Apron_Cost_Estimates.xls
XLS spreadsheet 107 KB Posted
- Attached to
- Notice of Award to Award Contract W912JB-14-C-2004, Repair Main Parking Apron, Alpena CRTC, Alpena, MI
- Solicitation number
- W912JB14R2004
About this file
Cost Estimate Worksheet
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Read First
| The Excel file for the apron cost estimate is for |
| informational purposes to help the contractors with their bids by entering |
| their unit costs. The contractors are still required to submit their |
| proposals in the bid schedule format provided with the RFP. Also, the |
| government shall not be responsible for the contractors changing the bid |
| quantities. |
ITEMS FOR ESTIMATE
| 5/3/14 14:44 | ||||||
| ESTIMATED | COST | TOTAL | ||||
| ITEM NO. | DESCRIPTION | UNIT | QUANTITY | PER UNIT | COST | |
| 1 | 010000 | STORM WATER AND MISC. PERMITS | LS | |||
| 2 | 010000 | SUBMITTALS , DOCUMENTATION AND REPORTING | LS | |||
| 3 | 010000 | CONSTRUCTION STAKING-PROJECT | LS | |||
| 4 | 010000 | MOBILIZATION | LS | |||
| 5 | 010000 | LOCATE AND PROTECT EXISTING CIRCUITS | LS | |||
| 6 | 015000 | TRAFFIC CONTROL | LS | |||
| 7 | 015000 | MAINTENANCE AND REPAIR OF HAUL ROADS | LS | |||
| 8 | 015000 | MAINTENANCE AND REPAIR OF AIRPORT HAUL ROADS | LS | |||
| 9 | 015000 | TEMPORARY CONSTRUCTION FACILITIES | LS | |||
| 10 | 015723 | SILT FENCE, MAINTAINED | LF | |||
| 11 | 015723 | SILT FENCE | LF | |||
| 12 | 015723 | EROSION MAT | SY | |||
| 13 | 024100 | REMOVE BITUMINOUS PAVEMENT | SY | |||
| 14 | 024100 | REMOVING RIGID PAVEMENT | SY | |||
| 15 | 024100 | MILLING BITUMINOUS PAVEMENT | SY | |||
| 16 | 024100 | REMOVE MITL (TO BE RELOCATED) | EACH | |||
| 17 | 024100 | REMOVE GUIDANCE SIGN (TO BE RELOCATED) | EACH | |||
| 18 | 024100 | REMOVE L-867 BASE CANS | EACH | |||
| 19 | 024100 | REMOVE GROUNDING POINT | EACH | |||
| 20 | 024100 | REMOVE RETROREFLECTOR | EACH | |||
| 21 | 024100 | SAW CUTTING BITUMINOUS PAVEMENT -FULL DEPTH | LF | |||
| 22 | 024100 | SAW CUTTING CONCRETE PAVEMENT-FULL DEPTH | LF | |||
| 23 | 310000 | UNCLASSIFIED EXCAVATION - SHOULDER AREA | CY | |||
| 310000 | UNCLASSIFIED EXCAVATION - APRON AREA | SY | ||||
| 24 | 310000 | SALVAGED TOPSOIL | SY | |||
| 25 | 320119 | SEAL CONCRETE/ASPHALT JOINT | LF | |||
| 26 | 321116 | RIGID PAVEMENT BASE COURSE | TON | |||
| 27 | 321123 | GRADED CRUSHED AGGREGATE BASE COURSE | TON | |||
