Q&A Dated 02Aug2017 0600Hours
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912J6-17-R-0002-0006.pdf | ||
| Q&A_Dated_15Aug2017.pdf | ||
| W912J6-17-R-0002-0005.pdf | ||
| Q&A_Dated_12Aug2017.pdf | ||
| REVISED_EXHIBIT_A-W912J617R0002_-_Copy.doc | DOC document | |
| Q&A_Dated_11Aug2017_0700_Hours.pdf | ||
| REVISED_EXHIBIT_A-W912J617R0002_-_Copy.doc | DOC document | |
| REVISED_EXHIBIT_A-W912J617R0002.doc | DOC document | |
| W912J6-17-R-0002-0004.pdf | ||
| A-304_CSMS-ARCH_042117-REVISED.pdf | ||
| Q&A_Dated_07Aug2017_1300_Hours.pdf | ||
| W912J6-17-R-0002-0003.pdf | ||
| PreProposal_Meeting_Minutes26Jul17.pdf | ||
| SIGN_IN_SHEET.pdf | ||
| Q&A_Dated_31Jul2017_0500_Hours.pdf | ||
| Addendum_1_Elec.pdf | ||
| Q&A_Dated_27Jul2017.pdf | ||
| W912J6-17-R-0002-0002.pdf | ||
| 87618_Subsurface_Information.pdf | ||
| Q&A_Dated_25Jul2017.pdf | ||
| Q&A_Dated_24Jul2017.pdf | ||
| W912J6-17-R-0002-0001.pdf | ||
| EXHIBIT_B-W912J617R0002_-_Copy.doc | DOC document | |
| EXHIBIT_A-W912J617R0002_-_Copy.doc | DOC document | |
| EXHIBIT_C-W912J617R0002_-_Copy.doc | DOC document | |
| Q&A_Dated_13Jul2017.pdf | ||
| W912J6-17-R-0002.pdf |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS RELATED TO:
SOLICITATION W912J6-17-R-0002
Dated 02 Aug 2017
Make Sure You Have the Latest Version of this Web Page “Refresh” or “Reload”
Dated 13 Jul 17
Q1. How do I access the files/documents for the Project?
A1. See, Sections 4.4, 4.5 & 4.7 of the FBO Vendor Guide available for download in PDF format via the Federal Business Opportunities / FBO Home Page. See also, Section 00100 of the Solicitation.
Additionally, to view and/or download Export Controlled Materials, a company must be certified (via an approved DD Form 2345) by the Joint Certification Program (JCP) administered by the DLA Logistic Information Service (DLIS). This certification establishes that a company is a U.S. or Canadian contractor eligible to receive unclassified technical data that is under the control of the U.S. Department of Defense (DoD) or the Canadian Department of National Defense (DND). Questions about this program or DD Form 2345 should be addressed to U.S./Canada Joint Certification Office, DLA Logistics Information Services (DLIS), Federal Center, 74 Washington Avenue North, Battle Creek, MI 49017-3084. The Joint Certification Office may be contacted by telephone at: 1-(800) 352-3572; or email: jcp-admin@.dla.mil.
Q2. I am trying to access the [export controlled] packages and have a number as assigned on DD Form 2345 but cannot get the packages to open. Our DD 2345 Number is ####### expiration ##/##/2018.
A2. The U.S./Canada Joint Certification Program (JCP) office reported to this office that once a company is certified with the JCP office (normally 7 to 12 business days), the company should contact FBO to have them add their JCP number to their FBO account. The FBO help desk (Federal Service Desk) reported to this office that companies need to make sure that they are registered and login as a Vendor to FBO. When the Vendor click's to open an export controlled package/document, they should be asked for their MPIN. After entering the MPIN, the export controlled package/document should be viewable/downloadable by Vendors that have gone through the JCP process. If a Vendor still has problems, the Vendor should check to make sure that their CCR registration and MPIN are valid and up-to-date. If problems still persist, the Vendor may call the FBO help desk at 866-606-8220, selection option 2 for FBO issues, and ask for troubleshooting assistance.
Q3. Please help me access the locked documents for solicitation W912J6-17-R-0002.
A3. Reference answers A1 and A2 above. After your firm contact and submits a DD Form 2345 to the Joint Certification Program (JCP) which is administered by the DLA Logistic Information (contact information provided in A1) your firm can send proof of this application and submission via a copy of the email receipt from the JCP or DLA personnel that your certification is in process to manual.llanes.mil@mail.mil and copy to russell.s.redila.mil@mail.mil . Pending receipt of the proof that your application is pending certification the Contracting Officer may make the locked files directly available to your frim via AMRDEC SAFE. This access will not be granted if your firm does not apply for certification and follow the above mentioned instructions in A1 and A2.
Q4. We cannot download the specification and drawing documents for the subject bid with MPIN. Is there any way we can get the export controlled documents except applying JCP certification?
A4. See Item A3 Above.
mailto:jcp-admin@.dla.mil mailto:manual.llanes.mil@mail.mil mailto:russell.s.redila.mil@mail.mil
Dated 24 Jul 17
Q5. Specification Section 07 53 23 section 2.1.1 EPDM Sheet is calling for a 90 Mil Reinforced EPDM Membrane. However No manufacturer produces reinforced EPDM membrane in White to meet the SRI value, they only produce a 115 Mil reinforced Fleeceback EPDM Membrane in white that will meet the SRI value as specified. Can we use a Carlisle 115 Mil reinforced Fleeceback EPDM?
A5.Offerors need to ensure they continue reading section 2.1.1 and note, 0.090 inch nominal thickness is referred to as a “minimum thickness”. Roofing systems complying to all requirements of the specification(s) including the achievement of a minimum EPDM thickness of 0.090 inch are acceptable.
Q6. My question concerns past-performance questionnaires (PPQs) as provided in Exhibit C. We have requested references for the three project we intend to submit using the US Navy/USACE forms. These were sent to us for inclusion in recent proposals. Would the Government please consider allowing us to use these completed PPQs and send them to you, in lieu of requesting our clients complete another past performance questionnaire form?
A6. Yes the Government will allow use of these completed PPQs. They should be sent from the client directly to the Contracting Officer if at all possible.
Q7. General Note No.5 on sheet S-001 refers to Geolabs Inc. geotechnical report dated April 01, 2016.
Please provide the abovementioned report to all bidders to make them familiar with the existing soil condition.
A7. The Geotechnical report will be provided in forthcoming Amendment and posted to www.fbo.gov
Dated 25 Jul 17
Q8. On sheet CS100 note 19 & 20 states for Base bid aggregate paving to be installed and for Bid option #7 heavy duty concrete paving is to be installed. If bid option #7 is not awarded and aggregate paving is installed per base bid the parking stall striping and handicap striping specified will not last very long on aggregate paving. Do you still require this to be striped if bid option #7 is not awarded?
A8. Yes this will still be required to be striped if bid option #7 is not awarded.
Q9. Sheet DT505 specifies a concrete Oil/Water separator and detail 4/DT509 specifies a steel body Oil/Water separator. Is there a particular manufacturer specified for these tanks? How many gallon capacity for each of these tanks?
A9. There is no specific manufacturer requirement. For the steel OWS (Detail 4/DT509), provide a 1,000 gallon tank that meets the requirements of the plans/specs. For the concrete OWS (Detail 2/DT505), provide the size and layout that matches the dimensions shown.
Dated 27 Jul 17
Q10. Project indicates a third-partly Commissioning Authority is involved with the projects and employed by the Gov't or A/E. Has the Commissioning Authority already been hired by the Gov't or A/E, or is the contractor to employ the Commissioning authority?
A10. Owner/Governemnt will provide Commissioning Authority utilizing local A/E Cx staff to execute the owner’s responsibilities. The Contractor shall provide the required Commissioning activites required by the Contracor/Builder as required by the project specifications.
Dated 31 Jul 17
Q11. We are requesting the addition of “PDQ Manufacturing” as an approved alternate manufacturer to that listed in the door schedule, and under section 08 71 00 of the specification for the following products when applicable to your project; 1) Mortis Locks, 2) Cylindrical Locks, 3) Door Closers, 4) Panic Devices with Trim.
Per FAR 36 2.02 Specifications, 11.103 Market acceptance paragraphs (a), (1), (i), (ii), (iii), (5) and
11.104 Use of brand name or equal purchase descriptions. We offer the following justification for review; test data, the material used, and certifications for the addition of PDQ Manufacturing. PDQ Manufacturing has also met all product testing, materials used, and certifications required by the UFGS and the FAR.
