W912J6-17-R-0002-0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912J6-17-R-0002-0006.pdf | ||
| Q&A_Dated_15Aug2017.pdf | ||
| Q&A_Dated_12Aug2017.pdf | ||
| REVISED_EXHIBIT_A-W912J617R0002_-_Copy.doc | DOC document | |
| Q&A_Dated_11Aug2017_0700_Hours.pdf | ||
| REVISED_EXHIBIT_A-W912J617R0002_-_Copy.doc | DOC document | |
| REVISED_EXHIBIT_A-W912J617R0002.doc | DOC document | |
| W912J6-17-R-0002-0004.pdf | ||
| A-304_CSMS-ARCH_042117-REVISED.pdf | ||
| Q&A_Dated_07Aug2017_1300_Hours.pdf | ||
| W912J6-17-R-0002-0003.pdf | ||
| Q&A_Dated_02Aug2017_0600_Hours.pdf | ||
| PreProposal_Meeting_Minutes26Jul17.pdf | ||
| SIGN_IN_SHEET.pdf | ||
| Q&A_Dated_31Jul2017_0500_Hours.pdf | ||
| Addendum_1_Elec.pdf | ||
| Q&A_Dated_27Jul2017.pdf | ||
| W912J6-17-R-0002-0002.pdf | ||
| 87618_Subsurface_Information.pdf | ||
| Q&A_Dated_25Jul2017.pdf | ||
| Q&A_Dated_24Jul2017.pdf | ||
| W912J6-17-R-0002-0001.pdf | ||
| EXHIBIT_B-W912J617R0002_-_Copy.doc | DOC document | |
| EXHIBIT_A-W912J617R0002_-_Copy.doc | DOC document | |
| EXHIBIT_C-W912J617R0002_-_Copy.doc | DOC document | |
| Q&A_Dated_13Jul2017.pdf | ||
| W912J6-17-R-0002.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
150035
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment incorporates current Wage Determination.
Amendment issues Revised 11Aug 2017 EXHIBIT A.
Amendment incorporates Q&A Dated 12 AUG 2017.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 55
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912J6-17-R-0002
X 9B. DATED (SEE ITEM 11)
13-Jul-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Aug-2017
CODE
USPFO FOR HAWAII
ATTN: MAJ MANUEL LLANES
91-1179 ENTERPRISE AVE
KAPOLEI HI 96707-2150
W912J6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912J6-17-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0005
Amendment 0005 Amendment incorporates current Wage Determination HI170001 08/11/2017 HI1.
Amendment issues Revised 11Aug 2017 EXHIBIT A.
Amendment incorporates Q&A Dated 12 AUG 2017.
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
SECTION 00100
Section 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. SCOPE
1.1. You are invited to submit a proposal in response to our Request for Proposal W912J6-17-R-0002 for Project No. 150035 at Keaukaha Military Reservation, Hilo, Hawaii. As a result of this solicitation, the Government intends to award a single Firm Fixed Price (FFP) contract to the responsible offeror whose proposal represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
1.2. This solicitation is set-aside 100% for small businesses.
2. NOTICE OF PRE-PROPOSAL CONFERENCE
2.1. A pre-proposal conference will be conducted on 26 Jul 17 at 0900 hours HST for the purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at Keaukaha Military Reservation (KMR), 1304 Kekuanaoa Street, Hilo, Hawaii 96720. Interested Contractors are highly encouraged to attend the pre-proposal conference. The site visit will be held following the conference.
2.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to manuel.llanes.mil@mail.mil .
Visitor’s Name Last Four Digits of Social Security No.
Driver’s License No., State Issued and Expiration Date Date of Birth Citizenship
2.3. This information must be provided in advance, not later than five (5) business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in mailto:manuel.llanes.mil@mail.mil the Government’s denial of your access to the pre-proposal conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
2.4. Visitors must pick up their passes at the Installation’s Main Entry Gate prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Driver’s License, (3) Proof of Insurance for Vehicle, and/or (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
2.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
2.6. A record of the conference shall be made and furnished to all prospective offerors via posting to www.fbo.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS
3.1. Submit all questions via email to the contracting office at the address shown below. Do NOT contact the A-E or Engineering personnel directly. Doing so will only delay the response to your question.
Subject Line: Reference No. W912J6-17-R-0002 Email: manuel.llanes.mil@mail.mil and copy to russell.s.redila.mil@mail.mil
INQUIRIES SHALL BE SUBMITTED VIA EMAIL AND INCLUDE THE FOLLOWING INFORMATION:
Date of Proposal Inquiry:
From: ______________________________
Company Name: ___________________________
Phone Number: ____________________________
Email address: _____________________________
Proposal Inquiry: Be specific as to part of solicitation you are questioning.
3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.
3.3. The Contracting Officer reserves the right to address questions received after the fifth day prior to solicitation closing with those offers deemed compliant and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day prior to closing and will be posted not later than two working days prior to closing. OFFERORS ARE STRONGLY ENCOURAGED
TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.
3.4. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to www.fbo.gov.
3.4.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other http://www.fbo.gov/ mailto:manuel.llanes.mil@mail.mil mailto:russell.s.redila.mil@mail.mil http://www.fbo.gov./ than an amendment to the solicitation shall not be binding. Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.
