Solicitation Amendment W912HN25BA0060006 SF 30.pdf

PDF 3 MB Posted

Attached to
Proj No. : 95170, Construct a 10MW Generation Plant, with Microgrid Controls
Solicitation number
W912HN25BA006
Issued by

About this file

This document is a Standard Form 30 (SF 30) Amendment to Solicitation W912HN25BA006 for Project No. 95170, issued by the U.S. Army Corps of Engineers Savannah Contracting Division. The amendment, dated 15 May 2025, incorporates revised drawings and specifications in response to ProjNet inquiries, specifically adding new contract drawings for sheets ES411, S-501, E-603, EG601, SS101, SS102, SS111, ES401, CE102, CG100, CS100, and CU100 with various revision dates between 13-14 May 2025.

The amendment updates the List of Drawing Sheets by adding two new document entries: "Drawings_AMD6 - PN 95170 Ft Stewart Microgrid" and "Specifications_AMD6 - PN 95170 Ft Stewart Microgrid", both dated 15 May 2025. The technical specification changes include revisions to Section 26 12 19.10, with the amendment noting that revised or added information is underlined and deleted information is struck out. The solicitation remains a 100% Small Business Set-Aside for constructing a 10MW generation plant with microgrid controls at Fort Stewart, Georgia.

View the file

Other files

File Type Posted
Abstract - W912HN25BA006 - PN 95170 Ft Stewart Microgrid (signed).pdf PDF
Solicitation Amendment - W912HN25BA0060009.pdf PDF
Solicitation Amendment W912HN25BA0060007 SF 30.pdf PDF
Solicitation Amendment W912HN25BA0060004 SF 30.pdf PDF
Solicitation Amendment - W912HN25BA0060004.pdf PDF
Solicitation Amendment - W912HN25BA0060003.pdf PDF
Solicitation Amendment - W912HN25BA0060008.pdf PDF
Solicitation Amendment W912HN25BA0060005 SF 30.pdf PDF
Solicitation Amendment - W912HN25BA0060006.pdf PDF
Solicitation Amendment W912HN25BA0060003 SF 30.pdf PDF
Solicitation Amendment W912HN25BA0060008 SF 30.pdf PDF
Solicitation Amendment W912HN25BA0060009 SF 30.pdf PDF
Solicitation Amendment - W912HN25BA0060007.pdf PDF
Solicitation Amendment - W912HN25BA0060005.pdf PDF
Solicitation Amendment W912HN25BA0060008 SF 30 (Manual).pdf PDF
Solicitation Amendment W912HN25BA0060007 SF 30 (Manual).pdf PDF
Specifications_AMD6 - PN 95170 Ft Stewart Microgrid.pdf PDF
Microsoft Teams Bid Opening Link.docx DOCX document
Drawings_AMD6 - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation Amendment W912HN25BA0060006 SF 30 (Manual).pdf PDF
Solicitation Amendment W912HN25BA0060005 SF 30 (Manual).pdf PDF
Drawings_AMD4 - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation Amendment W912HN25BA0060004 SF 30 (Manual).pdf PDF
Solicitation Amendment W912HN25BA0060003 SF 30 (Manual).pdf PDF
Ft Stewart Microgrid Geotechnical Report.pdf PDF
Solicitation Amendment W912HN25BA0060002 SF 30.pdf PDF
Drawings_AMD2 - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation Amendment - W912HN25BA0060002.pdf PDF
Specifications_AMD2 - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation Amendment - W912HN25BA0060001.pdf PDF
Solicitation Amendment W912HN25BA0060001 SF 30.pdf PDF
Site Visit Summary MFR - PN 95170 Ft Stewart Microgrid.pdf PDF
Site Visit Sign-In Sheet - PN 95170 Ft Stewart Microgrid.pdf PDF
Site Visit Directions - PN 95170 Ft Stewart Microgrid.pdf PDF
Specifications - PN 95170 Ft Stewart Microgrid.pdf PDF
Drawings - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation - W912HN25BA006.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to: 1) Block 14 (Description of Amendment/Modification):

Incorporate revised drawings and specification per responses to ProjNet inquiries. This system generated SF30 incorporates the manual SF30 issued on 15 May 2025 due to system technical issues preventing the contract writing system from automatically generating an SF30 and conformed version of the solicitation.

A. CONTRACT CHANGES: None

B. TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0006) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *6). The replaced and added Sections listed below (replaced and added by Amendment No. 0004) are hereby added to and made a part of the solicitation; such Sections are replaced in their entirety and changes are neither underlined nor struck out. Deleted Sections are also indicated below.

Revised Sections Added Sections Replaced Sections Deleted Sections 26 12 19.10

C. CONTRACT DRAWINGS - File No. None:

Sheets ES411 and S-501 with Revision 1 dated 13 May 2025 are hereby added to and made a part of the Contract Drawings.

Sheets E-603, EG601, SS101, SS102, and SS111 with Revision 2 dated 13 May 2025 are hereby added to and made a part of the Contract Drawings.

Sheet ES401 with Revision 3 date 13 May 2025 is hereby added to and made part of the Contract

Drawings.

Sheets CE102, CG100, CS100, and CU100 with Revision 3 dated 14 May 2025 are hereby added to and made a part of the Contract Drawings.

D. ADDITIONAL CHANGES: None

All other terms and conditions herein remain unchanged.

Section 00 01 15 - List of Drawing Sheets

The attachments table has changed from:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

Drawings - PN 95170, Ft Stewart Microgrid

Drawings 11 Mar 2025 Attachment No

Specifications - PN 95170, Ft Stewart Microgrid

Specification 11 Mar 2025 Attachment No

Site Visit Directions

- PN 95170, Ft Site Visit 11 Mar 2025 Attachment No

W912HN25BA0060006

Stewart Microgrid

Drawings_AMD2 - PN 95170 Ft Stewart Microgrid

Drawings 18 Apr 2025 Attachment No

Specifications_AM D2 - PN 95170 Ft Stewart Microgrid

Specification 18 Apr 2025 Attachment No

Drawings_AMD4 - PN 95170 Ft Stewart Microgrid

Drawings 06 May 2025 Attachment No

To:

Identifier Document Name Document Description Reference Identifier

Date Line Item Page Numbers

Document Type

Provided Under Separate Cover

Drawings - PN 95170, Ft Stewart Microgrid

Drawings 11 Mar 2025 Attachment No

Specifications - PN 95170, Ft Stewart Microgrid

Specification 11 Mar 2025 Attachment No

Site Visit Directions

- PN 95170, Ft Stewart Microgrid

Site Visit 11 Mar 2025 Attachment No

Drawings_AMD2 - PN 95170 Ft Stewart Microgrid

Drawings 18 Apr 2025 Attachment No

Specifications_AM D2 - PN 95170 Ft Stewart Microgrid

Specification 18 Apr 2025 Attachment No

Drawings_AMD4 - PN 95170 Ft Stewart Microgrid

Drawings 06 May 2025 Attachment No

Drawings_AMD6 - PN 95170 Ft Stewart Microgrid

Drawings 15 May 2025 Attachment No

Specifications_AM D6 - PN 95170 Ft Stewart Microgrid

Specification 15 May 2025 Attachment No

The following contract documents were added:

Drawings_AMD6 - PN 95170 Ft Stewart Microgrid Specifications_AMD6 - PN 95170 Ft Stewart Microgrid

W912HN25BA0060006

IDCode: J
Page: 1
Pages: 3
AmendNo: 0006
EffDate: 15 MAY 2025
ReqNo:
ProjNo: 95170
IssCode: W912HN
AdmCode:
IssuedBy: W074 ENDIST SAVANNAH

KO CONTRACTING DIVISION, 100 W OGLETHORPE AVE

SAVANNAH, GA 31401-3604

UNITED STATES

GERARD LEO, EMAIL: GERARD.F.LEO@USACE.ARMY.MIL TELEPHONE: (912) 652-5001

AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: W912HN25BA006
SolDate: 20 MAR 2025
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: SEE SCHEDULE
ContNameTitle:
CoNameTitle: GERARD F. LEO
ContDate:
CODate: 08 JUL 2025

File details come from the government source that posted it. Updated .