This document is a Memorandum for Record (MFR) summarizing a site visit for a federal contract opportunity at Fort Stewart to construct a 10MW Generation Plant with Microgrid Controls. The site visit occurred on 26 March 2025 at the Corner of Hero Rd and Davis Rd, Fort Stewart, GA, with 40 personnel present. Key activities included introducing government personnel, exploring two site locations, confirming the small business set-aside status, and verifying company registrations in SAM.gov and PIEE. William Matson of USACE-SAS-PM-M led the site visit, and all questions were directed to Projnet for formal response. The project is associated with Solicitation Number W912HN25BA006 and involves constructing a natural gas generation plant, installing underground gas lines, implementing a microgrid control system, and connecting to existing solar photovoltaic infrastructure at the military installation.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CESAS-PMM 27 March 2025
MEMORANDUM FOR RECORD
SUBJECT: Fort Stewart; Construct a 10MW Generation Plant, with Microgrid Controls;
W912HN25BA006; Site Visit Summary
1. The purpose of the memorandum is to capture and summarize the subject site visit held on 26 March 2025.
2. Fort Stewart; Construct a 10MW Generation Plant, with Microgrid Controls;
W912HN25BA006; was scheduled for26 March 2025 with a link up at the Project Site, Corner of Hero Rd and Davis Rd, Fort Stewart, GA at 10:00am. A total of 40 personnel was on site for the visit, reference the site visit sign in sheet for names and organizations. William Matson of USACE-SAS-PM-M led the site visit. The following is results of the site visit:
Introduction of key government personal that were present Viewed and explored the two site locations Discussed this was a small business set aside action Made sure the companies were registered and active with SAM.gov and PIEE Referred all questions and comments to Projnet for a formal response
3. The point of contact for this memorandum is William Matson at William.m.matson@usace.army.mil or at (912) 652-5658.
William Matson Project Manger
| 2025-03-27T07:49:22-0400 | |