J-1502000-08__San_Bruno _Preventative_Maintenance_Program_-_Index _Detail.xls

XLS spreadsheet 82 KB Posted

Attached to
Marine Force Reserve (MARFORRES), Facility Maintenance, West Region
Solicitation number
W912HP-13-R-0024
Issued by

About this file

Section J San Bruno Preventative Maintenance Program Index

View the file

Other files

File Type Posted
Award_NoticeCharleston_MFR_West_Facilities.pdf PDF
pd2BB08.pdf PDF
J-1502000-13__Equip_Inspection _Test_ _Certification_Program.xls XLS spreadsheet
Section_F.pdf PDF
J-1502000-09__Riverton _Preventative_Maintenance_Program_-_Index _Detail.xls XLS spreadsheet
Copy_of_Air_Filter_ _Equipment.pdf PDF
J-1502000-12__Equipment_Update_Report.xls XLS spreadsheet
Section_M.pdf PDF
Section_J.pdf PDF
J-1502000-05__Service_Call_Report.xls XLS spreadsheet
J-1502000-07__Pico_Rivera _Preventative_Maintenance_Program_-_Index _Detail.xls XLS spreadsheet
J-1502000-11_Repair_Work_Report.xls XLS spreadsheet
Section_C.pdf PDF
Schedule_B _CLINs.xls XLS spreadsheet
SF_1449.pdf PDF
J-1502000-10__Preventative_Maintenance_Program_-_Checklist.xls XLS spreadsheet
J-1502000-06_Pasadena _Preventative_Maintenance_Program_-_Index _Detail.xls XLS spreadsheet
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Index