3.4.2. For security reasons, all technical and engineering data related to this solicitation will be distributed using the Federal Business Opportunities (www.FedBizOpps.gov or www.fbo.gov) system. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system.
Registration instructions can be found on the FedBizOpps website at https://www.fbo.gov/?s=getstart. (Please note the registration for access to the secure site takes approximately 15 business days, so plan accordingly.)
3.4.2.2. Interested offerors must be registered in the System for Award Management (SAM). To register go to:
www.sam.gov. You will need your DUNS number to register. Instructions for registering are on the web page.
4. AMENDMENTS PRIOR TO DATE SET FOR RECEIPT OF PROPOSALS
4.1. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Proposal. All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted at www.fbo.gov.
4.2. Offerors are strongly cautioned to check this site frequently and to “refresh” their web page to ensure they have the lasted information.
5. HAND CARRIED PROPOSALS/INVITATIONS
5.1. A bid repository is provided for hand carried proposals and is located at: USPFO HAWAII, 91-1179 Enterprise Ave, Kapolei, HI 96707-2150.
5.2. Hand carried proposals must be deposited in the repository prior to the time established for receipt of proposals.
5.3. Offerors are cautioned that approval to enter the base must be obtained prior to the closing date for receipt of proposals. Follow the procedures outlined above in paragraph 2.1.2. for entry. Delays are probable at the entry point and should be accounted for. Late receipt of proposals due to base entry delays may not be deemed excusable and the Contracting Officer may declare the proposal late and remove it from consideration.
6. WAGE DETERMINATION
6.1. The Construction Wage Rate Requirements formerly known as Davis Bacon Wage Rates are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are HI170001 08/11/2017 HI1 06/30/2017 HI 1 for Honolulu County, Hawaii.
In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of the solicitation, the most current wage determination is in effect. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes.
If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404- 5(c)(4) will apply.
6.2. Applicable wage rates can be found at http://wdol.gov/dba.aspx.
7. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
http://www.fedbizopps.gov/ http://www.fbo.gov/ https://www.fbo.gov/?s=getstart http://www.sam.gov/portal/public/SAM/ http://www.fbo.gov/ http://wdol.gov/dba.aspx
This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.
8. REMOVAL OF SECTIONS AT TIME OF AWARD
Sections 00100, 00110, 00120, 00600 and all exhibits will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.
9. DISPOSITION OF UNSUCCESSFUL PROPOSALS
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful proposals. The Government will destroy extra copies of unsuccessful proposals. No destruction certificate will be provided.
10. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES
It has been determined that all temporary utilities shall be the responsibility of the contractor. The contractor will pay all charges (hook up fees, metering, monthly usage, etc.) resulting from temporary utilities. The offerors shall take this into consideration when computing their offers. (FAR Clause 52.236-14, Availability and Use of Utility Services.)
11. EXCEPTIONS
If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00010 through 00800) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions. Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.
12. CLAUSES
12.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
12.2. Clauses and provisions in this document may not appear in consecutive order.
13. BRAND NAME REQUIREMENTS
NONE
End of Section 00100
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
Q&A DATED 12AUG2017
QUESTIONS AND ANSWERS RELATED TO:
SOLICITATION W912J6-17-R-0002
Dated 12 Aug 2017
Make Sure You Have the Latest Version of this Web Page “Refresh” or “Reload”
Dated 13 Jul 17
Q1. How do I access the files/documents for the Project?
A1. See, Sections 4.4, 4.5 & 4.7 of the FBO Vendor Guide available for download in PDF format via the Federal Business Opportunities / FBO Home Page. See also, Section 00100 of the Solicitation. Additionally, to view and/or download Export Controlled Materials, a company must be certified (via an approved DD Form 2345) by the Joint Certification Program (JCP) administered by the DLA Logistic Information Service (DLIS). This certification establishes that a company is a U.S. or Canadian contractor eligible to receive unclassified technical data that is under the control of the U.S. Department of Defense (DoD) or the Canadian Department of National Defense (DND). Questions about this program or DD Form 2345 should be addressed to U.S./Canada Joint Certification Office, DLA Logistics Information Services (DLIS), Federal Center, 74 Washington Avenue North, Battle Creek, MI 49017-3084. The Joint Certification Office may be contacted by telephone at: 1-(800) 352-3572; or email: jcp-admin@.dla.mil.
Q2. I am trying to access the [export controlled] packages and have a number as assigned on DD Form 2345 but cannot get the packages to open. Our DD 2345 Number is ####### expiration ##/##/2018.
A2. The U.S./Canada Joint Certification Program (JCP) office reported to this office that once a company is certified with the JCP office (normally 7 to 12 business days), the company should contact FBO to have them add their JCP number to their FBO account. The FBO help desk (Federal Service Desk) reported to this office that companies need to make sure that they are registered and login as a Vendor to FBO. When the Vendor click's to open an export controlled package/document, they should be asked for their MPIN. After entering the MPIN, the export controlled package/document should be viewable/downloadable by Vendors that have gone through the JCP process. If a Vendor still has problems, the Vendor should check to make sure that their CCR registration and MPIN are valid and up-to-date. If problems still persist, the Vendor may call the FBO help desk at 866-606-8220, selection option 2 for FBO issues, and ask for troubleshooting assistance.
