1502000 ELINs-FFP Am 03 8-1-12.xlsx
XLSX spreadsheet 3 MB Posted
- Solicitation number
- W912HP-12-R-0027
About this file
Am 0003 Revised ELINs deleting service calls and totals for LA009 Ft. Polk and LA038 Belle Chasse
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 12R0027_Am03_AerialMaps_8-1-12.pdf | ||
| 12R0027_Am03_8-1-12.pdf | ||
| 12R0027-0002 Various Changes 7-30-12.pdf | ||
| 1502000 ELINs-FFP Am 02 7-30-12.xlsx | XLSX spreadsheet | |
| 12R0027-0001 Extend Date 7-27-12.pdf | ||
| 12R0027 Contract Info Sheet.docx | DOCX document | |
| 12R0027 PPQ.docx | DOCX document | |
| 12R0027 Past Perf Info Sheet.docx | DOCX document | |
| 12R0027 Site Visit Attendees 7-12-12.pdf | ||
| 12R0027 Prop Data Sheet.docx | DOCX document | |
| http //www.sac.usace.army.mil/ action organization.facility | — | |
| 1502000 ELINs-FFP 7-7-12.xlsx | XLSX spreadsheet | |
| 12R0027 RFP 7-7-12.pdf | ||
| 1502000 ELINs Facility Investment Region A.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLINs (Contract Line Items)
| This sheet is filled out automatically as the other sheets are completed. | |||
| 0001 | base period for FFP for 6 months | $ - 0 | Note: The reason 0001 is not 1/2 of 0003 is that some items only |
occur once per year and some are HVAC related and will occur twice in the 6 month base period.
1001 1st option for FFP for 12 months $ - 0
2001 2nd option for FFP for 12 months $ - 0
3001 3rd option for FFP for 12 months $ - 0
4001 4th option for FFP for 12 months $ - 0
$ - 0
&F
&A &P of &N
ELIN - BASE PERIOD FFP
| Cortractor is to fill out all highlighted in yellow cells for bid evaluation. | sample |
| Award will be made on all non strike-through cells. | sample |
| Strike-through cells will not be awarded. They are provided for illustrative purposes only, to indicate the work that is not in scope of this requirement. | sample |
| LA005 | Spec Item | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| Firm Fixed-Price Work | ||||||||
| 3.1 | Service Calls | |||||||
| A001 | 3.1.1 | 0-03 | Perform Emergency Service Call Work | SEE | CLIN | 0002 | ---- | |
| A002 | 3.1.2 | 0-03 | Perform Routine Service Call Work | SEE | CLIN | 0002 | ---- | |
| 3.2 | Preventive Maintenance (PM) Program | |||||||
| A003 | 3.2.1 | 0-04 | Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems | 6 | Month | $ - 0 | $ - 0 | |
| A004 | 3.2.1.1 | 0-04 | HVAC Seasonal Start-Up and Shutdown | 6 | Month | $ - 0 | $ - 0 | |
| A005 | 3.2.1.3 | 0-06 | Develop And Implement Preventive Maintenance Program For Furnaces | 6 | Month | $ - 0 | $ - 0 | |
| A006 | 3.2.1.4 | 0-07 | Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans | 6 | Month | $ - 0 | $ - 0 | |
| A007 | 3.2.1.5 | 0-08 | Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters | 6 | Month | $ - 0 | $ - 0 | |
| A008 | 3.2.1.8 | 0-11 | Develop And Implement Preventive Maintenance Program For Variable Air Volume (VAV) and Other Boxes | 6 | Month | $ - 0 | $ - 0 | |
| A009 | 3.2.1.9 | 0-12 | Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems | 6 | Month | $ - 0 | $ - 0 | |
| A010 | 3.2.1.12 | 0-15 | Develop And Implement Preventive Maintenance Program For Mini-Splits | 6 | Month | $ - 0 | $ - 0 | |
| A011 | 3.2.1.14 | 0-17 | Develop And Implement Preventive Maintenance Program For HVAC Control Systems | 6 | Month | $ - 0 | $ - 0 | |
| A012 | 3.2.1.15 | 0-18 | Develop And Implement Preventive Maintenance Program For Thermostats | 6 | Month | $ - 0 | $ - 0 | |
| A013 | 3.2.2 | 0-19 | Develop And Implement Preventive Maintenance Program For Boilers | 6 | Month | $ - 0 | $ - 0 | |
| A014 | 3.2.2.1 | 0-19 | Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown | 6 | Month | $ - 0 | $ - 0 | |
| A015 | 3.2.5 | 0-22 | ||||||
| 0-23 | Develop And Implement Preventive Maintenance Program For Emergency Generator Systems | 6 | Month | $ - 0 | $ - 0 | |||
| A016 | 3.2.7 | 0-25 | Develop And Implement Preventive Maintenance Program For Built In Food Service Equipment | 6 | Month | $ - 0 | $ - 0 | |
| A017 | 3.2.9.1 | 0-28 | Develop And Implement Preventive Maintenance Program For External Hose Faucets | 6 | Month | $ - 0 | $ - 0 | |
| A018 | 3.2.9.2 | 0-29 | Develop And Implement Preventive Maintenance Program For Toilets | 6 | Month | $ - 0 | $ - 0 | |
| A019 | 3.2.9.3 | 0-30 | Develop And Implement Preventive Maintenance Program For Urinals | 6 | Month | $ - 0 | $ - 0 | |
| A020 | 3.2.9.4 | 0-31 | Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories | 6 | Month | $ - 0 | $ - 0 | |
| A021 | 3.2.9.5 | 0-32 | Develop And Implement Preventive Maintenance Program For Showers | 6 | Month | $ - 0 | $ - 0 | |
| A022 | 3.2.9.6 | 0-33 | Develop And Implement Preventive Maintenance Program For Drinking fountains | 6 | Month | $ - 0 | $ - 0 | |
| A023 | 3.2.9.7 | 0-34 | Develop And Implement Preventive Maintenance Program For Water Heaters | 6 | Month | $ - 0 | $ - 0 | |
| A024 | 3.2.9.13 | 0-40 | Develop And Implement Preventive Maintenance Program For Sump Pumps | 6 | Month | $ - 0 | $ - 0 | |
| A025 | 3.2.9.16 | 0-43 | Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters | 6 | Month | $ - 0 | $ - 0 | |
| A026 | 3.2.9.17 | 0-44 | Develop And Implement Preventive Maintenance Program For Fire Protection Systems | 6 | Month | $ - 0 | $ - 0 | |
| A027 | 3.2.9.19 | 0-46 | Develop And Implement Preventive Maintenance Program For Mass Notification Boards | 6 | Month | $ - 0 | $ - 0 | |
| A028 | 3.2.9.20 | 0-47 | Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards | 6 | Month | $ - 0 | $ - 0 | |
| A029 | 3.2.9.22 | 0-49 | Develop And Implement Preventive Maintenance Program For Fire Extinguishers | 6 | Month | $ - 0 | ||
| A030 | 3.2.9.23 | 0-50 | Develop And Implement Preventive Maintenance Program For Smoke Detectors | 6 | Month | $ - 0 | $ - 0 | |
| 3.3 | Integrated Maintenance Program (IMP) | not used | ||||||
| 3.4 | Inspection, Testing, and Certification | |||||||
| A031 | 3.4.1 | 0-19 | Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs | 6 | Month | $ - 0 | $ - 0 | |
| 3.5 | Other Recurring Services | |||||||
| A032 | 3.5.1.1 | 0-55 | Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels | 6 | Month | $ - 0 | ||
| A033 | 3.5.1.2 | 0-56 | Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks | 6 | Month | $ - 0 | $ - 0 | |
| A034 | 3.5.1.3 | 0-57 | Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights | 6 | Month | $ - 0 | ||
| A035 | 3.5.1.4 | 0-58 | Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights | 6 | Month | $ - 0 | ||
| A036 | 3.5.1.6 | 0-60 | Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights | 6 | Month | $ - 0 | $ - 0 | |
| A037 | 3.5.1.7 | 0-61 | Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights | 6 | Month | $ - 0 | $ - 0 | |
| A038 | 3.5.1.8 | 0-62 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs | 6 | Month | $ - 0 | $ - 0 | |
| A039 | 3.5.1.9 | 0-63 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs | 6 | Month | $ - 0 | $ - 0 | |
| A040 | 3.5.4 | 0-69 | Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems | 6 | Month | $ - 0 | $ - 0 | |
| A041 | 3.5.5 | 0-70 | Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles | 6 | Month | $ - 0 | ||
| A042 | 3.5.6 | 0-71 | Develop and implement a program to inspect, and make all necessary repairs to Gates | 6 | Month | $ - 0 | $ - 0 | |
| A043 | 3.5.7 | 0-72 | Develop and implement a program to inspect, and make all necessary repairs to Fences | 6 | Month | $ - 0 | $ - 0 | |
| A044 | 3.5.8 | 0-73 | Develop and implement a program to inspect, and make all necessary repairs to Bollards | 6 | Month | $ - 0 | ||
| A045 | 3.5.9 | 0-74 | Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems | 6 | Month | $ - 0 | $ - 0 | |
| A046 | 3.5.12 | 0-77 | Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors | 6 | Month | $ - 0 | $ - 0 | |
| A047 | 3.5.14 | 0-79 | Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms | 6 | Month | $ - 0 | ||
| A048 | 3.5.15 | 0-80 | Develop and implement a program to inspect, and make all necessary repairs to Automated Access Control Systems | 6 | Month | $ - 0 | $ - 0 | |
| A049 | 3.5.17 | 0-82 | Develop and implement a program to inspect, and make all necessary repairs to Vault Doors | 6 | Month | $ - 0 | $ - 0 | |
| A050 | 3.5.19 | 0-84 | Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems | 6 | Month | $ - 0 | $ - 0 | |
| A051 | 3.5.20 | 0-25 | Develop and implement a program to inspect, and make all necessary repairs to Built-In Refrigerators/ Freezers | 6 | Month | $ - 0 | $ - 0 | |
| A052 | 3.5.21 | 0-85 | Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens | 6 | Month | $ - 0 | ||
| A053 | 3.5.22 | 0-86 | Develop and implement a program to inspect, and make all necessary repairs to Intrusion Detection Systems | 6 | Month | $ - 0 | $ - 0 | |
| A054 | 3.5.23 | 0-87 | Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building) | 6 | Month | $ - 0 | $ - 0 |
TOTAL FFP LINE ITEMS - A001 THROUGH A054 $ - 0
| LA009 | Spec Item | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| Firm Fixed-Price Work | ||||||||
| 3.1 | Service Calls | |||||||
| A055 | 3.1.1 | 0-03 | Perform Emergency Service Call Work | SEE | CLIN | 0002 | ---- | |
| A056 | 3.1.2 | 0-03 | Perform Routine Service Call Work | SEE | CLIN | 0002 | ---- | |
| 3.2 | Preventive Maintenance (PM) Program | |||||||
| A057 | 3.2.1 | 0-04 | Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems | 6 | Month | $ - 0 | ||
| A058 | 3.2.1.1 | 0-04 | HVAC Seasonal Start-Up and Shutdown | 6 | Month | $ - 0 | ||
| A059 | 3.2.1.3 | 0-06 | Develop And Implement Preventive Maintenance Program For Furnaces | 6 | Month | $ - 0 | ||
| A060 | 3.2.1.4 | 0-07 | Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans | 6 | Month | $ - 0 | ||
| A061 | 3.2.1.5 | 0-08 | Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters | 6 | Month | $ - 0 | ||
| A062 | 3.2.1.8 | 0-11 | Develop And Implement Preventive Maintenance Program For Variable Air Volume (VAV) and Other Boxes | 6 | Month | $ - 0 | ||
| A063 | 3.2.1.9 | 0-12 | Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems | 6 | Month | $ - 0 | ||
| A064 | 3.2.1.10 | 0-13 | Develop And Implement Preventive Maintenance Program For Humidifiers | 6 | Month | $ - 0 | ||
| A065 | 3.2.1.12 | 0-15 | Develop And Implement Preventive Maintenance Program For Mini-Splits | 6 | Month | $ - 0 | ||
| A066 | 3.2.1.13 | 0-16 | Develop And Implement Preventive Maintenance Program For Window Units | 6 | Month | $ - 0 | ||
| A067 | 3.2.1.14 | 0-17 | Develop And Implement Preventive Maintenance Program For HVAC Control Systems | 6 | Month | $ - 0 | ||
| A068 | 3.2.1.15 | 0-18 | Develop And Implement Preventive Maintenance Program For Thermostats | 6 | Month | $ - 0 | ||
| A069 | 3.2.2 | 0-19 | Develop And Implement Preventive Maintenance Program For Boilers | 6 | Month | $ - 0 | ||
| A070 | 3.2.2.1 | 0-19 | Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown | 6 | Month | $ - 0 | ||
| A071 | 3.2.5 | 0-22 | ||||||
| 0-23 | Develop And Implement Preventive Maintenance Program For Emergency Generator Systems | 6 | Month | $ - 0 | ||||
| A072 | 3.2.9.1 | 0-28 | Develop And Implement Preventive Maintenance Program For External Hose Faucets | 6 | Month | $ - 0 | ||
| A073 | 3.2.9.2 | 0-29 | Develop And Implement Preventive Maintenance Program For Toilets | 6 | Month | $ - 0 | ||
| A074 | 3.2.9.3 | 0-30 | Develop And Implement Preventive Maintenance Program For Urinals | 6 | Month | $ - 0 | ||
| A075 | 3.2.9.4 | 0-31 | Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories | 6 | Month | $ - 0 | ||
| A076 | 3.2.9.5 | 0-32 | Develop And Implement Preventive Maintenance Program For Showers | 6 | Month | $ - 0 | ||
| A077 | 3.2.9.6 | 0-33 | Develop And Implement Preventive Maintenance Program For Drinking fountains | 6 | Month | $ - 0 | ||
| A078 | 3.2.9.7 | 0-34 | Develop And Implement Preventive Maintenance Program For Water Heaters | 6 | Month | $ - 0 | ||
| A079 | 3.2.9.8 | 0-35 | Develop And Implement Preventive Maintenance Program For Built-in Emergency Shower/ Eye Wash Stations | 6 | Month | $ - 0 | ||
| A080 | 3.2.9.9 | 0-36 | Develop And Implement Preventive Maintenance Program For Circulating Pumps | 6 | Month | $ - 0 | ||
| A081 | 3.2.9.10 | 0-37 | Develop And Implement Preventive Maintenance Program For Backflow Prevention Devices | 6 | Month | $ - 0 | ||
| A082 | 3.2.9.16 | 0-43 | Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters | 6 | Month | $ - 0 | ||
| A083 | 3.2.9.17 | 0-44 | Develop And Implement Preventive Maintenance Program For Fire Protection Systems | 6 | Month | $ - 0 | ||
| A084 | 3.2.9.18 | 0-45 | Develop And Implement Preventive Maintenance Program For Fire Suppression Systems | 6 | Month | $ - 0 | ||
| A085 | 3.2.9.19 | 0-46 | Develop And Implement Preventive Maintenance Program For Mass Notification Boards | 6 | Month | $ - 0 | ||
| A086 | 3.2.9.20 | 0-47 | Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards | 6 | Month | $ - 0 | ||