| 28 | 321210 | BITUMINOUS TACK COAT | GAL | |||
| 29 | 321210 | BITUMINOUS PRIME COAT | GAL | |||
| 30 | 321215 | HOT MIX ASPHALT (HMA) FOR AIRFIELDS - TAXIWAY | TON | |||
| 31 | 321215 | HOT MIX ASPHALT (HMA) FOR AIRFIELDS - SHOULDER | TON | |||
| 32 | 321215 | ASPHALT REINFORCING MESH | SY | |||
| 33 | 321311 | CONCRETE PAVEMENT FOR AIRFIELDS | CY | |||
| 34 | 321311 | DRILL AND PLACE CONCRETE DOWELS | EACH | |||
| 35 | 321311 | CONCRETE REINFORCING MESH | SY | |||
| 36 | 321723 | PAINTING, REFLECTIVE YELLOW | SF | |||
| 37 | 321723 | PAINTING, NON-REFLECTIVE YELLOW | SF | |||
| 38 | 321723 | PAINTING, REFLECTIVE RED | SF | |||
| 39 | 321723 | PAINTING, NON-REFLECTIVE BLACK | SF | |||
| 40 | 329219 | TEMPORARY SEEDING | LBS | |||
| 41 | 329219 | SEEDING | LBS | |||
| 42 | 329219 | FERTILIZING | LBS | |||
| 43 | 329219 | LIME | LBS | |||
| 44 | 329219 | HYDRO-MULCHING | SY | |||
| 45 | 337102 | 5000V CABLE, NO. 8 | LF | |||
| 46 | 337102 | L-823 CABLE SPLICE | EACH | |||
| 47 | 337102 | COUNTERPOISE, BARE No. 4 | LF | |||
| 48 | 337102 | COUNTERPOISE GROUND ROD | EACH | |||
| 49 | 337102 | TRENCH RESTORATION | LF | |||
| 50 | 337102 | 2 - 4" ELECTRICAL DUCT ENCASED | LF | |||
| 51 | 337102 | 1 - 4" ELECTRICAL DUCT ENCASED | LF | |||
| 52 | 337102 | ELECTRICAL DUCT EDGE LIGHTS (RIGID PVC) | LF | |||
| 53 | 337102 | ELECTRICAL HANDHOLE | EACH | |||
| 54 | 344300 | REGULATOR | EACH | |||
| 55 | 344300 | BASE MOUNTED MITL - BLUE (QUARTZ) | EACH | |||
| 56 | 344300 | BASE MOUNTED MITL - YELLOW (QUARTZ) | EACH | |||
| 57 | 344300 | BASE MOUNTED MITL - BLUE (LED) | EACH | |||
| 58 | 344300 | L-867 BASE CAN WITH LID AND GASKET | EACH | |||
| 59 | 344300 | RELOCATE MITL (QUARTZ) | EACH | |||
| 60 | 344300 | RELOCATE GUIDANCE SIGN | EACH | |||
| 61 | 344300 | GUIDANCE SIGN - 1 MODULE | LS | |||
| 62 | 344300 | MISCELLANEOUS LIGHTING EQUIPMENT | LS | |||
| 63 | 344300 | MISCELLANEOUS ELECTRICAL VAULT WORK | LS | |||
| 64 | SUPPL | INSULATE WATERLINE | LF | |||
| TOTAL: | $0.00 |
B-3 FINAL CLIN 1
| MICHIGAN AIR NATIONAL GUARD - ALPENA CRTC | REPAIR PARKING APRON A01B AND A08B | ||||||||||||
| RECONSTRUCT AIRCRAFT APRON A01B AND A08B | TDVG122778 | ||||||||||||
| B-3 FINAL ESTIMATE | BASE BID | ||||||||||||
| MINOR CONSTRUCTION - CLIN 1 | MINOR CONSTRUCTION - CLIN 1 | ||||||||||||
| DATE | 3-May-14 | ITEM NO. | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL | ||||||
| 1 | 024100 | REMOVE BITUMINOUS PAVEMENT | SY | 4 | |||||||||
| ITEM NO. | DESCRIPTION | UNIT | QUANTITY | UNIT COST | 2 | 024100 | SAW CUTTING BITUMINOUS PAVEMENT -FULL DEPTH | LF | 61 | ||||
| PHASE 1 | PHASE 2 | 3 | 321123 | GRADED CRUSHED AGGREGATE BASE COURSE | TON | 6,580 | |||||||
| REMOVALS | 4 | 321210 | BITUMINOUS TACK COAT | GAL | 1,640 | ||||||||
| 024100 | REMOVE BITUMINOUS PAVEMENT | SY | 4 | 0 | 4 | 5 | 321210 | BITUMINOUS PRIME COAT | GAL | 3,840 | |||
| 024100 | SAW CUTTING BITUMINOUS PAVEMENT -FULL DEPTH | LF | 61 | 0 | 61 | 6 | 321215 | HOT MIX ASPHALT (HMA) FOR AIRFIELDS - SHOULDERS/ROADS | TON | 2,080 | |||
| 0 | 7 | 320119 | SEAL CONCRETE/ASPHALT JOINT | LF | 1,790 | ||||||||
| CRUSHED AGGREGATE | 0 | 8 | 321723 | BOLLARDS | EACH | 15 | |||||||
| 321123 | GRADED CRUSHED AGGREGATE BASE COURSE | TON | 3,440 | 3140 | 6580 | 9 | 337102 | 2-4" ENCASED DUCT | LF | 50 | |||
| 0 | BASE BID CLIN-1 TOTAL COST: | ||||||||||||
| ASPHALT SURFACE | 0 | ||||||||||||
| 321210 | BITUMINOUS TACK COAT | GAL | 840 | 800 | 1640 | This sheet is to be filled out and attached to the Bid Proposal. | |||||||
| 321210 | BITUMINOUS PRIME COAT | GAL | 2,010 | 1830 | 3840 | ||||||||
| 321215 | HOT MIX ASPHALT (HMA) FOR AIRFIELDS - SHOULDERS/ROADS | TON | 1,080 | 1000 | 2080 | ||||||||
| 0 | |||||||||||||
| 0 | |||||||||||||
| CONCRETE SURFACE | 0 | ||||||||||||
| 320119 | SEAL CONCRETE/ASPHALT JOINT | LF | 1,050 | 740 | 1790 | ||||||||
| 0 | |||||||||||||
| 0 | |||||||||||||
| PAVEMENT MARKINGS | 0 | ||||||||||||
| 321723 | BOLLARDS | EACH | 15 | 0 | 15 | ||||||||
| 0 | |||||||||||||
| MISC. ELECTRICAL | 0 | ||||||||||||
| 337102 | 2-4" ENCASED DUCT | LF | 50 | 0 | 50 | ||||||||
| 0 |
&L&7&Z&F&F&R&7Page &P of &N
B-3 FINAL CLIN 2
| MICHIGAN AIR NATIONAL GUARD - ALPENA CRTC | |||||||||||||
| RECONSTRUCT AIRCRAFT APRON A01B AND A08B | REPAIR PARKING APRON A01B AND A08B | ||||||||||||
| B-3 FINAL ESTIMATE | TDVG122778 | ||||||||||||
| REPAIR - CLIN 2 | BASE BID | ||||||||||||
| REPAIR - CLIN 2 | |||||||||||||
| ITEM NO. | DESCRIPTION | UNIT | QUANTITY | UNIT COST | ITEM NO. | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL | |||
| PHASE 1 | PHASE 2 | 1 | 010000 | STORM WATER AND MISC. PERMITS | LS | 1 | |||||||
| GENERAL | 2 | 010000 | SUBMITTALS , DOCUMENTATION AND REPORTING | LS | 1 | ||||||||
| 010000 | STORM WATER AND MISC. PERMITS | LS | 0.5 | 0.5 | 1.0 | 3 | 010000 | CONSTRUCTION STAKING-PROJECT | LS | 1 | |||
| 010000 | SUBMITTALS , DOCUMENTATION AND REPORTING | LS | 0.5 | 0.5 | 1 | 4 | 010000 | MOBILIZATION | LS | 1 | |||
| 010000 | CONSTRUCTION STAKING-PROJECT | LS | 0.5 | 0.5 | 1 | 5 | 010000 | LOCATE AND PROTECT EXISTING CIRCUITS | LS | 1 | |||
| 010000 | MOBILIZATION | LS | 0.5 | 0.5 | 1 | 6 | 010000 | SECURITY FORCES/GATE GUARD | LS | 1 | |||
| 010000 | LOCATE AND PROTECT EXISTING CIRCUITS | LS | 0.5 | 0.5 | 1 | 7 | 015000 | TRAFFIC CONTROL | LS | 1 | |||
| 010000 | SECURITY FORCES/GATE GUARD | LS | 0.5 | 0.5 | 1 | 8 | 015000 | MAINTENANCE AND REPAIR OF HAUL ROADS | LS | 1 | |||
| 015000 | TRAFFIC CONTROL | LS | 0.5 | 0.5 | 1 | 9 | 015000 | MAINTENANCE AND REPAIR OF AIRPORT HAUL ROADS | LS | 1 | |||
| 015000 | MAINTENANCE AND REPAIR OF HAUL ROADS | LS | 0.5 | 0.5 | 1 | 10 | 015000 | TEMPORARY CONSTRUCTION FACILITIES | LS | 1 | |||
| 015000 | MAINTENANCE AND REPAIR OF AIRPORT HAUL ROADS | LS | 0.5 | 0.5 | 1 | 11 | 015723 | EROSION MAT | SY | 21,170 | |||
| 015000 | TEMPORARY CONSTRUCTION FACILITIES | LS | 0.5 | 0.5 | 1 | 12 | 015723 | SILT FENCE, MAINTAINED | LF | 3270 | |||
| 13 | 015723 | SILT FENCE | LF | 3270 | |||||||||
| EROSION CONTROL | 14 | 024100 | REMOVE BITUMINOUS PAVEMENT | SY | 12,230 | ||||||||
| 015723 | EROSION MAT | SY | 12,150 | 9,020 | 21170 | 15 | 024100 | REMOVING RIGID PAVEMENT (EACH 7" LIFT) | SY | 155260 | |||
| 015723 | SILT FENCE, MAINTAINED | LF | 1,810 | 1,460 | 3270 | 16 | 024100 | REMOVING RIGID PAVEMENT | SY | 3900 | |||
| 015723 | SILT FENCE | LF | 1,810 | 1,460 | 3270 | 17 | 024100 | REMOVING ASPHALT INTERLAYER | SY | 73310 | |||
| 18 | 024100 | REMOVING BOLLARDS | EACH | 30 | |||||||||
| REMOVALS | 19 | 024100 | REMOVE GROUND LUG/TIE-DOWN | EACH | 158 | ||||||||
| 024100 | REMOVE BITUMINOUS PAVEMENT | SY | 5,420 | 6,810 | 12230 | 20 | 024100 | REMOVE, ADJUST, AND REINSTALL SIGN/GATE POST | EACH | 9 | |||
| 024100 | REMOVING RIGID PAVEMENT (EACH 7" LIFT) | SY | 78,270 | 76,990 | 155260 | 21 | 024100 | SAW CUTTING BITUMINOUS PAVEMENT -FULL DEPTH | LF | 860 | |||
| 024100 | REMOVING RIGID PAVEMENT | SY | 590 | 3,310 | 3900 | 22 | 024100 | SAW CUTTING CONCRETE PAVEMENT-FULL DEPTH | LF | 1260 | |||
| 024100 | REMOVING ASPHALT INTERLAYER | SY | 36,900 | 36,410 | 73310 | 23 | 310000 | UNCLASSIFIED EXCAVATION - SHOULDER AREA | CY | 12050 | |||