Q3. Please help me access the locked documents for solicitation W912J6-17-R-0002.
A3. Reference answers A1 and A2 above. After your firm contact and submits a DD Form 2345 to the Joint Certification Program (JCP) which is administered by the DLA Logistic Information (contact information provided in A1) your firm can send proof of this application and submission via a copy of the email receipt from the JCP or DLA personnel that your certification is in process to manual.llanes.mil@mail.mil and copy to russell.s.redila.mil@mail.mil . Pending receipt of the proof that your application is pending certification the Contracting Officer may make the locked files directly available to your frim via AMRDEC SAFE. This access will not be granted if your firm does not apply for certification and follow the above mentioned instructions in A1 and A2.
Q4. We cannot download the specification and drawing documents for the subject bid with MPIN. Is there any way we can get the export controlled documents except applying JCP certification?
mailto:jcp-admin@.dla.mil mailto:manual.llanes.mil@mail.mil mailto:russell.s.redila.mil@mail.mil
A4. See Item A3 Above.
Dated 24 Jul 17
Q5. Specification Section 07 53 23 section 2.1.1 EPDM Sheet is calling for a 90 Mil Reinforced EPDM Membrane. However No manufacturer produces reinforced EPDM membrane in White to meet the SRI value, they only produce a 115 Mil reinforced Fleeceback EPDM Membrane in white that will meet the SRI value as specified. Can we use a Carlisle 115 Mil reinforced Fleeceback EPDM?
A5.Offerors need to ensure they continue reading section 2.1.1 and note, 0.090 inch nominal thickness is referred to as a “minimum thickness”. Roofing systems complying to all requirements of the specification(s) including the achievement of a minimum EPDM thickness of 0.090 inch are acceptable.
Q6. My question concerns past-performance questionnaires (PPQs) as provided in Exhibit C. We have requested references for the three project we intend to submit using the US Navy/USACE forms. These were sent to us for inclusion in recent proposals. Would the Government please consider allowing us to use these completed PPQs and send them to you, in lieu of requesting our clients complete another past performance questionnaire form?
A6. Yes the Government will allow use of these completed PPQs. They should be sent from the client directly to the Contracting Officer if at all possible.
Q7. General Note No.5 on sheet S-001 refers to Geolabs Inc. geotechnical report dated April 01, 2016. Please provide the abovementioned report to all bidders to make them familiar with the existing soil condition.
A7. The Geotechnical report will be provided in forthcoming Amendment and posted to www.fbo.gov
Dated 25 Jul 17
Q8. On sheet CS100 note 19 & 20 states for Base bid aggregate paving to be installed and for Bid option #7 heavy duty concrete paving is to be installed. If bid option #7 is not awarded and aggregate paving is installed per base bid the parking stall striping and handicap striping specified will not last very long on aggregate paving. Do you still require this to be striped if bid option #7 is not awarded?
A8. Yes this will still be required to be striped if bid option #7 is not awarded.
Q9. Sheet DT505 specifies a concrete Oil/Water separator and detail 4/DT509 specifies a steel body Oil/Water separator. Is there a particular manufacturer specified for these tanks? How many gallon capacity for each of these tanks?
A9. There is no specific manufacturer requirement. For the steel OWS (Detail 4/DT509), provide a 1,000 gallon tank that meets the requirements of the plans/specs. For the concrete OWS (Detail 2/DT505), provide the size and layout that matches the dimensions shown.
Dated 27 Jul 17
Q10. Project indicates a third-partly Commissioning Authority is involved with the projects and employed by the Gov't or A/E. Has the Commissioning Authority already been hired by the Gov't or A/E, or is the contractor to employ the Commissioning authority?
A10. Owner/Governemnt will provide Commissioning Authority utilizing local A/E Cx staff to execute the owner’s responsibilities. The Contractor shall provide the required Commissioning activites required by the Contracor/Builder as required by the project specifications.
Dated 31 Jul 17
Q11. We are requesting the addition of “PDQ Manufacturing” as an approved alternate manufacturer to that listed in the door schedule, and under section 08 71 00 of the specification for the following products when applicable to your project; 1) Mortis Locks, 2) Cylindrical Locks, 3) Door Closers, 4) Panic Devices with Trim.
Per FAR 36 2.02 Specifications, 11.103 Market acceptance paragraphs (a), (1), (i), (ii), (iii), (5) and 11.104 Use of brand name or equal purchase descriptions. We offer the following justification for review; test data, the material used, and certifications for the addition of PDQ Manufacturing. PDQ Manufacturing has also met all product testing, materials used, and certifications required by the UFGS and the FAR.
11.103 (a), (1), (i) - Achieved commercial acceptance
PDQ Manufacturing is a member of BHMA, the governing body for commercial contract hardware products standards and specifications. PDQ has an onsite BHMA/InterTech® certified testing laboratory to meet the requirement of recertification of all products every three years. PDQ is an architecturally specified manufacturer for many commercial projects each year.
(a), (1), (ii) - Been satisfactorily supplied to an agency under current or recent contracts
PDQ Manufacturing has supplied many projects
(a), (2) - Otherwise meet the item description, specifications, or other criteria prescribed in the public notice and solicitation.
PDQ Manufacturing meets all salient physical, functional, and performance characteristics of the brand listed, and as required by the Unified Facility Guide specifications, BHMA standards, ANSI and UL testing.
A11. PDQ is acceptable provided products comply with all specification requirements
Q12. While at the site during the pre-proposal conference, we noticed concrete duct banks being installed crossing Circle Avenue and Earl's Alley and new telecommunication manholes on both sides of Earl's alley.
The conduits crossing Circle Alley appear to be terminated with risers up one of the power poles scheduled to be demolished by HELCO per CD010 and ES102. None of this new work is shown on ES102. Any new conduits crossing these recently poured ductbanks will probably need to be routed underneath to get the required cover. Can the telecom for project W912J6-17-R-0002 be routed through these recently installed conduits and manholes or must additional ductbanks and handholes be installed?
A12. Bid communication ductbank as shown on the plans. Further evaluation of the use of existing ductbank will be done during the construction phase.
Dated 01 Aug 17
Q13. Please clarify where the chemical resistive resinous flooring shall be installed. Spec. section 09 67 23 CHEMICAL RESISTIVE RESINOUS FLOORINS was provided in this project package but there is no chemical resistive resinous flooring indicated on A‐603.
A13. Provide in BATTERY ROOM 134.
Q14. Please refer to A‐109_Bldg insulation diagram. Insulation diagram @ Lower level depicts CMU wall with R‐6.5 un‐interrupted panel insulation for Area C perimeter walls. However, related detail drawings (A‐301, A‐304, A‐509) doesn’t show un‐interrupted panel insulation on these areas. Please clarify.
A14. To achieve the maximum level of cost competitiveness, project was designed with a non-proprietary assembly/system performance criteria along with a delegated design to accomplish the building insulation and air barrier performance criteria. Review A-109 along with Specification’s to accomplish the specified performance criteria for the insulation and air barrier. Related specification sections include 07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS, 07 21 16 MINERAL FIBER BLANKET INSULATION, 07 22 00 ROOF AND DECK INSULATION and 07 42 16 INSULATED CORE METAL WALL PANELS.
Q15. Related with above inquiry, exterior wall between grid F and K at Grid 14 has R‐12 uninterrupted panel insulation. However, exterior elevation drawing (A‐201) or B/A‐308 don’t show any panel finishes. Please clarify.
A15. See A14 above.
Q16. Refer to Roof Plan, A‐102. Please clarify what the ‘+’ symbols are?
A16. These are drafting grips in the BIM Revit model and inadvertently plotted. Please disregard them relative to the architecutal plan.
Q17. Please confirm welding table and workbay tables are GFGI on A‐103.
A17. Confirmed, note Design Building Contractor shall be responsible to provide the designated utility connections on the Work/Welding tables to include the coordination of the tables during construction so that the work can be completed.
Q18. Please clarify window type at RM103_PROD CNTR. Refer to A‐104 and 2D/A‐202.
A18. Provide F2 window type, see A-602.
Q19. Please clarify for the top running overhead bridge crane. For the 15 ton top running overhead bridge crane, is it to be a top running single girder crane per note 4.F Crane Load on Sheet S‐001 or a top running double girder crane per reference of CMAA70 on page 7 of spec section 412213.14 paragraph 2.1?
A19. Bridge crane shall be a single girder top running crane per note 4.F on S-001. Crane shall be in accordance with CMAA 74.
Q20. There is no detail on the parking canopy roof frame. Please provide existing condition of parking structure such as as‐built drawings.
A20. Existing drawings will be issued in a forthcoming Amendment.
07 Aug 2017
Q21. Specification Section 41 22 13.14, paragraph 2.1.2 Speeds: the specified Trolley (125FPM) and Bridge (150FPM) speeds are considered FAST per CMAA 70 suggested operating speeds for a pendant controlled crane and maybe unsafe for Class B non-production usage. Typically, for this type of crane and application, Slow to Medium Speeds would be specified per CMAA 70, i.e. Trolley= 80 FPM and Bridge = 120 FPM.
Can the speeds be reduced to Trolley (80FPM) and Bridge (120FPM)? The hoist is OK at 20 FPM, that is considered Medium speed
A21. Bridge crane speed shall be 150 feet per minute per specification 41 22 13.14 section 2.1.2.d and Crane Note 9 on S-121. Revise 41 22 13.14 Section 2.1.2.b to read “Trolley - rated speed of 80 feet per minute. Revise Crane Note 11 on S-121 to read “Hoist Speed: Travel speed 10 feet per minute”.
Q22. Please clarify overhead doors are whether Manual or Motor operated. Section 083323 notes both Motor operated (2.2.5 list Electric Doors) and Chain (2.2.4 list Manual Doors) operated. And motors are shown on electrical drawings E‐111 but architectural drawings detail looks like manual operated.
A22. Provide Overhead door as specified with both electrical and manual operation.
Q23. Refer to P701. In regards to Air Compress Schedule, please clarify that Is the required 63 SCFM or 94 SCFM combined for the package or a per pump total?
A23. Scheduled SCFM capacities are totals per packaged duplex systems, not individual compressors within duplex systems.
Q24. We cannot find a detail of the insulated wall panel/slab curb interface. The structural drawings seem to indicate the outer skin of the insulated panel extends past the curb. We cannot find this issue addressed on the architectural. Please provide a detail showing how the insulated metal and the concrete curb interface and how that intersection of those materials is to be.
A24. Detail 9/A-304 revised – see attached drawing. Revised Drawing A-304 Will be incorporated with forthcoming Amendment.
Q25. Section 00110, Para. 2.5.2.3 - For the required schedule, as it is not subject to the page limits, please advise if provision on 11x17 paper will be acceptable.
A25. Yes 11x17 paper is acceptable, offerors shall ensure the schedule is secured in the binder and not loose pages.
Q26. For the completion of Exhibit A, Part 1, Section 00110, Para. 2.5.3.4 states to "prepare not more than five(5) of these documents". However, referring to Exhibit A, Part 1, the top paragraph states "prepare not more than (3) of these documents". Please clarify the discrepancy.
A26. See A15 above. Please prepare not more than five (5) Exhibit A Part 1 Documents. Forthcoming amendment will reflect this instruction.
Q27. Referring to Exhibit A, Part 1, Para. D, there is a blank space in the second sentence. Please advise if there is a particular construction method(s) that the government would like offerors to meet.
A27. Government will issue a revised Exhibit A by forthcoming Amendment. Exhibit A, Part 1, Para D will be revised to read as follows: “ Provide detailed description of the work performed under the contract including, but not limited to your past performance. Note that your description will be evaluated for similarity of the construction methods particularly all utility services, information systems, fire detection and alarm systems, cranes, roads, sidewalks, curbs, gutters, storm drainage, parking areas, site improvements, backup emergency generator, paved organizational parking, controlled waste faciltiy, flamable materials facility, photovoltaic renewable energy systems, fuel storage and disposal systems and construction performed on an island environment or other remote geographic location which poses significant logistical challenges and concerns for material delivery and limited subcontractor availability; cost magnitude, and complexity of the work performed to those required for the proposed effort. The Government may also consider similarity of the client type (i.e. federal government) and the project sustainability requirements. Projects will consider United States Green Building Council (USGBC) LEED®. The location at which the work was performed to the location(s) at which work will be performed may also be considered.”
Q28. Section 00110, Para. 2.5.2.2, requires offerors to discuss and provide experience of key construction personnel for the positions of Project Manager, Site Superintendent(s), QC Manager (on site), and Safety Manager. However, Section 0120, Para. 2.2.3.4 states the positions of Project Manager, Site
Superintendent(s), Quality Control Manager (on site), and Safety Representative. For clarity, please clarify that Para. 2.2.3.4 should instead reference the position of Safety Manager.
A28. For the purpose of this solicitation the terms Safety Manager and Safety Representative are synonymous.
Forthcoming amendment will change Para 2.2.3.4 to reference the position of Safety Manager.
Q29. Section 00120, Para. 3.6, allows Offerors to provide information regarding other past performance considerations. Should Offerors choose to provide such additional information, please advise where Offerors are to provide the information allowed by Paragraphs 3.6.1, 3.6.2, and 3.6.3.
A29. Offerors chosing to provide such additional information as allowed by Section 00120 Para 3.6, 3.6.1, 3.6.2 and 3.6.3, the offeror shall include this information in a section of Volume 2, Part 2 Past/Present Performance Information. Offerors chosing to provide such information shall clearly notate its inclusion on the Table of Contents provided for their submitted Volume 2, Par 2
Q30. Please confirm that there is no page limit for Subfactors 3 and 4 under Volume 2, Part 1 and Exhibit A, Parts 1 and 2.
A30. Subfactor 3 no page limit Subfactor 4 no page limit however resumes are limited to two(2) pages each
Exhibit A Parts 1 and 2 no page limit Front and back of one 8.5 x 11 sheet each count as one page
Q31. Volume 2, Part 1, Subfactor 1 requires offerors to discuss "Experience and Capability", while Subfactor 3 requires addressing "Quality Control". However, referring to Section 00120, Para. 2.2.3 that details the proposal evaluation and basis of award for Volume 2, Part 1, Subfactor 1, Para. 2.2.3.3 addresses quality control, which on a side note such items are not required to be addressed under Subfactor 3 as detailed in Section 00110. Please clarify this discrepancy or confirm that it should be deleted.
A31. Forthcoming Amendment will address and remedy this issue. Section 00120 Para 2.2.3.3 shall be deleted.
Section 00120 Para 2.2.6.1 shall be added to read as follows : “2.2.6.1 Proposal must demonstrate adequate quality control processes to give the government confidence of the offeror’s ability to successfully manage the material submittal process, and ensure subcontractor compliance with contract documents”
Q32. Please confirm that the following paragraphs from Section 00110 are indeed missing from the RFP:
Paragraphs 2.4.8, 2.4.9, and 2.5.1.7.
A32. Confirmed. Forthcoming Amendment will address and remedy and mark Section 00110 Para 2.4.8, 2.4.9, and
2.5.1.7 as RESERVED.