| A087 | 3.2.9.22 | 0-49 | Develop And Implement Preventive Maintenance Program For Fire Extinguishers | 6 | Month | $ - 0 | ||
| A088 | 3.2.9.23 | 0-50 | Develop And Implement Preventive Maintenance Program For Smoke Detectors | 6 | Month | $ - 0 | ||
| 3.3 | Integrated Maintenance Program (IMP) | not used | ||||||
| 3.4 | Inspection, Testing, and Certification | |||||||
| A089 | 3.4.1 | 0-19 | Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs | 6 | Month | $ - 0 | ||
| A090 | 3.4.3 | 0-53 | Develop And Implement an Inspection, Testing, and Certification Program For Crane and Crane Trackage | 6 | Month | $ - 0 | ||
| A091 | 3.4.4 | 0-37 | Develop And Implement an Inspection, Testing, and Certification Program For Backflow Prevention Devices | 6 | Month | $ - 0 | ||
| 3.5 | Other Recurring Services | |||||||
| A092 | 3.5.1.1 | 0-55 | Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels | 6 | Month | $ - 0 | ||
| A093 | 3.5.1.2 | 0-56 | Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks | 6 | Month | $ - 0 | ||
| A094 | 3.5.1.3 | 0-57 | Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights | 6 | Month | $ - 0 | ||
| A095 | 3.5.1.4 | 0-58 | Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights | 6 | Month | $ - 0 | ||
| A096 | 3.5.1.5 | 0-59 | Develop and implement a program to inspect, and make all necessary repairs to Flag Pole Lights | 6 | Month | $ - 0 | ||
| A097 | 3.5.1.6 | 0-60 | Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights | 6 | Month | $ - 0 | ||
| A098 | 3.5.1.7 | 0-61 | Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights | 6 | Month | $ - 0 | ||
| A099 | 3.5.1.8 | 0-62 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs | 6 | Month | $ - 0 | ||
| A100 | 3.5.1.9 | 0-63 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs | 6 | Month | $ - 0 | ||
| A101 | 3.5.4 | 0-69 | Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems | 6 | Month | $ - 0 | ||
| A102 | 3.5.5 | 0-70 | Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles | 6 | Month | $ - 0 | ||
| A103 | 3.5.6 | 0-71 | Develop and implement a program to inspect, and make all necessary repairs to Gates | 6 | Month | $ - 0 | ||
| A104 | 3.5.7 | 0-72 | Develop and implement a program to inspect, and make all necessary repairs to Fences | 6 | Month | $ - 0 | ||
| A105 | 3.5.8 | 0-73 | Develop and implement a program to inspect, and make all necessary repairs to Bollards | 6 | Month | $ - 0 | ||
| A106 | 3.5.9 | 0-74 | Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems | 6 | Month | $ - 0 | ||
| A107 | 3.5.10 | 0-75 | Develop and implement a program to inspect, and make all necessary repairs to Oil Water Separators | 6 | Month | $ - 0 | ||
| A108 | 3.5.12 | 0-77 | Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors | 6 | Month | $ - 0 | ||
| A109 | 3.5.15 | 0-80 | Develop and implement a program to inspect, and make all necessary repairs to Automated Access Control Systems | 6 | Month | $ - 0 | ||
| A110 | 3.5.16 | 0-81 | Develop and implement a program to inspect, and make all necessary repairs to Automated Key Control Systems | 6 | Month | $ - 0 | ||
| A111 | 3.5.17 | 0-82 | Develop and implement a program to inspect, and make all necessary repairs to Vault Doors | 6 | Month | $ - 0 | ||
| A112 | 3.5.18 | 0-83 | Develop and implement a program to inspect, and make all necessary repairs to Interior Roll-up Doors | 6 | Month | $ - 0 | ||
| A113 | 3.5.19 | 0-84 | Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems | 6 | Month | $ - 0 | ||
| A114 | 3.5.21 | 0-85 | Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens | 6 | Month | $ - 0 | ||
| A115 | 3.5.22 | 0-86 | Develop and implement a program to inspect, and make all necessary repairs to Intrusion Detection Systems | 6 | Month | $ - 0 | ||
| A116 | 3.5.23 | 0-87 | Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building) | 6 | Month | $ - 0 |
TOTAL FFP LINE ITEMS - A055 THROUGH A116
| LA012 | Spec Item | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| Firm Fixed-Price Work | |||||||
| 3.1 | Service Calls | ||||||
| A117 | 3.1.1 | 0-03 | Perform Emergency Service Call Work | SEE | CLIN | 0002 | ---- |
| A118 | 3.1.2 | 0-03 | Perform Routine Service Call Work | SEE | CLIN | 0002 | ---- |
| 3.2 | Preventive Maintenance (PM) Program | ||||||
| A119 | 3.2.1 | 0-04 | Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems | 6 | Month | $ - 0 | $ - 0 |
| A120 | 3.2.1.1 | 0-04 | HVAC Seasonal Start-Up and Shutdown | 6 | Month | $ - 0 | $ - 0 |
| A121 | 3.2.1.4 | 0-07 | Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans | 6 | Month | $ - 0 | $ - 0 |
| A122 | 3.2.1.5 | 0-08 | Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters | 6 | Month | $ - 0 | $ - 0 |
| A123 | 3.2.1.7 | 0-10 | Develop And Implement Preventive Maintenance Program For Rooftop Units | 6 | Month | $ - 0 | $ - 0 |
| A124 | 3.2.1.12 | 0-15 | Develop And Implement Preventive Maintenance Program For Mini-Splits | 6 | Month | $ - 0 | $ - 0 |
| A125 | 3.2.1.15 | 0-18 | Develop And Implement Preventive Maintenance Program For Thermostats | 6 | Month | $ - 0 | $ - 0 |
| A126 | 3.2.7 | 0-25 | Develop And Implement Preventive Maintenance Program For Built In Food Service Equipment | 6 | Month | $ - 0 | $ - 0 |
| A127 | 3.2.9.1 | 0-28 | Develop And Implement Preventive Maintenance Program For External Hose Faucets | 6 | Month | $ - 0 | $ - 0 |
| A128 | 3.2.9.2 | 0-29 | Develop And Implement Preventive Maintenance Program For Toilets | 6 | Month | $ - 0 | $ - 0 |
| A129 | 3.2.9.3 | 0-30 | Develop And Implement Preventive Maintenance Program For Urinals | 6 | Month | $ - 0 | $ - 0 |
| A130 | 3.2.9.4 | 0-31 | Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories | 6 | Month | $ - 0 | $ - 0 |
| A131 | 3.2.9.5 | 0-32 | Develop And Implement Preventive Maintenance Program For Showers | 6 | Month | $ - 0 | $ - 0 |
| A132 | 3.2.9.6 | 0-33 | Develop And Implement Preventive Maintenance Program For Drinking fountains | 6 | Month | $ - 0 | $ - 0 |
| A133 | 3.2.9.7 | 0-34 | Develop And Implement Preventive Maintenance Program For Water Heaters | 6 | Month | $ - 0 | $ - 0 |
| A134 | 3.2.9.8 | 0-35 | Develop And Implement Preventive Maintenance Program For Built-in Emergency Shower/ Eye Wash Stations | 6 | Month | $ - 0 | |
| A135 | 3.2.9.15 | 0-42 | Develop And Implement Preventive Maintenance Program For Fire Hydrants | 6 | Month | $ - 0 | $ - 0 |
| A136 | 3.2.9.16 | 0-43 | Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters | 6 | Month | $ - 0 | $ - 0 |
