J-1502000-07__Pico_Rivera _Preventative_Maintenance_Program_-_Index _Detail.xls
XLS spreadsheet 79 KB Posted
- Solicitation number
- W912HP-13-R-0024
About this file
Section J Pico Rivera Preventative Maintenance Program Index
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Award_NoticeCharleston_MFR_West_Facilities.pdf | ||
| pd2BB08.pdf | ||
| J-1502000-13__Equip_Inspection _Test_ _Certification_Program.xls | XLS spreadsheet | |
| J-1502000-08__San_Bruno _Preventative_Maintenance_Program_-_Index _Detail.xls | XLS spreadsheet | |
| Section_F.pdf | ||
| J-1502000-09__Riverton _Preventative_Maintenance_Program_-_Index _Detail.xls | XLS spreadsheet | |
| Copy_of_Air_Filter_ _Equipment.pdf | ||
| J-1502000-12__Equipment_Update_Report.xls | XLS spreadsheet | |
| Section_M.pdf | ||
| Section_J.pdf | ||
| J-1502000-05__Service_Call_Report.xls | XLS spreadsheet | |
| J-1502000-11_Repair_Work_Report.xls | XLS spreadsheet | |
| Section_C.pdf | ||
| Schedule_B _CLINs.xls | XLS spreadsheet | |
| SF_1449.pdf | ||
| J-1502000-10__Preventative_Maintenance_Program_-_Checklist.xls | XLS spreadsheet | |
| J-1502000-06_Pasadena _Preventative_Maintenance_Program_-_Index _Detail.xls | XLS spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Index
| J-1502000-07 | |||||
| PREVENTATIVE MAINTENANCE PROGRAM INDEX | |||||
| MCRC PICO RIVERA CA | |||||
| (For Manufacturer, model and serial number of equipment see Detail tab) | |||||
| Equipment | Designation | Quantity | Location | Contractor Developed PM Program Checklist Sheet (Note 3) | Frequency of Inspection |
| 1502000 Spec Item 3.2 - HVAC | |||||
| Air Conditioner - Split System | ACS-1, ACS-2, ACS-3 | 3 | ACS-1 (Adjacent to Armory), ACS-2 (Adjacent to Server 126), ACS-3 (Adjacent to VMF) | Semiannual | |
| Air Filter (HVAC) | AF-1 through AF-17 | 17 | See Tab: Detail - Air Filter | Every Other Month | |
| Air Filter (HVAC) | AF-18 | 1 | H&V-1 | Every other month during heating season | |
| Air Handling Unit - Gas Heat Only | H&V-1 | 1 | Drill Hall | Annual (fall) | |
| Fan (duct) | EF-1 | 1 | Medical Toilet 102 | Annual | |
| Fan (roof) | EF-2 through EF-5 | 4 | Roof | Quarterly | |
| Fan (wall) | EF-6 | 1 | HazMat Locker | Semiannual | |
| Fan Coil Unit | FCU-1, FCU-2, FCU-3 | 3 | FCU-1 (Armory), FCU-2 (Server Rm 126), FCU-3 (VMF) | Annual (spring) | |
| Heat Pump - Package | HPP-1 through HPP-7 | 7 | HPP-1 (NCOIC), HPP-2 (First Sergeant), HPP-3 (I&I Office), HPP-4 (Computer Rm), HPP-5 (Admin Ofice), HPP-6 (Communication), HPP-7 (Communication) | Semiannual | |
| Rooftop Unit - Gas Heat | AC-1 through AC-5, AC-7, AC-8 | 7 | Roof | Semiannual | |
| 1502000 Spec Item 3.2 - Electrical Systems | |||||
| Lighting (exterior) | Lighting | Wall packs attached to buildings and pole lighting | Quarterly | ||
| Lighting (interior) | Lighting | Administrative Building, Gunshed, HazMat Locker | Quarterly | ||
| Panelboards | PB-MDB1, PB-MDB2, PB-A, PB-B, PB-D, PB-PP, PB-C, PB-HazMat | 8 | PB-MDB, PB-MDB2 (Boiler/Mechanical Room), PB-A, PB-B, PB-D, PB-PP (Corridor), PB-C (Gunshed, Vehicle Maintenance Bay), PB-HazMat (HazMat Locker) | Annual | |
| 1502000 Spec Item 3.2 - Fire Protection | |||||
| Fire Detection and Alarm System | FA-1 | 1 | Administrative Building | Annual | |
| Fire Extinguisher (portable)-Monthly Inspection | FE-1 through FE-9 | 9 | FE-1 (Corridor, adj to Medical), FE-2 (Computer Rm), FE-3 (Corridor, adj to Mens Toilet 105), FE-4 (Corridor, adj to Training), FE-5 (Corridor, adj to Men's Locker 106), FE-6 (Drill Hall), FE-7 (Gunshed, Vehicle Main Bay), FE-8, FE-9 (Gunshed, Open Bay) | Monthly | |
| Fire Extinguisher (portable)-Annual Maintenance | FE-1 through FE-9 | 9 | FE-1 (Corridor, adj to Medical), FE-2 (Computer Rm), FE-3 (Corridor, adj to Mens Toilet 105), FE-4 (Corridor, adj to Training), FE-5 (Corridor, adj to Men's Locker 106), FE-6 (Drill Hall), FE-7 (Gunshed, Vehicle Main Bay), FE-8, FE-9 (Gunshed, Open Bay) | Annual | |
| Fire Sprinkler - Chemical (dry/wet) | FSC-1 | 1 | HazMat Locker | Monthly | |
| Fire Sprinkler - Wet Pipe | FSW-1 | 1 | Administrative Building | Annual | |
| 1502000 Spec Item 3.2 - Miscellaneous Equipment | |||||
| Air Compressor | AC-1 | 1 | Gunshed, Vehicle Maintenance Bay | Semiannual | |
| Drinking Fountain | DF-1, DF-2, DF-3 | 3 | Corridor | Annual | |
| Door-Overhead (manual) | DR-1, DR-2, DR-3 | 3 | DR-1 (Gunshed, Storage), DR-2, DR-3 (Gunshed, Vehicle Maintenance Bay) | Semiannual | |
| Emergency Eyewash & Shower | EES-1 | 1 | Adj to HaxMat Locker | Monthly | |
| Plumbing Fixtures (by room) | PF-1 through PF-10 | 10 | PF-1 (Medical Storage 101), PF-2 (Medical Toilet 102), PF-3 (Unisex Toilet 103), PF-4 (Womens Locker 104), PF-5 (Mens Locker 105), PF-6 (Mens Locker 106), PF-8 (Janitorial), PF-9 (Kitchen), PF-10 (Gunshed, Toilet) | Semiannual | |
| Pump (potw) | P-1 | 1 | Boiler/Mechanical Room | Annual | |
| Pump - Sewage Lift | PSL-1, PSL-2 | 2 | Boiler/Mechanical Room | Annual | |
| Slide Gate Operator & Entry System | SGO-1 | 1 | Front Gate | Semiannual | |
| Water Heater-Gas | WHG-1 | 1 | Boiler/Mechanical Room | Semiannual | |
| NOTES | |||||
| Note 1 - Equipment listed without a building name/number is located in the Administrative building | |||||
| Note 2 - HVAC equipment shall be inspected in the spring or fall unless otherwise noted | |||||
| Note 3 - If blank, Government will provide PM Program checklist sheet | |||||
| Note 4 - For quantity/size of air filters (HVAC) see Tab: Air Filters (HVAC) | |||||
| Note 5 - For quantity of plumbing fixtures see Tab: Plumbing Fixtures |
Page &P of &N
Detail
| J-1502000-07 | |||||
| PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL | |||||
| MCRC PICO RIVERA, CA | |||||
| Equipment | Designation | Manufacturer | Model | Serial Number | Remarks |
| 1502000 Spec Item 3.2 - HVAC | |||||
| Air Conditioner - Split System | ACS-1 | International Comfort Products Corp | CA5536VHD3 | L9931S0149 L993150149 (1) 20X25X2 | |
| Air Conditioner - Split System | ACS-2 | EMI | S1HA8000D10 | 1-09-A-362-02 | |
| Air Conditioner - Split System | ACS-3 | EMI | S1HA2000D101 | 1-09-A-1347-02 | |
| Air Handling Unit - Gas Heat Only | H&V-1 | Reznor | RDH125-5-2L | EBIC83Y8N00934 | |
| Fan (roof) | EF-2, EF-3 | Centri Master | PV100_E5 | 04B766310 | 1/4 HP, Direct Drive |
| Fan (roof) | EF-4 | Centri Master | PV085_E5 | 04B766308 | 1/4 HP, Direct Drive |
| Fan (roof) | EF-5 | Centri Master | PV100_E5 | 03B127010 | 1/4 HP, Direct Drive |
| Fan Coil Unit | FCU-1 | International Comfort Products Corp | NFCX36000C1 | ||
| Fan Coil Unit | FCU-2 | Environmental International | CAHA24D2 | 1-09-A-1411-03 | |
| Fan Coil Unit | FCU-3 | Environmental International | WLHA12D0 | 1-09-A-1417-03 | |
| Heat Pump - Package Unit | HPP-1 | AAF-McQuay | U.AEQ.3.036.H.H.12.H.15.AL.22.G.I.C.1 | 280107900 | |
| Heat Pump - Package Unit | HPP-2 | AAF-McQuay | U.AEQ.3.024.G.H.12.H.15.AL.22.G.I.C.1 | 280108100 | |
| Heat Pump - Package Unit | HPP-3 | AAF-McQuay | U.AEQ.3.036.H.H.12.H.15.AL.22.G.I.C.1 | 280107900 | |
| Heat Pump - Package Unit | HPP-4 | AAF-McQuay | U.AEQ.3.040.G.H.12.H.15.AL.22.G.I.C.1 | 280107700 | |
| Heat Pump - Package Unit | HPP-5 | AAF-McQuay | U.AEQ.3.048.G.H.12.H.15.AL.22.G.I.C.1 | 280108000 | |
| Heat Pump - Package Unit | HPP-6 | AAF-McQuay | |||
| Heat Pump - Package Unit | HPP-7 | AAF-McQuay | U.AEQ.3.024.H.H.12.H.15.AL.22.G.I.C.1 | 280107800 | |
| Rooftop Unit - Gas Heat | AC-1 | Carrier | 48GXN024040311 | 4303G11913 | |
| Rooftop Unit - Gas Heat | AC-2 | Carrier | 48HJL006 | 5101G40076 | |
| Rooftop Unit - Gas Heat | AC-3 | Carrier | 48HJL006 | 4903G30418 | |
| Rooftop Unit - Gas Heat | AC-4 | Carrier | 48HJL005 | 2603G50341 | |
| Rooftop Unit - Gas Heat | AC-5 | Carrier | 48HJL005 | 2603G10169 | |
| Rooftop Unit - Gas Heat | AC-7 | Carrier | 48HJM004 | 0204G40072 | |
| Rooftop Unit - Gas Heat | AC-8 | Carrier | 48HJL005 | 2603G10167 | Weathermaster Series |
| 1502000 Spec Item 3.2 - Miscellaneous Equipment | |||||
| Air Compressor | AC-1 | Husky | Belt drive, Oil lubed | ||
| Pump (potw) | P-1 | Bell & Gossett | Series 100_AB/040 | Closed Couple End Suction | |
| Slide Gate Operator & Entry System | SGO-1 | Chamberlain Liftmaster Professional | SL585 | 4110N7357-C | |
| Water Heater-Gas | WHG-1 | Rheem-Ruud Universal | GN100-200 | URLN_1203G01011 | Gas |
Page &P of &N
Detail - AF
| J-1502000-07 | |||||||||
| PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL | |||||||||
| AIR FILTER (HVAC) | |||||||||
| MCRC PICO RIVERA, CA | |||||||||
| (FILTER SIZE/QUANTITY SHALL BE FIELD VERIFIED BEFORE PURCHASING REPLACEMENT FILTERS) | |||||||||
| DESIGNATION | EQUIPMENT | FILTER 1 | FILTER 2 | FILTER 3 | FILTER 4 | ||||
| SIZE | QUANTITY | SIZE | QUANTITY | SIZE | QUANTITY | SIZE | QUANTITY | ||
| AF-1 | HPP-1 | 10x30x1 | 2 | ||||||
| AF-2 | HPP-2 | 10x30x1 | 1 | 10x20x1 | 1 | ||||
| AF-3 | HPP-3 | 10x30x1 | 1 | 10x14x1 | 1 | ||||
| AF-4 | HPP-4 | 10x20x1 | 1 | 10x14x1 | 1 | ||||
| AF-5 | HPP-5 | 10x30x1 | 1 | 10x20x1 | 1 | ||||
| AF-6 | HPP-6 | 10x20x1 | 1 | 10x14x1 | 1 | ||||
| AF-7 | HPP-7 | 10x30x1 | 1 | 10x20x1 | 1 | ||||
| AF-8 | AC-1 | 20x20x1 | 1 | ||||||
| AF-9 | AC-2 | 16x25x2 | 2 | ||||||
| AF-10 | AC-3 | 16x25x2 | 2 | ||||||
| AF11 | AC-4 | 16x25x2 | 2 | ||||||
| AF-12 | AC-5 | 16x25x2 | 2 | ||||||
| AF-13 | AC-7 | 16x25x2 | 2 | ||||||
| AF-14 | AC-8 | 16x25x2 | 2 | ||||||
| AF-15 | FCU-1 | 20x20x1 | 1 | ||||||
| AF-16 | FCU-2 | ||||||||
| AF-17 | FCU-3 | ||||||||
| AF-18 | H&V-1 | 20x25x2 | 2 |
Page &P of &N
Detail - PF
| J-1502000-07 | ||
| PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL | ||
| PLUMBING FIXTURE | ||
| MCRC PICO RIVERA, CA | ||
| FIXTURE | QUANTITY | |
| Sink | 11 | |
| Shower Head | ||
| Toilet | 12 | |
| Urinal | 7 |