Abstract - W912HN25BA006 - PN 95170 Ft Stewart Microgrid (signed).pdf
PDF 364 KB Posted
- Solicitation number
- W912HN25BA006
About this file
This is an Abstract of Offers for a Construction solicitation (W912HN25BA006) issued by the Department of the Army, Corps of Engineers, Savannah District. The project involves constructing a 10MW Generation Plant with Microgrid Controls at Fort Stewart, Georgia, as a 100% Small Business Set-Aside Procurement. The project (Number 95170) requires construction of a power station, site development, and utility work involving Canoochee EMC and Georgia Power. Six vendors submitted bids ranging from $54,283,767.88 to $64,631,967.88, with two primary bidders being AACON-RavenVolt Joint Venture LLC and Bridger Richard JV LLC. The solicitation was issued on 20-Mar-25, with offers to be opened on 7-Aug-25, and includes four primary line items: power station construction, site development, work by Canoochee EMC (pre-priced at $18,657,767.88), and work by Georgia Power (pre-priced at $450,000.00).
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES
20-Mar-25 7-Aug-25 1 2
DATE SIGNED
20% $3,000,000.00 20%
7A. ITEM
NO.
7B. DESCRIPTION OF OFFERED ITEM
7C. EST
QUANTITY
D. UNIT E. UNIT PRICE
F. ESTIMATED
AMOUNT
E. UNIT PRICE
F. ESTIMATED
AMOUNT
E. UNIT PRICE
F. ESTIMATED
AMOUNT
Construction of 10MW Power Station Furnish and install all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the10MW Power Station, with Microgrid controls in accordance with the solicitation documents. This line item shall include but is not imited to the applicable power and pathway infrastructure for equipment, such as the engine-generator sets and fiber-optic communication cable.
1 Job $34,048,165.51 $34,048,165.51 $34,278,240.36 $34,278,240.36 $36,419,071.00 $36,419,071.00
Site Development and Hardstand Furnish and install all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the site development, hardstand, natural gas line service, water line extension for fire hydrant(s) and utilities in accordance with the solicitation documents.
1 Job $511,100.25 $511,100.25 $2,544,250.81 $2,544,250.81 $4,950,891.00 $4,950,891.00
Work Performed by Canoochee EMC Work performed by Canoochee EMC (Local EPS) within the 10MW Power Station, 25kV Canoochee Switch Station and New Canoochee Substation as delineated on the drawings. Furnish and install all materials, tools, substation, labor costs and associated incidentals necessary to complete the construction for the above areas. This line item shall include but is not limited to the applicable power and pathway infrastructure for equipment such as the 25kV connection to the 10MW substation and fiber-optic communication cable.
NOTE: This is a pre-priced line item in the amount of $18,657,767.88.
1 Job $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88
Work Performed by Georgia Power Work performed by Georgia Power (Area EPS) within the Fort Stewart Solar Substation and Fort Stewart GPC Substation as delineated on the drawings. Furnish and install all materials, tools, labor costs and associated incidentals necessary to complete the construction with the solicitation documents. This line item shall include but is not limited to the applicable power and pathway infrastructure for equipment such as the 35kV connection to the New Canoochee Substation and fiber-optic communication cable.
NOTE: This is a pre-priced line item in the amount of $450,000.00.
1 Job $450,000.00 $450,000.00 $450,000.00 $450,000.00 $450,000.00 $450,000.00
$53,667,033.64 $55,930,259.05 $60,477,729.88
C. AMENDMENTS ACKNOWLEDGED
A. HIRED LABOR
B. REASONABLE CONTRACT
X (Without Profit)
B. BID SECURITY (Type and Amount)
Yes
B. BID SECURITY (Type and Amount)
(Check A, B or C and complete D, E, and F) A. OFFEROR
6603 N Hiawatha Ave
A. OFFEROR
2509 Plantside Drive AACON-RavenVolt Joint Venture LLC
Chicago, IL 60646
Bridger Richard JV LLC
“Source Selection Information -- See FAR 2.101 and 3.104.”
NO. 1
Contracting Officer
W912HN25BA006
Department of the Army, Corps of Engineers
ABSTRACT OF OFFERS - CONSTRUCTION
9. OFFERS
NO. 2
I CERTIFY that I have opened, read, and recorded on this abstract all offers received In response to this solicitation.Savannah District Contracting Office
1. SOLICITATION NUMBER:
4. ISSUING OFFICE:
DAVID J. LIONE
8. GOVERNMENT ESTIMATE
5. PROJECT TITLE
SIGNATURE
NAME AND TITLE OF CERTIFYING OFFICIAL (Type)
100 W Oglethorpe Ave.
Savannah, GA 31401
Yes
TOTAL BID:
6. NUMBER OF AMENDMENTS ISSUED:
X
C. REASONABLE CONTRACT
X (IncludingProfit)
PROJECT NUMBER: 95170
CONSTRUCT A 10MW GENERATION PLANT, WITH MICROGRID CONTROLS
FORT STEWART, GEORGIA
100% SMALL BUSINEES SET-ASIDE PROCUREMENT
Louisville, KY 40299
C. AMENDMENTS ACKNOWLEDGED
PAGE OF PAGES
2 2
FESCO CLP JV, LLC HSGS-Ameresco, LLC
20% $3,000,000.00 20% $3,000,000.00 20% $3,000,000.00 20% $3,000,000.00
D. UNIT PRICE
E. ESTIMATED
AMOUNT
D. UNIT PRICE
E. ESTIMATED
AMOUNT
D. UNIT PRICE
E. ESTIMATED
AMOUNT
D. UNIT PRICE
E. ESTIMATED
AMOUNT
0001 1 Job $37,972,231.12 $37,972,231.12 $31,366,000.00 $31,366,000.00 $33,976,332.00 $33,976,332.00 $44,390,845.00 $44,390,845.00
0002 1 Job $1,815,282.00 $1,815,282.00 $3,810,000.00 $3,810,000.00 $11,503,327.00 $11,503,327.00 $1,133,355.00 $1,133,355.00
0003 1 Job $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88 $18,657,767.88
0004 1 Job $450,000.00 $450,000.00 $450,000.00 $450,000.00 $450,000.00 $450,000.00 $450,000.00 $450,000.00
$58,895,281.00 $54,283,767.88 $64,587,428.00 $64,631,967.88
Yes YesYes Yes
B. BID SECURITY (Type and Amount)
1. SOLICITATION NUMBER:
“Source Selection Information -- See FAR 2.101 and 3.104.”
ABSTRACT OF OFFERS -
CONSTRUCTION CONTINUATION SHEET
C. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED
Summerville, SC 29483 7470 New Technology Way
Copper Construction Company, Inc David Boland, Inc 410 McIntosh Street P.O. Box 1870
B. BID SECURITY (Type and Amount)
217 Cember Way, Ste C
C. AMENDMENTS ACKNOWLEDGED
4. OFFERS (Continued)2. PROJECT TITLE:
A. OFFEROR
NO. 4 NO. 5 NO. 6
A. OFFEROR A. OFFEROR
W912HN25BA006
Abstract of Offers - Construction Sheet, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 15 contract items to conform to the number of items which can be entered on page 1. Use additional continuation sheets for contract items in excess of 15 and attach additional continuation Sheets as needed.
Frederick, MD 21701
NO. 3PROJECT NUMBER: 95170
A. OFFEROR
100% SMALL BUSINEES SET-ASIDE
PROCUREMENT
TOTAL BID:
A. ITEM
NO.
C. UNIT
B.
ESTIMATED
QUANTITY
FORT STEWART, GEORGIA
CONSTRUCT A 10MW GENERATION
PLANT, WITH MICROGRID
C. AMENDMENTS ACKNOWLEDGED
B. BID SECURITY (Type and Amount) B. BID SECURITY (Type and Amount)
3. CONTRACT TERMS
Vidalia, GA 30474 Titusville, FL 32781-1870
| 2025-08-07T14:31:25-0400 | |
| LIONE.DAVID.J.1407451305 |
File details come from the government source that posted it. Updated .