This is a projections document providing informational notification of current and projected FY2026-FY2027 projects from the U.S. Army Corps of Engineers, Japan District (POJ). The document is specifically for informational planning purposes only and does not constitute a commitment by the Government for future solicitations or awards. All listed requirements will be solicited exclusively to local sources in Japan—defined as organizations physically located and licensed to conduct business in Japan—utilizing full and open competition procedures unless otherwise specified. The document explicitly states that this notification is NOT a solicitation and that all information is subject to change pending individual project solicitation issuance.

The Japan Engineer District emphasizes compliance with the Cybersecurity Maturity Model Certification (CMMC) 2.0 requirements, which became effective November 10, 2025. All solicitations and contracts issued on or after this date are anticipated to require Basic (Level 1) CMMC certification or higher for organizations handling Federal Contract Information (FCI) or Controlled Unclassified Information (CUI), in accordance with 48 CFR 52.204-21 and NIST SP 800-171. Industry representatives are invited to submit comments and concerns regarding the projections to identified points of contact for consideration in Government acquisition planning. The document has been updated quarterly, with the most recent version dated May 20, 2026 (Quarter 3 posting), superseding all previously posted information. Interested parties should continue monitoring SAM.gov for individual project solicitation issuance and updates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOR INFORMATIONAL PLANNING PURPOSES ONLY

FY2026-FY2027 Projections

W912HV26Z0001

As of 20 May 2026

The U.S. Army Corps of Engineers, Japan District (POJ) is providing notification of current and projected FY2026–FY2027 projects for informational planning purposes only

· The following requirements will only be solicited to local sources in Japan through the utilization of full and open competition procedures, unless otherwise specified.

· This notice does not constitute a commitment by the Government for any follow-on announcements, solicitation, or award.

· This notification is NOT a solicitation. Information contained in this notice is subject to change.

· Please continue to monitor SAM.gov for individual project solicitation issuance and updates.

· Any information that conflicts between this notice and a solicitation (if issued), the terms and conditions of the solicitation shall govern.

· Project magnitudes are estimates for planning purposes and may change at solicitation.

· Industry may submit comments or concerns regarding these projections to the Points of Contact identified in Section 12 for consideration in the Government's acquisition planning.

· Industry may submit any comments or concerns regarding these projections to the point of contacts identified below for consideration in Government’s acquisition planning.

CYBERSECURITY MATURITY MODEL CERTIFICATION (CMMC) 2.0 NOTICE

Description: DoD published the final CMMC rule on September 10, 2025, ref. 90 Federal Register (FR) 43560, with an effective date of November 10, 2025.

DoD’s CMMC Program mandates that all organizations handling Federal Contract Information (FCI) or Controlled Unclassified Information (CUI) maintain specific cybersecurity maturity levels to protect sensitive data. CMMC provides a consistent methodology to assess compliance with cybersecurity requirements and standards set forth in the 48 CFR 52.204-21; National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, Basic Safeguarding of Covered Contractor Information Systems.

USACE Japan District anticipates that all solicitations and contracts issued on or after November 10, 2025 will require Basic (Level 1) certification or higher. If your company is not certified at Basic (Level 1) or higher you will not be eligible to receive a contract award.

Please visit https://dodcio.defense.gov/CMMC/ for more information on how to get certified.

See separate attachments for the following informational slides.

1. PIEE New Vendor Getting Started (For vendors that do not have a PIEE account).

2. Create Supplier Performance Risk System (SPRS) Vendor User Role.

3. Cybersecurity Maturity Model Certification (CMMC) Level 1 Quick Entry Guide.

SYSTEM FOR AWARD MANAGEMENT (SAM)

All interested companies, including joint ventures, shall be registered in the SAM database in order to be eligible for award of Government contracts. https://www.sam.gov.

LOCAL SOURCES / ELIGIBILITY

Contracts will be performed in its entirety in the country of Japan and is intended only for local sources, unless otherwise specified. Only local sources will be considered. Local sources are sources (e.g. corporations, partnerships, or Joint Ventures [For a Joint Venture, the Joint Venture as an independent entity must satisfy the local source requirements or, in the alternative, each member of the Joint Venture must individually satisfy the local source requirements]) that are physically located in Japan and authorized (i.e. licensed and registered) to perform construction in Japan. Specifically, a prospective offeror must be duly authorized to operate and conduct construction business in Japan and must fully comply with all applicable laws, decrees, labor standards, and regulations of Japan during the performance of the resulting contracts.

