Proj No. : 95170, Construct a 10MW Generation Plant, with Microgrid Controls
Solicitation number
W912HN25BA006
Issued by

About this file

This document is a Solicitation Amendment (SF 30) for Solicitation Number W912HN25BA006, modifying a federal contract opportunity for constructing a 10MW Generation Plant with Microgrid Controls at Fort Stewart, Georgia. The amendment makes three key changes: 1) incorporates clause 52.223-23 on Sustainable Products and Services, 2) revises Canoochee EMC's pre-priced line item from $17,626,902.00 to $18,657,767.88, and 3) extends the bid response and opening deadline from May 15, 2025, to May 22, 2025. The solicitation is a 100% Small Business Set-Aside procurement under NAICS code 237130, with an estimated construction magnitude between $25-100 million and a 1,080-calendar day performance period.

The project scope involves constructing a natural gas generation plant, installing underground gas lines, transformers, switchgear, and a microgrid control system at Fort Stewart. The microgrid will integrate existing and future solar photovoltaic arrays, provide mission-critical load management, and connect with the existing SCADA system. Bidders must be registered in the System for Award Management (SAM) and submit proposals electronically through the Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. The U.S. Army Corps of Engineers Savannah District is the contracting agency, with point of contacts including Contract Specialist Gerard Leo and Contracting Officer David Lione.

View the file

Other files

File Type Posted
Abstract - W912HN25BA006 - PN 95170 Ft Stewart Microgrid (signed).pdf PDF
Solicitation Amendment W912HN25BA0060006 SF 30.pdf PDF
Solicitation Amendment - W912HN25BA0060009.pdf PDF
Solicitation Amendment W912HN25BA0060007 SF 30.pdf PDF
Solicitation Amendment W912HN25BA0060004 SF 30.pdf PDF
Solicitation Amendment - W912HN25BA0060004.pdf PDF
Solicitation Amendment - W912HN25BA0060003.pdf PDF
Solicitation Amendment - W912HN25BA0060008.pdf PDF
Solicitation Amendment W912HN25BA0060005 SF 30.pdf PDF
Solicitation Amendment - W912HN25BA0060006.pdf PDF
Solicitation Amendment W912HN25BA0060003 SF 30.pdf PDF
Solicitation Amendment W912HN25BA0060008 SF 30.pdf PDF
Solicitation Amendment W912HN25BA0060009 SF 30.pdf PDF
Solicitation Amendment - W912HN25BA0060007.pdf PDF
Solicitation Amendment - W912HN25BA0060005.pdf PDF
Solicitation Amendment W912HN25BA0060008 SF 30 (Manual).pdf PDF
Solicitation Amendment W912HN25BA0060007 SF 30 (Manual).pdf PDF
Specifications_AMD6 - PN 95170 Ft Stewart Microgrid.pdf PDF
Microsoft Teams Bid Opening Link.docx DOCX document
Drawings_AMD6 - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation Amendment W912HN25BA0060006 SF 30 (Manual).pdf PDF
Drawings_AMD4 - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation Amendment W912HN25BA0060004 SF 30 (Manual).pdf PDF
Solicitation Amendment W912HN25BA0060003 SF 30 (Manual).pdf PDF
Ft Stewart Microgrid Geotechnical Report.pdf PDF
Solicitation Amendment W912HN25BA0060002 SF 30.pdf PDF
Drawings_AMD2 - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation Amendment - W912HN25BA0060002.pdf PDF
Specifications_AMD2 - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation Amendment - W912HN25BA0060001.pdf PDF
Solicitation Amendment W912HN25BA0060001 SF 30.pdf PDF
Site Visit Summary MFR - PN 95170 Ft Stewart Microgrid.pdf PDF
Site Visit Sign-In Sheet - PN 95170 Ft Stewart Microgrid.pdf PDF
Site Visit Directions - PN 95170 Ft Stewart Microgrid.pdf PDF
Specifications - PN 95170 Ft Stewart Microgrid.pdf PDF
Drawings - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation - W912HN25BA006.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Block 14 (Description of Amendment/Modification): The purpose of this amendment is to: 1) Incorporate clause 52.223-23, Sustainable Products and Services (DEVIATION 2025-O0004); 2) Revise Canoochee EMC’s pre-price line item from $17,626,902.00 to 18,657,767.88; and 3) Extend the deadline for bid responses and the bid opening date from May 15, 2025, to May 22, 2025.

A. CONTRACT CHANGES: The following has been revised or added and are hereby incorporated into the solicitation.

Revised:

CLIN 0003 pre-priced line item in the amount of $17,626.902.00 changed to 18,657,767.88

Added:

52.223-23, Sustainable Products and Services (DEVIATION 2025-O0004)

B. TECHNICAL SPECIFICATION CHANGES: There are no technical specification changes with this amendment.

C. CONTRACT DRAWINGS: There are no contract drawing changes with this amendment.

D. ADDITIONAL CHANGES: None

BID SCHEDULE

W912HN25BA006SOLICITATION NUMBER:

OFFEROR'S NAME: ______________________________________________________________________________

BID SCHEDULE

CLIN Description QTY Unit Amount

0001 Construction of a 10MW Power Station 1 Job

0002 Site Develpment and Hardstand 1 Job

0003 Work Performed by Canoochee EMC (Pre-priced CLIN) 1 Job $17,626,902.00

0004 Work Performed by Georgia Power (Pre-priced CLIN) 1 Job $450,000.00

Total Bid (Items 0001 - 0004): _________________________________________________

Notes for Bid Schedule:

Note 1: To better facilitate the receipt and bidding process, all modifications to bids are to be submitted on copies of the latest Contract Line Item as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to (CLIN) Bid Schedule Summary Sheet line items, all Offerors shall state their revised prices for each item. Offerors are reminded that the Contract Line-Item Schedule will be utilized for award pricing and are not to be priced during the solicitation.

Note 2: CAUTION - Offerors shall insert a price on all numbered items of the Bid Summary Schedule, excluding 0003 and 0004 which are pre-priced line items. Failure to do so may result in rejection of an Offeror's Bid.

Note 3: All the extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

Note 4: All bidders are advised materially unbalanced bids may be rejected as non-responsive. See FAR 52.214-19 Contract Award - Sealed Bidding

- Construction. An unbalanced proposal is one that is based on prices significantly less than the cost for some work and prices that are significantly overstated for other work and can also exist where only overpricing or underpricing exists.

W912HN25BA0060002

$18,657,767.88

Section 00 21 00 - Instructions

Revised:

k6ctxgfl Cross-Out

Section 00 70 00 - Conditions of the Contract

FAR Clauses Incorporated by Reference

Added

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.223-23 Sustainable Products and Services.

(DEVIATION 2025-O0004) Mar 2025 Deviation 2025-

O0004 Mar 2025

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0005
Code[0]:
Code[1]:
AccountingData[0]: SEE SECTION G - CONTRACT ADMINISTRATION DATA
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: DAVID J. LIONE
Description[0]: SEE SCHEDULE
FacilityCode[0]:
Code[2]:
IssuedBy[0]: W074 ENDIST SAVANNAH

KO CONTRACTING DIVISION, 100 W OGLETHORPE AVE

SAVANNAH, GA 31401-3604

NameandAddress[0]:
AdministeredBy[0]:
ContractIDCode[0]: J
ReqNumber[0]:
AmendmentNo[1]: W912HN25BA006
ModificationNo[0]:
ProjectNo[0]: 95170
Page[0]: 1
Pages[0]: 4
EffectiveDate[0]: 13 May 2025
Dated9B[0]: 20 MAR 2025
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: 1
NotExtended[0]: Off
2025-05-13T14:25:41-0400
LIONE.DAVID.J.1407451305
DateSigned[0]:
DateSigned[1]: 13 May 2025
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .