J-1502000-06_Pasadena _Preventative_Maintenance_Program_-_Index _Detail.xls
XLS spreadsheet 91 KB Posted
- Solicitation number
- W912HP-13-R-0024
About this file
Section J Pasedena Preventative Maintenance Program Index
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Award_NoticeCharleston_MFR_West_Facilities.pdf | ||
| pd2BB08.pdf | ||
| J-1502000-13__Equip_Inspection _Test_ _Certification_Program.xls | XLS spreadsheet | |
| J-1502000-08__San_Bruno _Preventative_Maintenance_Program_-_Index _Detail.xls | XLS spreadsheet | |
| Section_F.pdf | ||
| J-1502000-09__Riverton _Preventative_Maintenance_Program_-_Index _Detail.xls | XLS spreadsheet | |
| Copy_of_Air_Filter_ _Equipment.pdf | ||
| J-1502000-12__Equipment_Update_Report.xls | XLS spreadsheet | |
| Section_M.pdf | ||
| Section_J.pdf | ||
| J-1502000-05__Service_Call_Report.xls | XLS spreadsheet | |
| J-1502000-07__Pico_Rivera _Preventative_Maintenance_Program_-_Index _Detail.xls | XLS spreadsheet | |
| J-1502000-11_Repair_Work_Report.xls | XLS spreadsheet | |
| Section_C.pdf | ||
| Schedule_B _CLINs.xls | XLS spreadsheet | |
| SF_1449.pdf | ||
| J-1502000-10__Preventative_Maintenance_Program_-_Checklist.xls | XLS spreadsheet |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Index
| J-1502000-06 | |||||
| PREVENTATIVEMAINTENANCE PROGRAM INDEX | |||||
| MCRC PASADENA, CA | |||||
| (For Manufacturer, model and serial number of equipment see Detail tab) | |||||
| Equipment | Designation | Quantity | Location | Contractor Developed PM Program Checklist Sheet (Note 3) | Frequency of Inspection |
| 1502000 Spec Item 3.2 - HVAC | |||||
| A/C - Package, Computer Room | ACPC-1 | 1 | Server Rm 135 | Semiannual | |
| Air Filter (HVAC) | AF-1 through AF-21 | 21 | See Tab: Detail - Air Filter | Quarterly | |
| Air Filter (HVAC) | AF-22 through AF-26 | 5 | See Tab: Detail - Air Filter | Every Other Month | |
| Boiler | B-1 | 1 | Mech Rm 116 | Monthly, during heating season | |
| Fan (roof) | EF-1 through EF-8 | 7 | Roof | Quarterly | |
| Fan (wall) | EF-9, EF-10 | 2 | EF-9 (HazMat Locker A), EF-10 (HazMat Locker B) | Semiannual | |
| Fan Coil Unit | FC-1 | 1 | Training ICOFT 211 | Annual (spring) | |
| Furnace - Forced Air, Gas | FG-1 | 1 | Roof | Annual (fall) | |
| Heat Pump - Split | SHP-1 | 1 | Roof | Semiannual | |
| Heater-Unit, Forced, Air, Water | UH-1 | 2 | B&G Work Shop 127, Battery Storage 142 | Annual (fall) | |
| Heater-Unit, Infra Red, Gas | RH-1 | 6 | Mechanics Bay 129 | Annual (fall) | |
| Rooftop Unit | AC-1, AC-2 | 2 | Roof | Semiannual | |
| System Water-Heating Hot Water | HW-1 | 1 | Mech Rm 116 | X | Annual (Note 4) |
| Terminal-VAV | VAV-1 through VAV-21 | 21 | For location see Tab: Detail - VAV Locations | Annual | |
| 1502000 Spec Item 3.2 - Electrical Systems | |||||
| Lighting (exterior) | Lighting | Wall packs attached to buildings and pole lighting | Quarterly | ||
| Lighting (interior) | Lighting | Administrative Building, HazMat Locker A, HazMat Locker B | Quarterly | ||
| Panelboards | PB-DPA, PB-L1, PB-MCCA, PB-1PA, PB-1PB, PB-TPP, PB-1PC, PB-2PA, PB-2PD, PB-2PB, PB-2PC, PB-HazMatA, PB-HazMatB | 13 | PB-DPA, PB-L1, PB-MCCA, PB-1PA (Elec Rm 118), PB-1PB (Corridor 128), PB-TPP (Server 135), PB-1PC (Corridor 146), PB-2PA, PB-2PD (Corridor 206), PB-2PB (Corridor 228), PB-2PC (Corridor 200), PB-HazMatA (HazMat Locker A), PB-HazMatB (HazMat Locker B) | Annual | |
| 1502000 Spec Item 3.2 - Fire Protection | |||||
| Fire Detection and Alarm System | FA-1 | 1 | Administrative Building | Annual | |
| Fire Extinguisher (portable)-Monthly Inspection | FE-1 through FE-12 | 12 | FE-1 (Corridor 104), FE-2 (Mech Rm 116), FE-3 (Elec Rm 118), FE-4 (Corridor (128), FE-5 (Mechanics Bay 129), FE-6, FE-7 (Supply Warehouse 139), FE-8 (Corridor 151), FE-9, FE-10 (Multi-Purpose Room 157), FE-11 (Corridor 206), FE-12 (Corridor 228) | Monthly | |
| Fire Extinguisher (portable)-Annual Maintenance | FE-1 through FE-12 | 12 | FE-1 (Corridor 104), FE-2 (Mech Rm 116), FE-3 (Elec Rm 118), FE-4 (Corridor (128), FE-5 (Mechanics Bay 129), FE-6, FE-7 (Supply Warehouse 139), FE-8 (Corridor 151), FE-9, FE-10 (Multi-Purpose Room 157), FE-11 (Corridor 206), FE-12 (Corridor 228) | Annual | |
| Fire Hydrant | FH-1 | 1 | Adj to south side of bulding | Annual | |
| Fire Sprinkler - Chemical (dry/wet) | FSC-1, FSC-2 | 2 | FSC-1 (HazMat Locker A), FSC-2 (HazMat Locker B) | Monthly | |
| Fire Sprinkler - Wet Pipe | FSW-1 | 1 | Administrative Building | Annual | |
| 1502000 Spec Item 3.2 - WHE | |||||
| Crane-Gantry (mobile) | CG-1 | 1 | Parking lot | X | As required by the manufacturer |
| Crane-Overhead Bridge | COB-1 | 1 | Mechanics Bay 129 | X | As required by the manufacturer |
| 1502000 Spec Item 3.2 - VTE | |||||
| Elevator | 1 | X | As required by the manufacturer | ||
| 1502000 Spec Item 3.2 - Miscellaneous Equipment | |||||
| Air Compressor | AC-1 | 1 | Air Compressor Rm 158 | Semiannual | |
| Air Dryer - Refrigerant | ADR-1 | 1 | Air Compressor Rm 158 | Semiannual | |
| Air Filter - Compressed Air | AFC-1 | 1 | Air Compressor Rm 158 | Semiannual | |
| Door-Overhead (manual) | DR-1 through DR-7 | 7 | DR-1 (B&G Work Shop 127), DR-2, DRM-3, DRM-4 (Mechanics Bay 129), DR-5 (Supply Warehouse 139), DR-6 (Radio Shop 144), DR-7 (Gym 158) | Semiannual | |
| Drinking Fountain | DF-1, DF-2, DF-3, DF-4 | 4 | DF-1 ,DF-2 (Corridor 109), DF-3,DF-4 (Corridor 228) | Annual | |
| Emergency Eyewash & Shower | EES-1 | 1 | Mechanics Bay 129 | Monthly | |
| Gutters/Down Spouts Cleaning | G-1 | 1 | Administrative Building | Annual | |
| Fire Door/Shutter - Roll Up Type | FS-1 through FS-4 | 4 | FS-1, FS-2 ( Mtg/Mtc/Avg Office 217), FS-3 (Supply Officer 219), FS-4 (Supply Staff 220) | Semiannual | |
| Oil Water Separator | Oil Water Separator | 1 | Adj to Mechanics Bay 129 | Semiannual | |
| Plumbing Fixtures (by room) | PF-1 through PF-11 | 11 | PF-1 (Recreation Room 110), PF-2 (Women 111), PF-3 (Men 112), PF-4 (Women's Locker/Shwr Rm 113), PF-5 (Men's Locker/Shwr Rm 114), PF-6 (Janitor Closet 116), PF-7 (Medical Head 205), PF-8 (Corridor 228), PF-9 (Men Head 229), PF-10 (Womens Head 230), PF-11 ( Perimeter of Building) | Semiannual | |
| Pump (hot water) | P-1 | 1 | Mech Rm 116 | Annual | |
| Pump (potw) | P-2 | 1 | Mech Rm 116 | Annual | |
| Slide Gate Operator & Entry System | SGO-1 | 1 | Front gate | Semiannual | |
| Water Heater-Gas | WH-1 | 1 | Mech Rm 116 | Semiannual | |
| NOTES | |||||
| Note 1 - SHP-1 linked to FC-1 | |||||
| Note 2 - HVAC equipment shall be inspected in the spring or fall unless otherwise noted | |||||
| Note 3 - If blank, Government will provide PM Program checklist sheet | |||||
| Note 4 - Shall be treated/tested after repairs/leaks resulting in refilling of the system | |||||
| Note 5 - For quantity of plumbing fixtures see Tab: Plumbing Fixtures |
Page &P of &N
Detail
| J-1502000-06 | |||||
| PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL | |||||
| MCRC PASADENA, CA | |||||
| Equipment | Designation | Manufacturer | Model | Serial Number | Remarks |
| 1502000 Spec Item 3.2 - HVAC | |||||
| A/C - Package, Computer Room | ACPC-1 | Liebert | |||
| Boiler | B-1 | Raypack | H-752C | 8174072 | 630 MBH, Natural Gas |
| Fan (roof) | EF-1 | Loren Cook | 150ACEB | Centrifugal, 2000 CFM, Belt Drive | |
| Fan (roof) | EF-2 | Loren Cook | 150ACEB | Centrifugal, 2000 CFM, Belt Drive | |
| Fan (roof) | EF-3 | Loren Cook | 120ACRUB | Centrifugal, 1000 CFM, Belt Drive | |
| Fan (roof) | EF-4 | Loren Cook | 100C15DH | Centrifugal, 450 CFM, Direct Drive | |
| Fan (roof) | EF-5 | Loren Cook | 225ACEB | Centrifugal, 4300 CFM, Belt Drive | |
| Fan (roof) | EF-6 | Loren Cook | 100CPV | Utility Set, 550 CFM, Belt Drive | |
| Fan (roof) | EF-7 | Loren Cook | 270CPV | Utility Set, 6925 CFM, Belt Drive | |
| Fan (roof) | EF-8 | Loren Cook | 180CPV | Utility Set, 3200 CFM, Belt Drive | |
| Fan Coil Unit | FC-1 | Carrier | FB4AN060 | 2000 cfm | |
| Furnace - Forced Air, Gas | FG-1 | Modine | HFG_75SFRLN10F2 | 1013900-0963 | |
| Heat Pump - Split | SHP-1 | Carrier | 38YCC060520 | 4200E15272 | |
| Heater-Unit, Forced, Water | UH-1 | Modine | HS33901 | 39014500-0902 | |
| Heater-Unit, Infra Red, Gas | RH-1 | Solaronics | K-1 | 50 MBH, Natural Gas | |
| Roof Top Unit | AC-1 | Trane | SLHFC504BW67D8AD3F010B | C00H22880 | DX cooling coil, Hot water coil, Supply and return fan |
| Roof Top Unit | AC-2 | Trane | SLHFC254BW47D5DD3F010B | C00H22881 | DX cooling coil, Hot water coil, Supply and return fan |
| VAV-Terminal | VAV-1(T-7) | Tuttle & Bailey | FPC D 370-4 | Fan, Filter | |
| VAV-Terminal | VAV-2, (T-8) | Tuttle & Bailey | FPC D 380-5 | Fan, Filter | |
| VAV-Terminal | VAV-3 through VAV-6 (T-10) | Tuttle & Bailey | FPC D 410-6 | Fan, Filter | |
| VAV-Terminal | VAV-7 (T-12) | Tuttle & Bailey | FPC D 512-7 | Fan, Filter | |
| VAV-Terminal | VAV-8 (TH-5) | Tuttle & Bailey | FPC D 250-2 | Fan, Filter, Hot water coil | |
| VAV-Terminal | VAV-9, VAV-10, VAV-11 (TH-7) | Tuttle & Bailey | FPC D 370-4 | Fan, Filter, Hot water coil | |
| VAV-Terminal | VAV-12 through VAV-15 (TH-10) | Tuttle & Bailey | FPC D 410-6 | Fan, Filter, Hot water coil | |
| VAV-Terminal | VAV-17, VAV-18 (TH-14) | Tuttle & Bailey | FPC D 614-8 | Fan, Filter, Hot water coil | |
| VAV-Terminal | VAV-19, VAV-20, VAV-21 (TH-16) | Tuttle & Bailey | FPC D 616-9 | Fan, Filter, Hot water coil | |
| 1502000 Spec Item 3.2 - WHE | |||||
| Crane-Gantry (mobile) | CGM-1 | Spanco (crane) Cyclone (hoist) | 3T1518S (crane), Series 646 (hoist) | 9605-82 (crane) | 3 Ton |
| Crane-Overhead Bridge | COB-1 | American Monorail of California | SGUH | AME-8259 | 5 ton |
| 1502000 Spec Item 3.2 - VTE | |||||
| Elevator | E-1 | Delta Elevator Co, Inc | |||
| 1502000 Spec Item 3.2 - Miscellaneous Equipment | |||||
| Air Compressor | AC-1 | Ingersoll Rand | 2-2545E7.5 | 0110180197 | 2 Compressors, Belt drive, Oil lubed |
| Air Dryer - Refrigerant | ADR-1 | Ingersoll Rand | SDR50 | 00MSDRA4258 | R134A Refrigerant |
| Compressed Air -Filter | AFC-1 | Ingersoll Rand | IR100CHE | CCN:39540353 Element:39540916 | |
| Pump (heat) | P-1 | Armstrong | Series 4280, Model 2X1X10 | Closed Couple End Suction, 3 HP, 42 GPM | |
| Pump (potw) | P-2 | Armstrong | LS-45BF | ||
| Slide Gate Operator & Entry System | SGO-1 | Elite Access Systems Inc | SL-3000-UL series | ||
| Water Heater-Gas | WH-1 | Lochinvar | EWN150PM | C014342 | Gas |
Page &P of &N
VAV Location
| J-1502000-06 | ||
| PREVENTATIVE MAINTENANCE PROGRAM DETAIL | ||
| VAV LOCATION | ||
| MCRC PASAFENA, CA | ||
| VAV Designation | Model Designation | Location |
| VAV-1 | T-7 | OVM/Tire Shop 136 |
| VAV-2 | T-8 | Mt Tools 131 |
| VAV-3 | T-10 | Comm Maint Chief 148 |
| VAV-4 | T-10 | Supply Officer 219 |
| VAV-5 | T-10 | S-4 225 |
| VAV-6 | T-10 | Platoon Sgt Office 227 |
| VAV-7 | T-12 | Reserve 1st Sgt Office 216 |
| VAV-8 | TH-5 | Supply Staff 220 |
| VAV-9 | TH-7 | Radio Shop 144 |
| VAV-10 | TH-7 | Site CO Office 203 |
| VAV-11 | TH-7 | Medical Examination 204 |
| VAV-12 | TH-10 | Rose Conf Rm 107 |
| VAV-13 | TH-10 | Corridor 128 |
| VAV-14 | TH-10 | Weight Room 156 |
| VAV-15 | TH-10 | Ops Training 212 |
| VAV-16 | TH-14 | Commanding Officer 106 |
| VAV-17 | TH-14 | Recreation Room 110 |
| VAV-18 | TH-14 | Site 1st Sgt Office 202 |
| VAV-19 | TH-16 | Corridor 151 |
| VAV-20 | TH-16 | Corridor 151 |
| VAV-21 | TH-16 | Adjudant 209 |
Page &P of &N
Detail - AF
| J-1502000-06 | |||||||||
| PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL | |||||||||
| AIR FILTER (HVAC) | |||||||||
| MCRC PASADENA, CA | |||||||||
| (FILTER SIZE/QUANTITY SHALL BE FIELD VERIFIED BEFORE PURCHASING REPLACEMENT FILTERS) | |||||||||
| DESIGNATION | EQUIPMENT | FILTER 1 | FILTER 2 | FILTER 3 | FILTER 4 | ||||
| SIZE | QUANTITY | SIZE | QUANTITY | SIZE | QUANTITY | SIZE | QUANTITY | ||
| AF-1 | VAV-1 | 16x20x1 | 1 | ||||||
| AF-2 | VAV-2 | ||||||||
| AF-3 | VAV-3 | 16x20x1 | 1 | ||||||
| AF-4 | VAV-4 | 16x20x1 | 1 | ||||||
| AF-5 | VAV-5 | 16x20x1 | 1 | ||||||
| AF-6 | VAV-6 | 16x20x1 | 1 | ||||||
| AF-7 | VAV-7 | 16x20x1 | 1 | ||||||
| AF-8 | VAV-8 | ||||||||
| AF-9 | VAV-9 | 16x20x1 | 1 | ||||||
| AF-10 | VAV-10 | 16x20x1 | 1 | ||||||
| AF11 | VAV-11 | 16x20x1 | 1 | ||||||
| AF-12 | VAV-12 | 16x20x1 | 1 | ||||||
| AF-13 | VAV-13 | 16x20x1 | 1 | ||||||
| AF-14 | VAV-14 | 16x20x1 | 1 | ||||||
| AF-15 | VAV-15 | 16x16x1 | 1 | ||||||
| AF-16 | VAV-16 | 20x20x1 | 1 | ||||||
| AF-17 | VAV-17 | 16x20x1 | 1 | ||||||
| AF-18 | VAV-18 | 20x20x1 | 1 | ||||||
| AF-19 | AV-19 | 20x25x1 | 1 | ||||||
| AF-20 | VAV-20 | 20x25x1 | 1 | ||||||
| AF-21 | VAV-21 | 20x25x1 | 1 | ||||||
| AF-22 | AC-1 | 24x24x2 | 9 | ||||||
| AF-23 | AC-2 | 24x24x2 | 3 | 12x25x2 | 2 | ||||
| AF-24 | FC-1 | 12x24x2 | 2 | ||||||
| AF-25 | FG-1 | 16x25x2 | 4 | ||||||
| AF-26 | ACPC-1 | 20x20x1 | 1 |
Page &P of &N
Detail - PF
| J-1502000-06 | ||
| PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL | ||
| PLUMBING FIXTURE | ||
| MCRC PASADENA, CA | ||
| FIXTURE | QUANTITY | |
| Sink | 18 | |
| Shower Head | ||
| Toilet | 16 | |
| Urinal | 6 |
Page &P of &N
File details come from the government source that posted it. Updated .