Solicitation_-_W912J3-19-Q-5001.pdf
PDF 1 MB Posted
- Attached to
- Repaint Static Display F-100A Aircraft
- Solicitation number
- W912J319Q5001
About this file
The solicitation document has been posted. With the solicitation you will find the Performance Work Statement (PWS) and the Wage Determination for the Service Contract Act.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912J319Q5001 03-Apr-2019
b. TELEPHONE NUMBER
(505) 407-3300 EXT 200768
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 07 May 2019
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912J39. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
EDWIN WIDGEON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
F8H0019078AW01
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USPFO FOR NEW MEXICO CONTRACTING OFFICE
ATTN: EDWIN WIDGEON 47 BATTAN BLVD
SANTA FE NM 87508-4695
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE F8H001 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
F8H001 - 150TH FIGHTER WING
MATTHEW DEMERS
2251 AIR GUARD RD SE
KIRTLAND AFB NM 87117-5875
TEL: 505-853-3608 FAX:
FAX:
TEL: (505) 407-3300 EXT 200768 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$15,000,000
NAICS:
238320
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF58
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912J319Q5001
Section SF 1449 - CONTINUATION SHEET
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
Painting of F-100A Static Aircraft Tail # 53-1532
March 8, 2019
Part 1
General Information
1. DESCRIPTION OF SERVICES AND GENERAL INFORMATION.
1.1. SCOPE OF WORK: The project consists of restoration and preservation of an F-100A Static
Display Aircraft, tail # 53-1532, on display at the New Mexico Air National Guard, 150th Special Operations Wing, 2251 Air Guard Rd, Kirtland AFB, NM 87117. The Primary goal is to preserve the history of the New Mexico Air National Guard and maintain authenticity of the static display aircraft. The period of performance for this requirement is 60 calendar days from date of award. The contractor shall provide all personnel, tools, equipment, material, supervision, technical expertise, and other related items necessary to perform restoration of the aircraft. Restoration and preservation consist of sheet metal work, maintenance repairs, bird proofing, and painting. Preparation of the surface of the aircraft includes pressure washing, stripping paint, sanding paint and corrosion repair to make the surface compatible to new paint with proper collection of paint chips, etc., so that no environmental hazard is created. All tasks performed shall be accomplished in a workmanship like manner and in accordance with applicable federal, state, and local regulations and any OSHA requirements. The contractor shall also ensure all personnel are provided appropriate personal protective equipment for the work being performed. The contractor shall paint aircraft in accordance with commercial practices and manufacturer’s recommended procedures. The contractor shall comply with all environmental codes and regulations while performing the services of this contract. Applicable work elements consist of, but are not limited to the following:
NOTE: The aircraft currently has a “Home Station” paint scheme of silver with unit emblem of a black and yellow stylized arrow on the sides and tail. This PWS will change the aircraft to the standard F-100 camouflage paint scheme used during the Vietnam war. Detailed aircraft tail numbers, pilot/crew name, and other aircraft markings will be given to contractor when the contract has been awarded.
1.2. DESCRIPTION OF SERVICES: Remove and repair all areas of corrosion, remove and/or repair minor dents from aircraft surface. Remove current paint if needed to level sufficient to facilitate new paint scheme (see Appendix B). Seal airframe and seal canopies to prevent water seepage. Prime all bare spots except where noted in paint scheme provided by 150 SOW (i.e.
engine cowl). All windows, doors, and hatches shall be secured and all vents, nozzles, wheel wells, cowlings and cowl flap areas, intakes, air scoops and exhausts shall be bird-proofed. All aircraft markings shall be replaced with 150 SOW unit markings in accordance with the attached paint scheme (see Appendix B), and any applicable aircraft technical orders. Paint to match standard F- 100 camouflage paint scheme used when deployed to the Vietnam War. Repairs do not have to meet aircraft airworthiness standards; however, they must meet the original shape and cosmetic appearance. All work shall be accomplished IAW, but not limited to; T.O. 1-1-4 Exterior Finishes, Insignia and Markings Applicable to Aircraft and Missiles, T.O. 1-1-691 Cleaning and Corrosion Prevention and Control, Aerospace and Non Aerospace Equipment. Air Force Instruction (AFI) 84-103, U.S. Air Force Heritage Program, 27 Oct 04; Historical Property Agreement (HPA) on file with the base Historical Property Custodian (SMSgt Matthew S. Demers) for review; AFI 21- 101, Aircraft and Equipment Maintenance Management, 26 Jul 10/Air Education and Training Command (AETC) Supplement, 21 Oct 10 (Incorporating Change 1, 24 Jan 12); all applicable T.O’s or as directed by the Contracting Officer (CO) and Air Force Instruction 91-203, Air Force Consolidated Occupational Safety Instruction.
1.2.1. Preparation of aircraft: The contractor shall assess aircraft for structural soundness and ensure previous paint, dirt deposits, residual oil/hydraulic fluid, biological soils, pest, and insect/bird nests etc. are removed from aircraft as necessary. Inspect 100% of aircraft substrate to ensure aged paint is in a sound condition. Areas with bubbles, blisters, peeling, chipped etc. are to be repaired. Inspection, by the government, to ensure substrate is free of corrosion and solid prior to painting is required. Any panels or structural pieces damaged should be replace or repair as required. All areas of corrosion (caused by bird droppings, which are highly corrosive to aluminum) or damage are to be replaced or repaired. Prepare aircraft to a sound substrate per paint manufactures paint specifications prior to painting. Ensure to coat aircraft with primer to bare/new metal prior to painting. Painting shall not be performed on aircraft until sheet metal damage is repaired or replaced, corrosion and composite repairs are completed, primer applied, and aircraft maintenance discrepancies are completed. The aircraft will be ready for paint once the exterior structure is repaired, prepped, and washed and government personnel inspect aircraft prior to painting. Paint scheme, colors, and pattern of aircraft shall simulate current schemes, colors, and patterns. Contractor shall ensure the painted/restored static display has a smooth (semi-gloss) finish and all decals are in appropriate positions simulating current configurations. All aircraft shall be painted with high quality polyurethane paint. Government will approve color selection provided by the contractor. Paint applications shall sustain 10-year durability for protection against weathering and peeling for the local area.
1.2.2. Restoration: Performance of restoration requirements shall include, but not limited to paint preparation, corrosion repairs, sheet metal work, fiberglass work, primer, aircraft maintenance repairs, painting, bird-proofing, hardware replacement, adhesive use and vinyl replacement. The contractor shall, protect all landscaping adjacent to aircraft from damage. All static display renovation/ maintenance will be accomplished on site. In some cases this may require the use of a cherry picker and/ or scaffolding/ high lift; the contractor shall us their own equipment.
1.2.3. Bird proofing: Install bird proofing securely to close openings and to prevent birds from landings on aircraft surfaces. Bird proofing consists of a number of processes, for example: bird spikes are a long lasting, humane, nearly invisible excellent low profile bird control product, used to protect numerous areas around an aircraft. Spikes deter problem birds from aircraft areas by presenting an unsuitable landing area and preventing birds from gaining footholds. Additionally, the use of wire mesh around holes and openings will keep pests and birds from entering aircraft.
All installed bird proofing shall be secure and effective, closing off holes and are humane. Bird proof aircraft by screening, plugging or covering vents, nozzles, wheel wells, cowlings and cowl flap areas, intakes, air scoops, exhausts, aircraft stand, and engines. The government shall approve all bird proofing solutions prior to installation.
1.2.4. Aircraft maintenance discrepancy repairs: The contractor shall make maintenance repairs and restore aircraft to their original unaltered or properly altered condition. Where repairs, alterations, or maintenance is to be performed, every effort shall be made to ensure repairs are comparable and similar in appearance and hardware. All work will be accomplished in accordance with, but not limited to; AFI 84-103 “United States Air Force Heritage Program”, Historical Property Agreement (HPA) 3132, and AFI 21-101_ ANGSUP1 “Aircraft And Equipment Maintenance Management”. Technical Data will be made available to contractor upon request.
Repairs do not have to meet aircraft airworthiness standards; however, they must meet the original shape and cosmetic appearance.
1.2.5. Guaranteed workmanship: The contractor shall guarantee completed repairs and painting remain in excellent condition for at least five years from acceptance of work by government personnel. Re-performance shall be required if static display shows evidence of rust, peeling, flaking, cracking, dulling, oxidation, loose hardware, looseness of repair, and/or any other surface deterioration within five years from acceptance. All tasks performed shall be accomplished in a workmanship like manner and in accordance with applicable federal, state, and local regulations and any OSHA requirements.
1.2.6. Painting conditions: All painting applications shall be done under conditions per manufacturer’s recommendations to include temperature, humidity, moisture, etc. Contractor shall apply coatings between the temperatures of 55 to 110 degrees Fahrenheit (no colder, no hotter).
No painting shall be done above 85 percent relative humidity. No exterior painting shall be done immediately after a rain, during foggy weather, or when rain is predicted; and painting should cease four hours prior to sundown to allow the coating sufficient time to cure prior to dew and moisture setting in.
1.2.6. Environmental: The contractor shall comply with all Federal, state, county, city, KAFB bioenvironmental, Occupational Safety & Health Administration (OSHA), Environmental Protection Agency (EPA), and/or any other applicable guidelines pertinent to outdoor preparation/painting of static displays, to include collection and disposal of waste materials. The contractor shall make available all Material Safety Data Sheet (MSDS) for all paints, solvents, and chemicals used during the work. The contractor shall ensure all contractor personnel are aware of the purpose and all the precautions associated with these documents.
1.2.7. Equipment: The contractor will provide all required safety equipment. All equipment used under this contract shall meet all OSHA, EPA and or any other applicable guidelines. All safety equipment must be used for its intended and designed purpose. The contractor shall be required to furnish all equipment such as high reach, lifts or scaffolding when required to perform the scope of work outlined in this PWS.
1.2.8. Damage: The contractor shall clean up the work area and ensure landscaped areas around static displays are not damaged. The contractor shall be held responsible for any damage to the vegetation surrounding the work area unless noted prior to the start of work. If any damage is noted prior to accomplishing the work, it will be noted and the contractor will not be held responsible. If there is any further damage to the already noted damaged areas, then the contractor assumes full liability for fixing all the damage. This is to include shrubs and any additional vegetation. The contractor assumes all responsibility for over-spray on vehicles, buildings, landscaping, etc.
1.2.9. Supervision: The contractor shall provide a supervisor who may be a member of the paint/repair crew. The supervisor will perform a walk around with the 150 SOW/HPC and the Government Point of Contact (GPOC) to check the aircraft for any damage before work begins and after completion of painting/repairs with this same person. The initial walk around will also be used to coordinate any requirements the contractor needs the 150 SOW/HPC to accomplish before work begins. Contractor will give 10 (ten) days’ notice to 150 SOW/HPC and GPCO before beginning any painting
1.2.10. Duty hours: The work shall be performed during normal duty hours, 7:30 a.m. to 4:30, Monday through Friday, with any additional time coordinated with the 150 SOW/HPC and GPOC.
1.2.11 Work completion: The contractor shall give a 24-hour notice prior to work completion so the area may be inspected and accepted by 150 SOW/HPC and GPOC, who serves as the Government Project Manager(s). All discrepancies shall be corrected in a timely manner.
1.2.12. Quality assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.3. PERSONNEL:
1.3.1. Employees: The government reserves the right to restrict the employment of any contractor personnel, or prospective contractor personnel, who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population. The contractor's designated representative must be able to read, write, speak, and understand English.
1.3.2. Identification: The contractor personnel shall present a neat appearance and be easily recognized. This may be accomplished by the wearing of distinctive clothing bearing the name the name of the company or appropriate badges containing the company and employee name. Such distinctive clothing and/or badges shall be furnished by the contractor.
1.3.3. Conflict of interest: The contractor shall not employ any person who is an employee of the United States government if the employment of that person would create a conflict of interest.
The contractor shall not employ any person who is an employee of the department of the Air Force
(AF), either military or civilian, unless such person seeks and receives approval IAW DoD 5500.7- R, Joint Ethics Regulation (JER), 30 Aug 99, (Incorporating Through Change 7, 17 Nov 11), IAW Department of Defense Directive(DODD) 5500.7, Standards of Conflict, 29 Nov 07 (for military) or AFI 36-703, Civilian Conduct and Responsibility, 1 Aug 99 (for civilians),and AF policy. In addition, the Contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies contained in AFI 64-106, Air Force Industrial Labor Relations Activities, 25 Mar 94/AETC Supplement, 23 Feb 10. The contractor is prohibited from hiring off-duty personnel as quality control personnel or construction inspectors.
1.3. PHYSICAL SECURITY: The contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government equipment and materials shall be secured.
1.4. SAFETY INFORMATION:
1.4.1. Obligations: The contractors shall comply with the Occupational Safety and Health Act (OSHA, Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926.
The detailed provisions of the act for accident prevention are directly applicable to all contractor operations. Prime contractors are also responsible for ensuring any sub-contractors also adhere to OSHA Guidance. OSHA compliance officers visit contractor worksites on the installation.
1.4.2. Responsibilities: The following is a list of responsibilities for contracting, contractor, and wing safety personnel.
a. Contractor responsibilities.
(1) Contractors are responsible for ensuring all industrial safety provisions are followed.
(2) Contractors must report all accidents involving Air Force people, property, or equipment damage, and any contractor personnel injured in the performance of the Air Force contract to the Contracting Officer (CO).
(3) Take immediate corrective action to comply with safety regulations if informed of a violation by the CO.
b. Contracting Officer (CO) responsibilities. Note: The CO is the only one authorized to make changes to the contract, this includes changing period of performance and dollar value of the contract.
(1) Inform the contractor of non-compliance with safety regulations, which may cause injury to Air Force personnel or property.
(2) Notify wing safety of any injuries or damage to AF property reported by the contractor, in performance of an Air Force contract.
(3) Administer the contract by issuing contract modifications.
c. Wing safety responsibilities.
(1) 150 SOW safety personnel will periodically monitor contractor operations to ensure safety regulation compliance as it applies to Air Force personnel and equipment.
(2) Wing safety personnel are available to the CO for technical assistance on matters pertaining to accident prevention.
(3) Notify the GCOR if a safety procedure or condition exists which requires correction by the contractor.
1.4.3. Safety rules: Contractors shall pay particular attention to the following safety rules and ensure strict compliance while on the installation.
a. General safety rules while on the installation.
(1) Ensure adequate lighting and barricading is available and used for day and night operations.
(2) Use proper shoring during trenching operations.
(3) Post proper warning signs at indoor and outdoor operations.
(4) Secure materials when doing high work, during high winds, or when high winds are forecasted.
(5) Use warning signs, barricades, or flagmen when operations present a hazard to drivers, pedestrians, or workers.
b. Traffic rules while on the installation. All drivers, mobile equipment, and vehicles must comply with applicable federal, state, and local laws.
(1) Seat belts are mandatory for all passengers as well as drivers
(2) An approved bicycle helmet is required to be properly worn while riding bicycles on the installation.
(3) Drive the speed limit:
(a) Base proper speed limit is 25 mph or as posted.
(b) Housing area speed limit is 15 mph.
(c) Parking lot speed limit is 5 mph.
(4) Give full attention to the operation of the vehicle. Avoid operator distractions, such as using cellular phones, text messaging, etc. while operating a vehicle.
(5) Park in designated areas.
(6) No riding in the beds of trucks, buckets of front end loaders, or tandem riding on vehicles designed for one-person operation.
(7) Use safety chains in addition to towing hooks when towing equipment.
(8) Place a light on the rear of equipment being towed during the hours of darkness.
(9) Mark overhanging portions of loads with warning flags or lights.
(10) When driving or using a crane or cherry picker, be cautious around power lines crossing the road and don't position booms closer than 10 feet to overhead high voltage lines.
(11) Ensure electrical work is IAW the National Electric Code.
(12) Upon encountering troop formations on the installation:
(a) Maintain 50-foot distance behind formations until signaled to pass by the troop commander. When signed to pass troop formation, do not exceed 10 mph while passing.
(b) When passing from the front, proceed without stopping, but slow to 10 mph while passing.
1.5. WEAPONS, FIREARMS, AND AMMUNITION: The contractor personnel are prohibited from possessing weapons, firearms, or ammunition on themselves or within their contractor-owned vehicle(s) or privately-owned vehicle(s) while on Kirtland Air Force Base.
1.7. CONTRACTOR CLEANUP: The contractor shall leave the work area free of all debris generated by this work at the end of each workday and for final cleanup when the job is completed.
Work area shall be returned to the Government in the same condition of cleanliness as existed when received by the contractor. All plumbing fixtures used to clean paint equipment shall be cleaned immediately after the equipment is cleaned of paint, and plumbing fixtures shall be restored to their prior state of cleanliness. Mineral spirits and other flammable liquids shall not be poured into plumbing fixtures, on grass, on plants, or on asphalt. Flammable paints, liquids, and materials will not be stored overnight at facilities other than the contractor storage area.
1.7.1. Dumpsters: The work includes demolition or removal of all construction-related materials indicated or specified. All material and debris shall become the property of the contractor and shall be transported and disposed of off base at the contractor’s expense. (Hazardous waste shall be disposed of as specified). All non-hazardous material shall be disposed of in a permitted landfill and in a legal manner that will not result in liability to the AF. The contractor shall comply with all federal, state and local regulations. If a dumpster is needed for any portion of this project the contractor is to pay for, and arrange the delivery and pickup of the dumpster. The 150 SOW/HPC will give you instructions as to where you can place the dumpster.
1.7.2. Trash disposal: The contractor shall dispose of all trash, debris, garbage, etc., from the worksite on a daily basis. Disposal shall conform to all base, local, state, federal guidelines, criteria, and regulations. Paint and material will not be disposed of in base dumpsters. Hazardous waste shall be properly disposed of off the installation.
2. PROPERTY AND SERVICES:
2.1. GOVERNMENT-FURNISHED PROPERTY AND SERVICES: The government shall provide, without cost, the facilities, materials, equipment, and/or services listed below:
2.1.1. Property: None.
2.1.2. Services: None
2.1.3. Utilities: Water and power, may NOT be available on site. The government MAY furnish a location for obtaining water, however it will be the contractor’s responsibility to transport and maintain water near work site. It will be the contractor’s responsibility to provide any generators necessary based on their requirements for power utilization. The bathrooms located in the south hallway of building 1055 may be utilized during normal duty hours.
2.1.4. Security Police and Fire Protection: Phone numbers:
Fire Department: 505-853-9111 Security Police: 505-846-7913 Emergency: 505-853-9111
2.1.5. References and technical documentation: See “Appendix A”. The government shall provide web based links to the documents in “Appendix A” upon request.
2.2. CONTRACTOR-FURNISHED ITEMS:
2.2.1. The contractor shall furnish all necessary supplies, materials, tools, support equipment, labor, and vehicles required to perform all operations required by this Performance Work Statement (PWS).
2.2.2. Materials and supplies: The contractor shall acquire the materials and supplies required for the performance of this contract. The contractor shall bear the cost of all materials and supplies.
2.2.3. Quality of materials and supplies: Materials and supplies purchased shall be of a quality which will adequately and economically serve their intended purpose, and meet the intent of this Performance Work Statement. The items supplied shall be standard products of manufacturers regularly engaged in the production of such supplies or materials.
2.2.4. Vehicles: The contractor shall operate vehicles to comply with base traffic regulations.
3. CONTRACTOR MANPOWER REPORTING (CMR).
CMR: The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor shall completely fill in all the information in the format using the following web address http://www.ecmra.mil/ or https://doncmra.nmci.navy.mil/.
The required information includes:
(1) Contracting Office, KO, Contracting Officer’s Technical Representative (COTR) or also known as the Contracting Officer’s Representative (COR);
(2) Contract number, including task and delivery order number;
(3) Beginning and ending dates covered by reporting period;
(4) Contractor's name, address, phone number, e-mail address, identity of Contractor employee entering data;
(5) Estimated direct labor hours (including sub-Contractors);
(6) Estimated direct labor dollars paid this reporting period (including sub- Contractors);
(7) Total payments (including sub-Contractors);
(8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different);
(9) Estimated data collection cost;
(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information);
(11) Locations where Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);
(12) Presence of deployment or contingency contract language;
(13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country).
As part of their submission, the Contractor shall provide the estimated total cost (if any) incurred to comply with this reporting requirement on CLIN 0002. Reporting period shall be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor’s system to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website shown above.
4. QUALITY ASSURANCE SURVEILLANCE PLAN
PWS
Paragraph Task Performance
Standard Acceptable
Quality Levels
(AQL)
Surveillance Method / By
Whom Para No.
1.2, and
1.2.1
Inspect and Document Aircraft Surface for Flaws / Dents / Corrosion
The contractor shall Inspect and
Document 98% of Aircraft Surface for
Flaws / Dents / Corrosion
2% failure to inspect and document Flaws / Dents /
Corrosion before Painting Aircraft.
GPOC will Inspect Documentation of
Flaws /Dents / Corrosion until aircraft prepped for paint.
Para No.
1.2, 1.2.1, 1.2.2, 1.2.6
Prepare Surface for Priming
Remove 99% of old paint, primer and corrosion
1% Failure to remove old paint, primer and corrosion.
GPOC will Inspect Surface prior to
Priming
Para No.
1.2.3
Install Bird Proofing
Install Bird Proofing on 99% or required areas
1% Failure to install Bird Proofing
GPOC will Inspect Bird Proofing instillation prior to Priming
Para No.
1.2, 1.2.1, 1.2.2, 1.2.6
Prime All Surface Areas requiring
Primer
Prime 99% or required Surfaces with corrosion resistant primer
1% Failure to Prime all surfaces.
GPOC will Inspect Surface during and after Priming
Para No.
1.2, 1.2.1, 1.2.2, 1.2.6
Apply Paint Scheme Topcoats
Apply Topcoat Paint Scheme to 99% of required surfaces to match unit provided Paint
Scheme
1% failure to Apply Paint
Scheme Topcoat to required Surfaces
GPOC will Inspect Surface during and after Topcoat application
Para No.
1.2, 1.2.1, 1.2.2, 1.2.6
Apply Final Aircraft Detail / Tail markings
Apply aircraft Detail / Tail Markings t0
99% accuracy through application of paint / Decals.
1% failure to Apply Paint
Scheme Final Detail /Tail Markings to required Surfaces
GPOC will Inspect Aircraft during and after application of final Aircraft detail
/ Tail markings
Para No.
1.2.1
Apply ultra-violet clear coat protective Sealant.
Apply ultra-violet clear coat protective sealant to
99% of required surfaces.
1% failure to apply ultra-violet clear coat protective sealant to
99% of required surfaces.
GPOC will Inspect Surface during and after Clear coat Application
Para No.1.2.8, Clean and prepare aircraft and jobsite
Remove 98% of debris from worksite
2% failure to remove debris from worksite
GPOC will inspect jobsite on a
1.7, 1.7.1, 1.7.2 weekly basis for cleanliness.
Para No.
1.2.11
Aircraft Final Inspection
Clean and prepare 99% of Aircraft for final Inspection
1% failure of preparation for aircraft final inspection
GPOC will inspect Aircraft for final inspection after painting and cleanup has been completed.
APPENDIX A
APPLICABLE REGULATIONS, MANUALS, AND SPECIFICATIONS
Regulations, manuals, specifications and forms applicable to this PWS are listed below. The contractor is obligated to follow these publications to the extent necessary to accomplish requirements of this PWS. The government shall provide all publications and forms listed at the start of the contract, if requested by the contractor. Supplements or amendments to listed publications from any organizational level may be issued during the life of the contract. The contractor shall be bound to accomplish the tasks set forth in this PWS and the references that this PWS provided.
(1)When there is a conflict between the PWS and references set forth therein the PWS shall control.
(2) Should there be a conflict between or among two or more references, those coded mandatory by the PWS shall control over those coded advisory between or among those similarly coded. Those issued by a higher authority shall control over those issued by a lower authority, and between or among those issued at the same level of authority, those with a later date of issue shall control over those with earlier dates of issue.
(3) Any task set forth in any such reference which shall call for the exercise of no delegable discretionary government authority shall be subject to the final approval of the government official having such authority.
AFI 91-203, Air Force Consolidated Occupational Safety Instruction 26 October 2016 AFI 32-7040, Air Quality Compliance and Resource Management, 04 November 2014 AFI 32-7041, Water Quality Compliance, 01 March 2009 AFI 32-7042, Waste Management, 07 November 2014 AFI 32-7086, Hazardous Materials Management, 04 February 2015 AFI 48-145, Occupational and Environmental Health Program, 22 July 2014 AFI 48-148, Ionizing Radiation Protection, 20 November 2014 AFI 90-821, Hazard Communication, 27 January 2014 AFPAM 90-803, Risk Management, 11 February 2013 AFMAN 91-201, Explosives Safety Standards, 21 March 2017 AFOSH Standard 48-137, Respiratory Protection Program, 15 July 2014
AFPAM 91-210, Contract Safety, 06 Jan 2012 AFPD 91-2, Safety Programs, 01 May 2017 T.O. 1-1-4 Exterior Finishes, Insignia and Markings TO 35-1-3, Corrosion Prevention and Control, Cleaning, Painting, and Marking of USAF Support Equipment (SE), 1 September 2006 UFC 3-410-04H, Industrial Ventilation ANSI A14.1, Ladders – Wood Safety Requirements, 20 August 2007 ANSI A14.3, Ladders – Fixed – Safety Requirements, 31 October 2008 ANSI Z359.1, Safety Requirements for Personal Fall Arrest Systems, Subsystems, and Components, 31 May 2007 NFPA 33, Standard for Spray Application Using Flammable or Combustible Materials, 21 June NFPA 410, Standard on Aircraft Maintenance, 5 December 2009 National Safety Council (NSC), Accident Prevention Manual National Safety Council (NSC), Accident Prevention Manual, Administration and Programs ANSI Z89.1, Personal Protection – Protective Headwear for Industrial Workers, 26 January 2009
APPENDIX B
Current Status of F-100 Static Display:
Switching Static Display to this New Mexico ANG F-100 Vietnam Paint Scheme:
End Performance Work Statement
SITE VISIT
1. SITE VISIT:
1.1. A site visit will be conducted on April 24, 2019 at 9:00 AM Mountain Standard Time (MST) for the purposes of the solicitation requirements and answering questions regarding this solicitation. This site visit will be held in the conference room of Building 1055 (150th Headquarters), 2251 Air Guard Rd SE, Kirtland Air Force Base, New Mexico. Interested Contractors are highly encouraged to attend the site visit.
1.2. Due to security conditions, all offerors must register to attend this site visit. Email the following information for all attendees to MSgt Edwin Widgeon at the following addresses: edwin.d.widgeon.mil@mail.mil
First Name, Middle Name, and Last Name Company Name Birthdate State of Drivers License Citizenship Phone Number Email address
1.3. This information must be provided NO LATER THAN 2:00PM MST April 17, 2019 in order to ensure access to the military base and to ensure adequate seating for the site visit. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the site visit. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
1.4. Visitors must pick up their passes at the Truman gate located just west of the San Mateo and Gibson intersection prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Drivers License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
1.5. Information provided at this site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing.
1.6. A record of the conference shall be made and furnished to all prospective offerors via posting at http://www.fbo.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
QUESTIONS AND RFI DEADLINE
The deadline to submit questions and/or Request for Information (RFI) is 2:00PM MST May 1, 2019. All questions and RFIs submitted after the deadline may not be answered or acknowledged.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Repaint F-100A Static Aircraft
FFP
Non Personal Services: Repaint F-100A static display Aircraft Tail number 53- 1532. The contractor shall provide all personnel, tools, equipment, material, supervision, technical expertise, and other related items necessary to perform restoration of the aircraft. Restoration and preservation consist of sheet metal work, maintenance repairs, bird proofing, and painting. All work shall be in accordance with the Performance Work Statement dated March 8, 2019.
FOB: Destination MFR PART NR: Null
PURCHASE REQUEST NUMBER: F8H0019078AW01
SIGNAL CODE: A
PSC CD: R499
NET AMT
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 04-JUN-2019 TO
19-JUL-2019
N/A F8H001 - 150TH FIGHTER WING
MATTHEW DEMERS
2251 AIR GUARD RD SE
KIRTLAND AFB NM 87117-5875
505-853-3608 FOB: Destination
F8H001
CLAUSES INCORPORATED BY REFERENCE
52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreements or Statements
JAN 2017
52.204-7 System for Award Management OCT 2018 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-17 Ownership or Control of Offeror JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-20 Predecessor of Offeror JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
OCT 2015
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law
FEB 2016
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011 52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 52.222-3 Convict Labor JUN 2003 52.222-19 Child Labor -- Cooperation with Authorities and Remedies JAN 2018 52.222-41 Service Contract Labor Standards AUG 2018 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-4 Recovered Material Certification MAY 2008 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving
AUG 2011
52.225-13 Restrictions on Certain Foreign Purchases JUN 2008 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.247-34 F.O.B. Destination NOV 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7005 Representation Relating to Compensation of Former DoD Officials
NOV 2011
252.204-7008 Compliance With Safeguarding Covered Defense Information Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
OCT 2016
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.223-7001 Hazard Warning Labels DEC 1991 252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (OCT 2018)
(a) North American Industry Classification System (NAICS) code and small business size standard. The NAICS code and small business size standard for this acquisition appear in Block 10 of the solicitation cover sheet (SF 1449). However, the small business size standard for a concern which submits an offer in its own name, but which proposes to furnish an item which it did not itself manufacture, is 500 employees.
