1502000 ELINs Facility Investment Region A.xlsx

XLSX spreadsheet 3 MB Posted

Attached to
FACILITY INVESTMENT (FACILITY AND PREVENTIVE MAINTENANCE) SERVICES, 81ST RSC REGION A
Solicitation number
W912HP-12-R-0027
Issued by

View the file

Other files

File Type Posted
12R0027_Am03_AerialMaps_8-1-12.pdf PDF
12R0027_Am03_8-1-12.pdf PDF
1502000 ELINs-FFP Am 03 8-1-12.xlsx XLSX spreadsheet
12R0027-0002 Various Changes 7-30-12.pdf PDF
1502000 ELINs-FFP Am 02 7-30-12.xlsx XLSX spreadsheet
12R0027-0001 Extend Date 7-27-12.pdf PDF
12R0027 Contract Info Sheet.docx DOCX document
12R0027 PPQ.docx DOCX document
12R0027 Past Perf Info Sheet.docx DOCX document
12R0027 Site Visit Attendees 7-12-12.pdf PDF
12R0027 Prop Data Sheet.docx DOCX document
http //www.sac.usace.army.mil/ action organization.facility —
1502000 ELINs-FFP 7-7-12.xlsx XLSX spreadsheet
12R0027 RFP 7-7-12.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLINs (Contract Line Items)

This sheet is filled out automatically as the other sheets are completed.
0001base period for FFP for 6 months$ - 0Note: The reason 0001 is not 1/2 of 0003 is that some items only

occur once per year and some are HVAC related and will occur twice in the 6 month base period.

0002base period for IDQ for 6 monthsERROR:#VALUE!0002 is 1/2 of 0004
00031st option for FFP for 12 months$ - 0
00041st option for IDQ for 12 monthsERROR:#VALUE!
00052nd option for FFP for 12 months$ - 0
00062nd option for IDQ for 12 monthsERROR:#VALUE!
00073rd option for FFP for 12 months$ - 0
00083rd option for IDQ for 12 monthsERROR:#VALUE!
00094th option for FFP for 12 months$ - 0
00104th option for IDQ for 12 monthsERROR:#VALUE!
ERROR:#VALUE!

&F

&A &P of &N

ELIN - BASE PERIOD FFP

Cortractor is to fill out all highlighted in yellow cells for bid evaluation.sample
Initial award will be made on all non strike-through cells.sample
Strike-through cells will not be awarded on the initial award.sample
LA005Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A0013.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A0023.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A0033.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0$ - 0
A0043.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A0053.2.1.30-06Develop And Implement Preventive Maintenance Program For Furnaces6Month$ - 0$ - 0
A0063.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0$ - 0
A0073.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0$ - 0
A0083.2.1.80-11Develop And Implement Preventive Maintenance Program For Variable Air Volume (VAV) and Other Boxes6Month$ - 0$ - 0
A0093.2.1.90-12Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems6Month$ - 0$ - 0
A0103.2.1.120-15Develop And Implement Preventive Maintenance Program For Mini-Splits6Month$ - 0$ - 0
A0113.2.1.140-17Develop And Implement Preventive Maintenance Program For HVAC Control Systems6Month$ - 0$ - 0
A0123.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0$ - 0
A0133.2.20-19Develop And Implement Preventive Maintenance Program For Boilers6Month$ - 0$ - 0
A0143.2.2.10-19Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A0153.2.50-22
0-23Develop And Implement Preventive Maintenance Program For Emergency Generator Systems6Month$ - 0$ - 0
A0163.2.70-25Develop And Implement Preventive Maintenance Program For Built In Food Service Equipment6Month$ - 0$ - 0
A0173.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0$ - 0
A0183.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0$ - 0
A0193.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0$ - 0
A0203.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0$ - 0
A0213.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0$ - 0
A0223.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0$ - 0
A0233.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0$ - 0
A0243.2.9.130-40Develop And Implement Preventive Maintenance Program For Sump Pumps6Month$ - 0$ - 0
A0253.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0$ - 0
A0263.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0$ - 0
A0273.2.9.190-46Develop And Implement Preventive Maintenance Program For Mass Notification Boards6Month$ - 0$ - 0
A0283.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0$ - 0
A0293.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A0303.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
A0313.4.10-19Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs6Month$ - 0$ - 0
3.5Other Recurring Services
A0323.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A0333.5.1.20-56Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks6Month$ - 0$ - 0
A0343.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A0353.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A0363.5.1.60-60Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights6Month$ - 0$ - 0
A0373.5.1.70-61Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights6Month$ - 0$ - 0
A0383.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0$ - 0
A0393.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0$ - 0
A0403.5.40-69Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems6Month$ - 0$ - 0
A0413.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A0423.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0$ - 0
A0433.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0$ - 0
A0443.5.80-73Develop and implement a program to inspect, and make all necessary repairs to Bollards6Month$ - 0
A0453.5.90-74Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems6Month$ - 0$ - 0
A0463.5.120-77Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors6Month$ - 0$ - 0
A0473.5.140-79Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms6Month$ - 0
A0483.5.150-80Develop and implement a program to inspect, and make all necessary repairs to Automated Access Control Systems6Month$ - 0$ - 0
A0493.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0$ - 0
A0503.5.190-84Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems6Month$ - 0$ - 0
A0513.5.200-25Develop and implement a program to inspect, and make all necessary repairs to Built-In Refrigerators/ Freezers6Month$ - 0$ - 0
A0523.5.210-85Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens6Month$ - 0
A0533.5.220-86Develop and implement a program to inspect, and make all necessary repairs to Intrusion Detection Systems6Month$ - 0$ - 0
A0543.5.230-87Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building)6Month$ - 0$ - 0

TOTAL FFP LINE ITEMS - A001 THROUGH A054 $ - 0

LA009Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A0553.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A0563.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A0573.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0
A0583.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0
A0593.2.1.30-06Develop And Implement Preventive Maintenance Program For Furnaces6Month$ - 0
A0603.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0
A0613.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0
A0623.2.1.80-11Develop And Implement Preventive Maintenance Program For Variable Air Volume (VAV) and Other Boxes6Month$ - 0
A0633.2.1.90-12Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems6Month$ - 0
A0643.2.1.100-13Develop And Implement Preventive Maintenance Program For Humidifiers6Month$ - 0
A0653.2.1.120-15Develop And Implement Preventive Maintenance Program For Mini-Splits6Month$ - 0
A0663.2.1.130-16Develop And Implement Preventive Maintenance Program For Window Units6Month$ - 0
A0673.2.1.140-17Develop And Implement Preventive Maintenance Program For HVAC Control Systems6Month$ - 0
A0683.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0
A0693.2.20-19Develop And Implement Preventive Maintenance Program For Boilers6Month$ - 0
A0703.2.2.10-19Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown6Month$ - 0
A0713.2.50-22
0-23Develop And Implement Preventive Maintenance Program For Emergency Generator Systems6Month$ - 0
A0723.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0
A0733.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0
A0743.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0
A0753.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0
A0763.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0
A0773.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0
A0783.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0
A0793.2.9.80-35Develop And Implement Preventive Maintenance Program For Built-in Emergency Shower/ Eye Wash Stations6Month$ - 0
A0803.2.9.90-36Develop And Implement Preventive Maintenance Program For Circulating Pumps6Month$ - 0
A0813.2.9.100-37Develop And Implement Preventive Maintenance Program For Backflow Prevention Devices6Month$ - 0
A0823.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0
A0833.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0
A0843.2.9.180-45Develop And Implement Preventive Maintenance Program For Fire Suppression Systems6Month$ - 0
A0853.2.9.190-46Develop And Implement Preventive Maintenance Program For Mass Notification Boards6Month$ - 0
A0863.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0
A0873.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A0883.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
A0893.4.10-19Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs6Month$ - 0
A0903.4.30-53Develop And Implement an Inspection, Testing, and Certification Program For Crane and Crane Trackage6Month$ - 0
A0913.4.40-37Develop And Implement an Inspection, Testing, and Certification Program For Backflow Prevention Devices6Month$ - 0
3.5Other Recurring Services
A0923.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A0933.5.1.20-56Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks6Month$ - 0
A0943.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A0953.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A0963.5.1.50-59Develop and implement a program to inspect, and make all necessary repairs to Flag Pole Lights6Month$ - 0
A0973.5.1.60-60Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights6Month$ - 0
A0983.5.1.70-61Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights6Month$ - 0
A0993.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0
A1003.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0
A1013.5.40-69Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems6Month$ - 0
A1023.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A1033.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0
A1043.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0
A1053.5.80-73Develop and implement a program to inspect, and make all necessary repairs to Bollards6Month$ - 0
A1063.5.90-74Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems6Month$ - 0
A1073.5.100-75Develop and implement a program to inspect, and make all necessary repairs to Oil Water Separators6Month$ - 0
A1083.5.120-77Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors6Month$ - 0
A1093.5.150-80Develop and implement a program to inspect, and make all necessary repairs to Automated Access Control Systems6Month$ - 0
A1103.5.160-81Develop and implement a program to inspect, and make all necessary repairs to Automated Key Control Systems6Month$ - 0
A1113.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0
A1123.5.180-83Develop and implement a program to inspect, and make all necessary repairs to Interior Roll-up Doors6Month$ - 0
A1133.5.190-84Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems6Month$ - 0
A1143.5.210-85Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens6Month$ - 0
A1153.5.220-86Develop and implement a program to inspect, and make all necessary repairs to Intrusion Detection Systems6Month$ - 0
A1163.5.230-87Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building)6Month$ - 0

TOTAL FFP LINE ITEMS - A055 THROUGH A116 $ - 0

LA012Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A1173.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A1183.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A1193.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0$ - 0
A1203.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A1213.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0$ - 0
A1223.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0$ - 0
A1233.2.1.70-10Develop And Implement Preventive Maintenance Program For Rooftop Units6Month$ - 0$ - 0
A1243.2.1.120-15Develop And Implement Preventive Maintenance Program For Mini-Splits6Month$ - 0$ - 0
A1253.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0$ - 0
A1263.2.70-25Develop And Implement Preventive Maintenance Program For Built In Food Service Equipment6Month$ - 0$ - 0
A1273.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0$ - 0
A1283.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0$ - 0
A1293.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0$ - 0
A1303.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0$ - 0
A1313.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0$ - 0
A1323.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0$ - 0
A1333.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0$ - 0
A1343.2.9.80-35Develop And Implement Preventive Maintenance Program For Built-in Emergency Shower/ Eye Wash Stations6Month$ - 0
A1353.2.9.150-42Develop And Implement Preventive Maintenance Program For Fire Hydrants6Month$ - 0$ - 0
A1363.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0$ - 0
A1373.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0$ - 0
A1383.2.9.190-46Develop And Implement Preventive Maintenance Program For Mass Notification Boards6Month$ - 0$ - 0
A1393.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0$ - 0
A1403.2.9.210-48Develop And Implement Preventive Maintenance Program For Kitchen Hoods System6Month$ - 0$ - 0
A1413.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A1423.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
3.5Other Recurring Services
A1433.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A1443.5.1.20-56Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks6Month$ - 0$ - 0
A1453.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A1463.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A1473.5.1.60-60Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights6Month$ - 0$ - 0
A1483.5.1.70-61Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights6Month$ - 0$ - 0
A1493.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0$ - 0
A1503.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0$ - 0
A1513.5.20-67Clean grease traps and remove and dispose of grease from designated Grease Traps6Month$ - 0$ - 0
A1523.5.40-69Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems6Month$ - 0$ - 0
A1533.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A1543.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0$ - 0
A1553.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0$ - 0
A1563.5.100-75Develop and implement a program to inspect, and make all necessary repairs to Oil Water Separators6Month$ - 0$ - 0
A1573.5.120-77Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors6Month$ - 0$ - 0
A1583.5.140-79Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms6Month$ - 0
A1593.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0$ - 0
A1603.5.180-83Develop and implement a program to inspect, and make all necessary repairs to Interior Roll-up Doors6Month$ - 0$ - 0
A1613.5.190-84Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems6Month$ - 0$ - 0
A1623.5.210-85Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens6Month$ - 0$ - 0