| A137 | 3.2.9.17 | 0-44 | Develop And Implement Preventive Maintenance Program For Fire Protection Systems | 6 | Month | $ - 0 | $ - 0 |
| A138 | 3.2.9.19 | 0-46 | Develop And Implement Preventive Maintenance Program For Mass Notification Boards | 6 | Month | $ - 0 | $ - 0 |
| A139 | 3.2.9.20 | 0-47 | Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards | 6 | Month | $ - 0 | $ - 0 |
| A140 | 3.2.9.21 | 0-48 | Develop And Implement Preventive Maintenance Program For Kitchen Hoods System | 6 | Month | $ - 0 | $ - 0 |
| A141 | 3.2.9.22 | 0-49 | Develop And Implement Preventive Maintenance Program For Fire Extinguishers | 6 | Month | $ - 0 | |
| A142 | 3.2.9.23 | 0-50 | Develop And Implement Preventive Maintenance Program For Smoke Detectors | 6 | Month | $ - 0 | $ - 0 |
| 3.3 | Integrated Maintenance Program (IMP) | not used | |||||
| 3.4 | Inspection, Testing, and Certification | ||||||
| 3.5 | Other Recurring Services | ||||||
| A143 | 3.5.1.1 | 0-55 | Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels | 6 | Month | $ - 0 | |
| A144 | 3.5.1.2 | 0-56 | Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks | 6 | Month | $ - 0 | $ - 0 |
| A145 | 3.5.1.3 | 0-57 | Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights | 6 | Month | $ - 0 | |
| A146 | 3.5.1.4 | 0-58 | Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights | 6 | Month | $ - 0 | |
| A147 | 3.5.1.6 | 0-60 | Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights | 6 | Month | $ - 0 | $ - 0 |
| A148 | 3.5.1.7 | 0-61 | Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights | 6 | Month | $ - 0 | $ - 0 |
| A149 | 3.5.1.8 | 0-62 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs | 6 | Month | $ - 0 | $ - 0 |
| A150 | 3.5.1.9 | 0-63 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs | 6 | Month | $ - 0 | $ - 0 |
| A151 | 3.5.2 | 0-67 | Clean grease traps and remove and dispose of grease from designated Grease Traps | 6 | Month | $ - 0 | $ - 0 |
| A152 | 3.5.4 | 0-69 | Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems | 6 | Month | $ - 0 | $ - 0 |
| A153 | 3.5.5 | 0-70 | Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles | 6 | Month | $ - 0 | |
| A154 | 3.5.6 | 0-71 | Develop and implement a program to inspect, and make all necessary repairs to Gates | 6 | Month | $ - 0 | $ - 0 |
| A155 | 3.5.7 | 0-72 | Develop and implement a program to inspect, and make all necessary repairs to Fences | 6 | Month | $ - 0 | $ - 0 |
| A156 | 3.5.10 | 0-75 | Develop and implement a program to inspect, and make all necessary repairs to Oil Water Separators | 6 | Month | $ - 0 | $ - 0 |
| A157 | 3.5.12 | 0-77 | Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors | 6 | Month | $ - 0 | $ - 0 |
| A158 | 3.5.14 | 0-79 | Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms | 6 | Month | $ - 0 | |
| A159 | 3.5.17 | 0-82 | Develop and implement a program to inspect, and make all necessary repairs to Vault Doors | 6 | Month | $ - 0 | $ - 0 |
| A160 | 3.5.18 | 0-83 | Develop and implement a program to inspect, and make all necessary repairs to Interior Roll-up Doors | 6 | Month | $ - 0 | $ - 0 |
| A161 | 3.5.19 | 0-84 | Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems | 6 | Month | $ - 0 | $ - 0 |
| A162 | 3.5.21 | 0-85 | Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens | 6 | Month | $ - 0 | $ - 0 |
TOTAL FFP LINE ITEMS - A117 THROUGH A162 $ - 0
| LA013 | Spec Item | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| Firm Fixed-Price Work | |||||||
| 3.1 | Service Calls | ||||||
| A163 | 3.1.1 | 0-03 | Perform Emergency Service Call Work | SEE | CLIN | 0002 | ---- |
| A164 | 3.1.2 | 0-03 | Perform Routine Service Call Work | SEE | CLIN | 0002 | ---- |
| 3.2 | Preventive Maintenance (PM) Program | ||||||
| A165 | 3.2.1 | 0-04 | Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems | 6 | Month | $ - 0 | $ - 0 |
| A166 | 3.2.1.1 | 0-04 | HVAC Seasonal Start-Up and Shutdown | 6 | Month | $ - 0 | $ - 0 |
| A167 | 3.2.1.4 | 0-07 | Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans | 6 | Month | $ - 0 | $ - 0 |
| A168 | 3.2.1.5 | 0-08 | Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters | 6 | Month | $ - 0 | $ - 0 |
| A169 | 3.2.1.6 | 0-09 | Develop And Implement Preventive Maintenance Program For Packaged Terminal Air Conditioners | 6 | Month | $ - 0 | $ - 0 |
| A170 | 3.2.1.7 | 0-10 | Develop And Implement Preventive Maintenance Program For Rooftop Units | 6 | Month | $ - 0 | $ - 0 |
| A171 | 3.2.1.9 | 0-12 | Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems | 6 | Month | $ - 0 | $ - 0 |
| A172 | 3.2.1.11 | 0-14 | Develop And Implement Preventive Maintenance Program For Steam Systems | 6 | Month | $ - 0 | $ - 0 |
| A173 | 3.2.1.14 | 0-17 | Develop And Implement Preventive Maintenance Program For HVAC Control Systems | 6 | Month | $ - 0 | $ - 0 |
| A174 | 3.2.1.15 | 0-18 | Develop And Implement Preventive Maintenance Program For Thermostats | 6 | Month | $ - 0 | $ - 0 |
| A175 | 3.2.2 | 0-19 | Develop And Implement Preventive Maintenance Program For Boilers | 6 | Month | $ - 0 | $ - 0 |
| A176 | 3.2.2.1 | 0-19 | Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown | 6 | Month | $ - 0 | $ - 0 |
| A177 | 3.2.6 | 0-24 | Develop And Implement Preventive Maintenance Program For Cathodic Protection Systems | 6 | Month | $ - 0 | $ - 0 |
| A178 | 3.2.7 | 0-25 | Develop And Implement Preventive Maintenance Program For Built In Food Service Equipment | 6 | Month | $ - 0 | $ - 0 |
| A179 | 3.2.9.1 | 0-28 | Develop And Implement Preventive Maintenance Program For External Hose Faucets | 6 | Month | $ - 0 | $ - 0 |
| A180 | 3.2.9.2 | 0-29 | Develop And Implement Preventive Maintenance Program For Toilets | 6 | Month | $ - 0 | $ - 0 |
| A181 | 3.2.9.3 | 0-30 | Develop And Implement Preventive Maintenance Program For Urinals | 6 | Month | $ - 0 | $ - 0 |
| A182 | 3.2.9.4 | 0-31 | Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories | 6 | Month | $ - 0 | $ - 0 |
| A183 | 3.2.9.5 | 0-32 | Develop And Implement Preventive Maintenance Program For Showers | 6 | Month | $ - 0 | $ - 0 |
| A184 | 3.2.9.6 | 0-33 | Develop And Implement Preventive Maintenance Program For Drinking fountains | 6 | Month | $ - 0 | $ - 0 |
| A185 | 3.2.9.7 | 0-34 | Develop And Implement Preventive Maintenance Program For Water Heaters | 6 | Month | $ - 0 | $ - 0 |
| A186 | 3.2.9.9 | 0-36 | Develop And Implement Preventive Maintenance Program For Circulating Pumps | 6 | Month | $ - 0 | $ - 0 |
| A187 | 3.2.9.16 | 0-43 | Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters | 6 | Month | $ - 0 | $ - 0 |
| A188 | 3.2.9.17 | 0-44 | Develop And Implement Preventive Maintenance Program For Fire Protection Systems | 6 | Month | $ - 0 | $ - 0 |
| A189 | 3.2.9.20 | 0-47 | Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards | 6 | Month | $ - 0 | $ - 0 |
| A190 | 3.2.9.21 | 0-48 | Develop And Implement Preventive Maintenance Program For Kitchen Hoods System | 6 | Month | $ - 0 | $ - 0 |
| A191 | 3.2.9.22 | 0-49 | Develop And Implement Preventive Maintenance Program For Fire Extinguishers | 6 | Month | $ - 0 | |
| A192 | 3.2.9.23 | 0-50 | Develop And Implement Preventive Maintenance Program For Smoke Detectors | 6 | Month | $ - 0 | $ - 0 |
| 3.3 | Integrated Maintenance Program (IMP) | not used | |||||
| 3.4 | Inspection, Testing, and Certification | ||||||
| 3.5 | Other Recurring Services | ||||||
| A193 | 3.5.1.1 | 0-55 | Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels | 6 | Month | $ - 0 | |
| A194 | 3.5.1.2 | 0-56 | Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks | 6 | Month | $ - 0 | $ - 0 |
| A195 | 3.5.1.3 | 0-57 | Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights | 6 | Month | $ - 0 | |
| A196 | 3.5.1.4 | 0-58 | Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights | 6 | Month | $ - 0 | |
| A197 | 3.5.1.5 | 0-59 | Develop and implement a program to inspect, and make all necessary repairs to Flag Pole Lights | 6 | Month | $ - 0 | |
| A198 | 3.5.1.6 | 0-60 | Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights | 6 | Month | $ - 0 | $ - 0 |
| A199 | 3.5.1.7 | 0-61 | Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights | 6 | Month | $ - 0 | $ - 0 |
| A200 | 3.5.1.8 | 0-62 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs | 6 | Month | $ - 0 | $ - 0 |
| A201 | 3.5.1.9 | 0-63 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs | 6 | Month | $ - 0 | $ - 0 |
| A202 | 3.5.4 | 0-69 | Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems | 6 | Month | $ - 0 | $ - 0 |
| A203 | 3.5.5 | 0-70 | Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles | 6 | Month | $ - 0 | |
| A204 | 3.5.6 | 0-71 | Develop and implement a program to inspect, and make all necessary repairs to Gates | 6 | Month | $ - 0 | $ - 0 |
| A205 | 3.5.7 | 0-72 | Develop and implement a program to inspect, and make all necessary repairs to Fences | 6 | Month | $ - 0 | $ - 0 |
| A206 | 3.5.9 | 0-74 | Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems | 6 | Month | $ - 0 | $ - 0 |
| A207 | 3.5.12 | 0-77 | Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors | 6 | Month | $ - 0 | $ - 0 |
| A208 | 3.5.14 | 0-79 | Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms | 6 | Month | $ - 0 | |
| A209 | 3.5.15 | 0-80 | Develop and implement a program to inspect, and make all necessary repairs to Automated Access Control Systems | 6 | Month | $ - 0 | $ - 0 |
| A210 | 3.5.17 | 0-82 | Develop and implement a program to inspect, and make all necessary repairs to Vault Doors | 6 | Month | $ - 0 | $ - 0 |
| A211 | 3.5.18 | 0-83 | Develop and implement a program to inspect, and make all necessary repairs to Interior Roll-up Doors | 6 | Month | $ - 0 | $ - 0 |
| A212 | 3.5.19 | 0-84 | Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems | 6 | Month | $ - 0 | $ - 0 |
| A213 | 3.5.23 | 0-87 | Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building) | 6 | Month | $ - 0 | $ - 0 |
TOTAL FFP LINE ITEMS - A163 THROUGH A213 $ - 0
| LA015 | Spec Item | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| Firm Fixed-Price Work | ||||||||
| 3.1 | Service Calls | |||||||
| A214 | 3.1.1 | 0-03 | Perform Emergency Service Call Work | SEE | CLIN | 0002 | ---- | |
| A215 | 3.1.2 | 0-03 | Perform Routine Service Call Work | SEE | CLIN | 0002 | ---- | |
| 3.2 | Preventive Maintenance (PM) Program | |||||||
| A216 | 3.2.1 | 0-04 | Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems | 6 | Month | $ - 0 | $ - 0 | |
| A217 | 3.2.1.1 | 0-04 | HVAC Seasonal Start-Up and Shutdown | 6 | Month | $ - 0 | $ - 0 | |
| A218 | 3.2.1.4 | 0-07 | Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans | 6 | Month | $ - 0 | $ - 0 | |
| A219 | 3.2.1.5 | 0-08 | Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters | 6 | Month | $ - 0 | $ - 0 | |
| A220 | 3.2.1.9 | 0-12 | Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems | 6 | Month | $ - 0 | $ - 0 | |
| A221 | 3.2.1.12 | 0-15 | Develop And Implement Preventive Maintenance Program For Mini-Splits | 6 | Month | $ - 0 | $ - 0 | |
| A222 | 3.2.1.14 | 0-17 | Develop And Implement Preventive Maintenance Program For HVAC Control Systems | 6 | Month | $ - 0 | $ - 0 | |
| A223 | 3.2.1.15 | 0-18 | Develop And Implement Preventive Maintenance Program For Thermostats | 6 | Month | $ - 0 | $ - 0 | |
| A224 | 3.2.2 | 0-19 | Develop And Implement Preventive Maintenance Program For Boilers | 6 | Month | $ - 0 | $ - 0 | |
| A225 | 3.2.2.1 | 0-19 | Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown | 6 | Month | $ - 0 | $ - 0 | |
| A226 | 3.2.5 | 0-22 | ||||||
| 0-23 | Develop And Implement Preventive Maintenance Program For Emergency Generator Systems | 6 | Month | $ - 0 | $ - 0 | |||
| A227 | 3.2.9.1 | 0-28 | Develop And Implement Preventive Maintenance Program For External Hose Faucets | 6 | Month | $ - 0 | $ - 0 | |
| A228 | 3.2.9.2 | 0-29 | Develop And Implement Preventive Maintenance Program For Toilets | 6 | Month | $ - 0 | $ - 0 | |
| A229 | 3.2.9.3 | 0-30 | Develop And Implement Preventive Maintenance Program For Urinals | 6 | Month | $ - 0 | $ - 0 | |
| A230 | 3.2.9.4 | 0-31 | Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories | 6 | Month | $ - 0 | $ - 0 | |
| A231 | 3.2.9.5 | 0-32 | Develop And Implement Preventive Maintenance Program For Showers | 6 | Month | $ - 0 | $ - 0 | |
| A232 | 3.2.9.6 | 0-33 | Develop And Implement Preventive Maintenance Program For Drinking fountains | 6 | Month | $ - 0 | $ - 0 | |
| A233 | 3.2.9.7 | 0-34 | Develop And Implement Preventive Maintenance Program For Water Heaters | 6 | Month | $ - 0 | $ - 0 | |
| A234 | 3.2.9.9 | 0-36 | Develop And Implement Preventive Maintenance Program For Circulating Pumps | 6 | Month | $ - 0 | $ - 0 | |
| A235 | 3.2.9.10 | 0-37 | Develop And Implement Preventive Maintenance Program For Backflow Prevention Devices | 6 | Month | $ - 0 | $ - 0 | |
| A236 | 3.2.9.16 | 0-43 | Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters | 6 | Month | $ - 0 | $ - 0 | |
