W912J6-17-R-0002-0006.pdf

PDF 156 KB Posted

Attached to
PN150035 COMBINED SUPPORT MAINTENANCE SHOP
Solicitation number
W912J6-17-R-0002
Issued by

About this file

W912J6-17-R-0002-0006

View the file

Other files

File Type Posted
Q&A_Dated_15Aug2017.pdf PDF
W912J6-17-R-0002-0005.pdf PDF
Q&A_Dated_12Aug2017.pdf PDF
REVISED_EXHIBIT_A-W912J617R0002_-_Copy.doc DOC document
Q&A_Dated_11Aug2017_0700_Hours.pdf PDF
REVISED_EXHIBIT_A-W912J617R0002_-_Copy.doc DOC document
REVISED_EXHIBIT_A-W912J617R0002.doc DOC document
W912J6-17-R-0002-0004.pdf PDF
A-304_CSMS-ARCH_042117-REVISED.pdf PDF
Q&A_Dated_07Aug2017_1300_Hours.pdf PDF
W912J6-17-R-0002-0003.pdf PDF
Q&A_Dated_02Aug2017_0600_Hours.pdf PDF
PreProposal_Meeting_Minutes26Jul17.pdf PDF
SIGN_IN_SHEET.pdf PDF
Q&A_Dated_31Jul2017_0500_Hours.pdf PDF
Addendum_1_Elec.pdf PDF
Q&A_Dated_27Jul2017.pdf PDF
W912J6-17-R-0002-0002.pdf PDF
87618_Subsurface_Information.pdf PDF
Q&A_Dated_25Jul2017.pdf PDF
Q&A_Dated_24Jul2017.pdf PDF
W912J6-17-R-0002-0001.pdf PDF
EXHIBIT_B-W912J617R0002_-_Copy.doc DOC document
EXHIBIT_A-W912J617R0002_-_Copy.doc DOC document
EXHIBIT_C-W912J617R0002_-_Copy.doc DOC document
Q&A_Dated_13Jul2017.pdf PDF
W912J6-17-R-0002.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

150035

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment incorporates the f inal Q&A Dated 15Aug17

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912J6-17-R-0002

X 9B. DATED (SEE ITEM 11)

13-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Aug-2017

CODE

USPFO FOR HAWAII

ATTN: MAJ MANUEL LLANES

91-1179 ENTERPRISE AVE

KAPOLEI HI 96707-2150

W912J6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912J6-17-R-0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

Q&A DATED 15AUG2017

QUESTIONS AND ANSWERS RELATED TO:

SOLICITATION W912J6-17-R-0002

Dated 15 Aug 2017

Make Sure You Have the Latest Version of this Web Page “Refresh” or “Reload”

Dated 13 Jul 17

Q1. How do I access the files/documents for the Project?

A1. See, Sections 4.4, 4.5 & 4.7 of the FBO Vendor Guide available for download in PDF format via the Federal Business Opportunities / FBO Home Page. See also, Section 00100 of the Solicitation. Additionally, to view and/or download Export Controlled Materials, a company must be certified (via an approved DD Form 2345) by the Joint Certification Program (JCP) administered by the DLA Logistic Information Service (DLIS). This certification establishes that a company is a U.S. or Canadian contractor eligible to receive unclassified technical data that is under the control of the U.S. Department of Defense (DoD) or the Canadian Department of National Defense (DND). Questions about this program or DD Form 2345 should be addressed to U.S./Canada Joint Certification Office, DLA Logistics Information Services (DLIS), Federal Center, 74 Washington Avenue North, Battle Creek, MI 49017-3084. The Joint Certification Office may be contacted by telephone at: 1-(800) 352-3572; or email: jcp-admin@.dla.mil.

Q2. I am trying to access the [export controlled] packages and have a number as assigned on DD Form 2345 but cannot get the packages to open. Our DD 2345 Number is ####### expiration ##/##/2018.

A2. The U.S./Canada Joint Certification Program (JCP) office reported to this office that once a company is certified with the JCP office (normally 7 to 12 business days), the company should contact FBO to have them add their JCP number to their FBO account. The FBO help desk (Federal Service Desk) reported to this office that companies need to make sure that they are registered and login as a Vendor to FBO. When the Vendor click's to open an export controlled package/document, they should be asked for their MPIN. After entering the MPIN, the export controlled package/document should be viewable/downloadable by Vendors that have gone through the JCP process. If a Vendor still has problems, the Vendor should check to make sure that their CCR registration and MPIN are valid and up-to-date. If problems still persist, the Vendor may call the FBO help desk at 866-606-8220, selection option 2 for FBO issues, and ask for troubleshooting assistance.

Q3. Please help me access the locked documents for solicitation W912J6-17-R-0002.

A3. Reference answers A1 and A2 above. After your firm contact and submits a DD Form 2345 to the Joint Certification Program (JCP) which is administered by the DLA Logistic Information (contact information provided in A1) your firm can send proof of this application and submission via a copy of the email receipt from the JCP or DLA personnel that your certification is in process to manual.llanes.mil@mail.mil and copy to russell.s.redila.mil@mail.mil . Pending receipt of the proof that your application is pending certification the mailto:jcp-admin@.dla.mil mailto:manual.llanes.mil@mail.mil mailto:russell.s.redila.mil@mail.mil

Contracting Officer may make the locked files directly available to your frim via AMRDEC SAFE. This access will not be granted if your firm does not apply for certification and follow the above mentioned instructions in A1 and A2.

Q4. We cannot download the specification and drawing documents for the subject bid with MPIN. Is there any way we can get the export controlled documents except applying JCP certification?

A4. See Item A3 Above.

Dated 24 Jul 17

Q5. Specification Section 07 53 23 section 2.1.1 EPDM Sheet is calling for a 90 Mil Reinforced EPDM Membrane. However No manufacturer produces reinforced EPDM membrane in White to meet the SRI value, they only produce a 115 Mil reinforced Fleeceback EPDM Membrane in white that will meet the SRI value as specified. Can we use a Carlisle 115 Mil reinforced Fleeceback EPDM?

A5.Offerors need to ensure they continue reading section 2.1.1 and note, 0.090 inch nominal thickness is referred to as a “minimum thickness”. Roofing systems complying to all requirements of the specification(s) including the achievement of a minimum EPDM thickness of 0.090 inch are acceptable.

Q6. My question concerns past-performance questionnaires (PPQs) as provided in Exhibit C. We have requested references for the three project we intend to submit using the US Navy/USACE forms. These were sent to us for inclusion in recent proposals. Would the Government please consider allowing us to use these completed PPQs and send them to you, in lieu of requesting our clients complete another past performance questionnaire form?

A6. Yes the Government will allow use of these completed PPQs. They should be sent from the client directly to the Contracting Officer if at all possible.

Q7. General Note No.5 on sheet S-001 refers to Geolabs Inc. geotechnical report dated April 01, 2016. Please provide the abovementioned report to all bidders to make them familiar with the existing soil condition.

A7. The Geotechnical report will be provided in forthcoming Amendment and posted to www.fbo.gov

Dated 25 Jul 17

Q8. On sheet CS100 note 19 & 20 states for Base bid aggregate paving to be installed and for Bid option #7 heavy duty concrete paving is to be installed. If bid option #7 is not awarded and aggregate paving is installed per base bid the parking stall striping and handicap striping specified will not last very long on aggregate paving. Do you still require this to be striped if bid option #7 is not awarded?

A8. Yes this will still be required to be striped if bid option #7 is not awarded.

Q9. Sheet DT505 specifies a concrete Oil/Water separator and detail 4/DT509 specifies a steel body Oil/Water separator. Is there a particular manufacturer specified for these tanks? How many gallon capacity for each of these tanks?

A9. There is no specific manufacturer requirement. For the steel OWS (Detail 4/DT509), provide a 1,000 gallon tank that meets the requirements of the plans/specs. For the concrete OWS (Detail 2/DT505), provide the size and layout that matches the dimensions shown.

Dated 27 Jul 17

Q10. Project indicates a third-partly Commissioning Authority is involved with the projects and employed by the Gov't or A/E. Has the Commissioning Authority already been hired by the Gov't or A/E, or is the contractor to employ the Commissioning authority?