TOTAL FFP LINE ITEMS - A117 THROUGH A162 $ - 0

LA013Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A1633.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A1643.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A1653.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0$ - 0
A1663.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A1673.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0$ - 0
A1683.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0$ - 0
A1693.2.1.60-09Develop And Implement Preventive Maintenance Program For Packaged Terminal Air Conditioners6Month$ - 0$ - 0
A1703.2.1.70-10Develop And Implement Preventive Maintenance Program For Rooftop Units6Month$ - 0$ - 0
A1713.2.1.90-12Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems6Month$ - 0$ - 0
A1723.2.1.110-14Develop And Implement Preventive Maintenance Program For Steam Systems6Month$ - 0$ - 0
A1733.2.1.140-17Develop And Implement Preventive Maintenance Program For HVAC Control Systems6Month$ - 0$ - 0
A1743.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0$ - 0
A1753.2.20-19Develop And Implement Preventive Maintenance Program For Boilers6Month$ - 0$ - 0
A1763.2.2.10-19Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A1773.2.60-24Develop And Implement Preventive Maintenance Program For Cathodic Protection Systems6Month$ - 0$ - 0
A1783.2.70-25Develop And Implement Preventive Maintenance Program For Built In Food Service Equipment6Month$ - 0$ - 0
A1793.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0$ - 0
A1803.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0$ - 0
A1813.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0$ - 0
A1823.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0$ - 0
A1833.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0$ - 0
A1843.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0$ - 0
A1853.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0$ - 0
A1863.2.9.90-36Develop And Implement Preventive Maintenance Program For Circulating Pumps6Month$ - 0$ - 0
A1873.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0$ - 0
A1883.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0$ - 0
A1893.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0$ - 0
A1903.2.9.210-48Develop And Implement Preventive Maintenance Program For Kitchen Hoods System6Month$ - 0$ - 0
A1913.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A1923.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
3.5Other Recurring Services
A1933.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A1943.5.1.20-56Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks6Month$ - 0$ - 0
A1953.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A1963.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A1973.5.1.50-59Develop and implement a program to inspect, and make all necessary repairs to Flag Pole Lights6Month$ - 0
A1983.5.1.60-60Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights6Month$ - 0$ - 0
A1993.5.1.70-61Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights6Month$ - 0$ - 0
A2003.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0$ - 0
A2013.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0$ - 0
A2023.5.40-69Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems6Month$ - 0$ - 0
A2033.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A2043.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0$ - 0
A2053.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0$ - 0
A2063.5.90-74Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems6Month$ - 0$ - 0
A2073.5.120-77Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors6Month$ - 0$ - 0
A2083.5.140-79Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms6Month$ - 0
A2093.5.150-80Develop and implement a program to inspect, and make all necessary repairs to Automated Access Control Systems6Month$ - 0$ - 0
A2103.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0$ - 0
A2113.5.180-83Develop and implement a program to inspect, and make all necessary repairs to Interior Roll-up Doors6Month$ - 0$ - 0
A2123.5.190-84Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems6Month$ - 0$ - 0
A2133.5.230-87Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building)6Month$ - 0$ - 0

TOTAL FFP LINE ITEMS - A163 THROUGH A213 $ - 0

LA015Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A2143.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A2153.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A2163.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0$ - 0
A2173.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A2183.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0$ - 0
A2193.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0$ - 0
A2203.2.1.90-12Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems6Month$ - 0$ - 0
A2213.2.1.120-15Develop And Implement Preventive Maintenance Program For Mini-Splits6Month$ - 0$ - 0
A2223.2.1.140-17Develop And Implement Preventive Maintenance Program For HVAC Control Systems6Month$ - 0$ - 0
A2233.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0$ - 0
A2243.2.20-19Develop And Implement Preventive Maintenance Program For Boilers6Month$ - 0$ - 0
A2253.2.2.10-19Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A2263.2.50-22
0-23Develop And Implement Preventive Maintenance Program For Emergency Generator Systems6Month$ - 0$ - 0
A2273.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0$ - 0
A2283.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0$ - 0
A2293.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0$ - 0
A2303.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0$ - 0
A2313.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0$ - 0
A2323.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0$ - 0
A2333.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0$ - 0
A2343.2.9.90-36Develop And Implement Preventive Maintenance Program For Circulating Pumps6Month$ - 0$ - 0
A2353.2.9.100-37Develop And Implement Preventive Maintenance Program For Backflow Prevention Devices6Month$ - 0$ - 0
A2363.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0$ - 0
A2373.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0$ - 0
A2383.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0$ - 0
A2393.2.9.210-48Develop And Implement Preventive Maintenance Program For Kitchen Hoods System6Month$ - 0$ - 0
A2403.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A2413.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
A2423.4.10-19Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs6Month$ - 0$ - 0
A2433.4.40-37Develop And Implement an Inspection, Testing, and Certification Program For Backflow Prevention Devices6Month$ - 0$ - 0
3.5Other Recurring Services
A2443.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A2453.5.1.20-56Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks6Month$ - 0$ - 0
A2463.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A2473.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A2483.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0$ - 0
A2493.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0$ - 0
A2503.5.20-67Clean grease traps and remove and dispose of grease from designated Grease Traps6Month$ - 0$ - 0
A2513.5.40-69Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems6Month$ - 0$ - 0
A2523.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A2533.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0$ - 0
A2543.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0$ - 0
A2553.5.90-74Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems6Month$ - 0$ - 0
A2563.5.100-75Develop and implement a program to inspect, and make all necessary repairs to Oil Water Separators6Month$ - 0$ - 0
A2573.5.140-79Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms6Month$ - 0
A2583.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0$ - 0
A2593.5.180-83Develop and implement a program to inspect, and make all necessary repairs to Interior Roll-up Doors6Month$ - 0$ - 0

TOTAL FFP LINE ITEMS - A214 THROUGH A259 $ - 0

LA019Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A2603.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A2613.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A2623.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0$ - 0
A2633.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A2643.2.1.30-06Develop And Implement Preventive Maintenance Program For Furnaces6Month$ - 0$ - 0
A2653.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0$ - 0
A2663.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0$ - 0
A2673.2.1.60-09Develop And Implement Preventive Maintenance Program For Packaged Terminal Air Conditioners6Month$ - 0$ - 0
A2683.2.1.80-11Develop And Implement Preventive Maintenance Program For Variable Air Volume (VAV) and Other Boxes6Month$ - 0$ - 0
A2693.2.1.90-12Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems6Month$ - 0$ - 0
A2703.2.1.120-15Develop And Implement Preventive Maintenance Program For Mini-Splits6Month$ - 0$ - 0
A2713.2.1.140-17Develop And Implement Preventive Maintenance Program For HVAC Control Systems6Month$ - 0$ - 0
A2723.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0$ - 0
A2733.2.20-19Develop And Implement Preventive Maintenance Program For Boilers6Month$ - 0$ - 0
A2743.2.2.10-19Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown6Month$ - 0$ - 0
A2753.2.30-20Develop And Implement Preventive Maintenance Program For Security Systems and Equipment6Month$ - 0$ - 0
A2763.2.70-25Develop And Implement Preventive Maintenance Program For Built In Food Service Equipment6Month$ - 0$ - 0
A2773.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0$ - 0
A2783.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0$ - 0
A2793.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0$ - 0
A2803.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0$ - 0
A2813.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0$ - 0
A2823.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0$ - 0
A2833.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0$ - 0
A2843.2.9.80-35Develop And Implement Preventive Maintenance Program For Built-in Emergency Shower/ Eye Wash Stations6Month$ - 0
A2853.2.9.100-37Develop And Implement Preventive Maintenance Program For Backflow Prevention Devices6Month$ - 0$ - 0
A2863.2.9.110-38Develop And Implement Preventive Maintenance Program For Lift Stations6Month$ - 0$ - 0
A2873.2.9.130-40Develop And Implement Preventive Maintenance Program For Sump Pumps6Month$ - 0$ - 0
A2883.2.9.150-42Develop And Implement Preventive Maintenance Program For Fire Hydrants6Month$ - 0$ - 0
A2893.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0$ - 0
A2903.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0$ - 0
A2913.2.9.180-45Develop And Implement Preventive Maintenance Program For Fire Suppression Systems6Month$ - 0$ - 0
A2923.2.9.190-46Develop And Implement Preventive Maintenance Program For Mass Notification Boards6Month$ - 0$ - 0
A2933.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0$ - 0
A2943.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A2953.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0$ - 0
A2963.2.9.240-51Develop And Implement Preventive Maintenance Program For Carbon Monoxide Sensors6Month$ - 0$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
A2973.4.10-19Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs6Month$ - 0$ - 0
A2983.4.40-37Develop And Implement an Inspection, Testing, and Certification Program For Backflow Prevention Devices6Month$ - 0$ - 0
3.5Other Recurring Services
A2993.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A3003.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A3013.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A3023.5.1.60-60Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights6Month$ - 0$ - 0
A3033.5.1.70-61Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights6Month$ - 0$ - 0
A3043.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0$ - 0
A3053.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0$ - 0
A3063.5.1.100-64Develop and implement a program to inspect, and make all necessary repairs to Lightning Arrestors and Grounding Devices6Month$ - 0$ - 0
A3073.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A3083.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0$ - 0
A3093.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0$ - 0
A3103.5.80-73Develop and implement a program to inspect, and make all necessary repairs to Bollards6Month$ - 0
A3113.5.90-74Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems6Month$ - 0$ - 0
A3123.5.100-75Develop and implement a program to inspect, and make all necessary repairs to Oil Water Separators6Month$ - 0$ - 0
A3133.5.120-77Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors6Month$ - 0$ - 0
A3143.5.140-79Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms6Month$ - 0
A3153.5.150-80Develop and implement a program to inspect, and make all necessary repairs to Automated Access Control Systems6Month$ - 0$ - 0
A3163.5.160-81Develop and implement a program to inspect, and make all necessary repairs to Automated Key Control Systems6Month$ - 0$ - 0
A3173.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0$ - 0
A3183.5.190-84Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems6Month$ - 0$ - 0
A3193.5.200-25Develop and implement a program to inspect, and make all necessary repairs to Built-In Refrigerators/ Freezers6Month$ - 0$ - 0
A3203.5.210-85Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens6Month$ - 0$ - 0
A3213.5.220-86Develop and implement a program to inspect, and make all necessary repairs to Intrusion Detection Systems6Month$ - 0$ - 0
A3223.5.230-87Develop and implement a program to inspect, and make all necessary repairs to Air Compressors (Fixed to building)6Month$ - 0$ - 0

TOTAL FFP LINE ITEMS - A260 THROUGH A322 $ - 0

LA038Spec ItemUNIT OFUNITTOTAL
ELINDESCRIPTIONQTYISSUEPRICEAMOUNT
Firm Fixed-Price Work
3.1Service Calls
A3233.1.10-03Perform Emergency Service Call Work6Month$ - 0$ - 0
A3243.1.20-03Perform Routine Service Call Work6Month$ - 0$ - 0
3.2Preventive Maintenance (PM) Program
A3253.2.10-04Develop And Implement Preventive Maintenance Program For HVAC And Refrigeration Systems6Month$ - 0
A3263.2.1.10-04HVAC Seasonal Start-Up and Shutdown6Month$ - 0
A3273.2.1.40-07Develop And Implement Preventive Maintenance Program For Exhaust and Transfer Fans6Month$ - 0
A3283.2.1.50-08Develop And Implement Preventive Maintenance Program For Fan Coils and Unit Heaters6Month$ - 0
A3293.2.1.60-09Develop And Implement Preventive Maintenance Program For Packaged Terminal Air Conditioners6Month$ - 0
A3303.2.1.70-10Develop And Implement Preventive Maintenance Program For Rooftop Units6Month$ - 0
A3313.2.1.80-11Develop And Implement Preventive Maintenance Program For Variable Air Volume (VAV) and Other Boxes6Month$ - 0
A3323.2.1.90-12Develop And Implement Preventive Maintenance Program For HVAC Water Distribution Systems6Month$ - 0
A3333.2.1.100-13Develop And Implement Preventive Maintenance Program For Humidifiers6Month$ - 0
A3343.2.1.120-15Develop And Implement Preventive Maintenance Program For Mini-Splits6Month$ - 0
A3353.2.1.140-17Develop And Implement Preventive Maintenance Program For HVAC Control Systems6Month$ - 0
A3363.2.1.150-18Develop And Implement Preventive Maintenance Program For Thermostats6Month$ - 0
A3373.2.20-19Develop And Implement Preventive Maintenance Program For Boilers6Month$ - 0
A3383.2.2.10-19Develop And Implement Preventive Maintenance Program For Boiler Seasonal Start-Up and Shutdown6Month$ - 0
A3383.2.50-22
0-23Develop And Implement Preventive Maintenance Program For Emergency Generator Systems6Month$ - 0
A3393.2.9.10-28Develop And Implement Preventive Maintenance Program For External Hose Faucets6Month$ - 0
A3403.2.9.20-29Develop And Implement Preventive Maintenance Program For Toilets6Month$ - 0
A3413.2.9.30-30Develop And Implement Preventive Maintenance Program For Urinals6Month$ - 0
A3423.2.9.40-31Develop And Implement Preventive Maintenance Program For Sinks/ Lavatories6Month$ - 0
A3433.2.9.50-32Develop And Implement Preventive Maintenance Program For Showers6Month$ - 0
A3443.2.9.60-33Develop And Implement Preventive Maintenance Program For Drinking fountains6Month$ - 0
A3453.2.9.70-34Develop And Implement Preventive Maintenance Program For Water Heaters6Month$ - 0
A3463.2.9.80-35Develop And Implement Preventive Maintenance Program For Built-in Emergency Shower/ Eye Wash Stations6Month$ - 0
A3473.2.9.90-36Develop And Implement Preventive Maintenance Program For Circulating Pumps6Month$ - 0
A3483.2.9.100-37Develop And Implement Preventive Maintenance Program For Backflow Prevention Devices6Month$ - 0
A3493.2.9.150-42Develop And Implement Preventive Maintenance Program For Fire Hydrants6Month$ - 0
A3503.2.9.160-43Develop And Implement Preventive Maintenance Program For Roof Drains/Gutters6Month$ - 0
A3513.2.9.170-44Develop And Implement Preventive Maintenance Program For Fire Protection Systems6Month$ - 0
A3523.2.9.180-45Develop And Implement Preventive Maintenance Program For Fire Suppression Systems6Month$ - 0
A3533.2.9.190-46Develop And Implement Preventive Maintenance Program For Mass Notification Boards6Month$ - 0
A3543.2.9.200-47Develop And Implement Preventive Maintenance Program For Fire Alarm Panel Boards6Month$ - 0
A3553.2.9.220-49Develop And Implement Preventive Maintenance Program For Fire Extinguishers6Month$ - 0
A3563.2.9.230-50Develop And Implement Preventive Maintenance Program For Smoke Detectors6Month$ - 0
A3573.2.9.240-51Develop And Implement Preventive Maintenance Program For Carbon Monoxide Sensors6Month$ - 0
A3583.2.9.250-52Develop And Implement Preventive Maintenance Program For VTE6Month$ - 0
3.3Integrated Maintenance Program (IMP)not used
3.4Inspection, Testing, and Certification
A3593.4.10-19Develop And Implement an Inspection, Testing, and Certification Program For Boilers and UPVs6Month$ - 0
A3603.4.40-37Develop And Implement an Inspection, Testing, and Certification Program For Backflow Prevention Devices6Month$ - 0
3.5Other Recurring Services
A3613.5.1.10-55Develop and implement a program to inspect, and make all necessary repairs to Circuit Break Sub-Panels6Month$ - 0
A3623.5.1.20-56Develop and implement a program to inspect, and make all necessary repairs to Exterior Lighting Photocell Contactors and/or Time Clocks6Month$ - 0
A3633.5.1.30-57Develop and implement a program to inspect, and make all necessary repairs to Facility Exterior Lights6Month$ - 0
A3643.5.1.40-58Develop and implement a program to inspect, and make all necessary repairs to Facility Interior Lights6Month$ - 0
A3653.5.1.50-59Develop and implement a program to inspect, and make all necessary repairs to Flag Pole Lights6Month$ - 0
A3663.5.1.60-60Develop and implement a program to inspect, and make all necessary repairs to Public Vehicle (POV) Parking Area Lights6Month$ - 0
A3673.5.1.70-61Develop and implement a program to inspect, and make all necessary repairs to Motor Equipment Park Lights6Month$ - 0
A3683.5.1.80-62Develop and implement a program to inspect, and make all necessary repairs to Emergency Light Wall Packs6Month$ - 0
A3693.5.1.90-63Develop and implement a program to inspect, and make all necessary repairs to Emergency Exit Signs6Month$ - 0
A3703.5.1.100-64Develop and implement a program to inspect, and make all necessary repairs to Lightning Arrestors and Grounding Devices6Month$ - 0
A3713.5.40-69Develop and implement a program to inspect, and make all necessary repairs to Perimeter Swales/Drainage Systems6Month$ - 0
A3723.5.50-70Develop and implement a program to inspect, and make all necessary repairs to FACILITY SYSTEMS -Flag Poles6Month$ - 0
A3733.5.60-71Develop and implement a program to inspect, and make all necessary repairs to Gates6Month$ - 0
A3743.5.70-72Develop and implement a program to inspect, and make all necessary repairs to Fences6Month$ - 0
A3753.5.80-73Develop and implement a program to inspect, and make all necessary repairs to Bollards6Month$ - 0
A3763.5.90-74Develop and implement a program to inspect, and make all necessary repairs to Site Drainage Systems6Month$ - 0
A3773.5.120-77Develop and implement a program to inspect, and make all necessary repairs to Overhead Doors6Month$ - 0
A3783.5.140-79Develop and implement a program to inspect, and make all necessary repairs to Exterior Door Lock Mechanisms6Month$ - 0
A3793.5.160-81Develop and implement a program to inspect, and make all necessary repairs to Automated Key Control Systems6Month$ - 0
A3803.5.170-82Develop and implement a program to inspect, and make all necessary repairs to Vault Doors6Month$ - 0
A3813.5.190-84Develop and implement a program to inspect, and make all necessary repairs to Vehicle Exhaust Systems6Month$ - 0
A3823.5.210-85Develop and implement a program to inspect, and make all necessary repairs to Built-In Projection Screens6Month$ - 0