In addition, offerors/bidders must possess a Japanese civil construction (doboku isshiki koji)) license or Japanese architectural construction (kenchiku isshiki koji)) license by the proposal/bid due date and time. The U.S. Government will verify that the offeror/bidder has the license through the Ministry of Land, Infrastructure, Transport and Tourism (MLIT) website at https://etsuran2.mlit.go.jp/TAKKEN. It is the responsibility of the offeror/bidder to ensure that it has the license (Japanese civil construction or Japanese architectural construction), and that it is accurately shown on the MLIT website, by the proposal/bid due date and time. Failure to comply with this requirement will be cause for rejection of your offer/bid.

The U.S. Government will not offer “United States Official Contractor” status under Article XIV of the US-Japan Status of Forces Agreement (SOFA) to U.S. contractors normally resident in the United States; nor will the U.S. Government certify employees of such contractors as “Members of the Civilian Component” under Article I(b) of the SOFA.

JOINT VENTURE. In the event the bidder/offeror is a joint venture, the bid/offer must be signed by an authorized representative of each participant in the joint venture. The joint venture as an entity shall also have an active System for Award Management registration – See FAR 52.204-7 System for Award Management.

For a Joint Venture, the Joint Venture as an independent entity must satisfy the local source requirements or, in the alternative, each member of the Joint Venture must individually satisfy the local source requirements that are physically located in Japan and authorized (i.e. licensed and registered) to perform construction in Japan (see above local source/eligibility).

ELECTRONIC BID/PROPOSAL SUBMISSION

The US Army Corps of Engineers Japan District (POJ) has transitioned to Procurement Integrated Enterprise Environment (PIEE) Solicitation Module for bid and proposal submission (unless otherwise specified in the solicitation), to replace DOD SAFE. It is highly recommended that contractors create their PIEE Solicitation Module account as soon as possible and not wait till bid/proposal due date, as access may take time. The following information is provided for reference.

Step 1: Complete vendor registration on https://piee.eb.mil/. Instructions for registration can be found through:

https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf

Step 2: Upload offer in the Solicitation Module through https://piee.eb.mil/. Instructions for uploading an offer can be found through: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml

MAINLAND JAPAN

********* FY26 MILCON *********

1. Project Title: FY25 ZNRE224305P2 Improve Military Family Housing PAIP 9 Phase 2, Yokota Air Base (DBB) Solicitation Number: W912HV25B0007 (Closed) https://sam.gov/workspace/contract/opp/8e5480e52987430d8c06747b8a5e0309/view Awarded.

2. Project Title: FY26 Repair Whole House Building 1255, MCAS Iwakuni (DB) Solicitation Number: W912HV25RA009 (Issued) https://sam.gov/workspace/contract/opp/e32bf7bec6cb44f9815b52a7864cb112/view

3. Project Title: FY26 ZNRE224305P3 Improve Military Family Housing PAIP 9 Phase 3, Yokota Air Base (DBB) Solicitation Number: W912HV26BA001 (Issued) https://sam.gov/workspace/contract/opp/03f91ff864de47fb8f83cbdb3d416f2d/view

4. Project Title: DESC2103C Construct JP-8 Bulk Storage Tanks Phase 2 (DBB) Market Research/Sources Sought: W912HV26Z0002 (Closed) https://sam.gov/workspace/contract/opp/9dbe1aa766c143f1887b773e178609e6/view

Project Location: Yokota Air Base

Project NAICS: 237120 - Oil and Gas Pipeline and Related Structures Construction

Project Magnitude: Between ¥2,500,000,000 and ¥10,000,000,000 (Japanese YEN)

Anticipated Schedule: FY26 Qtr 4 Solicitation & FY27 Award

Anticipated Acquisition Method: Request for Proposal.

Project Description: Construct one 100,000-barrel cut-and-cover JP-8 storage tank. A pump house is to be provided on the top of the tank and contain four 600-gpm issue vertical turbine pumps and one 50-gpm water draw off vertical turbine pump. The new tank will include a high-level valve, independent level alarms, and the hardware necessary for the automatic tank gauging (ATG) system. The new tank includes piping, valves, vaults and appurtenances connecting to an existing filter separator building.

The new control system of the new tank will be connected to the existing filter building that houses pump control Programmable Logic Controller (PLC) and Human Machine Interface (HMI), automatic tank gauge (ATG) reporting module capable of reporting inputs from all Eastside Fuel Facility tanks. A product saver tank is to be provided for the new bulk storage tank.

The Pump House will be of reinforced concrete construction and site adapted to meet local conditions.

The roof will be a low slope concrete roof with built-up roofing with overhangs over doorways.

The tank is to be steel with concrete outer wall with a rolling cover for access to tank mounted equipment. The product recovery pump will return reclaimed fuel back through receipt filtration to the bulk storage tanks.

********* FY26 SRM/OTHER *********

5. Project Title: SRM Provide Secondary Containment at JP-8 Rail Offload, Yokota (DBB) Solicitation Number: W912HV25R0003 (cancelled)

6. AF Renovate New Sanno Hotel Bldg 38 (DBB) Sources Sought/Market Research W912HV25Z0011 (closed) https://sam.gov/workspace/contract/opp/66683d039f5e48b5b19b64b92a80bb67/view

Project Location: Tokyo

Project NAICS: 236118 – Residential Remodelers.

Project Magnitude: Between ¥2,500,000,000 and ¥10,000,000,000 (Japanese YEN)

Anticipated Acquisition Method: To be determined.

Anticipated Schedule: To be determined.

Project Description: Non-appropriated funds. This project will include a full renovation of the interior of 149 guest rooms, corridor, elevator cab with replacement of flooring, carpeting, ceiling, furnishing, window, lighting, sanitary equipment and painting wall covering, door installation, bathroom reconfiguration throughout New Sanno Hotel, Bldg. 38.

7. Project Title: Repair Unaccompanied Personnel Housing (UPH) Building 760, Camp Zama (DBB)

Sources Sought/Market Research W912HV26Z0010 (issued) https://sam.gov/workspace/contract/opp/3772ccfa529b4ac580fb776cf96da332/view

Project Location: Camp Zama

Project NAICS: 236118 – Residential Remodelers

Project Magnitude: Between ¥1,000,000,000 and ¥2,500,000 (Japanese YEN)

Anticipated Acquisition Method: Invitation for Bid

Anticipated Schedule: FY26 solicitation & award

Project Description: Full renovation of unaccompanied personnel housing for building 760. Repairs include exterior walls, interior finishes, windows, doors, latrine, kitchenette, living, laundry room, interior electrical, plumbing, fire protection, HVAC, communications systems, and other building components as needed.

8. Project Title: Sollars Elementary School HVAC Upgrades (DBB) Sources Sought/Market Research W912HV26BA018 (Prequalification Issued) https://sam.gov/workspace/contract/opp/67320f464d0c482faf432c0a11185141/view

Project Location: Misawa AB

Project NAICS: 236220 – Commercial and Institutional Building Construction

Project Magnitude: Between ¥2,500,000,000 and ¥10,000,000,000 (Japanese YEN)

Anticipated Acquisition Method: Prequalification of Sources with Sealed Bidding

Anticipated Schedule: FY26 Prequalification of Sources. FY26 solicitation (prequalified sources only) & FY27 award.

Project Description: Upgrade the existing heating system and add full building cooling capabilities to include 5 bldgs. 80, 90, 92, 94 & 98. Scope is to include transformer upgrades and structural roof changes. Scope of work includes, but is not limited to, removal and replacement of HVAC systems, removal and replacement of building systems to support the HVAC renovations, including ceilings, partitions, lighting, power, and fire protection systems, roof upgrades at b94, reinforcement of structural beams and columns at b94, construction of a new central plant enclosure, construction of new mechanical rooms at b90 and b98, and associated site work to support the renovations, including Trenching and repaving/resodding, removal and replacement of Transformers, and removal of site structures.

9. Project Title: USACE Japan SRM Honshu Pilot Multiple Award Task Order Contract (MATOC) Sources Sought/Market Research: W912HV26Z0005 (Closed) https://sam.gov/workspace/contract/opp/3c28b3b44e8c4d5792f54d63ba824437/view

Project Location: Honshu Area, Japan/To be determined.

Project NAICS: 236220 – Commercial and Institutional Building Construction

Project Magnitude: TBD

Anticipated Acquisition Method: RFP

Anticipated Schedule: TBD

Project Description: The Government is exploring the establishment of new Unpriced Multiple Award Task Order Contracts. The results from this market research will assist us in determining the best approach and acquisition strategy. The acquisition strategy involves unpriced MATOCs without seed projects to streamline the procurement process for both the Government and industry partners. The Government is considering an acquisition approach with the following characteristics:

Technical evaluation of offerors without price evaluation at the base MATOC level Price competition at the task order level Award to all acceptable competing offerors meeting qualification criteria No seed project requirement for base contract award Task order awards based on best value determinations appropriate to each requirement

********* FY27 MILCON *********

10. Project Title: FY27 Improve Family Housing Yokota AB PAI 10 Phase 1 (32 UN) Sources Sought/Market Research: W912HV26Z0008 (Closed) https://sam.gov/workspace/contract/opp/720bd5f58ace4249b8d660e94a5f4cde/view