A10. Owner/Governemnt will provide Commissioning Authority utilizing local A/E Cx staff to execute the owner’s responsibilities. The Contractor shall provide the required Commissioning activites required by the Contracor/Builder as required by the project specifications.

Dated 31 Jul 17

Q11. We are requesting the addition of “PDQ Manufacturing” as an approved alternate manufacturer to that listed in the door schedule, and under section 08 71 00 of the specification for the following products when applicable to your project; 1) Mortis Locks, 2) Cylindrical Locks, 3) Door Closers, 4) Panic Devices with Trim.

Per FAR 36 2.02 Specifications, 11.103 Market acceptance paragraphs (a), (1), (i), (ii), (iii), (5) and 11.104 Use of brand name or equal purchase descriptions. We offer the following justification for review; test data, the material used, and certifications for the addition of PDQ Manufacturing. PDQ Manufacturing has also met all product testing, materials used, and certifications required by the UFGS and the FAR.

11.103 (a), (1), (i) - Achieved commercial acceptance

PDQ Manufacturing is a member of BHMA, the governing body for commercial contract hardware products standards and specifications. PDQ has an onsite BHMA/InterTech® certified testing laboratory to meet the requirement of recertification of all products every three years. PDQ is an architecturally specified manufacturer for many commercial projects each year.

(a), (1), (ii) - Been satisfactorily supplied to an agency under current or recent contracts

PDQ Manufacturing has supplied many projects

(a), (2) - Otherwise meet the item description, specifications, or other criteria prescribed in the public notice and solicitation.

PDQ Manufacturing meets all salient physical, functional, and performance characteristics of the brand listed, and as required by the Unified Facility Guide specifications, BHMA standards, ANSI and UL testing.

A11. PDQ is acceptable provided products comply with all specification requirements

Q12. While at the site during the pre-proposal conference, we noticed concrete duct banks being installed crossing Circle Avenue and Earl's Alley and new telecommunication manholes on both sides of Earl's alley.

The conduits crossing Circle Alley appear to be terminated with risers up one of the power poles scheduled to be demolished by HELCO per CD010 and ES102. None of this new work is shown on ES102. Any new conduits crossing these recently poured ductbanks will probably need to be routed underneath to get the required cover. Can the telecom for project W912J6-17-R-0002 be routed through these recently installed conduits and manholes or must additional ductbanks and handholes be installed?

A12. Bid communication ductbank as shown on the plans. Further evaluation of the use of existing ductbank will be done during the construction phase.

Dated 01 Aug 17

Q13. Please clarify where the chemical resistive resinous flooring shall be installed. Spec. section 09 67 23 CHEMICAL RESISTIVE RESINOUS FLOORINS was provided in this project package but there is no chemical resistive resinous flooring indicated on A‐603.

A13. Provide in BATTERY ROOM 134.

Q14. Please refer to A‐109_Bldg insulation diagram. Insulation diagram @ Lower level depicts CMU wall with R‐6.5 un‐interrupted panel insulation for Area C perimeter walls. However, related detail drawings (A‐301, A‐304, A‐509) doesn’t show un‐interrupted panel insulation on these areas. Please clarify.

A14. To achieve the maximum level of cost competitiveness, project was designed with a non-proprietary assembly/system performance criteria along with a delegated design to accomplish the building insulation and air barrier performance criteria. Review A-109 along with Specification’s to accomplish the specified performance criteria for the insulation and air barrier. Related specification sections include 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS, 07 21 16 MINERAL FIBER BLANKET INSULATION, 07 22 00 ROOF AND DECK INSULATION and 07 42 16 INSULATED CORE METAL WALL PANELS.

Q15. Related with above inquiry, exterior wall between grid F and K at Grid 14 has R‐12 uninterrupted panel insulation. However, exterior elevation drawing (A‐201) or B/A‐308 don’t show any panel finishes. Please clarify.

A15. See A14 above.

Q16. Refer to Roof Plan, A‐102. Please clarify what the ‘+’ symbols are?

A16. These are drafting grips in the BIM Revit model and inadvertently plotted. Please disregard them relative to the architecutal plan.

Q17. Please confirm welding table and workbay tables are GFGI on A‐103.

A17. Confirmed, note Design Building Contractor shall be responsible to provide the designated utility connections on the Work/Welding tables to include the coordination of the tables during construction so that the work can be completed.

Q18. Please clarify window type at RM103_PROD CNTR. Refer to A‐104 and 2D/A‐202.

A18. Provide F2 window type, see A-602.

Q19. Please clarify for the top running overhead bridge crane. For the 15 ton top running overhead bridge crane, is it to be a top running single girder crane per note 4.F Crane Load on Sheet S‐001 or a top running double girder crane per reference of CMAA70 on page 7 of spec section 412213.14 paragraph 2.1?

A19. Bridge crane shall be a single girder top running crane per note 4.F on S-001. Crane shall be in accordance with CMAA 74.

Q20. There is no detail on the parking canopy roof frame. Please provide existing condition of parking structure such as as‐built drawings.

A20. Existing drawings will be issued in a forthcoming Amendment.

07 Aug 2017

Q21. Specification Section 41 22 13.14, paragraph 2.1.2 Speeds: the specified Trolley (125FPM) and Bridge (150FPM) speeds are considered FAST per CMAA 70 suggested operating speeds for a pendant controlled crane and maybe unsafe for Class B non-production usage. Typically, for this type of crane and application, Slow to Medium Speeds would be specified per CMAA 70, i.e. Trolley= 80 FPM and Bridge = 120 FPM.

Can the speeds be reduced to Trolley (80FPM) and Bridge (120FPM)? The hoist is OK at 20 FPM, that is considered Medium speed

A21. Bridge crane speed shall be 150 feet per minute per specification 41 22 13.14 section 2.1.2.d and Crane Note 9 on S-121. Revise 41 22 13.14 Section 2.1.2.b to read “Trolley - rated speed of 80 feet per minute. Revise Crane Note 11 on S-121 to read “Hoist Speed: Travel speed 10 feet per minute”.

Q22. Please clarify overhead doors are whether Manual or Motor operated. Section 083323 notes both Motor operated (2.2.5 list Electric Doors) and Chain (2.2.4 list Manual Doors) operated. And motors are shown on electrical drawings E‐111 but architectural drawings detail looks like manual operated.

A22. Provide Overhead door as specified with both electrical and manual operation.

Q23. Refer to P701. In regards to Air Compress Schedule, please clarify that Is the required 63 SCFM or 94 SCFM combined for the package or a per pump total?

A23. Scheduled SCFM capacities are totals per packaged duplex systems, not individual compressors within duplex systems.

Q24. We cannot find a detail of the insulated wall panel/slab curb interface. The structural drawings seem to indicate the outer skin of the insulated panel extends past the curb. We cannot find this issue addressed on the architectural. Please provide a detail showing how the insulated metal and the concrete curb interface and how that intersection of those materials is to be.

A24. Detail 9/A-304 revised – see attached drawing. Revised Drawing A-304 Will be incorporated with forthcoming Amendment.

Q25. Section 00110, Para. 2.5.2.3 - For the required schedule, as it is not subject to the page limits, please advise if provision on 11x17 paper will be acceptable.

A25. Yes 11x17 paper is acceptable, offerors shall ensure the schedule is secured in the binder and not loose pages.

Q26. For the completion of Exhibit A, Part 1, Section 00110, Para. 2.5.3.4 states to "prepare not more than five(5) of these documents". However, referring to Exhibit A, Part 1, the top paragraph states "prepare not more than (3) of these documents". Please clarify the discrepancy.

A26. See A15 above. Please prepare not more than five (5) Exhibit A Part 1 Documents. Forthcoming amendment will reflect this instruction.

Q27. Referring to Exhibit A, Part 1, Para. D, there is a blank space in the second sentence. Please advise if there is a particular construction method(s) that the government would like offerors to meet.

A27. Government will issue a revised Exhibit A by forthcoming Amendment. Exhibit A, Part 1, Para D will be revised to read as follows: “ Provide detailed description of the work performed under the contract including, but not limited to your past performance. Note that your description will be evaluated for similarity of the construction methods particularly all utility services, information systems, fire detection and alarm systems, cranes, roads, sidewalks, curbs, gutters, storm drainage, parking areas, site improvements, backup emergency generator, paved organizational parking, controlled waste faciltiy, flamable materials facility, photovoltaic renewable energy systems, fuel storage and disposal systems and construction performed on an island environment or other remote geographic location which poses significant logistical challenges and concerns for material delivery and limited subcontractor availability; cost magnitude, and complexity of the work performed to those required for the proposed effort. The Government may also consider similarity of the client type (i.e. federal government) and the project sustainability requirements. Projects will consider United States Green Building Council (USGBC) LEED®. The location at which the work was performed to the location(s) at which work will be performed may also be considered.”

Q28. Section 00110, Para. 2.5.2.2, requires offerors to discuss and provide experience of key construction personnel for the positions of Project Manager, Site Superintendent(s), QC Manager (on site), and Safety Manager. However, Section 0120, Para. 2.2.3.4 states the positions of Project Manager, Site Superintendent(s), Quality Control Manager (on site), and Safety Representative. For clarity, please clarify that Para. 2.2.3.4 should instead reference the position of Safety Manager.

A28. For the purpose of this solicitation the terms Safety Manager and Safety Representative are synonymous.

Forthcoming amendment will change Para 2.2.3.4 to reference the position of Safety Manager.

Q29. Section 00120, Para. 3.6, allows Offerors to provide information regarding other past performance considerations. Should Offerors choose to provide such additional information, please advise where Offerors are to provide the information allowed by Paragraphs 3.6.1, 3.6.2, and 3.6.3.

A29. Offerors chosing to provide such additional information as allowed by Section 00120 Para 3.6, 3.6.1, 3.6.2 and 3.6.3, the offeror shall include this information in a section of Volume 2, Part 2 Past/Present Performance Information. Offerors chosing to provide such information shall clearly notate its inclusion on the Table of Contents provided for their submitted Volume 2, Par 2

Q30. Please confirm that there is no page limit for Subfactors 3 and 4 under Volume 2, Part 1 and Exhibit A, Parts 1 and 2.

A30. Subfactor 3 no page limit Subfactor 4 no page limit however resumes are limited to two(2) pages each

Exhibit A Parts 1 and 2 no page limit Front and back of one 8.5 x 11 sheet each count as one page

Q31. Volume 2, Part 1, Subfactor 1 requires offerors to discuss "Experience and Capability", while Subfactor 3 requires addressing "Quality Control". However, referring to Section 00120, Para. 2.2.3 that details the proposal evaluation and basis of award for Volume 2, Part 1, Subfactor 1, Para. 2.2.3.3 addresses quality control, which on a side note such items are not required to be addressed under Subfactor 3 as detailed in Section 00110. Please clarify this discrepancy or confirm that it should be deleted.

A31. Forthcoming Amendment will address and remedy this issue. Section 00120 Para 2.2.3.3 shall be deleted.

Section 00120 Para 2.2.6.1 shall be added to read as follows : “2.2.6.1 Proposal must demonstrate adequate quality control processes to give the government confidence of the offeror’s ability to successfully manage the material submittal process, and ensure subcontractor compliance with contract documents”

Q32. Please confirm that the following paragraphs from Section 00110 are indeed missing from the RFP:

Paragraphs 2.4.8, 2.4.9, and 2.5.1.7.

A32. Confirmed. Forthcoming Amendment will address and remedy and mark Section 00110 Para 2.4.8, 2.4.9, and

2.5.1.7 as RESERVED.

11 Aug 2017

Q33. Exhibit A, Part 1, Para. D was corrected to fill the blank space, and now notes "that your description will be evaluated for similarity of the construction methods particularlyall utility services, information systems, fire detection and alarm systems, cranes, roads, sidewalks, curbs, gutters, storm drainage, parking areas, site improvements, backup emergency generator, paved organizational parking, controlled waste faciltiy, flamable materials facility, photovoltaic renewable energy systems, fuel storage and disposal systems and construction performed on an island environment or other remote geographic location which poses significant logistical challenges and concerns for material delivery and limited subcontractor availability; cost magnitude, and complexity of the work performed to those required for the proposed effort." However the highlighted section is not included in Section 00110, Paragraph 2.5.2.2, which states "Specifically discuss construction of fuel storage facilities and fuel disposal systems, photovoltaic renewable energy system components, and construction performed on an island environment or other remote geographic location which poses significant logistical challenges and concerns for material delivery and limited subcontractor availability." If is indeed the intent of the government to have Offerors include experience that also addresses the underlined experience, please provide at least one (1) week for Offerors to address this new requirement that we were not aware of until the issuance of the revised Exhibit A with Amendment No. 0004, which includes requesting completion of a Past Performance Questionnaire if required.

A33. Exhibit A will be revised to correct this issue. Exhibit A Part 1 Paragraph D will be revised to match Section 00110 Paragraph 2.5.2.2 “Specifically discuss construction of fuel storage facilities and fuel disposal systems, photovoltaic renewable energy system components, and construction performed on an island environment or other remote geographic location which poses significant logistical challenges and concerns for material delivery and limited subcontractor availability.” Revised Exhibit will be issued in Forthcoming Amendment.

Q34. Reference ES101. Note 3 states to provide 3-3 cell fabric mesh inner duct in each conduit. Is this meant to go from the new building and then stop at the existing manhole (key note 2) or is the inner duct to go from the new building to the existing building? Please clarify. Note 5 does not call for new inner duct, only new cables and mandrel or existing conduit. If there is inner duct in existing conduits then it will not be possible to mandrel the existing conduits. If new inner duct is required in the existing conduits how many conduits are to receive inner duct and mandrel? Please clarify.

A34. Yes stop inner duct at existing manhole. No new inner duct is required, contractor include the cost to mandrel existing conduit in bid.

Q35. Reference ES102. Please see the next page general note 4, we have been calling the phone number and leaving a message but have not been able to contact the person listed to receive a quote for this project.

Please verify.

A35. The contact person listed and phone number listed are current.

12 Aug 2017

Q36. The solicitation requires a complete copy of the proposal on CD/DVD to be submitted by the due date and time, however some pricing may not be available until the last minute and may need to be hand written into the bid schedule line items. This presents a problem with providing an electronic copy of the line items on the CD/DVD which needs to be burned ahead of time in our home office. Would the Government allow offerors to submit everything except the Bid Schedule on the CD/DVD, and allow hand written numbers on the line items?

A36. Yes. It is acceptable to provide the Government with the completed Bid Schedule (all line items must be completed) only in hard copy. The Government does require three (3) copies of the Bid Schedule whether submitted electronically on the CD/DVD or in handwritten hard copy. THE GOVERNMENT DOES NOT AUTHORIZE ANY PORTION OF THIS SOLICITATION OR PROPOSALS TO BE SUBMITTED VIA ELECTRONIC MAIL.

Proposals must be delivered to the address listed on the SF 1442 Item 7.

Q37. The Government has just issued Amendment 0005 on 12Aug2017, our hardcopy of proposal is already been shipped to the address specified. Does Amendment 0005 need to have an original signature on it? Or would it be acceptable for our local agent to print a copy of the signed Amendment 0005 and include this with the deliver of our proposal?

A37. Amendment 0005 MUST be signed by personnel authorized to sign for your business, however Amendment 0005 does not need to have an original signature on it. Per Section 00110 Paragraph 2.5.1.3 one copy of the SF1442 must have an original signature on it.

14 Aug 17

Q38. In regard to bid item 0001, does this amount be the sum of bid item 0001AA and 0001AB?

A38. Line Item 0001 is to be the sum of Item 0001AA and 0001AB.

Q39. Please provide section for the Sun Shade.

A39. See A-508 and S-572 for Sunshade Detail.

Q40. Please provide section for tackboard and whiteboard. Only markerboard and projection screen are described on the section 10 11 00 VISUAL DISPLAY UNITS.

A40. Specification revised to include the following:

2.3 TACKBOARDS

2.3.1 Fabric Covered

Tackboard shall have a woven fabric covering laminated to a minimum 1/8 inch thick cork laminated to a minimum 3/8 inch thick insulation board or fiberboard, and shall have an aluminum frame, color to match markerboard. The size shall be as shown on the drawings.

Q41. . Refer to S‐133. It calls out 1‐1/2” steel roof deck on cold‐formed steel truss overbuild framing. Please provide spec. section for cold‐form trusses. And please provide connection detail between steel joist and cold‐from trusses.

A41. See spec section 05 40 00. Per S-001, Note 6.F.2, “Supplier shall design and detail all engineered cold-formed metal framing elements, including connections, members for which sizes are not indicated on the drawings and any temporary and permanent bracing, for loads based on the criteria given on drawing S-001, S-002, S-004 and S-005.”

Q42. Please clarify entry sidewalk floor finishes. Refer to DT506, 6/DT501, A‐104 and A‐603. Civil drawings indicate that the floor finishes of concrete sidewalk to the building entry is broom finish. However, architectural drawings calls out “Rock Salt” finish on the entry sidewalk.

A42. Provide finish on the entry sidewalk as per the architectural drawings.

Q43. Please clarify material for window frames and glass. Aluminum window spec section was provided on this project package. However HM windows is depicted on detail drawing A‐502.

A43. Provide material/assembly as specified

Q44. There is no wood doors in the door schedule. Please clarify where the section 08 14 00 WOOD DOORS is applied to?

A44. Wood doors are not scheduled, disreagard 08 14 00 WOOD DOORS Specifcation section.

Q45. Per section 09 90 00, painting contractor shall be obtained SSPC QP 1 prior to contract award, and shall remain certified while accomplishing any surface preparation or coating application. However, SSPC QP‐1 certification program is designed to perform surface preparations and coating application in the field on complex industrial and marine structure such as Bridges, Food and beverage facilities, Off‐shore drilling, Power generation facilities, Petro/chemical plants, Storage tanks, Ships maintenance Waste water treatment facilities. This facility doesn’t look like categorized one of these facilities. Can be waived the SSPC QP‐1 certification requirement for this project?

A45. The certification should be provided, we believe the standard to be applicable to the project as native SpecsIntact language. From the SSPC FAQ resource: These standards are considered the MINIMUM level of service and quality for today's coatings industry. The ranks of SSPC certified contractors include large, medium, and small businesses; those that paint bridges, storage tanks, structural steel, concrete, military facilities, Navy ships, or a variety of complex industrial structures. Given the existing finishes at the canopy that will need to be prepared and re-finished having this level of certification will assist in ensuring coating(s) will be properly applied.

Q46. Please provide exterior signage schedule and detail. Only on plaque exterior signage is shown on the Exterior Elevation drawing (A‐201).

A46. Scope only includes the Exterior Plaque sign on building

Q47. Insulation diagram at roof on A‐109 indicates roofing has R‐11 un‐interrupted insulation with R‐19 blanket insulation at grid line 7‐14/A‐K roof and 8‐12/M‐N roof section. However, section details (A‐302, A‐303, A‐305 and all related section detail drawings) do not show any R‐19 insulation. Section detail drawing on A306 shows only rigid insulation on metal decking. Please clarify.

A47. See A14 above.

Q48. Please confirm existing roof structure shall be strong enough for new 40kW PV Panels.

A48. Confirmed. Roof structure can support 3 psf of flush mounted PV panels.

Q49. Please clarify scope of work for bid option #1 and #5. Refer to section 01 11 00 page 2, the scope of work for Option 1 indicates “Roof‐mounted Photovoltaic (PV) array ‐ Base bid includes first 50 percent of the building PV array. Fifth option is for the second 50 percent of the array….” Does this sentence mean 50% of PV array on primary building will be part of base bid and the rest 50% on primary building will be option #5? Or is the work “Base bid” on this sentence typo? As shown on E‐151, 50% of PV array (40kW) on existing parking structure will be Option #1 and the rest of 50% PV array (another 40kW) is option #5?

A49. Bid Option 1 includes the 40KW PV array located on the Park Shed Roof. Bid Option 5 includes the 40KW PV array located on the new CSMS facility. See Drawings E-602 and E-151 for division of work

The following have been deleted:

Q&A DATED 12AUG2017

(End of Summary of Changes)