1502000 ELINs-FFP Am 02 7-30-12.xlsx

XLSX spreadsheet 3 MB Posted

Attached to
FACILITY INVESTMENT (FACILITY AND PREVENTIVE MAINTENANCE) SERVICES, 81ST RSC REGION A
Solicitation number
W912HP-12-R-0027
Issued by

About this file

Amendment 0002 Revised ELINs

View the file

Other files

File Type Posted
12R0027_Am03_AerialMaps_8-1-12.pdf PDF
12R0027_Am03_8-1-12.pdf PDF
1502000 ELINs-FFP Am 03 8-1-12.xlsx XLSX spreadsheet
12R0027-0002 Various Changes 7-30-12.pdf PDF
12R0027-0001 Extend Date 7-27-12.pdf PDF
12R0027 Contract Info Sheet.docx DOCX document
12R0027 PPQ.docx DOCX document
12R0027 Past Perf Info Sheet.docx DOCX document
12R0027 Site Visit Attendees 7-12-12.pdf PDF
12R0027 Prop Data Sheet.docx DOCX document
http //www.sac.usace.army.mil/ action organization.facility —
1502000 ELINs-FFP 7-7-12.xlsx XLSX spreadsheet
12R0027 RFP 7-7-12.pdf PDF
1502000 ELINs Facility Investment Region A.xlsx XLSX spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLINs (Contract Line Items)

This sheet is filled out automatically as the other sheets are completed.
0001base period for FFP for 6 months$ - 0Note: The reason 0001 is not 1/2 of 0003 is that some items only

occur once per year and some are HVAC related and will occur twice in the 6 month base period.

1001 1st option for FFP for 12 months $ - 0

2001 2nd option for FFP for 12 months $ - 0

3001 3rd option for FFP for 12 months $ - 0

4001 4th option for FFP for 12 months $ - 0

$ - 0

&F

&A &P of &N

ELIN - BASE PERIOD FFP

Cortractor is to fill out all highlighted in yellow cells for bid evaluation.sample
Award will be made on all non strike-through cells.sample
Strike-through cells will not be awarded. They are provided for illustrative purposes only, to indicate the work that is not in scope of this requirement.sample
LA005Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A0013.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A0023.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A0033.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0$ - 0
A0043.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A0053.2.1.30-06Develop And Implement Preventive Maintenance Program For Furnaces6Month$ - 0$ - 0
A0063.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0$ - 0
A0073.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0$ - 0
A0083.2.1.80-11Develop And Implement Preventive Maintenance Program For Variable Air Volume (VAV) and Other Boxes6Month$ - 0$ - 0
A0093.2.1.90-12Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems6Month$ - 0$ - 0
A0103.2.1.120-15Develop And Implement Preventive Maintenance Program For Mini-Splits6Month$ - 0$ - 0
A0113.2.1.140-17Develop And Implement Preventive Maintenance Program For HVAC Control Systems6Month$ - 0$ - 0
A0123.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0$ - 0
A0133.2.20-19Develop And Implement Preventive Maintenance Program For Boilers6Month$ - 0$ - 0
A0143.2.2.10-19Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A0153.2.50-22
0-23Develop And Implement Preventive Maintenance Program For Emergency Generator Systems6Month$ - 0$ - 0
A0163.2.70-25Develop And Implement Preventive Maintenance Program For Built In Food Service Equipment6Month$ - 0$ - 0
A0173.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0$ - 0
A0183.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0$ - 0
A0193.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0$ - 0
A0203.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0$ - 0
A0213.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0$ - 0
A0223.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0$ - 0
A0233.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0$ - 0
A0243.2.9.130-40Develop And Implement Preventive Maintenance Program For Sump Pumps6Month$ - 0$ - 0
A0253.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0$ - 0
A0263.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0$ - 0
A0273.2.9.190-46Develop And Implement Preventive Maintenance Program For Mass Notification Boards6Month$ - 0$ - 0
A0283.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0$ - 0
A0293.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A0303.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
A0313.4.10-19Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs6Month$ - 0$ - 0
3.5Other Recurring Services
A0323.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A0333.5.1.20-56Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks6Month$ - 0$ - 0
A0343.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A0353.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A0363.5.1.60-60Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights6Month$ - 0$ - 0
A0373.5.1.70-61Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights6Month$ - 0$ - 0
A0383.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0$ - 0
A0393.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0$ - 0
A0403.5.40-69Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems6Month$ - 0$ - 0
A0413.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A0423.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0$ - 0
A0433.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0$ - 0
A0443.5.80-73Develop and implement a program to inspect, and make all necessary repairs to Bollards6Month$ - 0
A0453.5.90-74Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems6Month$ - 0$ - 0
A0463.5.120-77Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors6Month$ - 0$ - 0
A0473.5.140-79Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms6Month$ - 0
A0483.5.150-80Develop and implement a program to inspect, and make all necessary repairs to Automated Access Control Systems6Month$ - 0$ - 0
A0493.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0$ - 0
A0503.5.190-84Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems6Month$ - 0$ - 0
A0513.5.200-25Develop and implement a program to inspect, and make all necessary repairs to Built-In Refrigerators/ Freezers6Month$ - 0$ - 0
A0523.5.210-85Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens6Month$ - 0
A0533.5.220-86Develop and implement a program to inspect, and make all necessary repairs to Intrusion Detection Systems6Month$ - 0$ - 0
A0543.5.230-87Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building)6Month$ - 0$ - 0

TOTAL FFP LINE ITEMS - A001 THROUGH A054 $ - 0

LA009Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A0553.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A0563.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A0573.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0
A0583.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0
A0593.2.1.30-06Develop And Implement Preventive Maintenance Program For Furnaces6Month$ - 0
A0603.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0
A0613.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0
A0623.2.1.80-11Develop And Implement Preventive Maintenance Program For Variable Air Volume (VAV) and Other Boxes6Month$ - 0
A0633.2.1.90-12Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems6Month$ - 0
A0643.2.1.100-13Develop And Implement Preventive Maintenance Program For Humidifiers6Month$ - 0
A0653.2.1.120-15Develop And Implement Preventive Maintenance Program For Mini-Splits6Month$ - 0
A0663.2.1.130-16Develop And Implement Preventive Maintenance Program For Window Units6Month$ - 0
A0673.2.1.140-17Develop And Implement Preventive Maintenance Program For HVAC Control Systems6Month$ - 0
A0683.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0
A0693.2.20-19Develop And Implement Preventive Maintenance Program For Boilers6Month$ - 0
A0703.2.2.10-19Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown6Month$ - 0
A0713.2.50-22
0-23Develop And Implement Preventive Maintenance Program For Emergency Generator Systems6Month$ - 0
A0723.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0
A0733.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0
A0743.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0
A0753.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0
A0763.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0
A0773.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0
A0783.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0
A0793.2.9.80-35Develop And Implement Preventive Maintenance Program For Built-in Emergency Shower/ Eye Wash Stations6Month$ - 0
A0803.2.9.90-36Develop And Implement Preventive Maintenance Program For Circulating Pumps6Month$ - 0
A0813.2.9.100-37Develop And Implement Preventive Maintenance Program For Backflow Prevention Devices6Month$ - 0
A0823.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0
A0833.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0
A0843.2.9.180-45Develop And Implement Preventive Maintenance Program For Fire Suppression Systems6Month$ - 0
A0853.2.9.190-46Develop And Implement Preventive Maintenance Program For Mass Notification Boards6Month$ - 0
A0863.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0
A0873.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A0883.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
A0893.4.10-19Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs6Month$ - 0
A0903.4.30-53Develop And Implement an Inspection, Testing, and Certification Program For Crane and Crane Trackage6Month$ - 0
A0913.4.40-37Develop And Implement an Inspection, Testing, and Certification Program For Backflow Prevention Devices6Month$ - 0
3.5Other Recurring Services
A0923.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A0933.5.1.20-56Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks6Month$ - 0
A0943.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A0953.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A0963.5.1.50-59Develop and implement a program to inspect, and make all necessary repairs to Flag Pole Lights6Month$ - 0
A0973.5.1.60-60Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights6Month$ - 0
A0983.5.1.70-61Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights6Month$ - 0
A0993.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0
A1003.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0
A1013.5.40-69Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems6Month$ - 0
A1023.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A1033.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0
A1043.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0
A1053.5.80-73Develop and implement a program to inspect, and make all necessary repairs to Bollards6Month$ - 0
A1063.5.90-74Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems6Month$ - 0
A1073.5.100-75Develop and implement a program to inspect, and make all necessary repairs to Oil Water Separators6Month$ - 0
A1083.5.120-77Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors6Month$ - 0
A1093.5.150-80Develop and implement a program to inspect, and make all necessary repairs to Automated Access Control Systems6Month$ - 0
A1103.5.160-81Develop and implement a program to inspect, and make all necessary repairs to Automated Key Control Systems6Month$ - 0
A1113.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0
A1123.5.180-83Develop and implement a program to inspect, and make all necessary repairs to Interior Roll-up Doors6Month$ - 0
A1133.5.190-84Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems6Month$ - 0
A1143.5.210-85Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens6Month$ - 0
A1153.5.220-86Develop and implement a program to inspect, and make all necessary repairs to Intrusion Detection Systems6Month$ - 0
A1163.5.230-87Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building)6Month$ - 0

TOTAL FFP LINE ITEMS - A055 THROUGH A116 $ - 0

LA012Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A1173.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A1183.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A1193.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0$ - 0
A1203.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A1213.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0$ - 0
A1223.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0$ - 0
A1233.2.1.70-10Develop And Implement Preventive Maintenance Program For Rooftop Units6Month$ - 0$ - 0
A1243.2.1.120-15Develop And Implement Preventive Maintenance Program For Mini-Splits6Month$ - 0$ - 0
A1253.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0$ - 0
A1263.2.70-25Develop And Implement Preventive Maintenance Program For Built In Food Service Equipment6Month$ - 0$ - 0
A1273.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0$ - 0
A1283.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0$ - 0
A1293.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0$ - 0
A1303.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0$ - 0
A1313.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0$ - 0
A1323.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0$ - 0
A1333.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0$ - 0
A1343.2.9.80-35Develop And Implement Preventive Maintenance Program For Built-in Emergency Shower/ Eye Wash Stations6Month$ - 0
A1353.2.9.150-42Develop And Implement Preventive Maintenance Program For Fire Hydrants6Month$ - 0$ - 0
A1363.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0$ - 0
A1373.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0$ - 0
A1383.2.9.190-46Develop And Implement Preventive Maintenance Program For Mass Notification Boards6Month$ - 0$ - 0
A1393.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0$ - 0
A1403.2.9.210-48Develop And Implement Preventive Maintenance Program For Kitchen Hoods System6Month$ - 0$ - 0
A1413.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A1423.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
3.5Other Recurring Services
A1433.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A1443.5.1.20-56Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks6Month$ - 0$ - 0
A1453.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A1463.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A1473.5.1.60-60Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights6Month$ - 0$ - 0
A1483.5.1.70-61Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights6Month$ - 0$ - 0
A1493.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0$ - 0
A1503.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0$ - 0
A1513.5.20-67Clean grease traps and remove and dispose of grease from designated Grease Traps6Month$ - 0$ - 0
A1523.5.40-69Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems6Month$ - 0$ - 0
A1533.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A1543.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0$ - 0
A1553.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0$ - 0
A1563.5.100-75Develop and implement a program to inspect, and make all necessary repairs to Oil Water Separators6Month$ - 0$ - 0
A1573.5.120-77Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors6Month$ - 0$ - 0
A1583.5.140-79Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms6Month$ - 0
A1593.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0$ - 0
A1603.5.180-83Develop and implement a program to inspect, and make all necessary repairs to Interior Roll-up Doors6Month$ - 0$ - 0
A1613.5.190-84Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems6Month$ - 0$ - 0
A1623.5.210-85Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens6Month$ - 0$ - 0

TOTAL FFP LINE ITEMS - A117 THROUGH A162 $ - 0

LA013Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A1633.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A1643.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A1653.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0$ - 0
A1663.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A1673.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0$ - 0
A1683.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0$ - 0
A1693.2.1.60-09Develop And Implement Preventive Maintenance Program For Packaged Terminal Air Conditioners6Month$ - 0$ - 0
A1703.2.1.70-10Develop And Implement Preventive Maintenance Program For Rooftop Units6Month$ - 0$ - 0
A1713.2.1.90-12Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems6Month$ - 0$ - 0
A1723.2.1.110-14Develop And Implement Preventive Maintenance Program For Steam Systems6Month$ - 0$ - 0
A1733.2.1.140-17Develop And Implement Preventive Maintenance Program For HVAC Control Systems6Month$ - 0$ - 0
A1743.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0$ - 0
A1753.2.20-19Develop And Implement Preventive Maintenance Program For Boilers6Month$ - 0$ - 0
A1763.2.2.10-19Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A1773.2.60-24Develop And Implement Preventive Maintenance Program For Cathodic Protection Systems6Month$ - 0$ - 0
A1783.2.70-25Develop And Implement Preventive Maintenance Program For Built In Food Service Equipment6Month$ - 0$ - 0
A1793.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0$ - 0
A1803.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0$ - 0
A1813.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0$ - 0
A1823.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0$ - 0
A1833.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0$ - 0
A1843.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0$ - 0
A1853.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0$ - 0
A1863.2.9.90-36Develop And Implement Preventive Maintenance Program For Circulating Pumps6Month$ - 0$ - 0
A1873.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0$ - 0
A1883.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0$ - 0
A1893.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0$ - 0
A1903.2.9.210-48Develop And Implement Preventive Maintenance Program For Kitchen Hoods System6Month$ - 0$ - 0
A1913.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A1923.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
3.5Other Recurring Services
A1933.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A1943.5.1.20-56Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks6Month$ - 0$ - 0
A1953.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A1963.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A1973.5.1.50-59Develop and implement a program to inspect, and make all necessary repairs to Flag Pole Lights6Month$ - 0
A1983.5.1.60-60Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights6Month$ - 0$ - 0
A1993.5.1.70-61Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights6Month$ - 0$ - 0
A2003.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0$ - 0
A2013.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0$ - 0
A2023.5.40-69Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems6Month$ - 0$ - 0
A2033.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A2043.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0$ - 0
A2053.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0$ - 0
A2063.5.90-74Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems6Month$ - 0$ - 0
A2073.5.120-77Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors6Month$ - 0$ - 0
A2083.5.140-79Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms6Month$ - 0
A2093.5.150-80Develop and implement a program to inspect, and make all necessary repairs to Automated Access Control Systems6Month$ - 0$ - 0
A2103.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0$ - 0
A2113.5.180-83Develop and implement a program to inspect, and make all necessary repairs to Interior Roll-up Doors6Month$ - 0$ - 0
A2123.5.190-84Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems6Month$ - 0$ - 0
A2133.5.230-87Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building)6Month$ - 0$ - 0

TOTAL FFP LINE ITEMS - A163 THROUGH A213 $ - 0

LA015Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A2143.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A2153.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A2163.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0$ - 0
A2173.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A2183.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0$ - 0
A2193.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0$ - 0
A2203.2.1.90-12Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems6Month$ - 0$ - 0
A2213.2.1.120-15Develop And Implement Preventive Maintenance Program For Mini-Splits6Month$ - 0$ - 0
A2223.2.1.140-17Develop And Implement Preventive Maintenance Program For HVAC Control Systems6Month$ - 0$ - 0
A2233.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0$ - 0
A2243.2.20-19Develop And Implement Preventive Maintenance Program For Boilers6Month$ - 0$ - 0
A2253.2.2.10-19Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A2263.2.50-22
0-23Develop And Implement Preventive Maintenance Program For Emergency Generator Systems6Month$ - 0$ - 0
A2273.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0$ - 0
A2283.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0$ - 0
A2293.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0$ - 0
A2303.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0$ - 0
A2313.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0$ - 0
A2323.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0$ - 0
A2333.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0$ - 0
A2343.2.9.90-36Develop And Implement Preventive Maintenance Program For Circulating Pumps6Month$ - 0$ - 0
A2353.2.9.100-37Develop And Implement Preventive Maintenance Program For Backflow Prevention Devices6Month$ - 0$ - 0
A2363.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0$ - 0
A2373.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0$ - 0
A2383.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0$ - 0
A2393.2.9.210-48Develop And Implement Preventive Maintenance Program For Kitchen Hoods System6Month$ - 0$ - 0
A2403.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A2413.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
A2423.4.10-19Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs6Month$ - 0$ - 0
A2433.4.40-37Develop And Implement an Inspection, Testing, and Certification Program For Backflow Prevention Devices6Month$ - 0$ - 0
3.5Other Recurring Services
A2443.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A2453.5.1.20-56Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks6Month$ - 0$ - 0
A2463.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A2473.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A2483.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0$ - 0
A2493.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0$ - 0
A2503.5.20-67Clean grease traps and remove and dispose of grease from designated Grease Traps6Month$ - 0$ - 0
A2513.5.40-69Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems6Month$ - 0$ - 0
A2523.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A2533.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0$ - 0
A2543.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0$ - 0
A2553.5.90-74Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems6Month$ - 0$ - 0
A2563.5.100-75Develop and implement a program to inspect, and make all necessary repairs to Oil Water Separators6Month$ - 0$ - 0
A2573.5.140-79Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms6Month$ - 0
A2583.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0$ - 0
A2593.5.180-83Develop and implement a program to inspect, and make all necessary repairs to Interior Roll-up Doors6Month$ - 0$ - 0

TOTAL FFP LINE ITEMS - A214 THROUGH A259 $ - 0

LA019Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A2603.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A2613.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A2623.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0$ - 0
A2633.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A2643.2.1.30-06Develop And Implement Preventive Maintenance Program For Furnaces6Month$ - 0$ - 0
A2653.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0$ - 0
A2663.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0$ - 0
A2673.2.1.60-09Develop And Implement Preventive Maintenance Program For Packaged Terminal Air Conditioners6Month$ - 0$ - 0
A2683.2.1.80-11Develop And Implement Preventive Maintenance Program For Variable Air Volume (VAV) and Other Boxes6Month$ - 0$ - 0
A2693.2.1.90-12Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems6Month$ - 0$ - 0
A2703.2.1.120-15Develop And Implement Preventive Maintenance Program For Mini-Splits6Month$ - 0$ - 0
A2713.2.1.140-17Develop And Implement Preventive Maintenance Program For HVAC Control Systems6Month$ - 0$ - 0
A2723.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0$ - 0
A2733.2.20-19Develop And Implement Preventive Maintenance Program For Boilers6Month$ - 0$ - 0
A2743.2.2.10-19Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A2753.2.30-20Develop And Implement Preventive Maintenance Program For Security Systems and Equipment6Month$ - 0$ - 0
A2763.2.70-25Develop And Implement Preventive Maintenance Program For Built In Food Service Equipment6Month$ - 0$ - 0
A2773.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0$ - 0
A2783.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0$ - 0
A2793.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0$ - 0
A2803.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0$ - 0
A2813.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0$ - 0
A2823.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0$ - 0
A2833.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0$ - 0
A2843.2.9.80-35Develop And Implement Preventive Maintenance Program For Built-in Emergency Shower/ Eye Wash Stations6Month$ - 0
A2853.2.9.100-37Develop And Implement Preventive Maintenance Program For Backflow Prevention Devices6Month$ - 0$ - 0
A2863.2.9.110-38Develop And Implement Preventive Maintenance Program For Lift Stations6Month$ - 0$ - 0
A2873.2.9.130-40Develop And Implement Preventive Maintenance Program For Sump Pumps6Month$ - 0$ - 0
A2883.2.9.150-42Develop And Implement Preventive Maintenance Program For Fire Hydrants6Month$ - 0$ - 0
A2893.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0$ - 0
A2903.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0$ - 0
A2913.2.9.180-45Develop And Implement Preventive Maintenance Program For Fire Suppression Systems6Month$ - 0$ - 0
A2923.2.9.190-46Develop And Implement Preventive Maintenance Program For Mass Notification Boards6Month$ - 0$ - 0
A2933.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0$ - 0
A2943.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A2953.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0$ - 0
A2963.2.9.240-51Develop And Implement Preventive Maintenance Program For Carbon Monoxide Sensors6Month$ - 0$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
A2973.4.10-19Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs6Month$ - 0$ - 0
A2983.4.40-37Develop And Implement an Inspection, Testing, and Certification Program For Backflow Prevention Devices6Month$ - 0$ - 0
3.5Other Recurring Services
A2993.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A3003.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A3013.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A3023.5.1.60-60Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights6Month$ - 0$ - 0
A3033.5.1.70-61Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights6Month$ - 0$ - 0
A3043.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0$ - 0
A3053.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0$ - 0
A3063.5.1.100-64Develop and implement a program to inspect, and make all necessary repairs to Lightning Arrestors and Grounding Devices6Month$ - 0$ - 0
A3073.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A3083.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0$ - 0
A3093.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0$ - 0
A3103.5.80-73Develop and implement a program to inspect, and make all necessary repairs to Bollards6Month$ - 0
A3113.5.90-74Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems6Month$ - 0$ - 0
A3123.5.100-75Develop and implement a program to inspect, and make all necessary repairs to Oil Water Separators6Month$ - 0$ - 0
A3133.5.120-77Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors6Month$ - 0$ - 0
A3143.5.140-79Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms6Month$ - 0
A3153.5.150-80Develop and implement a program to inspect, and make all necessary repairs to Automated Access Control Systems6Month$ - 0$ - 0
A3163.5.160-81Develop and implement a program to inspect, and make all necessary repairs to Automated Key Control Systems6Month$ - 0$ - 0
A3173.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0$ - 0
A3183.5.190-84Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems6Month$ - 0$ - 0
A3193.5.200-25Develop and implement a program to inspect, and make all necessary repairs to Built-In Refrigerators/ Freezers6Month$ - 0$ - 0
A3203.5.210-85Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens6Month$ - 0$ - 0
A3213.5.220-86Develop and implement a program to inspect, and make all necessary repairs to Intrusion Detection Systems6Month$ - 0$ - 0
A3223.5.230-87Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building)6Month$ - 0$ - 0

TOTAL FFP LINE ITEMS - A260 THROUGH A322 $ - 0

LA038Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A3233.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A3243.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A3253.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0
A3263.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0
A3273.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0
A3283.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0
A3293.2.1.60-09Develop And Implement Preventive Maintenance Program For Packaged Terminal Air Conditioners6Month$ - 0
A3303.2.1.70-10Develop And Implement Preventive Maintenance Program For Rooftop Units6Month$ - 0
A3313.2.1.80-11Develop And Implement Preventive Maintenance Program For Variable Air Volume (VAV) and Other Boxes6Month$ - 0
A3323.2.1.90-12Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems6Month$ - 0
A3333.2.1.100-13Develop And Implement Preventive Maintenance Program For Humidifiers6Month$ - 0
A3343.2.1.120-15Develop And Implement Preventive Maintenance Program For Mini-Splits6Month$ - 0
A3353.2.1.140-17Develop And Implement Preventive Maintenance Program For HVAC Control Systems6Month$ - 0
A3363.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0
A3373.2.20-19Develop And Implement Preventive Maintenance Program For Boilers6Month$ - 0
A3383.2.2.10-19Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown6Month$ - 0
A3383.2.50-22
0-23Develop And Implement Preventive Maintenance Program For Emergency Generator Systems6Month$ - 0
A3393.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0
A3403.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0
A3413.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0
A3423.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0
A3433.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0
A3443.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0
A3453.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0
A3463.2.9.80-35Develop And Implement Preventive Maintenance Program For Built-in Emergency Shower/ Eye Wash Stations6Month$ - 0
A3473.2.9.90-36Develop And Implement Preventive Maintenance Program For Circulating Pumps6Month$ - 0
A3483.2.9.100-37Develop And Implement Preventive Maintenance Program For Backflow Prevention Devices6Month$ - 0
A3493.2.9.150-42Develop And Implement Preventive Maintenance Program For Fire Hydrants6Month$ - 0
A3503.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0
A3513.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0
A3523.2.9.180-45Develop And Implement Preventive Maintenance Program For Fire Suppression Systems6Month$ - 0
A3533.2.9.190-46Develop And Implement Preventive Maintenance Program For Mass Notification Boards6Month$ - 0
A3543.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0
A3553.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A3563.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0
A3573.2.9.240-51Develop And Implement Preventive Maintenance Program For Carbon Monoxide Sensors6Month$ - 0
A3583.2.9.250-52Develop And Implement Preventive Maintenance Program For VTE6Month$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
A3593.4.10-19Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs6Month$ - 0
A3603.4.40-37Develop And Implement an Inspection, Testing, and Certification Program For Backflow Prevention Devices6Month$ - 0
3.5Other Recurring Services
A3613.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A3623.5.1.20-56Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks6Month$ - 0
A3633.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A3643.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A3653.5.1.50-59Develop and implement a program to inspect, and make all necessary repairs to Flag Pole Lights6Month$ - 0
A3663.5.1.60-60Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights6Month$ - 0
A3673.5.1.70-61Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights6Month$ - 0
A3683.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0
A3693.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0
A3703.5.1.100-64Develop and implement a program to inspect, and make all necessary repairs to Lightning Arrestors and Grounding Devices6Month$ - 0
A3713.5.40-69Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems6Month$ - 0
A3723.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A3733.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0
A3743.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0
A3753.5.80-73Develop and implement a program to inspect, and make all necessary repairs to Bollards6Month$ - 0
A3763.5.90-74Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems6Month$ - 0
A3773.5.120-77Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors6Month$ - 0
A3783.5.140-79Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms6Month$ - 0
A3793.5.160-81Develop and implement a program to inspect, and make all necessary repairs to Automated Key Control Systems6Month$ - 0
A3803.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0
A3813.5.190-84Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems6Month$ - 0
A3823.5.210-85Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens6Month$ - 0
A3833.5.220-86Develop and implement a program to inspect, and make all necessary repairs to Intrusion Detection Systems6Month$ - 0
A3843.5.230-87Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building)6Month$ - 0

TOTAL FFP…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .