2017 (0800-1630) – WA CTE #2, Day 2 (Monday)

25 mannequins with water proof laminated injury cards for rubble pile and water decontaminations operations. (Camp Rilea)

Real-world medical support with 4x EMT-certified medics and 2x Ambulance on site to support civilian role players medical needs. (Camp Rilea)

15 Displaced Civilian (DC) role players available for placement at site NLT 0800 hours to support CBRN Assistance Support Element (CASE) operations. DC role players shall come prepared with appropriate undergarments and water shoes. (Camp Rilea)

3 reinforced concrete slabs and 3 non-reinforced concrete slabs at the CP

Rilea rubble pile

1 Lumber Kit for Shoring Operations.

60 casualty role players shall be moulaged and available for placement at site

NLT 0800 hours. Casualty iterations and injury types will be determined by exercise requirements, but no less than three (3) iterations during the operational period. (Camp Rilea)

Type III IMT for check-in and Operational Period (OP) Brief (Camp Rilea) o Incident Command (IC) role players (one shift of 5 personnel: IC, Operations Section Chief, Logistics Section Chief, Planning Section Chief and Safety Officer) o Area Command Staff (AC) role players (one shift of 5 personnel: IC, Operations Section Chief, Logistics Section Chief, Planning Section Chief and Safety Officer)

OR CTE #2

6 June 2017 (0800-1630) – OR CTE #2, Day 1 (Tuesday)

Type III IMT for check-in and Operational Period (OP) Brief (Camp Rilea) o Incident Command (IC) role players (one shift of 5 personnel: IC, Operations Section Chief, Logistics Section Chief, Planning Section Chief and Safety Officer) o Area Command Staff (AC) role players (one shift of 5 personnel: IC, Operations Section Chief, Logistics Section Chief, Planning Section Chief and Safety Officer)

25 mannequins with water proof laminated injury cards for rubble pile and water decontaminations operations. (Camp Rilea)

Real-world medical support with 4x EMT-certified medics and 2x Ambulance on site to support civilian role players medical needs. (Camp Rilea)

75 casualty role players shall be moulaged and available for placement at site

NLT 0800 hours. Casualty iterations and injury types will be determined by exercise requirements, but no less than three (3) iterations during the operational period. (Camp Rilea)

3 reinforced concrete slabs and 3 non-reinforced concrete slabs at the CP

1 Lumber Kit for Shoring Operations.

OR/WA EXEVAL

7 June 2017 (0600-1800) – WA / OR EXEVAL, Day 1 (Wednesday)

Type III IMT for check-in and Operational Period (OP) Brief (Camp Rilea) o Incident Command (IC) role players (one shift of 5 personnel: IC, Operations Section Chief, Logistics Section Chief, Planning Section Chief and Safety Officer) o Area Command Staff (AC) role players (one shift of 5 personnel: IC, Operations Section Chief, Logistics Section Chief, Planning Section Chief and Safety Officer)

25 mannequins with water proof laminated injury cards for rubble pile and water decontaminations operations. (Camp Rilea)

Real-world medical support with 4x EMT-certified medics and 2x Ambulance on site to support civilian role players medical needs. (Camp Rilea)

30 Displaced Civilian (DC) role players available for placement at site NLT 0800 hours to support CBRN Assistance Support Element (CASE) operations. DC role players shall come prepared with appropriate undergarments and water shoes. (Camp Rilea)

125 casualty role players shall be moulaged and available for placement at site

NLT 0800 hours. Casualty iterations and injury types will be determined by exercise requirements, but no less than three (3) iterations during the operational period. (Camp Rilea)

3 reinforced concrete slabs and 3 non-reinforced concrete slabs at the CP

07-08 June 2017 (1800-0600) – WA / OR EXEVAL, Night 1 (Wednesday/Thursday)

Type III IMT for check-in and Operational Period (OP) Brief (Camp Rilea) o Incident Command (IC) role players (one shift of 3 personnel: IC, Operations Section Chief, Logistics Section Chief.

8 June 2017 (0600-1800) – WA / OR EXEVAL, Day 3 (Thursday)

Type III IMT for check-in and Operational Period (OP) Brief (Camp Rilea) o Incident Command (IC) role players (one shift of 5 personnel: IC, Operations Section Chief, Logistics Section Chief, Planning Section Chief and Safety Officer) o Area Command Staff (AC) role players (one shift of 5 personnel: IC, Operations Section Chief, Logistics Section Chief, Planning Section Chief and Safety Officer)

8 June 2017 (0800-1630) – WA / OR EXEVAL, Day 3 (Thursday)

25 mannequins with water proof laminated injury cards for rubble pile and water decontaminations operations. (Camp Rilea)

Real-world medical support with 4x EMT-certified medics and 2x Ambulance on site to support civilian role players medical needs. (Camp Rilea)

30 Displaced Civilian (DC) role players available for placement at site NLT 0800 hours to support CBRN Assistance Support Element (CASE) operations. DC role players shall come prepared with appropriate undergarments and water shoes. (Camp Rilea)

125 casualty role players shall be moulaged and available for placement at site

NLT 0800 hours. Casualty iterations and injury types will be determined by exercise requirements, but no less than three (3) iterations during the operational period. (Camp Rilea)

3 reinforced concrete slabs and 3 non-reinforced concrete slabs at the CP

File details come from the government source that posted it. Updated .