J-1502000-08
PREVENTATIVE MAINTENANCE PROGRAM INDEX
MCRC SAN BRUNO, CA
(For Manufacturer, model and serial number of equipment see Detail tab)
EquipmentDesignationQuantityLocationContractor Developed PM Program Checklist Sheet (Note 3)Frequency of Inspection
1502000 Spec Item 3.2 - HVAC
Air Conditioner - PackageACP-11RoofSemiannual
Air Handling UnitHV-1, AHU-12HV-1 (Mechanical Rm 185), AHU-1 (Mechanical 126)Semiannual
Air Filter (HVAC)AF-1 through AF-44See Tab: Detail - Air FilterEvery other month
Air Filter (HVAC)AF-5 through AF-84See Tab: Detail - Air FilterEvery other month during heating season
BoilerB-11Mechanical Rm 185Monthly during heating season
ChillerC-11RoofXAs required by manufacturer
Condensing UnitCU-11RoofSemiannual
Fan (duct) (vehicle exhaust)EF-51EF-5 (Roof)Semiannual
Fan (duct)EF-61Supply Warehouse ISemiannual
Fan (roof)EF-11RoofQuarterly
Fan (wall)EF-2, EF-3, EF-43EF-2 (HazMat Locker A), EF-3 (HazMat Locker B), EF-4 (HazMat Locker C)Semiannual
Fan Coil Unit-ComputerFCU-11Room 283Semiannual
Heater-Unit, Forced, GasHUG-1 through HUH-33VMF 180Annual (fall)
Rooftop Unit - Gas Heat OnlyHV-2 through HV-54RoofAnnual (fall)
System Water-Hot WaterHW-11Administrative BuildingXAnnual (Note 4)
1502000 Spec Item 3.2 - Electrical Systems
Lighting (exterior)LightingFixtures attached to buildings and pole lightingQuarterly
Lighting (interior)LightingAdministrative Building, HazMat Locker A, HazMat Locker B, HazMat Locker C, Supply Warehouse I, Supply Warehouse IIQuarterly
PanelboardsPB19PB-H1A, PB-L1A (Corridor 116), PB-P1, PB-DPL1A, PB-DPH1A (Mechanical 126), PB-L1B, PB-H1BA, PB-H1BB (Corridor 170), PB-L1C (VMF 180), PB-DPL1B, PB-outdoor lights (Mechanical Rm 185), PB-H2A, PB-L2A (Janitorial 210), PB-NMCI (Room 283), PB-HazMatA (HazMat Locker A), PB-HazMatB (HazMat Locler B), PB-HazMatC (HazMat Locker C), PB-LL (Supply Warehouse I), PB-LM (Supply Warehouse II)Annual
1502000 Spec Item 3.2 - Fire Protection
Fire Detection and Alarm SystemFA-11Administrative BuildingAnnual
Fire Extinguisher (portable)-Monthly InspectionFE-1 through FE-14 1616FE-1 (Corridor 116), FE-2 (Rm 140), FE-3 (Coridor 143), FE-4, FE-5, FE-6 (Drill Hall 151), FE-7 (Locker Rm 162), FE-8, FE-9 (Corridor 176), FE-10 (VMF 180), FE-11 (Mechanical Rm 185), FE-12, FE-13, FE-14 (Corridor 208), FE-15 (POL Storage), FE-16 (Supply Storage I)Monthly
Fire Extinguisher (portable)-Monthly InspectionFE-1 through FE-14 1616FE-1 (Corridor 116), FE-2 (Rm 140), FE-3 (Coridor 143), FE-4, FE-5, FE-6 (Drill Hall 151), FE-7 (Locker Rm 162), FE-8, FE-9 (Corridor 176), FE-10 (VMF 180), FE-11 (Mechanical Rm 185), FE-12, FE-13, FE-14 (Corridor 208), FE-15 (POL Storage), FE-16 (Supply Storage I)Annual
Fire HydrantFH-1through FH-44FH-1 (front of Admin building, adj to Commodore Drive), FH-2 (rear of Admin building), FH-3 (adj to HaxMat Lockers), FH-4 (adj to Sneath Lane)Annual
Fire Sprinkler - Chemical (dry/wet)FSC-1, FSC-2, FSC-33FSC-1 (HazMat Locker A), FSC-2 (HazMat Locker B), FSC-3 (HazMat Locker C)Monthly
Fire Sprinkler - Wet PipeFSW-11Administrative BuildingAnnual
1502000 Spec Item 3.2.4 - WHE
Hydraulic Lift-AutoHLA-11VMF 180XAs required by the manufacturer
1502000 Spec Item 3.2.5 - Miscellaneous Equipment
Air CompressorAC-11Mechanical Rm 185Semiannual
Door-Overhead (manual)DR-1 through DR-66DR-1 (Rm 159A), DR-2 (Rm 159), DR-3 (Rm 161), DR-4 through DR-6 (Supply Warehouse II)Semiannual
Door-Overhead (motorized)DR-7 through DR-93VMF 180Semiannual
Drinking FountainDF-1 through DF-55DF-1 (Corridor 116), DF-2 (Corridor 143), DF-3 (Drill Hall 151), DF-4 (Corridor 160), DF-5 (Corridor 208)Semiannual
Emergency Eyewash - PortableEEP-11VMF 180Monthly
Gutters/Down Spouts CleaningG-11Administrative BuildingAnnual
Plumbing Fixtures (by room)PF-1 through PF-1414PF-1 (Toilet 129), PF-2 (Toilet 130), PF-3 (Toilet 136), PF-4 (Toilet 153), PF-5 (Rm 153C), PF-6 (Men 167), PF-7 (Men's Shower 168), PF-8 (Men 169), PF-9 (Motor T Office 172), PF-10 (Janitorial 173), PF-11 (Toilet 186), PF-12 (Janitorial 210), PF-13 (Toilet 229), PF-14 (Women 231)Semiannual
Pump (chilled water)P-CWP11Mechanical Rm 185Semiannual
Pump (hot water)P-HWP11Mechanical Rm 185Annual
Pump (Potw)P-1, P-22P-1 (Mechanical Rm 185), P-2 (Room 211)Annual
RefrigeratorR-11Medical 154Annual
Slide Gate Operator & Entry SystemSGO-11Front GateSemiannual
Water Heater-GasWHG-1, WHG-2, WHG-33WHG-1, WHG-2 (Mechanical Rm 185), WHG-3 (Room 211)Semiannual
NOTES
Note 1 - Equipment listed without a building name is located in the Administrative building
Note 2 - HVAC equipment shall be inspected in the spring or fall unless otherwise noted
Note 3 - If blank, Government will provide PM Program checklist sheet
Note 4 - Shall be treated/tested after repairs/leaks resulting in refilling of the system
Note 5 - For quantity/size of air filters (HVAC) see Tab: Air Filters (HVAC)
Note 6 - For quantity of plumbing fixtures see Tab: Plumbing Fixtures