11 Aug 2017
Q33. Exhibit A, Part 1, Para. D was corrected to fill the blank space, and now notes "that your description will be evaluated for similarity of the construction methods particularlyall utility services, information systems, fire detection and alarm systems, cranes, roads, sidewalks, curbs, gutters, storm drainage, parking areas, site improvements, backup emergency generator, paved organizational parking, controlled waste faciltiy, flamable materials facility, photovoltaic renewable energy systems, fuel storage and disposal systems and construction performed on an island environment or other remote geographic location which poses significant logistical challenges and concerns for material delivery and limited subcontractor availability; cost magnitude, and complexity of the work performed to those required for the proposed effort." However the highlighted section is not included in Section 00110, Paragraph 2.5.2.2, which states "Specifically discuss construction of fuel storage facilities and fuel disposal systems, photovoltaic renewable energy system components, and construction performed on an island environment or other remote geographic location which poses significant logistical challenges and concerns for material delivery and limited subcontractor availability." If is indeed the intent of the government to have Offerors include experience that also addresses the underlined experience, please provide at least one (1) week for Offerors to address this new requirement that we were not aware of until the issuance of the revised Exhibit A with Amendment No. 0004, which includes requesting completion of a Past Performance Questionnaire if required.
A33. Exhibit A will be revised to correct this issue. Exhibit A Part 1 Paragraph D will be revised to match Section 00110 Paragraph 2.5.2.2 “Specifically discuss construction of fuel storage facilities and fuel disposal systems, photovoltaic renewable energy system components, and construction performed on an island environment or other remote geographic location which poses significant logistical challenges and concerns for material delivery and limited subcontractor availability.” Revised Exhibit will be issued in Forthcoming Amendment.
Q34. Reference ES101. Note 3 states to provide 3-3 cell fabric mesh inner duct in each conduit. Is this meant to go from the new building and then stop at the existing manhole (key note 2) or is the inner duct to go from the new building to the existing building? Please clarify. Note 5 does not call for new inner duct, only new cables and mandrel or existing conduit. If there is inner duct in existing conduits then it will not be possible to mandrel the existing conduits. If new inner duct is required in the existing conduits how many conduits are to receive inner duct and mandrel? Please clarify.
A34. Yes stop inner duct at existing manhole. No new inner duct is required, contractor include the cost to mandrel existing conduit in bid.
Q35. Reference ES102. Please see the next page general note 4, we have been calling the phone number and leaving a message but have not been able to contact the person listed to receive a quote for this project.
Please verify.
A35. The contact person listed and phone number listed are current.
12 Aug 2017
Q36. The solicitation requires a complete copy of the proposal on CD/DVD to be submitted by the due date and time, however some pricing may not be available until the last minute and may need to be hand written into the bid schedule line items. This presents a problem with providing an electronic copy of the line items on the CD/DVD which needs to be burned ahead of time in our home office. Would the Government allow offerors to submit everything except the Bid Schedule on the CD/DVD, and allow hand written numbers on the line items?
A36. Yes. It is acceptable to provide the Government with the completed Bid Schedule (all line items must be completed) only in hard copy. The Government does require three (3) copies of the Bid Schedule whether submitted electronically on the CD/DVD or in handwritten hard copy. THE GOVERNMENT DOES NOT AUTHORIZE ANY PORTION OF THIS SOLICITATION OR PROPOSALS TO BE SUBMITTED VIA ELECTRONIC MAIL.
Proposals must be delivered to the address listed on the SF 1442 Item 6.
Q37. The Government has just issued Amendment 0005 on 12Aug2017, our hardcopy of proposal is already been shipped to the address specified. Does Amendment 0005 need to have an original signature on it? Or would it be acceptable for our local agent to print a copy of the signed Amendment 0005 and include this with the deliver of our proposal?
A37. Amendment 0005 MUST be signed by personnel authorized to sign for your business, however Amendment 0005 does not need to have an original signature on it. Per Section 00110 Paragraph 2.5.1.3 one copy of the SF1442 must have an original signature on it.
The following have been modified:
WAGE DETERMINATION
General Decision Number: HI170001 08/11/2017 HI1
Superseded General Decision Number: HI20160001
State: Hawaii
Construction Types: Building, Heavy (Heavy and Dredging), Highway and Residential
Counties: Hawaii Statewide.
BUILDING CONSTRUCTION PROJECTS; RESIDENTIAL CONSTRUCTION
PROJECTS (consisting of single family homes and apartments up to and including 4 stories); HEAVY AND HIGHWAY CONSTRUCTION
PROJECTS AND DREDGING
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017.
The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 01/20/2017 2 02/24/2017 3 03/03/2017 4 03/10/2017 5 03/17/2017 6 06/30/2017 7 08/11/2017
ASBE0132-001 08/31/2015
Rates Fringes
Asbestos Workers/Insulator Includes application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems. Also the application of firestopping material for wall openings and penetrations in walls, floors, ceilings and curtain walls...............$ 39.65 23.50
BOIL0627-005 01/01/2013
Rates Fringes
BOILERMAKER......................$ 35.20 27.35
BRHI0001-001 08/29/2016
Rates Fringes
BRICKLAYER
Bricklayers and Stonemasons.$ 44.26 21.92 Pointers, Caulkers and Weatherproofers.............$ 44.51 21.92
BRHI0001-002 08/29/2016
Rates Fringes
Tile, Marble & Terrazzo Worker Terrazzo Base Grinders......$ 43.54 21.92 Terrazzo Floor Grinders and Tenders.................$ 41.99 21.92 Tile, Marble and Terrazzo Workers.....................$ 45.35 21.92
CARP0745-001 08/29/2016
Rates Fringes
Carpenters:
Carpenters; Hardwood Floor Layers; Patent Scaffold Erectors (14 ft. and over); Piledrivers;
Pneumatic Nailers; Wood Shinglers and Transit and/or Layout Man...........$ 45.65 21.21 Millwrights and Machine Erectors....................$ 45.90 21.21 Power Saw Operators (2 h.p. and over)..............$ 45.80 21.21
CARP0745-002 08/29/2016
Rates Fringes
Drywall and Acoustical Workers and Lathers..............$ 45.90 21.21
ELEC1186-001 02/19/2017
Rates Fringes
Electricians:
Cable Splicers..............$ 51.54 28.07 Electricians................$ 46.85 26.81 Telecommunication worker....$ 26.30 11.58
ELEC1186-002 02/19/2017
Rates Fringes
Line Construction:
Cable Splicers..............$ 51.54 28.07 Groundmen/Truck Drivers.....$ 35.14 23.61 Heavy Equipment Operators...$ 42.17 25.53 Linemen.....................$ 46.85 26.81 Telecommunication worker....$ 26.30 11.58
ELEV0126-001 01/01/2017
Rates Fringes
ELEVATOR MECHANIC................$ 55.61 31.59
a. VACATION: Employer contributes 8% of basic hourly rate for 5 years service and 6% of basic hourly rate for 6 months to 5 years service as vacation pay credit.
b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the Friday after Thanksgiving Day and Christmas Day.
ENGI0003-002 08/29/2016
Rates Fringes
Diver (Aqua Lung) (Scuba)) Diver (Aqua Lung) (Scuba) (over a depth of 30 feet)...$ 63.75 28.56 Diver (Aqua Lung) (Scuba) (up to a depth of 30 feet)..$ 54.38 28.56 Stand-by Diver (Aqua Lung) (Scuba)....................$ 45.00 28.56 Diver (Other than Aqua Lung) Diver (Other than Aqua Lung).......................$ 63.75 28.56
Diver Tender (Other than Aqua Lung)..................$ 41.97 28.56 Stand-by Diver (Other than Aqua Lung)..................$ 45.00 28.56 Helicopter Work Airborne Hoist Operator for Helicopter..............$ 43.55 28.56 Co-Pilot of Helicopter......$ 43.69 28.56 Pilot of Helicopter.........$ 43.86 28.56 Power equipment operator -tunnel work
GROUP 1....................$ 39.99 28.56
GROUP 2....................$ 40.10 28.56
GROUP 3....................$ 40.27 28.56
GROUP 4....................$ 40.54 28.56
GROUP 5....................$ 40.85 28.56
GROUP 6....................$ 41.50 28.56
GROUP 7....................$ 41.82 28.56
GROUP 8....................$ 41.93 28.56
GROUP 9....................$ 42.04 28.56
GROUP 9A...................$ 42.27 28.56
GROUP 10....................$ 42.33 28.56
GROUP 10A...................$ 42.48 28.56
GROUP 11....................$ 42.63 28.56
GROUP 12....................$ 42.99 28.56
GROUP 12A...................$ 43.35 28.56
Power equipment operators:
GROUP 1....................$ 39.69 28.56
GROUP 2....................$ 39.80 28.56
GROUP 3....................$ 39.97 28.56
GROUP 4....................$ 40.24 28.56
GROUP 5....................$ 40.55 28.56
GROUP 6....................$ 41.20 28.56
GROUP 7....................$ 41.52 28.56
GROUP 8....................$ 41.63 28.56
GROUP 9....................$ 41.74 28.56
GROUP 9A...................$ 41.97 28.56
GROUP 10....................$ 42.03 28.56
GROUP 10A...................$ 42.18 28.56
GROUP 11....................$ 42.33 28.56
GROUP 12....................$ 42.69 28.56
GROUP 12A...................$ 43.05 28.56
GROUP 13....................$ 39.97 28.56
GROUP 13A...................$ 40.24 28.56
GROUP 13B...................$ 40.55 28.56
GROUP 13C...................$ 41.20 28.56
GROUP 13D...................$ 41.52 28.56
GROUP 13E...................$ 41.63 28.56
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Fork Lift (up to and including 10 tons); Partsman (heavy duty repair shop parts room when needed).
GROUP 2: Conveyor Operator (Handling building material);
Hydraulic Monitor; Mixer Box Operator (Concrete Plant).
GROUP 3: Brakeman; Deckhand; Fireman; Oiler;
Oiler/Gradechecker; Signalman; Switchman; Highline Cableway Signalman; Bargeman; Bunkerman; Concrete Curing Machine (self-propelled, automatically applied unit on streets, highways, airports and canals); Leveeman; Roller (5 tons and under); Tugger Hoist.
GROUP 4: Boom Truck or dual purpose "A" Frame Truck (5 tons or less); Concrete Placing Boom (Building Construction);
Dinky Operator; Elevator Operator; Hoist and/or Winch (one drum); Straddle Truck (Ross Carrier, Hyster and similar).