| 024100 | REMOVING BOLLARDS | EACH | 0 | 30 | 30 | 24 | 310000 | UNCLASSIFIED EXCAVATION - APRON AREA | CY | 710 | |||
| 024100 | REMOVE GROUND LUG/TIE-DOWN | EACH | 80 | 78 | 158 | 25 | 310000 | BORROW EXCAVATION - SELECT MATERIAL SUBBASE COURSE | CY | 4,870 | |||
| 024100 | REMOVE, ADJUST, AND REINSTALL SIGN/GATE POST | EACH | 5 | 4 | 9 | 26 | 310000 | CLAY EXCAVATION AND REPLACEMENT | SY | 21,400 | |||
| 024100 | SAW CUTTING BITUMINOUS PAVEMENT -FULL DEPTH | LF | 450 | 410 | 860 | 27 | 321723 | EROSION CONTROL MOBILIZATION | LS | 4 | |||
| 024100 | SAW CUTTING CONCRETE PAVEMENT-FULL DEPTH | LF | 790 | 470 | 1260 | 28 | 310000 | SALVAGED TOPSOIL | SY | 26660 | |||
| 310000 | UNCLASSIFIED EXCAVATION - SHOULDER AREA | CY | 5,270 | 6,780 | 12050 | 29 | 329219 | TEMPORARY SEEDING | LBS | 490 | |||
| 310000 | UNCLASSIFIED EXCAVATION - APRON AREA | CY | 380 | 330 | 710 | 30 | 329219 | SEEDING | LBS | 970 | |||
| 310000 | BORROW EXCAVATION - SELECT MATERIAL SUBBASE COURSE | CY | 2,670 | 2,200 | 4870 | 31 | 329219 | FERTILIZING | LBS | 1660 | |||
| 310000 | CLAY EXCAVATION AND REPLACEMENT | SY | 17,700 | 3,700 | 21400 | 32 | 329219 | LIME | LBS | 2760 | |||
| 33 | 329219 | HYDRO-MULCHING | SY | 5480 | |||||||||
| LANDSCAPING | 34 | 337102 | TACKIFIER | SY | 5,480 | ||||||||
| 321723 | EROSION CONTROL MOBILIZATION | LS | 2 | 2 | 4 | 35 | 321116 | RIGID PAVEMENT BASE COURSE | TON | 35,130 | |||
| 310000 | SALVAGED TOPSOIL | SY | 16,220 | 10,440 | 26660 | 36 | 321123 | GRADED CRUSHED AGGREGATE BASE COURSE | TON | 2,800 | |||
| 329219 | TEMPORARY SEEDING | LBS | 300 | 190 | 490 | 37 | 321210 | BITUMINOUS TACK COAT | GAL | 720 | |||
| 329219 | SEEDING | LBS | 590 | 380 | 970 | 38 | 321210 | BITUMINOUS PRIME COAT | GAL | 1395 | |||
| 329219 | FERTILIZING | LBS | 1,010 | 650 | 1660 | 39 | 321215 | HOT MIX ASPHALT (HMA) FOR AIRFIELDS - APRON | TON | 390 | |||
| 329219 | LIME | LBS | 1,680 | 1,080 | 2760 | 40 | 321215 | HOT MIX ASPHALT (HMA) FOR AIRFIELDS - SHOULDERS/ROADS | TON | 650 | |||
| 329219 | HYDRO-MULCHING | SY | 4,060 | 1,420 | 5480 | 41 | 321311 | CONCRETE PAVEMENT FOR AIRFIELDS | CY | 36,760 | |||
| 337102 | TACKIFIER | SY | 4,060 | 1,420 | 5480 | 42 | 321311 | CONCRETE CURING FACILITY | LS | 1 | |||
| 43 | 321311 | DRILL AND PLACE CONCRETE DOWELS | EACH | 296 | |||||||||
| CRUSHED AGGREGATE | 44 | 321311 | CONCRETE REINFORCING MESH | SY | 1696 | ||||||||