Project Location: Yokota, AB

Project NAICS: 236118– Commercial and Institutional Building Construction

Project Magnitude: Between ¥2,500,000,000 and ¥10,000,000,000 (Japanese YEN)

Anticipated Acquisition Method: IFB

Anticipated Schedule: FY2027 Solicitation

Project Description: Provide whole house interior and exterior modernization, renovation and repair of 32 family housing units at Yokota Air Base. 12 units are type 2GAN, 2-bedroom company grade officer units within 3 buildings, and 20 are type 2GA, 2-bedroom junior non-commissioned officer units within 5 multi- plex residential buildings. The work includes, but is not limited to, providing all labor, materials, transportation, and performing all work necessary for the improvement of the family housing units to meet current codes and standards. Modernize finishes in each unit’s rooms including, but not limited to, the kitchen, bathroom, living room, dining, laundry, bedrooms, family rooms and storage rooms. Replace windows with American Society for Testing and Materials (ASTM) F2090 window fall protection and doors, with energy efficient products. Provides insulation in perimeter walls and roofs, and noise attenuation on interior walls and ceilings. Provide lifecycle replacement of interior and exterior electrical, water, sewer, and communications systems that are sized and configured for anticipated loads. Provide each unit with hard wired smoke alarms and fire sprinklers to meet Unified Facilities Criteria 3-600-01 Fire Protection and International Residential Code. Convert mechanical systems from district heat/cool to unit-level HVAC and hot water heaters to provide efficient and effective heating, cooling, and humidity control. Demolish the two supporting mechanical buildings and all utility lines all the way to main line (see attached facility list). Inspect and repair exterior and interior wall/ceiling cracks.

11. Project Title: FY27 AFHC Renovate Tower B743 CZ Sources Sought/Market Research: W912HV26Z0011 (closed) https://sam.gov/workspace/contract/opp/3a0595475c20434082a1f9de03e645ee/view

Project Location: Camp Zama

Project NAICS: 236118 – Residential Remodelers

Project Magnitude: Between ¥10,000,000,000 and ¥25,000,000,000 (Japanese YEN)

Anticipated Acquisition Method: TBD

Anticipated Schedule: FY27 solicitation & award.

Project Description: Repair family housing high-rise Building 743 (B743). B743 is a nine-story, 141,598 SF, multi-unit family housing tower, comprised of 68 three-bedroom, two-bath apartment units with public areas and a community room on the ground floor. The facility was constructed in 1992. The project includes the removal and replacement of the existing failed/failing building systems to include roof, roof drains and downspouts, windows, exterior doors, railings at stairs and balconies, bird control netting on balconies, louvers, grills, ventilation wall caps, interior walls, interior doors, elevators and elevator control systems, interior finish, finish floors, cabinets and countertops, ceilings, plumbing, HVAC, HVAC controls, electrical infrastructure including conduits and conductors, distribution gear, transformers, panels, and standby generator with diesel fuel tank, fire detection, alarm, and protection system; fire pump with standby power and fuel storage tank; interior, exterior, and emergency lighting and lighting controls; building access security and video monitoring; building communications infrastructure to include telephone, internet connectivity and cable; and Energy Management and Control System (EMCS).

12. Project Title: FY25 AFHC Housing Improvements Pt. 2 Quarters 82 & 86

Project Location: Camp Zama

Project NAICS: 236118 – Residential Remodelers

Project Magnitude: Between ¥5,000,000,000 and ¥15,000,000,000 (Japanese YEN)

Anticipated Acquisition Method: IFB

Anticipated Schedule: FY26 solicitation & FY 27 award, target qtr. 1.

Project Description: Repair family 9 family housing-units quarters 82 and 86, which were the 2 options that died at time of award in FY25.

13. Project Title: DESC1803B Construction Bulk Storage Tanks Phase 2, Iwakuni

Project Location: MCAS Iwakuni

Project NAICS: 237120 - Oil and Gas Pipeline and Related Structures Construction

Project Magnitude: Between ¥10,000,000,000 and ¥25,000,000,000 (Japanese YEN)

Anticipated Acquisition Method: Negotiated Acquisition.

Anticipated Schedule: FY27 Qtr 4 solicitation & FY28 award.

Project Description: Demolish and remove Facilities 2180 and 2181, two (2) 25,000-barrel JP-5 tanks in Area 2. Existing piping will be demolished back to pump shed 2125. Construct one (1) 100,000-barrel aboveground JP-5 storage tanks with concrete dike walls and slab for spill containment. Supporting facilities include access and utilities: stairs and catwalks; electric service; site lighting; fire protection; storm drainage; and site improvements.

********* FY27 SRM/OTHER *********

14. Project Title: Repair Unaccompanied Personnel Housing (UPH) Building 581, Camp Zama (DBB) – Moved from FY26 Sources Sought/Market Research W912HV26Z0010 (Issued) https://sam.gov/workspace/contract/opp/3772ccfa529b4ac580fb776cf96da332/view

Project Location: Camp Zama

Project NAICS: 236118 – Residential Remodelers

Project Magnitude: Between ¥1,000,000,000 and ¥2,500,000,000 (Japanese YEN)

Anticipated Acquisition Method: Invitation for Bid

Anticipated Schedule: FY27 solicitation & award

Project Description: Provide full renovation of unaccompanied personnel housing for building 581. Repairs include exterior walls, interior finishes, windows, doors, latrine, kitchenette, living, laundry room, interior electrical, plumbing, fire protection, HVAC, communications systems, and other building components as needed.

15. Project Title: FY27 Maintenance Dredging, YND

Project Location: Yokohama North Dock

Project NAICS: 237990 – Other Heavy and Civil Engineering Construction

Project Magnitude: Between ¥1,000,000,000 and ¥2,500,000,000 (Japanese YEN)

Anticipated Acquisition Method: TBD

Anticipated Schedule: FY27 solicitation & award

Project Description: Conduct routine maintenance dredging within the United States Exclusive Use Area of Yokohama North Dock to maintain required navigational depths and ensure safe and reliable passage of watercraft and operational use of berthing areas.

16. Project Title: FY27 Repair Electrical Distribution, Camp Zama

Project Location: Camp Zama

Project NAICS: 238210 – Electrical Contractors and Other Wiring Installation Contractors

Project Magnitude: Between ¥1,000,000,000 and ¥2,500,000 (Japanese YEN)

Anticipated Acquisition Method: TBD

Anticipated Schedule: FY27 solicitation & award

Project Description: The high voltage underground electrical cables in the selected FEWRs are more than 10-15 years over their useful life. Design and repair of multiple lines. To repair the cables, we are designing a replacement for each area, including CB425 – the cubicle transformer behind the BX. There are multiple lines that are already down and are currently running on a back fed configuration.

17. Project Title: DLA DWCF B1907 Backup Power Generator (DBB)

Project Location: Yokosuka

Project NAICS: 236220 – Commercial and Institutional Building Construction

Project Magnitude: Between ¥500,000,000 and ¥1,000,000,000 (Japanese YEN)

Anticipated Acquisition Method: Invitation for Bid

Anticipated Schedule: FY27 solicitation & award

Project Description: Construct and install a 750-kW diesel backup generator and 5,000-gallon fuel tank to include switchgear and a 750kA transformer to support Building 1907 for DLA distribution at Yokosuka. Supporting work includes demolition of existing transformer station, removal of existing backup diesel generator, and providing a temporary power generator to serve the facility during construction

OKINAWA

********* FY26 MILCON *********

18. Project Title: Demolish Maintenance Hangar, B3542, Kadena Air Base (DBB)

Solicitation No.: W912HV26BA010 [bids due 22 May 2026] https://sam.gov/workspace/contract/opp/0224fdcf5bab4cb681fbe735461e51b9/view

Project NAICS: 236220 – Commercial and Institutional Building Construction

Project Magnitude: Between ¥150,000,000 and ¥750,000,000

Anticipated Acquisition Method: Sealed Bidding. Invitation for Bid.

Schedule: Solicitation March 2026. Award September 2026.

Project Description: This project will demolish an existing Maintenance Hangar, Building 3542, on Kadena Air Base, Okinawa.

19. Project Title: FY26 MCN P309 School Age Care Centers Replacement, Camp Foster and Camp McTureous, Okinawa (DBB) Sources Sought/Market Research W912HV25Z0012 (Closed) https://sam.gov/workspace/contract/opp/04acac4f39cd48ab8f7e9b03bbd5e66d/view

Solicitation No.: W912HV26BA007

Project NAICS: 236220 – Commercial and Institutional Building Construction

Project Magnitude: Between ¥2,500,000,000 and ¥10,000,000,000

Anticipated Acquisition Method: Sealed Bidding. Invitation for Bid.

Anticipated Schedule: Solicitation June 2026. Award Spring 2027.

Project Description: Construct low-rise reinforced concrete structures to replace the current School Age Care (SAC) Centers located on Camp Foster (Building 1) and Camp McTureous (Building 2). These new structures will serve the eligible elementary school communities from Killin Elementary School (ES), Zukeran ES, Kinser ES, and Bechtel ES in support of the SAC Program. Construct an outdoor playground area next to SAC at each site. Demolition includes the removal of Buildings 2137, 2139, 2141, 2143, 2150, 2152, and 2154 family housing townhouses and at Camp McTureous structure 5014 a skate park to clear the site.

20. FY26 Repair Military Family Housing (MFH), Courtney Tower 4511 (DBB) Market Research/Sources Sought: W912HV25Z0005 (Closed) https://sam.gov/workspace/contract/opp/79ae442cd9c44137b00ad0b688c3245d/view

Project Location: Camp Courtney, Okinawa, Japan

Project NAICS: 236118 – Residential Remodelers

Project Magnitude: Between ¥2,500,000,000 and ¥10,000,000,000

Anticipated Acquisition Method: Sealed Bidding. Invitation for Bid (IFB)

Anticipated Solicitation Schedule: Solicitation June 2026. Award September 2026.

Project Description: DBB. This project uses conventional design and construction methods that are compatible with applicable Department of Defense and Air Force standards. Provides all management, tools, design, supplies, equipment, transportation, labor, and services necessary to repair Tower 4511 at Camp Courtney. Work to include but is not limited to restoration and repair of: Shell & Core: Building System - Electrical Systems, Exterior Structure, Fire and Life Safety, Interior Structure, Mechanical Systems, Plumbing Systems and Roof Structure; Common Area - Storage, Corridors, Garbage Disposal Rooms, Janitors Closets, Mechanical Room, and Restrooms; Lot - Utilities. Unit: Building System - Electrical Systems, Exterior Structure, Fire and Life Safety, Interior Structure, Mechanical Systems, Plumbing Systems. Space – Balcony, Bathroom, Bedroom, Dining Room, Foyer, Hallway, Interior Storage, Kitchen, Laundry Room, and Living Room. In addition, environmental (asbestos/lead) sampling, testing, remediation, and all other related work are programmed into the project to provide complete and usable facilities.

********* FY26 SRM/OTHER *********

21. Construct Outdoor Recreation Center, Kadena Air Base, Okinawa, Japan (DBB)

Solicitation No.: NAFQJ3-26-B-0002 https://sam.gov/workspace/contract/opp/08d7cc1c4a014f3bad9ef929d968e6a1/view

Project NAICS: 236220 – Commercial and Institutional Building Construction

Project Magnitude: Between ¥1,000,000,000 and ¥2,500,000,000

Anticipated Acquisition Method: Sealed Bidding. Invitation for Bid (IFB)

Anticipated Solicitation Schedule: Solicitation [Issued] March 2026. Award August 2026.

Project Description: Design-Bid-Build. The project is to construct a new Outdoor Recreation Center at Kadena Air Base. The new building will be a 1,040 square meter structure with concrete walls, roof, and floor slab. The final facility will provide modern retail and warehouse spaces to relocate the existing Kadena Outdoor Recreation building. The project will include all associated utilities, mechanical, electrical, plumbing, fire protection, and telecommunication components. The project area has been cleared with the required cultural asset study completed. The site will be redeveloped to include new roads and access roads, site utilities, and infrastructure. The project also includes site improvements such as signage, paving, landscaping, sidewalks, and accessible visitor parking. The project comprises related infrastructure such as water, sewer, electrical, telephone, Local Area Network (LAN), Community Access Television Systems (CATV), intercom/public address system, loading/service areas, and area lighting. Work includes all labor, transportation, materials, equipment, and supervision necessary to accomplish various construction, demolition, repairs, alterations, and associated incidental environmental work (including but not limited to asbestos, lead-based paint, mold, PCBs, site contamination, etc.) to U.S. Government facilities in Japan.

22. Project Title: Space Force Repair HVAC Wide-Band SATCOM Ops, Bldg. 100, Fort Buckner, Okinawa (DBB)

Market Research/Sources Sought: W912HV26Z0013 (closed) https://sam.gov/opp/64ce7e29b85f449eb91cf9559ca04031/view.

Project NAICS: 236220 – Commercial and Institutional Building Construction

Project Magnitude: Between ¥1,000,000,000 and ¥2,500,000,000

Anticipated Acquisition Method: Sealed Bidding. Invitation for Bid (IFB).

Anticipated Schedule: Solicitation Summer 2026. Award September 2026.

Project Description. Provide all plant, labor and materials to repair by replacement the existing HVAC system and interior fire suppression lines throughout the facility. This may include new packaged water chiller unit with concrete block enclosure, Air Handling Units (AHUs), Variable Air Volume (VAV) terminal units, chilled water system (including but not limited to chilled water pumps, chilled water piping, chemical feed systems, expansion tanks, etc.), replacement of the building exhaust system, Direct Digital Control (DDC) system, feed main lines, branch line, and pendent sprinklers. Modify the existing fire sprinkler and fire alarm systems affected by mechanical and architectural work. Most of this facility contains a secure work area. Cybersecurity of Facility-Related Control System requirements include but are not limited to utility control systems, building control systems, electronic security systems, Utility Monitoring Control Systems (UMCS), and fire and life safety systems.

Based on an asbestos and lead based paint analysis report completed in September 2022, both asbestos and lead based paint have been detected at multiple locations throughout building 100 to include the mechanical room, electrical room, server room and the building extension. All ACM/LBP abatement/encapsulation work shall be performed in accordance with all applicable Federal and GOJ rules and regulations.

A Seismic evaluation was completed in FEB 2021. Work includes strengthening reinforced concrete walls that exceed their sheer capacity, repairing cracks and spalls, and providing 20mm clearance between free edges of integrated suspended ceiling and enclosing wall partitions.

Work sequencing will be required for partial continued use of the facility during construction. There are no temporary facilities planned in conjunction with this project at this time. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02.

********* FY27 MILCON *********

23. Project Title: FY27 DLA DESC2701 Construct Truck Offload, MCAS Futenma, Okinawa (DBB) Market Research/Sources Sought: W912HV25Z0013 (Closed) https://sam.gov/workspace/contract/opp/5bd13a3985da4f7a83335986684b3e86/view

Project NAICS: 237120 – Oil and Gas Pipeline and Related Structures Construction

Project Magnitude: Between ¥1,000,000,000 and ¥2,500,000,000

Anticipated Acquisition Method: Negotiated Acquisition. Request for Proposal.

Anticipated Schedule: Solicitation October 2026. Award September 2027.

Project Description: The project will provide four truck offload positions with offload skids, transfer pipeline, remote secondary containment basins, new site generator and upgraded site power distribution. The project will also provide a new parking area to accommodate six refueler vehicles. Currently, there is no contingency for an alternate resupply of JP-5 should the existing DLA pipeline become inoperable. To achieve the programed 507,600 gallons of JP-5 daily, four offload skids are necessary. The requested number of skids accounts for connection, offload, and disconnection time, but assumes that the necessary tanker trucks will be available for continuous offloading throughout a 24-hour period.

24. Project Title: FY27 Construct Vehicle Maintenance Shop, Kadena Air Base, Okinawa (DBB)

Market Research/Sources Sought: Fall of 2025 completed.

Project NAICS: 236220 – Commercial and Institutional Building Construction

Project Magnitude: Between ¥2,500,000,000 and ¥10,000,000,000

Anticipated Acquisition Method: Negotiated Acquisition. Request for Proposals.

Project Description: Construct a standard design medium Vehicle Maintenance Shop, Unit Supply and Support Activity Warehouse. Primary facilities include Vehicle Maintenance Shop (VMS), unit supply storage building, special foundations, organizational storage building, POL and hazardous waste storage buildings, wash platform, organizational vehicle parking, supply support storage shed, water storage tank, swing space, cybersecurity and antiterrorism/force protection (AT/FP) measures, building information systems, fire protection and alarm systems, intrusion detection system (IDS) installation, and energy monitoring control systems (EMCS) connection, post construction award services (PCAS) and Sustainability and energy enhancement measures are included. Supporting facilities include site development, utilities and connections, storm drainage, paving, parking, walkways, lighting, information systems, landscaping and signage. Heating and air conditioning will be provided by a self-contained system. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Access for individuals with disabilities will be provided as appropriate. Demolish 6 buildings at Kadena Air Base (13,680 Total SF).

25. Project Title: FY27 P530 Construct Aircraft Intermediate Maintenance Facility (AIMF), Kadena Air Base, Okinawa (DBB)

Market Research/Sources Sought: W912HV26Z0007 (Closed) https://sam.gov/workspace/contract/opp/697cb083f8374fdb9505b723d3822fc4/view

Project NAICS: 236220 – Commercial and Institutional Building Construction

Project Magnitude: Between ¥2,500,000,000 and ¥10,000,000,000

Anticipated Acquisition Method: Sealed Bidding. Invitation for Bid (IFB).

Project Description: This project is for new construction of an Intermediate-Level (I-Level) maintenance facility for the AIMD to support the Navy’s MPRA squadron. The building shall consist of a two-story reinforced concrete structure that will consist of administration space of the Intermediate Maintenance Activity (IMA), training room, locker room, conference room, shop spaces, tool room, storage, communication room, mechanical room, electrical room, SIPR room, paint and sandblast booth, and all required common spaces and circulation for a complete facility. The facility will incorporate the latest accessibility standards, including an elevator. Site preparation includes site clearing, excavation, asphalt pavement removal, sidewalk pavement removal and preparation for construction.

26. FY27 Repair Military Family Housing (MFH), Kishaba Tower 2602 (DBB)

Market Research/Sources Sought: Winter 2025

Project Location: Camp Foster, Okinawa, Japan

Project NAICS: 236118 – Residential Remodelers

Project Magnitude: Between ¥2,500,000,000 and ¥10,000,000,000

Anticipated Acquisition Method: Sealed Bidding. Invitation for Bid (IFB)

Anticipated Solicitation Schedule: Solicitation Fall 2026. Award Summer 2027.

Project Description: DBB. 68 Units. This project uses conventional design and construction methods that are compatible with applicable Department of Defense and Air Force standards. Provides all management, tools, design, supplies, equipment, transportation, labor, and services necessary to repair Kishaba Tower 2602 at Camp Foster. Work to include but is not limited to restoration and repair of: Shell & Core: Building System - Electrical Systems, Exterior Structure, Fire and Life Safety, Interior Structure, Mechanical Systems, Plumbing Systems and Roof Structure; Common Area - Storage, Corridors, Garbage Disposal Rooms, Janitors Closets, Mechanical Room, and Restrooms; Lot - Utilities. Unit: Building System - Electrical Systems, Exterior Structure, Fire and Life Safety, Interior Structure, Mechanical Systems, Plumbing Systems. Space – Balcony, Bathroom, Bedroom, Dining Room, Foyer, Hallway, Interior Storage, Kitchen, Laundry Room, and Living Room. In addition, environmental (asbestos/lead) sampling, testing, remediation, and all other related work are programmed into the project to provide complete and usable facilities.

********* FY27 SRM/OTHER *********

27. Project Title: FY27 DLA DWCF Futenma Fueling System Repair, MCAS Futenma, Okinawa (DBB)

Market Research/Sources Sought: Published W912HV25Z0015 (Closed) https://sam.gov/workspace/contract/opp/d9212d1b203940ccb05efd3f0e7c2fa5/view

Project NAICS: 237120 – Oil and Gas Pipeline and Related Structures Construction.

Project Magnitude: Between ¥1,000,000,000 and ¥2,500,000,000

Anticipated Acquisition Method: Sealed Bidding. Invitation for Bid (IFB).

Anticipated Schedule: Solicitation Fall 2026. Award Spring 2027.

Project Description. 1. Bulk Fuels Site Repairs; 2. Direct Fuel Site Repairs.

28. Project Title: LXEZ221052 Repair/Upgrade Aircraft Refueler Parking Area, Kadena Air Base, Okinawa (DBB) Market Research/Sources Sought: W912HV24Z0025 (closed) https://sam.gov/opp/355c45171dae44d9bd8ca7b1dc80362e/view

Project Location: Kadena Air Base, Okinawa, Japan

NAICS Code: 236220 – Commercial and Institutional Building Construction.

Project Magnitude: Between ¥500,000,000 and ¥1,000,000,000

Anticipated Acquisition Method: Sealed Bidding. Invitation for Bid (IFB).

Anticipated Schedule: Moved to FY27 due to site unavailability. Solicitation May 2027. Award September 2027.

Project Description. Repair the existing aircraft refueler parking area by removing existing asphalt pavement, constructing new concrete pavement including pavement markings, and trench drain. The trench drain will be U-type concrete with heavy duty galvanized grating. Supporting facilities include site improvement, and demolition work. Site improvement work consists of replacing bollards, landscaping, and exterior signage. Demolition work consists of removal of existing pavement and bollards. There will be work such as the disposal of residual Aqueous Film Forming Foam (AFFF) materials and handling of AFFF materials.

********* Point of Contacts *********

Point of Contacts (Mainland)
Point of Contact (Okinawa)

Dr. Nakiba Jackson Contracting Officer // Army, Air Force, Housing Nakiba.S.Jackson@usace.army.mil Phone: 046-407-8839

Mr. Jack Letscher Contracting Officer Jack.T.Letscher@usace.army.mil Phone: 098-970-4402

Mr. Ryan Marzetta Contracting Officer // DoDEA, DLA, Navy, Marine Corps Ryan.J.Marzetta@usace.army.mil Phone: 046-407-3398

FOR INFORMATIONAL PLANNING PURPOSES ONLY

As of: 20 May 2026 2