11.103 (a), (1), (i) - Achieved commercial acceptance
PDQ Manufacturing is a member of BHMA, the governing body for commercial contract hardware products standards and specifications. PDQ has an onsite BHMA/InterTech® certified testing laboratory to meet the requirement of recertification of all products every three years. PDQ is an architecturally specified manufacturer for many commercial projects each year.
(a), (1), (ii) - Been satisfactorily supplied to an agency under current or recent contracts
PDQ Manufacturing has supplied many projects
(a), (2) - Otherwise meet the item description, specifications, or other criteria prescribed in the public notice and solicitation.
PDQ Manufacturing meets all salient physical, functional, and performance characteristics of the brand listed, and as required by the Unified Facility Guide specifications, BHMA standards, ANSI and UL testing.
A11. PDQ is acceptable provided products comply with all specification requirements
Q12. While at the site during the pre-proposal conference, we noticed concrete duct banks being installed crossing Circle Avenue and Earl's Alley and new telecommunication manholes on both sides of Earl's alley. The conduits crossing Circle Alley appear to be terminated with risers up one of the power poles scheduled to be demolished by HELCO per CD010 and ES102. None of this new work is shown on ES102. Any new conduits crossing these recently poured ductbanks will probably need to be routed underneath to get the required cover. Can the telecom for project W912J6-17-R-0002 be routed through these recently installed conduits and manholes or must additional ductbanks and handholes be installed?
A12. Bid communication ductbank as shown on the plans. Further evaluation of the use of existing ductbank will be done during the construction phase.
Dated 01 Aug 17
Q13. Please clarify where the chemical resistive resinous flooring shall be installed. Spec. section 09 67 23 CHEMICAL RESISTIVE RESINOUS FLOORINS was provided in this project package but there is no chemical resistive resinous flooring indicated on A‐603.
A13. Provide in BATTERY ROOM 134.
Q14. Please refer to A‐109_Bldg insulation diagram. Insulation diagram @ Lower level depicts CMU wall with R‐6.5 un‐interrupted panel insulation for Area C perimeter walls. However, related detail drawings (A‐301, A‐304, A‐509) doesn’t show un‐interrupted panel insulation on these areas. Please clarify.
A14. To achieve the maximum level of cost competitiveness, project was designed with a non-proprietary assembly/system performance criteria along with a delegated design to accomplish the building insulation and air barrier performance criteria. Review A-109 along with Specification’s to accomplish the specified performance criteria for the insulation and air barrier. Related specification sections include 07 05 23
PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS, 07 21 16 MINERAL
FIBER BLANKET INSULATION, 07 22 00 ROOF AND DECK INSULATION and 07 42 16
INSULATED CORE METAL WALL PANELS.
Q15. Related with above inquiry, exterior wall between grid F and K at Grid 14 has R‐12 uninterrupted panel insulation. However, exterior elevation drawing (A‐201) or B/A‐308 don’t show any panel finishes. Please clarify.
A15. See A14 above.
Q16. Refer to Roof Plan, A‐102. Please clarify what the ‘+’ symbols are?
A16. These are drafting grips in the BIM Revit model and inadvertently plotted. Please disregard them relative to the architecutal plan.
Q17. Please confirm welding table and workbay tables are GFGI on A‐103.
A17. Confirmed, note Design Building Contractor shall be responsible to provide the designated utility connections on the Work/Welding tables to include the coordination of the tables during construction so that the work can be completed.
Q18. Please clarify window type at RM103_PROD CNTR. Refer to A‐104 and 2D/A‐202.
A18. Provide F2 window type, see A-602.
Q19. Please clarify for the top running overhead bridge crane. For the 15 ton top running overhead bridge crane, is it to be a top running single girder crane per note 4.F Crane Load on Sheet S‐001 or a top running double girder crane per reference of CMAA70 on page 7 of spec section 412213.14 paragraph 2.1?
A19. Bridge crane shall be a single girder top running crane per note 4.F on S-001. Crane shall be in accordance with CMAA 74.
Q20. There is no detail on the parking canopy roof frame. Please provide existing condition of parking structure such as as‐built drawings.
A20. Existing drawings will be issued in a forthcoming Amendment.