| 321116 | RIGID PAVEMENT BASE COURSE | TON | 17,230 | 17,900 | 35130 | 45 | 320119 | SEAL CONCRETE/ASPHALT JOINT | LF | 2,000 | |||
| 321123 | GRADED CRUSHED AGGREGATE BASE COURSE | TON | 1,090 | 1,710 | 2800 | 46 | 321723 | BOLLARDS | EACH | 30 | |||
| 47 | 321723 | STOP/ATC SIGN | EACH | 2 | |||||||||
| ASPHALT SURFACE | 48 | 321723 | PAINTING, YELLOW (REFLECTIVE) | SF | 11390 | ||||||||
| 321210 | BITUMINOUS TACK COAT | GAL | 270 | 450 | 720 | 49 | 321723 | PAINTING, YELLOW (NON-REFLECTIVE) | SF | 1640 | |||
| 321210 | BITUMINOUS PRIME COAT | GAL | 525 | 870 | 1395 | 50 | 321723 | PAINTING, BLACK | SF | 19500 | |||
| 321215 | HOT MIX ASPHALT (HMA) FOR AIRFIELDS - APRON | TON | 180 | 210 | 390 | 51 | 321723 | PAINTING, WHITE (NON-REFLECTIVE) | SF | 1110 | |||
| 321215 | HOT MIX ASPHALT (HMA) FOR AIRFIELDS - SHOULDERS/ROADS | TON | 220 | 430 | 650 | 52 | 321723 | PAINTING, RED (NON-REFLECTIVE) | SF | 290 | |||
| 53 | 321723 | PAINTING, FOD STOP BARS | SF | 685 | |||||||||
| CONCRETE SURFACE | 54 | 337102 | COUNTERPOISE CABLE | LF | 8,840 | ||||||||
| 321311 | CONCRETE PAVEMENT FOR AIRFIELDS | CY | 18,240 | 18,520 | 36760 | 55 | 337102 | CAD WELD | EACH | 158 | |||
| 321311 | CONCRETE CURING FACILITY | LS | 0.5 | 0.5 | 1 | 56 | 337102 | GROUND ROD/ TIE-DOWN | EACH | 158 | |||
| 321311 | DRILL AND PLACE CONCRETE DOWELS | EACH | 44 | 252 | 296 | BASE BID CLIN-2 TOTAL COST: | |||||||
| 321311 | CONCRETE REINFORCING MESH | SY | 964 | 732 | 1696 | ||||||||
| 320119 | SEAL CONCRETE/ASPHALT JOINT | LF | 710 | 1,290 | 2000 | This sheet is to be filled out and attached to the Bid Proposal. | |||||||
| PAVEMENT MARKINGS | |||||||||||||
| 321723 | BOLLARDS | EACH | 0 | 30 | 30 | ||||||||
| 321723 | STOP/ATC SIGN | EACH | 1 | 1 | 2 | ||||||||
| 321723 | PAINTING, YELLOW (REFLECTIVE) | SF | 5,680 | 5,710 | 11390 | ||||||||
| 321723 | PAINTING, YELLOW (NON-REFLECTIVE) | SF | 780 | 860 | 1640 | ||||||||
| 321723 | PAINTING, BLACK | SF | 9,710 | 9,790 | 19500 | ||||||||
| 321723 | PAINTING, WHITE (NON-REFLECTIVE) | SF | 520 | 590 | 1110 | ||||||||
| 321723 | PAINTING, RED (NON-REFLECTIVE) | SF | 140 | 150 | 290 | ||||||||
| 321723 | PAINTING, FOD STOP BARS | SF | 245 | 440 | 685 | ||||||||
| MISC. ELECTRICAL | |||||||||||||
| 337102 | COUNTERPOISE CABLE | LF | 4,480 | 4,360 | 8840 | ||||||||
| 337102 | CAD WELD | EACH | 78 | 80 | 158 | ||||||||
| 337102 | GROUND ROD/ TIE-DOWN | EACH | 78 | 80 | 158 |