GROUP 5: Asphalt Plant Fireman; Compressors, Pumps, Generators and Welding Machines ("Bank" of 9 or more, individually or collectively); Concrete Pumps or Pumpcrete Guns; Lubrication and Service Engineer (Grease Rack);
Screedman.
GROUP 6: Boom Truck or Dual Purpose "A"Frame Truck (over 5 tons); Combination Loader/Backhoe (up to and including 3/4
cu. yd.); Concrete Batch Plants (wet or dry); Concrete Cutter, Groover and/or Grinder (self-propelled unit on streets, highways, airports, and canals); Conveyor or Concrete Pump (Truck or Equipment Mounted); Drilling Machinery (not to apply to waterliners, wagon drills or jack hammers); Fork Lift (over 10 tons); Loader (up to and including 3 and 1/2 cu. yds); Lull High Lift (under 40 feet); Lubrication and Service Engineer (Mobile); Maginnis Internal Full Slab Vibrator (on airports, highways, canals and warehouses); Man or Material Hoist; Mechanical Concrete Finisher (Large Clary, Johnson Bidwell, Bridge Deck and similar); Mobile Truck Crane Driver; Portable Shotblast Concrete Cleaning Machine; Portable Boring Machine (under streets, highways, etc.); Portable Crusher; Power Jumbo Operator (setting slip forms, etc., in tunnels); Rollers (over 5 tons); Self-propelled Compactor (single engine);
Self-propelled Pavement Breaker; Skidsteer Loader with attachments; Slip Form Pumps (Power driven by hydraulic, electric, air, gas, etc., lifting device for concrete forms); Small Rubber Tired Tractors; Trencher (up to and including 6 feet); Underbridge Personnel Aerial Platform (50 feet of platform or less).
GROUP 7: Crusher Plant Engineer, Dozer (D-4, Case 450, John Deere 450, and similar); Dual Drum Mixer, Extend Lift;
Hoist and/or Winch (2 drums); Loader (over 3 and 1/2 cu.
yds. up to and including 6 yards.); Mechanical Finisher or Spreader Machine (asphalt), (Barber Greene and similar) (Screedman required); Mine or Shaft Hoist; Mobile Concrete Mixer (over 5 tons); Pipe Bending Machine (pipelines only);
Pipe Cleaning Machine (tractor propelled and supported);
Pipe Wrapping Machine (tractor propelled and supported);
Roller Operator (Asphalt); Self-Propelled Elevating Grade
Plane; Slusher Operator; Tractor (with boom) (D-6, or similar); Trencher (over 6 feet and less than 200 h.p.);
Water Tanker (pulled by Euclids, T-Pulls, DW-10, 20 or 21, or similar); Winchman (Stern Winch on Dredge).
GROUP 8: Asphalt Plant Operator; Barge Mate (Seagoing);
Cast-in-Place Pipe Laying Machine; Concrete Batch Plant (multiple units); Conveyor Operator (tunnel); Deckmate;
Dozer (D-6 and similar); Finishing Machine Operator (airports and highways); Gradesetter; Kolman Loader (and similar); Mucking Machine (Crawler-type); Mucking Machine (Conveyor-type); No-Joint Pipe Laying Machine; Portable Crushing and Screening Plant; Power Blade Operator (under 12); Saurman Type Dragline (up to and including 5 yds.);
Stationary Pipe Wrapping, Cleaning and Bending Machine;
Surface Heater and Planer Operator, Tractor (D-6 and similar); Tri-Batch Paver; Tunnel Badger; Tunnel Mole and/or Boring Machine Operator Underbridge Personnel Aerial Platform (over 50 feet of platform).
GROUP 9: Combination Mixer and Compressor (gunite); Do-Mor Loaderand Adams Elegrader; Dozer (D-7 or equal); Wheel and/or Ladder Trencher (over 6 feet and 200 to 749 h.p.).
GROUP 9A: Dozer (D-8 and similar); Gradesetter (when required by the Contractor to work from drawings, plans or specifications without the direct supervision of a foreman or superintendent); Push Cat; Scrapers (up to and including 20 cu. yds); Self-propelled Compactor with Dozer;
Self-Propelled, Rubber-Tired Earthmoving Equipment (up to and including 20 cu. yds) (621 Band and similar); Sheep's Foot; Tractor (D-8 and similar); Tractors with boom (larger than D-6, and similar).
GROUP 10: Chicago Boom; Cold Planers; Heavy Duty Repairman or Welder; Hoist and/or Winch (3 drums); Hydraulic Skooper (Koehring and similar); Loader (over 6 cu. yds. up to and including 12 cu. yds.); Saurman type Dragline (over 5 cu.
yds.); Self-propelled, rubber-tired Earthmoving Equipment (over 20 cu. yds. up to and including 31 cu. yds.) (637D and similar); Soil Stabilizer (P & H or equal); Sub-Grader (Gurries or other automatic type); Tractors (D-9 or equivalent, all attachments); Tractor (Tandem Scraper);
Watch Engineer.
GROUP 10A: Boat Operator; Cable-operated Crawler Crane (up to and including 25 tons); Cable-operated Power Shovel, Clamshell,…