Page &P of &N

Detail

J-1502000-08
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
MCRC SAN BRUNO, CA
EquipmentDesignationManufacturerModelSerial NumberRemarks
1502000 Spec Item 3.2.1 - HVAC
Air Conditioner - PackageACP-1International Comfort ProductsGPCM24K060FG054041091
Air Handling UnitHV-1TraneClimate ChangerHot water coil
Air Handling UnitAHU-1TraneClimate ChangerChilled water coil
BoilerB-1HydrothermKN-20KN-H-NET-M08-2535Gas
ChillerC-1Carrier30GTN020-D-6001801F81032
Condensing UnitCU-1Russell-ScottsboroACS001B-12VDE08F43689501001
Fan (roof)EF-1Dayton4YU9711547174 0810
Fan Coil Unit-ComputerFCU-1LiebertMMD18A-P00800318NTT185
Rooftop Unit - Gas Heat OnlyHV-2Sterling Division of MestekE3G-RT20A1B01B61C20A1B1E01200425001004
Rooftop Unit - Gas Heat OnlyHV-3Sterling Division of MestekE3G-RT20A1B01B61C20A1B1E01200425001001
Rooftop Unit - Gas Heat OnlyHV-4Sterling Division of MestekE3G-RT20A1B01B61C20A1B1E01200425001003
Rooftop Unit - Gas Heat OnlyHV-5Sterling Division of MestekE3G-RT20A1B01B61C20A1B1E01200425001002
1502000 Spec Item 3.2.4 - WHE
Hydraulic Lift-AutoHLA-1Rotary Lift (A Dover Co)SP012N510BHM04R008912,000 # capacity
1502000 Spec Item 3.2.5 - Miscellaneous Equipment
Air CompressorAC-1Ingersoll-RandT305TM341616
Pump (chilled water)P-CWP1Bell & Gossett1510PH0061243 HP
Pump (hot water)P-HWP1Bell & Gossett1510PH0061257.5 HP
Pump (Potw)P-1Bell & GossettPR AB L401/6 HP
Slide Gate Operator & Entry SystemSGO-1EuiteSL 3000-UCU12310252779
Water Heater-GasWHG-1State IndustriesSBD100399NEH04M010300100 Gal, 399 MBTUH
Water Heater-GasWHG-2State IndustriesSBD100399NEH04232482100 Gal, 399 MBTUH
Water Heater-GasWHG-3Rheem21V750189A0449375 Gal

Page &P of &N

Detail - AF

J-1502000-08
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
AIR FILTER (HVAC)
MCRC SAN BRUENO, CA
(FILTER SIZE/QUANTITY SHALL BE FIELD VERIFIED BEFORE PURCHASING REPLACEMENT FILTERS)
DESIGNATIONEQUIPMENTFILTER 1FILTER 2FILTER 3FILTER 4
SIZEQUANTITYSIZEQUANTITYSIZEQUANTITYSIZEQUANTITY
AF-1ACP-120X20X11
AF-2HV-116X25X27
AF-3AHU-1
AF-4FCU-120x20x11
AF-5HV-220X20X24
AF-6HV-320X20X24
AF-7HV-420X20X24
AF-8HV-520X20X24

Page &P of &N

Detail - PF

J-1502000-08
PREVENTATIVE MAINTENANCE PROGRAM EQUIPMENT DETAIL
PLUMBING FIXTURE
MCRC SAN BRUENO, CA
FIXTUREQUANTITY
Sink15
Shower Head
Toilet17
Urinal9

Page &P of &N

File details come from the government source that posted it. Updated .