&L&7&Z&F&F&R&7Page &P of &N
B-3 FINAL CLIN 3
| MICHIGAN AIR NATIONAL GUARD - ALPENA CRTC | ||||||||||||||
| RECONSTRUCT AIRCRAFT APRON A01B AND A08B | REPAIR PARKING APRON A01B AND A08B | |||||||||||||
| B-3 FINAL ESTIMATE | TDVG122778 | |||||||||||||
| REPAIR - CLIN 3 | BASE BID | |||||||||||||
| REPAIR - CLIN 3 | ||||||||||||||
| ITEM NO. | DESCRIPTION | UNIT | QUANTITY | UNIT COST | ITEM NO. | DESCRIPTION | UNIT | QUANTITY | UNIT PRICE | TOTAL | ||||
| PHASE 1 | PHASE 2 | 1 | 1 | 010000 | CONSTRUCTION STAKING-PROJECT | LS | 1 | |||||||
| GENERAL | 1 | 2 | 010000 | LOCATE AND PROTECT EXISTING CIRCUITS | LS | 1 | ||||||||
| 010000 | CONSTRUCTION STAKING-PROJECT | LS | 0.5 | 0.5 | 3 | 024100 | REMOVING RIGID PAVEMENT (EACH 7" LIFT) | SY | 40,090 | |||||
| 010000 | LOCATE AND PROTECT EXISTING CIRCUITS | LS | 0.5 | 0.5 | 4 | 024100 | REMOVING ASPHALT INTERLAYER | SY | 20,050 | |||||
| 40090 | 5 | 024100 | SAW CUTTING CONCRETE PAVEMENT-FULL DEPTH | LF | 4,800 | |||||||||
| REMOVALS | 20050 | 6 | 310000 | UNCLASSIFIED EXCAVATION - APRON AREA | CY | 1,610 | ||||||||
| 024100 | REMOVING RIGID PAVEMENT (EACH 7" LIFT) | SY | 20,190 | 19,900 | 4800 | 7 | 321116 | RIGID PAVEMENT BASE COURSE | TON | 8,080 | ||||
| 024100 | REMOVING ASPHALT INTERLAYER | SY | 10,100 | 9,950 | 1610 | 8 | 321311 | CONCRETE PAVEMENT FOR AIRFIELDS | CY | 9,180 | ||||
| 024100 | SAW CUTTING CONCRETE PAVEMENT-FULL DEPTH | LF | 2,420 | 2,380 | 9 | 321311 | DRILL AND PLACE CONCRETE DOWELS | EACH | 60 | |||||
| 310000 | UNCLASSIFIED EXCAVATION - APRON AREA | CY | 830 | 780 | BASE BID CLIN-3 TOTAL COST: | |||||||||
| 8080 | ||||||||||||||
| CRUSHED AGGREGATE | This sheet is to be filled out and attached to the Bid Proposal. | |||||||||||||
| 321116 | RIGID PAVEMENT BASE COURSE | TON | 4,000 | 4,080 | ||||||||||
| 9180 | ||||||||||||||
| CONCRETE SURFACE | 60 | |||||||||||||
| 321311 | CONCRETE PAVEMENT FOR AIRFIELDS | CY | 4,570 | 4,610 | ||||||||||
| 321311 | DRILL AND PLACE CONCRETE DOWELS | EACH | 0 | 60 | ||||||||||
| REPAIR PARKING APRON A01B AND A08B | ||||||||||||||
| TDVG122778 | ||||||||||||||
| BASE BID SUMMARY | ||||||||||||||
| CLIN No. | DESCRIPTION | TOTAL COST | ||||||||||||
| CLIN 1 | MINOR CONSTRUCTION | |||||||||||||
| CLIN 2 | REPAIR | |||||||||||||
| CLIN 3 | REPAIR | |||||||||||||
| BASE BID TOTAL COST: | ||||||||||||||
| This sheet is to be filled out and attached to the Bid Proposal. |