| A237 | 3.2.9.17 | 0-44 | Develop And Implement Preventive Maintenance Program For Fire Protection Systems | 6 | Month | $ - 0 | $ - 0 | |
| A238 | 3.2.9.20 | 0-47 | Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards | 6 | Month | $ - 0 | $ - 0 | |
| A239 | 3.2.9.21 | 0-48 | Develop And Implement Preventive Maintenance Program For Kitchen Hoods System | 6 | Month | $ - 0 | $ - 0 | |
| A240 | 3.2.9.22 | 0-49 | Develop And Implement Preventive Maintenance Program For Fire Extinguishers | 6 | Month | $ - 0 | ||
| A241 | 3.2.9.23 | 0-50 | Develop And Implement Preventive Maintenance Program For Smoke Detectors | 6 | Month | $ - 0 | $ - 0 | |
| 3.3 | Integrated Maintenance Program (IMP) | not used | ||||||
| 3.4 | Inspection, Testing, and Certification | |||||||
| A242 | 3.4.1 | 0-19 | Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs | 6 | Month | $ - 0 | $ - 0 | |
| A243 | 3.4.4 | 0-37 | Develop And Implement an Inspection, Testing, and Certification Program For Backflow Prevention Devices | 6 | Month | $ - 0 | $ - 0 | |
| 3.5 | Other Recurring Services | |||||||
| A244 | 3.5.1.1 | 0-55 | Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels | 6 | Month | $ - 0 | ||
| A245 | 3.5.1.2 | 0-56 | Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks | 6 | Month | $ - 0 | $ - 0 | |
| A246 | 3.5.1.3 | 0-57 | Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights | 6 | Month | $ - 0 | ||
| A247 | 3.5.1.4 | 0-58 | Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights | 6 | Month | $ - 0 | ||
| A248 | 3.5.1.8 | 0-62 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs | 6 | Month | $ - 0 | $ - 0 | |
| A249 | 3.5.1.9 | 0-63 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs | 6 | Month | $ - 0 | $ - 0 | |
| A250 | 3.5.2 | 0-67 | Clean grease traps and remove and dispose of grease from designated Grease Traps | 6 | Month | $ - 0 | $ - 0 | |
| A251 | 3.5.4 | 0-69 | Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems | 6 | Month | $ - 0 | $ - 0 | |
| A252 | 3.5.5 | 0-70 | Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles | 6 | Month | $ - 0 | ||
| A253 | 3.5.6 | 0-71 | Develop and implement a program to inspect, and make all necessary repairs to Gates | 6 | Month | $ - 0 | $ - 0 | |
| A254 | 3.5.7 | 0-72 | Develop and implement a program to inspect, and make all necessary repairs to Fences | 6 | Month | $ - 0 | $ - 0 | |
| A255 | 3.5.9 | 0-74 | Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems | 6 | Month | $ - 0 | $ - 0 | |
| A256 | 3.5.10 | 0-75 | Develop and implement a program to inspect, and make all necessary repairs to Oil Water Separators | 6 | Month | $ - 0 | $ - 0 | |
| A257 | 3.5.14 | 0-79 | Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms | 6 | Month | $ - 0 | ||
| A258 | 3.5.17 | 0-82 | Develop and implement a program to inspect, and make all necessary repairs to Vault Doors | 6 | Month | $ - 0 | $ - 0 | |
| A259 | 3.5.18 | 0-83 | Develop and implement a program to inspect, and make all necessary repairs to Interior Roll-up Doors | 6 | Month | $ - 0 | $ - 0 |
TOTAL FFP LINE ITEMS - A214 THROUGH A259 $ - 0
| LA019 | Spec Item | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| Firm Fixed-Price Work | |||||||
| 3.1 | Service Calls | ||||||
| A260 | 3.1.1 | 0-03 | Perform Emergency Service Call Work | SEE | CLIN | 0002 | ---- |
| A261 | 3.1.2 | 0-03 | Perform Routine Service Call Work | SEE | CLIN | 0002 | ---- |
| 3.2 | Preventive Maintenance (PM) Program | ||||||
| A262 | 3.2.1 | 0-04 | Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems | 6 | Month | $ - 0 | $ - 0 |
| A263 | 3.2.1.1 | 0-04 | HVAC Seasonal Start-Up and Shutdown | 6 | Month | $ - 0 | $ - 0 |
| A264 | 3.2.1.3 | 0-06 | Develop And Implement Preventive Maintenance Program For Furnaces | 6 | Month | $ - 0 | $ - 0 |
| A265 | 3.2.1.4 | 0-07 | Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans | 6 | Month | $ - 0 | $ - 0 |
| A266 | 3.2.1.5 | 0-08 | Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters | 6 | Month | $ - 0 | $ - 0 |
| A267 | 3.2.1.6 | 0-09 | Develop And Implement Preventive Maintenance Program For Packaged Terminal Air Conditioners | 6 | Month | $ - 0 | $ - 0 |
| A268 | 3.2.1.8 | 0-11 | Develop And Implement Preventive Maintenance Program For Variable Air Volume (VAV) and Other Boxes | 6 | Month | $ - 0 | $ - 0 |
| A269 | 3.2.1.9 | 0-12 | Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems | 6 | Month | $ - 0 | $ - 0 |
| A270 | 3.2.1.12 | 0-15 | Develop And Implement Preventive Maintenance Program For Mini-Splits | 6 | Month | $ - 0 | $ - 0 |
| A271 | 3.2.1.14 | 0-17 | Develop And Implement Preventive Maintenance Program For HVAC Control Systems | 6 | Month | $ - 0 | $ - 0 |
| A272 | 3.2.1.15 | 0-18 | Develop And Implement Preventive Maintenance Program For Thermostats | 6 | Month | $ - 0 | $ - 0 |
| A273 | 3.2.2 | 0-19 | Develop And Implement Preventive Maintenance Program For Boilers | 6 | Month | $ - 0 | $ - 0 |
| A274 | 3.2.2.1 | 0-19 | Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown | 6 | Month | $ - 0 | $ - 0 |
| A275 | 3.2.3 | 0-20 | Develop And Implement Preventive Maintenance Program For Security Systems and Equipment | 6 | Month | $ - 0 | $ - 0 |
| A276 | 3.2.7 | 0-25 | Develop And Implement Preventive Maintenance Program For Built In Food Service Equipment | 6 | Month | $ - 0 | $ - 0 |
| A277 | 3.2.9.1 | 0-28 | Develop And Implement Preventive Maintenance Program For External Hose Faucets | 6 | Month | $ - 0 | $ - 0 |
| A278 | 3.2.9.2 | 0-29 | Develop And Implement Preventive Maintenance Program For Toilets | 6 | Month | $ - 0 | $ - 0 |
| A279 | 3.2.9.3 | 0-30 | Develop And Implement Preventive Maintenance Program For Urinals | 6 | Month | $ - 0 | $ - 0 |
| A280 | 3.2.9.4 | 0-31 | Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories | 6 | Month | $ - 0 | $ - 0 |
| A281 | 3.2.9.5 | 0-32 | Develop And Implement Preventive Maintenance Program For Showers | 6 | Month | $ - 0 | $ - 0 |
| A282 | 3.2.9.6 | 0-33 | Develop And Implement Preventive Maintenance Program For Drinking fountains | 6 | Month | $ - 0 | $ - 0 |
| A283 | 3.2.9.7 | 0-34 | Develop And Implement Preventive Maintenance Program For Water Heaters | 6 | Month | $ - 0 | $ - 0 |
| A284 | 3.2.9.8 | 0-35 | Develop And Implement Preventive Maintenance Program For Built-in Emergency Shower/ Eye Wash Stations | 6 | Month | $ - 0 | |
| A285 | 3.2.9.10 | 0-37 | Develop And Implement Preventive Maintenance Program For Backflow Prevention Devices | 6 | Month | $ - 0 | $ - 0 |
| A286 | 3.2.9.11 | 0-38 | Develop And Implement Preventive Maintenance Program For Lift Stations | 6 | Month | $ - 0 | $ - 0 |
| A287 | 3.2.9.13 | 0-40 | Develop And Implement Preventive Maintenance Program For Sump Pumps | 6 | Month | $ - 0 | $ - 0 |
| A288 | 3.2.9.15 | 0-42 | Develop And Implement Preventive Maintenance Program For Fire Hydrants | 6 | Month | $ - 0 | $ - 0 |
| A289 | 3.2.9.16 | 0-43 | Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters | 6 | Month | $ - 0 | $ - 0 |
| A290 | 3.2.9.17 | 0-44 | Develop And Implement Preventive Maintenance Program For Fire Protection Systems | 6 | Month | $ - 0 | $ - 0 |
| A291 | 3.2.9.18 | 0-45 | Develop And Implement Preventive Maintenance Program For Fire Suppression Systems | 6 | Month | $ - 0 | $ - 0 |
| A292 | 3.2.9.19 | 0-46 | Develop And Implement Preventive Maintenance Program For Mass Notification Boards | 6 | Month | $ - 0 | $ - 0 |
| A293 | 3.2.9.20 | 0-47 | Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards | 6 | Month | $ - 0 | $ - 0 |
| A294 | 3.2.9.22 | 0-49 | Develop And Implement Preventive Maintenance Program For Fire Extinguishers | 6 | Month | $ - 0 | |
| A295 | 3.2.9.23 | 0-50 | Develop And Implement Preventive Maintenance Program For Smoke Detectors | 6 | Month | $ - 0 | $ - 0 |
| A296 | 3.2.9.24 | 0-51 | Develop And Implement Preventive Maintenance Program For Carbon Monoxide Sensors | 6 | Month | $ - 0 | $ - 0 |
| 3.3 | Integrated Maintenance Program (IMP) | not used | |||||
| 3.4 | Inspection, Testing, and Certification | ||||||
| A297 | 3.4.1 | 0-19 | Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs | 6 | Month | $ - 0 | $ - 0 |
| A298 | 3.4.4 | 0-37 | Develop And Implement an Inspection, Testing, and Certification Program For Backflow Prevention Devices | 6 | Month | $ - 0 | $ - 0 |
| 3.5 | Other Recurring Services | ||||||
| A299 | 3.5.1.1 | 0-55 | Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels | 6 | Month | $ - 0 | |
| A300 | 3.5.1.3 | 0-57 | Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights | 6 | Month | $ - 0 | |
| A301 | 3.5.1.4 | 0-58 | Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights | 6 | Month | $ - 0 | |
| A302 | 3.5.1.6 | 0-60 | Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights | 6 | Month | $ - 0 | $ - 0 |
| A303 | 3.5.1.7 | 0-61 | Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights | 6 | Month | $ - 0 | $ - 0 |
| A304 | 3.5.1.8 | 0-62 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs | 6 | Month | $ - 0 | $ - 0 |
| A305 | 3.5.1.9 | 0-63 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs | 6 | Month | $ - 0 | $ - 0 |
| A306 | 3.5.1.10 | 0-64 | Develop and implement a program to inspect, and make all necessary repairs to Lightning Arrestors and Grounding Devices | 6 | Month | $ - 0 | $ - 0 |
| A307 | 3.5.5 | 0-70 | Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles | 6 | Month | $ - 0 | |
| A308 | 3.5.6 | 0-71 | Develop and implement a program to inspect, and make all necessary repairs to Gates | 6 | Month | $ - 0 | $ - 0 |
| A309 | 3.5.7 | 0-72 | Develop and implement a program to inspect, and make all necessary repairs to Fences | 6 | Month | $ - 0 | $ - 0 |
| A310 | 3.5.8 | 0-73 | Develop and implement a program to inspect, and make all necessary repairs to Bollards | 6 | Month | $ - 0 | |
| A311 | 3.5.9 | 0-74 | Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems | 6 | Month | $ - 0 | $ - 0 |
| A312 | 3.5.10 | 0-75 | Develop and implement a program to inspect, and make all necessary repairs to Oil Water Separators | 6 | Month | $ - 0 | $ - 0 |
| A313 | 3.5.12 | 0-77 | Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors | 6 | Month | $ - 0 | $ - 0 |
| A314 | 3.5.14 | 0-79 | Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms | 6 | Month | $ - 0 | |
| A315 | 3.5.15 | 0-80 | Develop and implement a program to inspect, and make all necessary repairs to Automated Access Control Systems | 6 | Month | $ - 0 | $ - 0 |
| A316 | 3.5.16 | 0-81 | Develop and implement a program to inspect, and make all necessary repairs to Automated Key Control Systems | 6 | Month | $ - 0 | $ - 0 |
| A317 | 3.5.17 | 0-82 | Develop and implement a program to inspect, and make all necessary repairs to Vault Doors | 6 | Month | $ - 0 | $ - 0 |
| A318 | 3.5.19 | 0-84 | Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems | 6 | Month | $ - 0 | $ - 0 |
| A319 | 3.5.20 | 0-25 | Develop and implement a program to inspect, and make all necessary repairs to Built-In Refrigerators/ Freezers | 6 | Month | $ - 0 | $ - 0 |
| A320 | 3.5.21 | 0-85 | Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens | 6 | Month | $ - 0 | $ - 0 |
| A321 | 3.5.22 | 0-86 | Develop and implement a program to inspect, and make all necessary repairs to Intrusion Detection Systems | 6 | Month | $ - 0 | $ - 0 |
| A322 | 3.5.23 | 0-87 | Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building) | 6 | Month | $ - 0 | $ - 0 |
TOTAL FFP LINE ITEMS - A260 THROUGH A322 $ - 0
| LA038 | Spec Item | UNIT OF | UNIT | TOTAL | ||
| ELIN | DESCRIPTION | QTY | ISSUE | PRICE | AMOUNT |
| Firm Fixed-Price Work | ||||||||
| 3.1 | Service Calls | |||||||
| A323 | 3.1.1 | 0-03 | Perform Emergency Service Call Work | SEE | CLIN | 0002 | ---- | |
| A324 | 3.1.2 | 0-03 | Perform Routine Service Call Work | SEE | CLIN | 0002 | ---- | |
| 3.2 | Preventive Maintenance (PM) Program | |||||||
| A325 | 3.2.1 | 0-04 | Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems | 6 | Month | $ - 0 | ||
| A326 | 3.2.1.1 | 0-04 | HVAC Seasonal Start-Up and Shutdown | 6 | Month | $ - 0 | ||
| A327 | 3.2.1.4 | 0-07 | Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans | 6 | Month | $ - 0 | ||
| A328 | 3.2.1.5 | 0-08 | Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters | 6 | Month | $ - 0 | ||
| A329 | 3.2.1.6 | 0-09 | Develop And Implement Preventive Maintenance Program For Packaged Terminal Air Conditioners | 6 | Month | $ - 0 | ||
| A330 | 3.2.1.7 | 0-10 | Develop And Implement Preventive Maintenance Program For Rooftop Units | 6 | Month | $ - 0 | ||
| A331 | 3.2.1.8 | 0-11 | Develop And Implement Preventive Maintenance Program For Variable Air Volume (VAV) and Other Boxes | 6 | Month | $ - 0 | ||
| A332 | 3.2.1.9 | 0-12 | Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems | 6 | Month | $ - 0 | ||
| A333 | 3.2.1.10 | 0-13 | Develop And Implement Preventive Maintenance Program For Humidifiers | 6 | Month | $ - 0 | ||
| A334 | 3.2.1.12 | 0-15 | Develop And Implement Preventive Maintenance Program For Mini-Splits | 6 | Month | $ - 0 | ||
| A335 | 3.2.1.14 | 0-17 | Develop And Implement Preventive Maintenance Program For HVAC Control Systems | 6 | Month | $ - 0 | ||
| A336 | 3.2.1.15 | 0-18 | Develop And Implement Preventive Maintenance Program For Thermostats | 6 | Month | $ - 0 | ||
| A337 | 3.2.2 | 0-19 | Develop And Implement Preventive Maintenance Program For Boilers | 6 | Month | $ - 0 | ||
| A338 | 3.2.2.1 | 0-19 | Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown | 6 | Month | $ - 0 | ||
| A338 | 3.2.5 | 0-22 | ||||||
| 0-23 | Develop And Implement Preventive Maintenance Program For Emergency Generator Systems | 6 | Month | $ - 0 | ||||
| A339 | 3.2.9.1 | 0-28 | Develop And Implement Preventive Maintenance Program For External Hose Faucets | 6 | Month | $ - 0 | ||
| A340 | 3.2.9.2 | 0-29 | Develop And Implement Preventive Maintenance Program For Toilets | 6 | Month | $ - 0 | ||
| A341 | 3.2.9.3 | 0-30 | Develop And Implement Preventive Maintenance Program For Urinals | 6 | Month | $ - 0 | ||
| A342 | 3.2.9.4 | 0-31 | Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories | 6 | Month | $ - 0 | ||
| A343 | 3.2.9.5 | 0-32 | Develop And Implement Preventive Maintenance Program For Showers | 6 | Month | $ - 0 | ||
| A344 | 3.2.9.6 | 0-33 | Develop And Implement Preventive Maintenance Program For Drinking fountains | 6 | Month | $ - 0 | ||
| A345 | 3.2.9.7 | 0-34 | Develop And Implement Preventive Maintenance Program For Water Heaters | 6 | Month | $ - 0 | ||
| A346 | 3.2.9.8 | 0-35 | Develop And Implement Preventive Maintenance Program For Built-in Emergency Shower/ Eye Wash Stations | 6 | Month | $ - 0 | ||
| A347 | 3.2.9.9 | 0-36 | Develop And Implement Preventive Maintenance Program For Circulating Pumps | 6 | Month | $ - 0 | ||
| A348 | 3.2.9.10 | 0-37 | Develop And Implement Preventive Maintenance Program For Backflow Prevention Devices | 6 | Month | $ - 0 | ||
| A349 | 3.2.9.15 | 0-42 | Develop And Implement Preventive Maintenance Program For Fire Hydrants | 6 | Month | $ - 0 | ||
| A350 | 3.2.9.16 | 0-43 | Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters | 6 | Month | $ - 0 | ||
| A351 | 3.2.9.17 | 0-44 | Develop And Implement Preventive Maintenance Program For Fire Protection Systems | 6 | Month | $ - 0 | ||
| A352 | 3.2.9.18 | 0-45 | Develop And Implement Preventive Maintenance Program For Fire Suppression Systems | 6 | Month | $ - 0 | ||
| A353 | 3.2.9.19 | 0-46 | Develop And Implement Preventive Maintenance Program For Mass Notification Boards | 6 | Month | $ - 0 | ||
| A354 | 3.2.9.20 | 0-47 | Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards | 6 | Month | $ - 0 | ||
| A355 | 3.2.9.22 | 0-49 | Develop And Implement Preventive Maintenance Program For Fire Extinguishers | 6 | Month | $ - 0 | ||
| A356 | 3.2.9.23 | 0-50 | Develop And Implement Preventive Maintenance Program For Smoke Detectors | 6 | Month | $ - 0 | ||
| A357 | 3.2.9.24 | 0-51 | Develop And Implement Preventive Maintenance Program For Carbon Monoxide Sensors | 6 | Month | $ - 0 | ||
| A358 | 3.2.9.25 | 0-52 | Develop And Implement Preventive Maintenance Program For VTE | 6 | Month | $ - 0 | ||
| 3.3 | Integrated Maintenance Program (IMP) | not used | ||||||
| 3.4 | Inspection, Testing, and Certification | |||||||
| A359 | 3.4.1 | 0-19 | Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs | 6 | Month | $ - 0 | ||
| A360 | 3.4.4 | 0-37 | Develop And Implement an Inspection, Testing, and Certification Program For Backflow Prevention Devices | 6 | Month | $ - 0 | ||
| 3.5 | Other Recurring Services | |||||||
| A361 | 3.5.1.1 | 0-55 | Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels | 6 | Month | $ - 0 | ||
| A362 | 3.5.1.2 | 0-56 | Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks | 6 | Month | $ - 0 | ||
| A363 | 3.5.1.3 | 0-57 | Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights | 6 | Month | $ - 0 | ||
| A364 | 3.5.1.4 | 0-58 | Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights | 6 | Month | $ - 0 | ||
| A365 | 3.5.1.5 | 0-59 | Develop and implement a program to inspect, and make all necessary repairs to Flag Pole Lights | 6 | Month | $ - 0 | ||
| A366 | 3.5.1.6 | 0-60 | Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights | 6 | Month | $ - 0 | ||
| A367 | 3.5.1.7 | 0-61 | Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights | 6 | Month | $ - 0 | ||
| A368 | 3.5.1.8 | 0-62 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs | 6 | Month | $ - 0 | ||
| A369 | 3.5.1.9 | 0-63 | Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs | 6 | Month | $ - 0 | ||
| A370 | 3.5.1.10 | 0-64 | Develop and implement a program to inspect, and make all necessary repairs to Lightning Arrestors and Grounding Devices | 6 | Month | $ - 0 | ||
| A371 | 3.5.4 | 0-69 | Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems | 6 | Month | $ - 0 | ||
| A372 | 3.5.5 | 0-70 | Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles | 6 | Month | $ - 0 | ||
| A373 | 3.5.6 | 0-71 | Develop and implement a program to inspect, and make all necessary repairs to Gates | 6 | Month | $ - 0 | ||
| A374 | 3.5.7 | 0-72 | Develop and implement a program to inspect, and make all necessary repairs to Fences | 6 | Month | $ - 0 | ||
| A375 | 3.5.8 | 0-73 | Develop and implement a program to inspect, and make all necessary repairs to Bollards | 6 | Month | $ - 0 | ||
| A376 | 3.5.9 | 0-74 | Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems | 6 | Month | $ - 0 | ||
| A377 | 3.5.12 | 0-77 | Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors | 6 | Month | $ - 0 | ||
| A378 | 3.5.14 | 0-79 | Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms | 6 | Month | $ - 0 | ||
| A379 | 3.5.16 | 0-81 | Develop and implement a program to inspect, and make all necessary repairs to Automated Key Control Systems | 6 | Month | $ - 0 | ||
| A380 | 3.5.17 | 0-82 | Develop and implement a program to inspect, and make all necessary repairs to Vault Doors | 6 | Month | $ - 0 | ||
| A381 | 3.5.19 | 0-84 | Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems | 6 | Month | $ - 0 | ||
| A382 | 3.5.21 | 0-85 | Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens | 6 | Month | $ - 0 | ||
| A383 | 3.5.22 | 0-86 | Develop and implement a program to inspect, and make all necessary repairs to Intrusion Detection Systems | 6 | Month | $ - 0 | ||
| A384 | 3.5.23 | 0-87 | Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building) | 6 | Month | $ - 0 |
TOTAL FFP LINE ITEMS - A323…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .