Abstract - W912HN25BA006 - PN 95170 Ft Stewart Microgrid (signed).pdf

PDF 364 KB Posted

Attached to
Proj No. : 95170, Construct a 10MW Generation Plant, with Microgrid Controls
Solicitation number
W912HN25BA006
Issued by

About this file

This is an Abstract of Offers for a Construction solicitation (W912HN25BA006) issued by the Department of the Army, Corps of Engineers, Savannah District. The project involves constructing a 10MW Generation Plant with Microgrid Controls at Fort Stewart, Georgia, as a 100% Small Business Set-Aside Procurement. The project (Number 95170) requires construction of a power station, site development, and utility work involving Canoochee EMC and Georgia Power. Six vendors submitted bids ranging from $54,283,767.88 to $64,631,967.88, with two primary bidders being AACON-RavenVolt Joint Venture LLC and Bridger Richard JV LLC. The solicitation was issued on 20-Mar-25, with offers to be opened on 7-Aug-25, and includes four primary line items: power station construction, site development, work by Canoochee EMC (pre-priced at $18,657,767.88), and work by Georgia Power (pre-priced at $450,000.00).

View the file

Other files

File Type Posted
Solicitation Amendment W912HN25BA0060006 SF 30.pdf PDF
Solicitation Amendment - W912HN25BA0060009.pdf PDF
Solicitation Amendment W912HN25BA0060007 SF 30.pdf PDF
Solicitation Amendment W912HN25BA0060004 SF 30.pdf PDF
Solicitation Amendment - W912HN25BA0060004.pdf PDF
Solicitation Amendment - W912HN25BA0060003.pdf PDF
Solicitation Amendment - W912HN25BA0060008.pdf PDF
Solicitation Amendment W912HN25BA0060005 SF 30.pdf PDF
Solicitation Amendment - W912HN25BA0060006.pdf PDF
Solicitation Amendment W912HN25BA0060003 SF 30.pdf PDF
Solicitation Amendment W912HN25BA0060008 SF 30.pdf PDF
Solicitation Amendment W912HN25BA0060009 SF 30.pdf PDF
Solicitation Amendment - W912HN25BA0060007.pdf PDF
Solicitation Amendment - W912HN25BA0060005.pdf PDF
Solicitation Amendment W912HN25BA0060008 SF 30 (Manual).pdf PDF
Solicitation Amendment W912HN25BA0060007 SF 30 (Manual).pdf PDF
Specifications_AMD6 - PN 95170 Ft Stewart Microgrid.pdf PDF
Microsoft Teams Bid Opening Link.docx DOCX document
Drawings_AMD6 - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation Amendment W912HN25BA0060006 SF 30 (Manual).pdf PDF
Solicitation Amendment W912HN25BA0060005 SF 30 (Manual).pdf PDF
Drawings_AMD4 - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation Amendment W912HN25BA0060004 SF 30 (Manual).pdf PDF
Solicitation Amendment W912HN25BA0060003 SF 30 (Manual).pdf PDF
Ft Stewart Microgrid Geotechnical Report.pdf PDF
Solicitation Amendment W912HN25BA0060002 SF 30.pdf PDF
Drawings_AMD2 - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation Amendment - W912HN25BA0060002.pdf PDF
Specifications_AMD2 - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation Amendment - W912HN25BA0060001.pdf PDF
Solicitation Amendment W912HN25BA0060001 SF 30.pdf PDF
Site Visit Summary MFR - PN 95170 Ft Stewart Microgrid.pdf PDF
Site Visit Sign-In Sheet - PN 95170 Ft Stewart Microgrid.pdf PDF
Site Visit Directions - PN 95170 Ft Stewart Microgrid.pdf PDF
Specifications - PN 95170 Ft Stewart Microgrid.pdf PDF
Drawings - PN 95170 Ft Stewart Microgrid.pdf PDF
Solicitation - W912HN25BA006.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES

20-Mar-25 7-Aug-25 1 2

DATE SIGNED

20% $3,000,000.00 20%

7A. ITEM

NO.

7B. DESCRIPTION OF OFFERED ITEM

7C. EST

QUANTITY

D. UNIT E. UNIT PRICE

F. ESTIMATED

AMOUNT

E. UNIT PRICE

F. ESTIMATED

AMOUNT

E. UNIT PRICE

F. ESTIMATED

AMOUNT

Construction of 10MW Power Station Furnish and install all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the10MW Power Station, with Microgrid controls in accordance with the solicitation documents. This line item shall include but is not imited to the applicable power and pathway infrastructure for equipment, such as the engine-generator sets and fiber-optic communication cable.

1 Job $34,048,165.51 $34,048,165.51 $34,278,240.36 $34,278,240.36 $36,419,071.00 $36,419,071.00

Site Development and Hardstand Furnish and install all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the site development, hardstand, natural gas line service, water line extension for fire hydrant(s) and utilities in accordance with the solicitation documents.

1 Job $511,100.25 $511,100.25 $2,544,250.81 $2,544,250.81 $4,950,891.00 $4,950,891.00

Work Performed by Canoochee EMC Work performed by Canoochee EMC (Local EPS) within the 10MW Power Station, 25kV Canoochee Switch Station and New Canoochee Substation as delineated on the drawings. Furnish and install all materials, tools, substation, labor costs and associated incidentals necessary to complete the construction for the above areas. This line item shall include but is not limited to the applicable power and pathway infrastructure for equipment such as the 25kV connection to the 10MW substation and fiber-optic communication cable.

NOTE: This is a pre-priced line item in the amount of $18,657,767.88.

1 Job $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88

Work Performed by Georgia Power Work performed by Georgia Power (Area EPS) within the Fort Stewart Solar Substation and Fort Stewart GPC Substation as delineated on the drawings. Furnish and install all materials, tools, labor costs and associated incidentals necessary to complete the construction with the solicitation documents. This line item shall include but is not limited to the applicable power and pathway infrastructure for equipment such as the 35kV connection to the New Canoochee Substation and fiber-optic communication cable.

NOTE: This is a pre-priced line item in the amount of $450,000.00.

1 Job $450,000.00 $450,000.00 $450,000.00 $450,000.00 $450,000.00 $450,000.00

$53,667,033.64 $55,930,259.05 $60,477,729.88

C. AMENDMENTS ACKNOWLEDGED

A. HIRED LABOR

B. REASONABLE CONTRACT

X (Without Profit)

B. BID SECURITY (Type and Amount)

Yes

B. BID SECURITY (Type and Amount)

(Check A, B or C and complete D, E, and F) A. OFFEROR

6603 N Hiawatha Ave

A. OFFEROR

2509 Plantside Drive AACON-RavenVolt Joint Venture LLC

Chicago, IL 60646

Bridger Richard JV LLC

“Source Selection Information -- See FAR 2.101 and 3.104.”

NO. 1

Contracting Officer

W912HN25BA006

Department of the Army, Corps of Engineers

ABSTRACT OF OFFERS - CONSTRUCTION

9. OFFERS

NO. 2

I CERTIFY that I have opened, read, and recorded on this abstract all offers received In response to this solicitation.Savannah District Contracting Office

1. SOLICITATION NUMBER:

4. ISSUING OFFICE:

DAVID J. LIONE

8. GOVERNMENT ESTIMATE

5. PROJECT TITLE

SIGNATURE

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

100 W Oglethorpe Ave.

Savannah, GA 31401

Yes

TOTAL BID:

6. NUMBER OF AMENDMENTS ISSUED:

X

C. REASONABLE CONTRACT

X (IncludingProfit)

PROJECT NUMBER: 95170

CONSTRUCT A 10MW GENERATION PLANT, WITH MICROGRID CONTROLS

FORT STEWART, GEORGIA

100% SMALL BUSINEES SET-ASIDE PROCUREMENT

Louisville, KY 40299

C. AMENDMENTS ACKNOWLEDGED

PAGE OF PAGES

2 2

FESCO CLP JV, LLC HSGS-Ameresco, LLC

20% $3,000,000.00 20% $3,000,000.00 20% $3,000,000.00 20% $3,000,000.00

D. UNIT PRICE

E. ESTIMATED

AMOUNT

D. UNIT PRICE

E. ESTIMATED

AMOUNT

D. UNIT PRICE

E. ESTIMATED

AMOUNT

D. UNIT PRICE

E. ESTIMATED

AMOUNT

0001 1 Job $37,972,231.12 $37,972,231.12 $31,366,000.00 $31,366,000.00 $33,976,332.00 $33,976,332.00 $44,390,845.00 $44,390,845.00

0002 1 Job $1,815,282.00 $1,815,282.00 $3,810,000.00 $3,810,000.00 $11,503,327.00 $11,503,327.00 $1,133,355.00 $1,133,355.00

0003 1 Job $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88

0004 1 Job $450,000.00 $450,000.00 $450,000.00 $450,000.00 $450,000.00 $450,000.00 $450,000.00 $450,000.00

$58,895,281.00 $54,283,767.88 $64,587,428.00 $64,631,967.88

Yes YesYes Yes

B. BID SECURITY (Type and Amount)

1. SOLICITATION NUMBER:

“Source Selection Information -- See FAR 2.101 and 3.104.”

ABSTRACT OF OFFERS -

CONSTRUCTION CONTINUATION SHEET

C. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED

Summerville, SC 29483 7470 New Technology Way

Copper Construction Company, Inc David Boland, Inc 410 McIntosh Street P.O. Box 1870

B. BID SECURITY (Type and Amount)

217 Cember Way, Ste C

C. AMENDMENTS ACKNOWLEDGED

4. OFFERS (Continued)2. PROJECT TITLE:

A. OFFEROR

NO. 4 NO. 5 NO. 6

A. OFFEROR A. OFFEROR

W912HN25BA006

Abstract of Offers - Construction Sheet, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 15 contract items to conform to the number of items which can be entered on page 1. Use additional continuation sheets for contract items in excess of 15 and attach additional continuation Sheets as needed.

Frederick, MD 21701

NO. 3PROJECT NUMBER: 95170

A. OFFEROR

100% SMALL BUSINEES SET-ASIDE

PROCUREMENT

TOTAL BID:

A. ITEM

NO.

C. UNIT

B.

ESTIMATED

QUANTITY

FORT STEWART, GEORGIA

CONSTRUCT A 10MW GENERATION

PLANT, WITH MICROGRID

C. AMENDMENTS ACKNOWLEDGED

B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)

3. CONTRACT TERMS

Vidalia, GA 30474 Titusville, FL 32781-1870

2025-08-07T14:31:25-0400
LIONE.DAVID.J.1407451305

File details come from the government source that posted it. Updated .