J-1502000-13__Equip_Inspection _Test_ _Certification_Program.xls
XLS spreadsheet 31 KB Posted
- Solicitation number
- W912HP-13-R-0024
About this file
Section J Equipment Testing Inspection and Certification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Award_NoticeCharleston_MFR_West_Facilities.pdf | ||
| pd2BB08.pdf | ||
| J-1502000-08__San_Bruno _Preventative_Maintenance_Program_-_Index _Detail.xls | XLS spreadsheet | |
| Section_F.pdf | ||
| J-1502000-09__Riverton _Preventative_Maintenance_Program_-_Index _Detail.xls | XLS spreadsheet | |
| Copy_of_Air_Filter_ _Equipment.pdf | ||
| J-1502000-12__Equipment_Update_Report.xls | XLS spreadsheet | |
| Section_M.pdf | ||
| Section_J.pdf | ||
| J-1502000-05__Service_Call_Report.xls | XLS spreadsheet | |
| J-1502000-07__Pico_Rivera _Preventative_Maintenance_Program_-_Index _Detail.xls | XLS spreadsheet | |
| J-1502000-11_Repair_Work_Report.xls | XLS spreadsheet | |
| Section_C.pdf | ||
| Schedule_B _CLINs.xls | XLS spreadsheet | |
| SF_1449.pdf | ||
| J-1502000-10__Preventative_Maintenance_Program_-_Checklist.xls | XLS spreadsheet | |
| J-1502000-06_Pasadena _Preventative_Maintenance_Program_-_Index _Detail.xls | XLS spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet 1
| J-1502000-13 | |||||
| EQUIPMENT INSPECTION, TESTING, AND CERTIFICATION PROGRAM | |||||
| MCRC | Item | Designation | Location | Inspection/Test and Frequency (Note 1) | Date of Last Inspection/Test/ Certification (Note 2) |
| Pasadena | Boiler | B-1 | Mech Rm 116 | Annual support as outlined in Annex 1502000, Spec Item 3.3.1 | |
| Pasadena | Water Heater, Potable | WH-1 | Mech Rm 116 | Annual support as outlined in Annex 1502000, Spec Item 3.3.1 | |
| Pasadena | Crane-Gantry (mobile) | CG-1 | Parking lot | Frequent (Monthly), Periodic (Annual), Operational (Annual), Load (Annual) | |
| Pasadena | Crane-Overhead Bridge | COB-1 | Mechanics Bay 129 | Frequent (Monthly), Periodic (Annual), Operational (Annual), Load (Annual) | |
| Pasadena | Elevator | Certification (Annual) | |||
| Pasadena | Backflow Assembly, Fire, 8", Febco, MN 876, SN 9802031437 | Southeast corner of facility | Certification (Annual) | ||
| Pasadena | Backflow Assembly, Potw, 4", Wilkins Zurn, MN 375, SN L01895 | Southeast corner of facility | Certification (Annual) | ||
| Pasadena | Backflow Assembly, Hot Water Make-up, 3/4 | Mech Rm 116 | Certification (Annual) | ||
| Pasadena | Backflow Assembly, Irrigation, 2" | Adjacent to Administrative Building (East Side) | Certification (Annual) | ||
| Pico Rivera | Backflow Assembly,Potw, 2" | Property line | Certification (Annual) | ||
| San Bruno | Boiler | B-1 | Mechanical Rm 185 | Annual support as outlined in Annex 1502000, Spec Item 3.3.1 | |
| San Bruno | Water Heater, Potable | WHG-1 | Mechanical Rm 185 | Annual support as outlined in Annex 1502000, Spec Item 3.3.1 | |
| San Bruno | Water Heater, Potable | WHG-2 | Mechanical Rm 185 | Annual support as outlined in Annex 1502000, Spec Item 3.3.1 | |
| San Bruno | Water Heater, Potable | WHG-3 | Room 211 | Annual support as outlined in Annex 1502000, Spec Item 3.3.1 | |
| San Bruno | Hydraulic Lift-Auto | HLA-1 | VMF 180 | Certification (Annual) | |
| San Bruno | Backflow Assembly, 8" | Back gate, adjacent to Sneath Lane | Certification (Annual) | ||
| San Bruno | Backflow Assembly, 4" | Back gate, adjacent to Sneath Lane | Certification (Annual) | ||
| San Bruno | Backflow Assembly, 2" | Back gate, adjacent to Sneath Lane | Certification (Annual) | ||
| San Bruno | Backflow Assembly, Hot Water Make-up, 3/4 | Mechanical Rm 185 | Certification (Annual) | ||
| San Bruno | Backflow Assembly, Chilled Water Make-up, 3/4 | Mechanical Rm 185 | Certification (Annual) | ||
| San Bruno | Backflow Assembly, Potw, 3" | Adjacent to Mechanical Room 185 | Certification (Annual) | ||
| San Bruno | Backflow Assembly, Wash Rack 1-1/4" | Vehicle Wash Rack | Certification (Annual) | ||
| Riverton | Boiler | B-1 | Outside (Adj to Mechanical) | Annual support as outlined in Annex 1502000, Spec Item 3.3.1 | |
| Riverton | Water Heater, Potable | WHG-1 | Administrative, Janitorial | Annual support as outlined in Annex 1502000, Spec Item 3.3.1 | |
| Riverton | Water Heater, Potable | WHG-2 | LMF, Mezzanine | Annual support as outlined in Annex 1502000, Spec Item 3.3.1 | |
| Riverton | Crane-Overhead Bridge | COB-1 | LMF, Maintenance Bay | Frequent (Monthly), Periodic (Annual), Operational (Annual), Load (Annual) | |
| NOTES | |||||
| Note 1 - Inspection shall be completed before current certificate expires | |||||
| Note 2 - Not required for crane frequent (monthly) inspections |
Page &P of &N
File details come from the government source that posted it. Updated .