J-1502000-13__Equip_Inspection _Test_ _Certification_Program.xls

XLS spreadsheet 31 KB Posted

Attached to
Marine Force Reserve (MARFORRES), Facility Maintenance, West Region
Solicitation number
W912HP-13-R-0024
Issued by

About this file

Section J Equipment Testing Inspection and Certification

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet 1

J-1502000-13
EQUIPMENT INSPECTION, TESTING, AND CERTIFICATION PROGRAM
MCRCItemDesignationLocationInspection/Test and Frequency (Note 1)Date of Last Inspection/Test/ Certification (Note 2)
PasadenaBoilerB-1Mech Rm 116Annual support as outlined in Annex 1502000, Spec Item 3.3.1
PasadenaWater Heater, PotableWH-1Mech Rm 116Annual support as outlined in Annex 1502000, Spec Item 3.3.1
PasadenaCrane-Gantry (mobile)CG-1Parking lotFrequent (Monthly), Periodic (Annual), Operational (Annual), Load (Annual)
PasadenaCrane-Overhead BridgeCOB-1Mechanics Bay 129Frequent (Monthly), Periodic (Annual), Operational (Annual), Load (Annual)
PasadenaElevatorCertification (Annual)
PasadenaBackflow Assembly, Fire, 8", Febco, MN 876, SN 9802031437Southeast corner of facilityCertification (Annual)
PasadenaBackflow Assembly, Potw, 4", Wilkins Zurn, MN 375, SN L01895Southeast corner of facilityCertification (Annual)
PasadenaBackflow Assembly, Hot Water Make-up, 3/4Mech Rm 116Certification (Annual)
PasadenaBackflow Assembly, Irrigation, 2"Adjacent to Administrative Building (East Side)Certification (Annual)
Pico RiveraBackflow Assembly,Potw, 2"Property lineCertification (Annual)
San BrunoBoilerB-1Mechanical Rm 185Annual support as outlined in Annex 1502000, Spec Item 3.3.1
San BrunoWater Heater, PotableWHG-1Mechanical Rm 185Annual support as outlined in Annex 1502000, Spec Item 3.3.1
San BrunoWater Heater, PotableWHG-2Mechanical Rm 185Annual support as outlined in Annex 1502000, Spec Item 3.3.1
San BrunoWater Heater, PotableWHG-3Room 211Annual support as outlined in Annex 1502000, Spec Item 3.3.1
San BrunoHydraulic Lift-AutoHLA-1VMF 180Certification (Annual)
San BrunoBackflow Assembly, 8"Back gate, adjacent to Sneath LaneCertification (Annual)
San BrunoBackflow Assembly, 4"Back gate, adjacent to Sneath LaneCertification (Annual)
San BrunoBackflow Assembly, 2"Back gate, adjacent to Sneath LaneCertification (Annual)
San BrunoBackflow Assembly, Hot Water Make-up, 3/4Mechanical Rm 185Certification (Annual)
San BrunoBackflow Assembly, Chilled Water Make-up, 3/4Mechanical Rm 185Certification (Annual)
San BrunoBackflow Assembly, Potw, 3"Adjacent to Mechanical Room 185Certification (Annual)
San BrunoBackflow Assembly, Wash Rack 1-1/4"Vehicle Wash RackCertification (Annual)
RivertonBoilerB-1Outside (Adj to Mechanical)Annual support as outlined in Annex 1502000, Spec Item 3.3.1
RivertonWater Heater, PotableWHG-1Administrative, JanitorialAnnual support as outlined in Annex 1502000, Spec Item 3.3.1
RivertonWater Heater, PotableWHG-2LMF, MezzanineAnnual support as outlined in Annex 1502000, Spec Item 3.3.1
RivertonCrane-Overhead BridgeCOB-1LMF, Maintenance BayFrequent (Monthly), Periodic (Annual), Operational (Annual), Load (Annual)
NOTES
Note 1 - Inspection shall be completed before current certificate expires
Note 2 - Not required for crane frequent (monthly) inspections

Page &P of &N

File details come from the government source that posted it. Updated .