(b) Submission of offers. Submit signed and dated offers to the office specified in this solicitation at or before the exact time specified in this solicitation. Offers may be submitted on the SF 1449, letterhead stationery, or as otherwise specified in the solicitation. As a minimum, offers must show--
(1) The solicitation number;
(2) The time specified in the solicitation for receipt of offers;
(3) The name, address, and telephone number of the offeror;
(4) A technical description of the items being offered in sufficient detail to evaluate compliance with the requirements in the solicitation. This may include product literature, or other documents, if necessary;
(5) Terms of any express warranty;
(6) Price and any discount terms;
(7) "Remit to" address, if different than mailing address;
(8) A completed copy of the representations and certifications at FAR 52.212-3 (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically);
(9) Acknowledgment of Solicitation Amendments;
(10) Past performance information, when included as an evaluation factor, to include recent and relevant contracts for the same or similar items and other references (including contract numbers, points of contact with telephone numbers and other relevant information); and
(11) If the offer is not submitted on the SF 1449, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Offers that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration.
(c) Period for acceptance of offers. The offeror agrees to hold the prices in its offer firm for 30 calendar days from the date specified for receipt of offers, unless another time period is specified in an addendum to the solicitation.
(d) Product samples. When required by the solicitation, product samples shall be submitted at or prior to the time specified for receipt of offers. Unless otherwise specified in this solicitation, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during preaward testing.
(e) Multiple offers. Offerors are encouraged to submit multiple offers presenting alternative terms and conditions, including alternative line items (provided that the alternative line items are consistent with subpart 4.10 of the Federal Acquisition Regulation), or alternative commercial items for satisfying the requirements of this solicitation.
Each offer submitted will be evaluated separately.
(f) Late submissions, modifications, revisions, and withdrawals of offers:
(1) Offerors are responsible for submitting offers, and any modifications, revisions, or withdrawals, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that offers or revisions are due.
(2)(i) Any offer, modification, revision, or withdrawal of an offer received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(A) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of offers; or
(B) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(C) If this solicitation is a request for proposals, it was the only proposal received.
(ii) However, a late modification of an otherwise successful offer, that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(3) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the offer wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(4) If an emergency or unanticipated event interrupts normal Government processes so that offers cannot be received at the Government office designated for receipt of offers by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation or other notice of an extension of the closing date, the time specified for receipt of offers will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(5) Offers may be withdrawn by written notice received at any time before the exact time set for receipt of offers.
Oral offers in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile offers, offers may be withdrawn via facsimile received at any time before the exact time set for receipt of offers, subject to the conditions specified in the solicitation concerning facsimile offers. An offer may be withdrawn in person by an offeror or its authorized representative if, before the exact time set for receipt of offers, the identity of the person requesting withdrawal is established and the person signs a receipt for the offer.
(g) Contract award (not applicable to Invitation for Bids). The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all offers if such action is in the public interest; accept other than the lowest offer; and waive informalities and minor irregularities in offers received.
(h) Multiple awards. The Government may accept any item or group of items of an offer, unless the offeror qualifies the offer by specific limitations. Unless otherwise provided in the Schedule, offers may not be submitted for quantities less than those specified. The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit prices offered, unless the offeror specifies otherwise in the offer.
(i) Availability of requirements documents cited in the solicitation. (1)(i) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--GSA Federal Supply Service Specifications Section, Suite 8100, 470 East L'Enfant Plaza, SW, Washington, DC 20407, Telephone (202) 619-8925, Facsimile (202) 619-8978.
(ii) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (i)(1)(i) of this provision.
Additional copies will be issued for a fee.
(2) Most unclassified Defense specifications and standards may be downloaded from the following ASSIST websites:
(i) ASSIST (https://assist.dla.mil/online/start/).
(ii) Quick Search (http://quicksearch.dla.mil/).
(iii) ASSISTdocs.com (http://assistdocs.com).
(3)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.