This amendment modifies a solicitation for the BTC4 Phase 2 construction project at Fort Jackson, South Carolina. The scope of work involves construction and infrastructure upgrades across the base as outlined in the specification and drawing attachments. Revisions to the specifications and drawings are provided, and the response due date is extended to October 11, 2019. The solicitation package seeks construction services and includes a site visit date, proposal forms, and plans/specifications covering areas such as site work, utilities, buildings and facilities. The opportunity is available to all contractor types through the Department of the Army Corps of Engineers, Charleston District.
Amendment 0002
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912HP19R2001 BTC4 Phase 2, is hereby amended to revise specs and draw ings as summarized on the continuation pages and to extend proposal due date until Friday, 11 October 2019 at 10:00am EST. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Oct-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HP19R2001
X 9B. DATED (SEE ITEM 11)
28-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Oct-2019
CODE
U.S. ARMY CORPS OF ENGINEERS, CHARLESTON
DISTRICT, CONTRACTING DIVISION
69-A HAGOOD AVENUE
CHARLESTON SC 29403
W912HP 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HP19R2001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMD 0001
A. CONTRACT CHANGES: Proposal due date has been extended from Friday, 4 October to Friday, 11 October at 1000 hours EST.
B. TECHNICAL SPECIFICATION CHANGES: The revised and added Sections listed below (revised and added by Amendment No. 0002) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out.
Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1). The replaced Sections listed below (replaced by Amendment No. 0002) are hereby added to and made a part of the solicitation; such Sections are replaced in their entirety and changes are neither underlined nor struck out. Deleted Sections are also indicated below.
Revised Sections Added Sections Replaced Sections Deleted Sections 01 91 00.15 07 41 13 Attachment A 01 91 00.15 Attachment B 12 21 00 06 61 16 07 81 00 12 24 13 32 18 23.39 07 41 13 11 81 29 32 32 23 07 53 23 13 34 19 Attachment A 08 71 00 09 06 00 12 93 00 23 00 00 23 11 25 27 05 14 32 16 19 33 46 16
C. CONTRACT DRAWINGS – File No. 721-81-10:
Volume 1 Sheets GI103, VF106, CS102, CS105, CS106, CS107, CS108, CS504, CG502, ES101, ES102 and ES601with Revision 1 dated 23 September 2019 are hereby added to and made a part of the Contract Drawings.
W912HP19R2001
Volume 2 Sheets GI001, S-001, S-002, SB503, SB601, SF103, SF105, SF123, A-011, A-103, A-105, A- 115, A-117, A-201, A-202, A-203, A-301, A-302, A-312, A-303, A-405, A-406, A-504, A-505, A-512, A-551, A-552, A-570, A-601, A-604, A-606, A-701, A-702, A-703, I-103, I-113, I-122, I-132, EY102, and EY106 with Revision 1 dated 23 September 2019 are hereby added to and made a part of the Contract Drawings.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 04-Oct-2019 02:00 PM to 11-Oct-2019 10:00 AM.
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
SOW
Scope of Work BTC4, Phase 2 Ft. Jackson, SC
The full Scope of Work is outlined in the Drawing and Specifications PDF files entitled as follows and are included as separate attachments and incorporated into the solicitation/contract by reference:
Drawings Volume 1 – BTC4 Phase 2.pdf Drawings Volume 2 – BTC4 Phase 2.pdf
Specifications Volume 1 – BTC4 Phase 2.pdf Specifications Volume 2 – BTC4 Phase 2.pdf Specifications Volume 3 – BTC4 Phase 2.pdf Specifications Volume 4 – BTC4 phase 2.pdf
Record of Environmental Consideration – BTC4 phase 2.pdf NPDES Notice of Intent – BTC4 phase 2.pdf
AMD 0002
Drawings Volume 1 - BTC4 Phase2_AMD2 Drawings Volume 2 - BTC Phase2_AMD2 Specifications Volume 1 - BTC4 Phase 2_AMD2 Specifications Volume 2 - BTC4 Phase 2_AMD2 Specifications Volume 3 - BTC4 Phase 2_AMD2 Specifications Volume 4 - BTC4 Phase 2_AMD2
(End of Summary of Changes)