Plastic Supplies BPA W912HZ26QA025 Questions and Answers_7-1-26.pdf

PDF 94 KB Posted

Attached to
Plastic Supplies Master BPA
Solicitation number
W912HZ26QA025
Issued by

About this file

This document is a Questions and Answers file for Plastic Supplies BPA W912HZ26QA025, issued by the Engineering Research and Development Center (ERDC). The solicitation seeks to establish multiple Blanket Purchase Agreements (approximately 3-5 awardees) for plastic supplies, with a proposal due date of 17 July 2026. All items on the pricing schedule are written as one each unit, unless otherwise stated in the item description. For items priced per "EACH" that list full sheet, rod, or tube dimensions, pricing should reflect one complete unit at the stated dimensions rather than a per-square-foot or cut-to-order basis, except where explicitly noted as "cut to size." Line items 59 and 61 (PBLT foam sheets) require a density of 20 pounds per square foot.

Pricing will be verified at the time of each BPA Call to ensure current market rates; no Economic Price Adjustment clause or indexed adjustment mechanism will apply, and pricing will be re-quoted independently with each order. Geographic capability to deliver to all nine ERDC facilities is a mandatory gateway criterion; contractors must determine and provide appropriate delivery details for all locations, including Fox, Alaska and Fairbanks, Alaska. TAA compliance certification will not be required at BPA award but may be required at the BPA Call stage. Product substitutions require Government approval on a case-by-case basis. Past Performance Questionnaires must be submitted by customer references prior to the 17 July 2026 closing date with no extensions for late submissions. Contracts completed within five years of the solicitation date will be considered for past performance evaluation. Contractors may utilize multiple supplier partners and nationwide supplier networks to meet requirements. No historical purchasing data or annual usage estimates are available. No amendments or additional attachments are anticipated prior to the proposal due date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 1, 2026

PLASTIC SUPPLIES BPA W912HZ26QA025

QUESTION

1. • Line item 59: PBLT 2" x 4.75" x 30"…What is the density needed for this item?

• Line item 61: PBLT foam sheet 6" x 48" x 96"…what is the density needed for this item?

ANSWER

1. Both at 20lb per sq ft

June 30, 2026

PLASTIC SUPPLIES BPA W912HZ26QA025

QUESTIONS AND ANSWERS

QUESTION

1. PRICING SCHEDULE

Section L states that Attachment 01 has pre-populated Units of Measure (e.g., "FT" for rods/tubes, "Each" for sheets). However, the posted Attachment 01 lists "per ft" for rod items and "EACH" for nearly all other items, including several tube items (e.g., "Acrylic tube 12" od x 11.25" id x 72" lg" and "Polycarb tube 4" od x .125" wall x 8' ft lg") that would logically price per linear foot.

• Please confirm whether the Unit of Measure listed in the posted Attachment 01 is final and authoritative, or whether offerors should propose an alternate UOM where the listed unit appears inconsistent with the item description. Also please confirm the number of items on the list.

- For items priced "EACH" that list full sheet/rod/tube dimensions, please confirm that pricing should reflect one complete unit at the stated dimensions, rather than a per square-foot or cut-to-order basis, except where the item description explicitly states, "cut to size."

1. All items on the lis t are written up as 1 eac h if not s tated otherwis e

2. PRICE ESCALATION / RE-VERIFICATION MECHANISM

The Question-and-Answer document dated 22 June 2026 states that pricing will be verified at the time of each BPA Call to ensure pricing remains current.

• Will the resulting BPA include an Economic Price Adjustment clause or an indexed adjustment mechanism (e.g., tied to a published plastics resin index), or will each BPA Call simply require a new quote at time of order independent of the pricing submitted with the proposal? This will inform whether offerors should price the schedule as a firm five-year price or as a current-market baseline.

2. Pric ing will be verified at the time of eac h BPA C all to ens ure pric ing remains c urrent.

QUESTION

3. GEOGRAPHIC CAPABILITY

Section M identifies the Geographic Capability Statement, including delivery to all nine listed ERDC facilities, as a mandatory gateway criterion.

• Will a written delivery commitment supported by a named common carrier and a standard transit-time estimate satisfy this requirement for the Fox, AK and Fairbanks, AK locations, or does the Government require additional documentary evidence (e.g., a signed carrier agreement or historical delivery performance data) at the time of proposal submission?

- For the Fox, AK and Fairbanks, AK locations, does the Government's delivery requirement end at a standard commercial carrier depot, or does it require delivery to the specific facility gate or dock, which may require last-mile or specialized transport beyond standard commercial freight carriers?

ANSWER

3. Pleas e provide the details you determine appropriate to deliver to the Fac ility loc ation.

4. KEY PERSONNEL

Section M, Factor 1, Subfactor 2 requires the proposed Procurement Specialist to demonstrate experience purchasing supplies of similar size and scope to this requirement.

• Please confirm whether plastics-industry-specific procurement experience is required, or whether general industrial commodity and supply-chain procurement experience on federal contracts is considered equally relevant and creditable.

- Volume I's 80-page limit explicitly excludes resumes and licensing documentation. Please confirm whether a separate page limit applies to Key Personnel resumes, or whether resumes may be of any length provided they are excluded from the 80-page Volume I count.

4. Pleas e provide the details you determine appropriate not to exc eed any limits s et in the s olic itation.

QUESTION

5. PAST PERFORMANCE QUESTIONNAIRE

Section L states that customer references must submit completed Past Performance Questionnaires directly to the Contracting Officer prior to the solicitation closing date and time.

• a. Given the compressed timeline between RFQ issuance and the 17 July 2026 due date, will the Government accept a PPQ received within a reasonable number of days after closing if the offeror can demonstrate the PPQ was transmitted to the customer reference prior to the deadline?

a. No

QUESTION

b. Section L (Volume II General Instructions) defines "Recent Contracts" as those active or completed within the last three years, while Section M, Factor 2 states that only contracts completed within five years of the solicitation date will be considered.

• Please clarify which recency window governs for purposes of (a) the Relevant Experience Narrative references in Volume II and (b) the overall Past Performance evaluation under Factor 2.

b. C ontrac ts c ompleted within five years of the s olic itation date will be c ons idered.

QUESTION

6. BUY AMERICAN ACT

Will TAA compliant country of origin certification be required at the proposal stage or at the BPA Call order stage?

6. No orders will be plac ed requiring c ertific ation at the time of award of the BPA.

7. ITEM SUBSTITUTIONS

Section 14 states that once an "equal" product is approved, no substitutions are allowed.

• Given that plastic is a commodity subject to manufacturer and distributor availability fluctuations, will the Government allow offerors to propose a list of pre-approved equivalent manufacturers at the proposal stage?

• Or must each equal be submitted and approved on a call-by-call basis?

7. Any time the C ontrac tor propos es a produc t that is not exac tly as s pec ified the item must be approved by the Government.

8. Is historical purchasing data, annual usage, or estimated spend by material category available for this BPA?

ANSWER

8. No

9. Approximately how many BPA awardees does the Government anticipate selecting?

9. Government plans to award around 3-5 Blanket Purc has e Agreements

QUESTION

10. May offerors utilize multiple supplier partners to satisfy the full range of material requirements.

ANSWER

10. Yes .

QUESTION

11. For the geographic capability requirement, is it acceptable for a prime contractor to leverage a nationwide supplier network to support deliveries to all required locations?

ANSWER

11. It is the respons ibility of the C ontrac tor to determine the best way to meet the Government’s requirement.

QUESTION

12. Are there any anticipated amendments or additional attachments that offerors should expect prior to the proposal due date?

12. No

File details come from the government source that posted it. Updated .