B.08 - W912HN22R30010005 - Combined Ramey Amendment & Conformed Copy.pdf
PDF 2 MB Posted
- Attached to
- Ramey Unit School Replacement
- Solicitation number
- W912HN22R3001
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN22R3001
X 9B. DATED (SEE ITEM 11)
06-Jun-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Aug-2022
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN22R3001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
The following have been added by full text:
AMD 0005
A. CONTRACT CHANGES:
The proposal due date has been changed from 8 August 2022 to 23 August 2022.
Second Site Visit Memo is attached with this amendment.
B. TECHNICAL SPECIFICATION CHANGES:
There are no technical specification changes with this amendment.
C. CONTRACT DRAWINGS:
(End of Summary of Changes)
PN AM00049 Ramey Unit School Replacement Aguadilla, Puerto Rico
A. This acquisition w ill be aw arded utilizing a Low est Priced Technically Acceptable (LPTA) Source Selection Process in accordance w ith
FAR 15.101-2.
B. This acquisition is being solicited as 100% Competitive, Full and Open, Unrestricted w ith Hubzone preference under NAICS 236220. A price evaluation preference w ill be applied to offerors in accordance w ith FAR Clause 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns.
C. Per DFAR 236.204(ii) Disclosure of Magnitude: the Magnitude of this project is betw een $25M and $100M.
D. Offerors must be registered in the System for Aw ard Management (w w w .sam.gov) E. The Contractual POC for the Procurement is Mr. Rohan Bryan, 912-652-5619 or rohan.a.bryan@usace.army.mil
***Offerors should include the offeror's cage code in block 14 of the 1442 of the proposal submission.***
ROHAN BRYAN 912-652-5619
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
06-Jun-2022
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1673 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________08 Aug 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912HN22R3001 96
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 00 00 - Procurement and Contracting Requirements
A. CONTRACT CHANGES: There are no contract changes with this amendment.
B. TECHNICAL SPECIFICATION: There is no technical specification with this amendment.
C. CONTRACT DRAWINGS:
The correct contract drawings are attached with this amendment. The incorrect contract drawings were erroneously uploaded with the original solicitation. All previous CONTRACT DRAWINGS ONLY should be ignored.
A Site visit has been scheduled for the 27th June at 1030 am Local Time.
B. TECHNICAL SPECIFICATION: There is no technical specification with this amendment.
C. CONTRACT DRAWINGS: There is no contract drawings with this amendment.
AMD 0003
The proposal due date has been changed from 18 July 2022 to 8 August
2022.
Projnet close date has been moved from 7 days prior to proposal due date, to 15 days prior to proposal due date.
QUALITY CONTROL SYSTEM (QCS) statement on page 13 was a duplicate and has been deleted.
A note has been added to Municipal Tax-Equipment Tax on page 83. This note states that “A WAIVER MAY BE” issued.
The MFR site visit attendee roster is also attached to this amendment, along with a conformed copy of the solicitation.
Municipality of Offeror in Puerto Rico is added below each bid Schedule.
B. TECHNICAL SPECIFICATION:
All Technical Specifications are posted in both PIEE and SAM.gov website.
All Contract Drawings are posted in both PIEE and SAM.gov website.
All changes with this amendment are highlighted in RED below.
AMD 0004
A site visit is schedule for 25th July 2022 at 10:30 am Local Time. Point of Contact for this site visit is Mrs. Janice Rivera (787) 397-3089, janice.rivera@usace.army.mil.
C. CONTRACT DRAWINGS – File No. 730-46-01:
Sheets A-101C2, A-101D1, A-141C2, A-190A, A-260, A-480, A-481, A-482, A-487, A- 500, A-574, IN101C2, and IN278 with Revision 1 dated 13 July 2022 are hereby added to and made a part of the Contract Drawings.
AMD 0005
The proposal due date has been changed from 8 August 2022 to 23 August 2022.
Second Site Visit Memo is attached with this amendment.
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Construction of New Ramey Unit School -FFP
Primary Facilities Construct New Ramey Unit School to 5-foot line as indicated in the plans and specifications. Complete Facility. Proposal acceptance period 1: (90 days) Municipality of Offeror in Puerto Rico ____________________
FOB: Destination
PSC CD: Y1CA
NET AMT
0002 1 Job Supporting Facilities - "SitesFFP
Preparation and Development outside the 5-foot line, Including all utilities and all site improvements (permanent and temporary) indicated in the plans and specifications. Complete Facility. Proposal acceptance period 1: (90 days) Municipality of Offeror in Puerto Rico_________________________
0003 1 Job Provide and Install Emergency GeneratorFFP
As indicated in the plans and specifications. Complete Facility. Proposal acceptance period 1: (90 days) Municipality of Offeror in Puerto Rico__________________________
0004 1 Job Demolition, Abatement, and Disposal ofFFP
Existing School features: Complete Facility. Proposal acceptance period 1: (90 days) Municipality of Offeror in Puerto Rico_________________________
0005 1 Job OPTION Option 1: Roof mounted Photovoltaic -FFP
Provide and install system at area as indicated on the drawings and details.
Provide all items and accessories as required for a complete installation in every aspect. Complete Facility. Proposal acceptance period 1: (90 days) Municipality of Offeror in Puerto Rico____________________________
AM00049 Ramey Unit Replacement School Aguadilla, Puerto Rico
Totals for Proposal Acceptance Period 1: (0-90 Days)
Total Base CLINs 0001-0004 $_________________________
Total Option CLIN 0005 $_______________________
Total Base and Option CLINs 0001-0005 $_______________________
At the Contracting Officer's discretion, Option 1, CLIN 0005 may be exercised in accordance with FAR 52.217-7.
PROPOSAL ACCEPTANCE PERIOD 2
0001 1 Job Construction of New Ramey Unit School -FFP
"Primary Facilities" Construct New Ramey Unit School to 5-foot line as indicated in the plans and specifications. Complete Facility. Proposal acceptance period 2 : (91 - 270 days)
0002 1 Job Supporting Facilities - "SitesFFP
Preparation and Development" outside the 5-foot line, Including all utilities and all site improvements (permanent and temporary) indicated in the plans and specifications. Complete Facility. Proposal acceptance period 2 : (91 - 270 days)
0003 1 Job “Provide and Install Emergency GeneratorFFP
" As indicated in the plans and specifications. Complete Facility.
Proposal acceptance period 2 : (91 - 270 days)
0004 1 Job “Demolition, Abatement, and Disposal ofFFP
Existing School features: Complete Facility. Proposal acceptance period 2 : (91 - 270 days)
0005 1 Job OPTION Option 1: Roof mounted Photovoltaic -FFP
Provide and install system at area as indicated on the drawings and details. Provide all items and accessories as required for a complete installation in every aspect.
Complete Facility. Proposal acceptance period 2 : (91 - 270 days)
Totals for Proposal Acceptance Period 2: (91-270 Days)
Total Base CLINs 0001-0004 $_________________________
Total Option CLIN 0005 $_______________________
Total Base and Option CLINs 0001-0004 and CLIN 0005 $_______________________
At the Contracting Officer's discretion, Option 1, CLIN 0005 may be exercised in accordance with FAR 52.217-7.
CLIN DESCRIPTIONS
EXPLANATION OF CLIN ITEMS
CLIN 0001 Base Bid- Construction New Ramey Unit School “Primary Facilities” Construct New Ramey Unit School to 5-foot line as indicated in the plans and specifications. To include all construction work for the primary facilities including but not limited to excavation of existing site, all underground foundations and support services, construction of the building pad, new building construction, and construction/installation of all building appurtenances as indicated on the Construction Documents. Complete.
CLIN 0002 Base Bid- Construction New Ramey Unit School “Supporting Facilities – Site Preparation and Development" Includes all preparation of site for new construction, including but not limited to clearing, grubbing, grading, all dirt work outside of the building pad, utility services to the facility, all communication utilities and appurtenances, storm drainage, site improvements, permanent and temporary access and facilities, parking lots, lighting, concrete, paving, landscaping, and striping as indicated on the Construction Documents. Complete.
CLIN 0003 Base Bid - “Provide and Install Emergency Generator” – Provide and install emergency generator as indicated in the plans and specifications. Complete.
CLIN 0004 Base Bid – “Demolition, Abatement, and Disposal of Existing School Features” includes all demolition and removal of existing school structures and site features. Demolition entails the removal of all above and below ground construction associated with the existing school facilities as well as final grading, infill, and compaction of disturbed areas (previously occupied by removed structures). Any existing construction to be abandoned in place must be documented and located for Government records. Site demolition includes, but is not limited to, the removal of all existing roadways, driveways, sidewalks, above ground utilities, fire hydrants, gate valves and abandoned utilities impacted by the new construction.
This CLIN also includes the required labor, supervision, materials, equipment and applicable safety precautions necessary to conduct asbestos and lead removal and abatement present at the existing school facilities. Refer to “Ramey School 2016 Asbestos Report” and “Ramey School 2016 Lead Report” for testing results. CLIN also includes required sampling/testing for Cadmium, Chromium and Chlordane prior to the demolition to assess the need for any remediation of these materials. Complete.
CLIN 0005 Option 1 – Roof mounted Photovoltaic Provide and install roof mounted photovoltaic system at area as indicated on the construction drawings. Provide all items and accessories as required for a complete installation in every aspect. Complete.
If exercised in 1-90 days.
END OF EXPLANATION OF CLIN’S
ACCEPTANCE PERIODS
Proposal Acceptance Period Explanation:
There will be two (2) Proposal Acceptance Periods. Contractors are to price both Proposal Acceptance Periods in accordance with the below guidance.
Pricing for Proposal Acceptance Period 1 shall be effective for 90 calendar days starting from date proposals are due through 90 calendar days. Pricing for Proposal Acceptance Period 1 expires on the 91st calendar day from proposal due date.
Pricing for Proposal Acceptance Period 2 shall be effective for 180 calendar days starting 91 calendar days from date proposals are due through 270 calendar days from proposal due date. Pricing for Proposal Acceptance Period 2 expires on the 271st calendar day from proposal due date.
Section 00 21 00 - Instructions
Instructions to Offerors:
** Each Offeror is authorized to submit one (1) Electronic Proposal Package.
1. PRE-AWARD INFORMATION: This Acquisition will be solicited using FAR Part 15, Contracting by Negotiation procedures as Lowest Price Technically Acceptable (LPTA) unrestricted. This Solicitation includes a Price Evaluation Preference for HUBZone Small Business Concerns, 52.219-4. This Acquisition will be Full and Open Competition. The resultant Contract will be a Single, Firm Fixed-Price Contract for Project Number: AM00049, Ramey Unit School Replacement Aguadilla, Puerto Rico
2. BASIS FOR AWARD - Required Documentation: Contract shall be awarded to the responsive and responsible, lowest priced prospective contractor determined technically acceptable based on the evaluation criteria. PRIOR TO AWARD, IN ORDER TO BE DETERMINED
RESPONSIVE AND RESPONSIBLE, A PROSPECTIVE OFFEROR
MUST FURNISH THE FOLLOWING INFORMATION WITHIN THE
ELECTRONICALLY SUBMITTED PROPOSAL per Section V Instructions, paragraph 3.2 Proposal Format:
a. Standard Form 1442, completed and signed by an authorized person, ensuring any/all amendments are acknowledged.
b. Pricing for all items in each acceptance periods, are required to be priced to be considered complete for this submittal. Failure to do so may result in rejection of an Offeror’s proposal.
c. Offerors are required to submit a proposal guarantee for this project in accordance with FAR Clause 52.228-1, Bid Guarantee. An electronic copy of the bid guarantee must be submittal with the electronic proposal submission.
d. Provide last 3 years Financial Statements/balance sheets are the only acceptable option for submittal for this element. Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. The financial statement information will be protected from disclosure by the Contracting Officer.
Please note that offerors shall submit a subcontracting plan pursuant to FAR 52.219-9 Alt II per instruction. Does not apply to small business offerors.
See subcontracting Plan instructions at Section 00 73 00.
SUBMISSION OF PROPOSALS: The Offeror’s proposal shall be submitted electronically, as described below. The Offeror’s proposal shall not contain classified data. The use of hyperlinks in the proposals is prohibited. The offeror’s proposal is due in accordance with block 13 of the
SF1442.
NOTE: The only authorized transmission method for proposals in response to this solicitation is electronic via the PIEE Solicitation Module. NO OTHER TRANSMISSION METHODS
(EMAIL, FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED.
The Offeror’s proposal must be received by the Government by the date/time specified in the solicitation. Offerors shall submit their proposal using the following link:
https://piee.eb.mil/
** The Government will not be responsible for submissions delivered to any location or to anyone other than those designated to receive proposals. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient. Offerors are responsible for allowing sufficient time for proposals to be received in accordance with the instructions provided.
FILE DESCRIPTION: Include a “File Description” for each file(s) you upload. The “File Description” will be included in the email notice to each of the recipients you choose to have access your file(s). NOTE: Do NOT enter Privacy Act Data (Personal Identification Information (PII)) in the File Description.) Submission shall be in Adobe PDF format.
W912HN22R3004_Company Name_Document Name.
In order to submit through the Solicitation Module in PIEE, you must have an active Proposal Manager role in PIEE at https://piee.eb.mil/.
To upload the proposal in Solicitation module in PIEE:
1. Ensure you have an active role as with the Proposal Manager in PIEE.
2. Log into PIEE at https://piee.eb.mil/ to access the Solicitation Module.
3. Select Solicitation icon.
4. At the Home screen of the Solicitation Module, select the Search link to find the solicitation you intend to post an offer against.
5. In the Solicitation Search Criteria filter by entering the complete solicitation number and for Status, select Open, then click Search.
6. When search results display, select the solicitation number link to open the solicitation.
7. The solicitation displays, with information as view only.
8. To post the offer, click the Offer tab.
9. Click the Add button to add an offer to the solicitation.
10. Select the applicable CAGE Code for which you are submitting the offer. The list is pre-filtered based on the CAGEs in the Proposal Manager’s profile.
11. Click on the Choose Files link to upload attachments that comprise your offer.
12. Enter Signature Date and click Signature button after entering all necessary information.
13. Sign Document pop-up will be displayed requiring the user to enter a Digital Pin and OTP.
Click the Sign and Submit button to continue.
14. After successfully adding the Offer a success message of the submission will be displayed providing confirmation of on-time/late proposal receipt.
Refer to Attachment 7 for additional guidance on the use of the PIEE Solicitation Module.
For addition information on PIEE Vendor Access Instructions or PIEE Solicitation Module Frequently
Asked Questions visit:
https://dodprocurementtoolbox.com/site-pages/solicitation-module
For additional instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf
TECHNICAL MATTERS: Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in ProjNet at (https://www.projnet.org) at least 15 calendar days prior to the date established in the solicitation for receipt of proposals. If a Offeror believes that the requirements in this Request For Proposal contain an error, omission, or are otherwise unsound;
immediately notify the Contract Specialist in writing with supporting rationale. The Government reserves the right to award this Request For Proposal based on the initial proposal, as received, without discussions. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment or question will receive an acknowledgement via email, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on the beta.sam.gov in the form of a report generated from ProjNet as soon as the comment/question entering period is over and answers are all finalized.
REQUEST FOR PROPOSAL NO: W912HN22R3001
PROJECT NUMBER: AM00049
TITLE OF PROJECT: Ramey Unit School Replacement Aguadilla, Puerto Rico
BIDDER INQUIRY KEY: V4QEXA-N74Q3G
Specific Instructions for Initial ProjNet Bidder Inquiry Access:
1. From the ProjNet home page, click on Quick Add on the upper right side of the screen.
2. Identify the Agency as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret
Question, Secret Answer, and Time Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bidder Inquiry Access: Steps 1 through 3: Same as Above.
4. Email. Enter the email address you used to register previously in ProjNet.
5. Click Continue. A page will then open asking for the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.
NOTICE TO OFFERORS PART 2
SECTION V
SECTION 00 21 00
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. OVERVIEW.
1.1 This Request for Proposal (RFP) solicits for offers to construct the Ramey
Unit School Replacement in Aguadilla, Puerto Rico. This will be a Firm- Fixed Price (FFP) contract.
2. GENERAL INSTRUCTIONS
2.1 Who May Submit a Proposal. The requirement will be advertised for full and open competition; any legally organized firm may submit a proposal. Offerors submitting as a joint venture must provide the agreement forming the joint venture.
2.2 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors WILL NOT be evaluated for any factor. Information about firms that are part of a joint venture will be considered when the joint venture is the Offeror.
2.3 Offerors shall submit their proposal to the address shown in Proposal and Bid Bond Submission Instructions in Section 00 21 00.
3. GENERAL PROPOSAL FORMAT
3.1 Submissions
Material shall be on 8 ½ x 11-inch paper size, using no smaller than a 10 pitch or 10 font.
Offerors shall submit an electronic version (PDF Format) of Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II). These two files should be named in a specific format:
Solicitation Number, Offeror’s Company name and the volume (i.e.
W912HN22R3001 USACE_Volume_I.pdf).
Given the limited time and resources of the evaluation board, failure to provide proposal in the correct format may hinder the board's ability to evaluate the Offeror's proposal.
3.2 Proposal Format. The Proposal shall be organized and tabbed as follows:
VOLUME I Price/Representations/Certifications
Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
Table of Contents. Each volume of the proposal shall contain a detailed table of contents. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidence in the proposal.
TAB B – Section 00 10 00 – Proposal Pricing Schedule
TAB C - Section 00 45 00– Representations and Certifications
TAB D – Proposal Data Sheet – See Attachment 1 provided at the end of this section. Offerors should ensure telephone number; fax number, e-mail address and Unique Entity Identifier (UEI) number are all included. The UEI number provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data.
Offerors should also provide any other assigned number that identifies them in the CPARS database. If a separate UEI has been created for a joint venture, it must be submitted. The Offeror should also submit its Tax ID number on the proposal data sheet.
TAB E – Bid Bond – See FAR Clause 52.228-1, for required bond information. The Offeror is required to submit a bid bond. Photocopied or electronically scanned bid bonds are acceptable. Offerors shall use the most recent bond form SF24 (REV. 8/2016).
TAB F – Financial Information:
1. Provide last 3 years Financial Statements (balance sheets are the only acceptable option for submittal for this element).
2. Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.
3. The Offeror shall also provide a Subcontracting Plan in accordance with FAR Clause 52.219-9, Small Business Subcontracting Plan.
** The financial statement information will be protected from disclosure by the Contracting Officer.
TAB G – Joint Venture Agreement, if applicable. See paragraph 2.1
VOLUME II Technical Submittal
Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
Table of Contents. Each volume of the proposal shall contain a detailed table of contents. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
TAB H – Past Performance Questionnaires Summary Sheet (Attachment
2) and Past Performance Questionnaire (PPQ)(CPARS) (Attachment 3).
These forms will be used to evaluate both FACTOR 1 Corporate Relevant Specialized Experience and FACTOR 2 Past Performance.
4. TAB H – FACTOR 1 – Corporate Relevant Specialized Experience
a. The SSEB will review the two Offerors with the lowest price for technical acceptability (for Factors 1 and 2) with the intent to identify at least two offerors who are technically acceptable for a price reasonableness determination. If the two offerors are not determined technically acceptable, the SSEB will continue to evaluate subsequent lowest priced offerors until at least two are determined technically acceptable. The Contracting Officer reserves the right to require evaluation of more than two offerors if there are other unknown situations that arise per Contracting Officer’s discretion. The Government will evaluate price reasonableness based on at minimum two technically acceptable offerors.
4.1 SUBMISSION REQUIREMENTS:
4.1.1. Using the Past Performance Questionnaires Summary Sheet
(Attachment 2) and the Past Performance Questionnaire (PPQ)(CPARS) (Attachment 3), the Offeror shall demonstrate experience in performing projects meeting the requirements described in paragraphs below. Offerors shall submit projects wherein the Offeror, or proposed joint venture members, were the prime contractor and played a significant role and clearly define those roles. If any Offeror has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. Ensure that the PPQs/CPARs and continuation sheet, if used, submitted for this Factor clearly describe the relevant characteristics of the project.
4.1.2. If the Offeror is a joint venture, the projects do not have to have been performed by the joint venture submitting the offer. These projects could have been performed by either company in the joint venture.
4.1.3. The Government may contact sources other than those
provided by the Offeror for information. These other sources may include, but are not restricted to, CPARS (Contractor Performance Assessment Reporting System), and Government personnel with personal knowledge of the Offeror’s performance capability. Additional interviews with Government personnel will be documented.
4.1.4. The projects submitted for consideration in Factor 1 shall be the same projects submitted for evaluation in Factor 2. The total number of projects submitted must not exceed three (3).
If more than three (3) are submitted, only the first three (3) will be reviewed.
4.1.5. Basis for Evaluation. The Offeror is required to demonstrate their experience of recent and relevant projects are similar in size, scope, and complexity to the RFP.
For the purposes of this evaluation, a recent and relevant project is further defined as follows:
1. Recent projects:
Projects submitted must have been successfully completed, or fully designed and at least 50% construction completed, within the last six
(6) years from effective date of this solicitation.
2. Relevant experience:
All projects submitted must be new construction, however, they may be either design-build or design-bid-build projects. The Government will not consider multiple projects, such as individual task orders, which have been combined to meet the minimum contract value.
Offerors shall submit three (3) projects which demonstrate experience in construction of vertical construction facilities, excluding pre- engineered metal buildings, with characteristics described below.
Projects submitted shall collectively demonstrate experience with all three characteristics below.
Individual projects shall meet one, two, or all three characteristics below:
1. must have been built on a Department of Defense property/installation or other Federal Government location that required controlled access to the property or installation and at a minimum must include:
vertical construction (excluding pre-engineered metal buildings);
minimum of $20,000,000;
site work, interior/exterior finishes (including but not limited to floors, ceilings, doors, windows, paint, siding), architectural, electrical, mechanical, plumbing, structural and fire suppression systems; and construction of a minimum of 2 of 4 requirements:
cafeteria, gym, auditorium, or sports fields
2. must demonstrate experience in the construction of an educational facility and at a minimum must include:
over 15,000 square feet;
minimum $20,000,000; and construction of a minimum of 2 of 4 requirements:
cafeteria, gym, auditorium, or sports fields
*** Note that for the requirement of “construction of a minimum of 2 of 4: cafeteria, gym, auditorium, or sports fields,” the offeror demonstrate all 4 four requirements between the submitted projects.
3. must demonstrate experience in the construction of a facility using Reinforced Cast-In-Place Concrete Structure System; and Must be multi-story
4.1.6 The project description shall clearly describe the project. The Government will not assume any project characteristics that are not specifically identified and described. The Offeror may attach a continuation sheet to the PPQ/CPARS if needed consisting of one (1) page to describe how the project contained the elements described above and meets the requirements of this factor. The submission must contain sufficient information for the government to determine whether the project meets the requirements of 4.1.5.
4.1.7 The PPQ must provide a Point of Contact for the Client. If the Government is unable to verify the information provided on the PPQs with the client Point of Contact, or by other sources available (e.g. CPARS), the Government reserves the right to disregard that project when evaluating the Offeror’s experience.
4.2 EVALUATION CRITERIA
4.2.1 Corporate Relevant Specialized Experience. The SSEB will evaluate the experience by looking at the projects provided by the Offeror and determine if the projects meet the minimum criteria required for this solicitation.
4.2.2 Primary Elements for Evaluation. The rating methodology for Factor 1 is “Acceptable” or “Unacceptable” as defined in Table 4. All three (3) projects must meet the requirements outlined in paragraph 4.1.4 and 4.1.5.
Table 4. Corporate Relevant Specialized Experience
RATINGS DEFINITION
ACCEPTABLE Proposal meets the requirements of the solicitation.
UNACCEPTABLE Proposal does not meet the requirements of the solicitation.
5. TAB H - FACTOR 2 - Past Performance
a. The SSEB will review the two Offerors with the lowest price for technical who are technically acceptable for a price reasonableness determination. If the two offerors are not determined technically acceptable, the SSEB will continue to evaluate subsequent lowest priced offerors until at least two are determined technically acceptable. The Contracting Officer reserves the right to require evaluation of more than two offerors if there are other unknown situations that arise in order to make a fair and reasonable price determination. The Government will evaluate price reasonableness based on at minimum two technically acceptable offerors.
5.1. SUBMISSION REQUIREMENTS
5.1.1. The Offeror shall demonstrate a record of performance on each project submitted for Factor 1. The information submitted through the Past Performance Questionnaire Summary Sheet (Attachment
2) and the Past Performance Questionnaire (PPQ)/CPARS) (Attachment 3) for Factor 1 will be evaluated for this factor. The
PPQ is provided for the Offeror to submit to the client (Point of Contact) for each project the Offeror includes in its proposal. Offeror must ensure correct phone numbers and email addresses are provided for the client Point of Contact. Completed PPQs must be submitted with your proposal by the specified closing date and time. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. While it is important to submit a PPQ signed by the client if the Offeror is unable to obtain a completed PPQ from a point of contact for a project(s) before proposal closing date, the Offeror shall complete blocks 1-5 of the PPQ which will contain contract and client information and submit it with the proposal.
The Government may call and confirm information provided by the Offeror on the PPQs with the points of contact, to the extent necessary to verify the information in the PPQ or to obtain additional information. The Government reserves the right to interview other individuals if the point of contact is not available.
If the Government is unable to verify the information in the PPQ, it may be disregarded.
Offerors are cautioned that the PPQ must contain sufficient information for the government to determine whether the project contains the elements of work similar to this requirement as described in Factor 1. One (1) additional page may be used for each PPQ if needed to include this information as stated in Factor 1.
Offerors may also submit a CPARS evaluation for each relevant project in lieu of a PPQ. Ensure that the PPQs or CPARS evaluations submitted for this Factor and Factor 1 clearly describe the relevant characteristics of the project to include the client’s information (Name(s), Phone Number(s), Email Address), and for the respective project(s).
5.1.2. Basis of Evaluation. The evaluation of the Offeror’s past performance will be used as a means of assessing the Offeror’s probability to successfully meet the requirements of the RFP.
Offeror, using the same three (3) projects and narrative from Factor 1 shall demonstrate the quality of performance information on projects determined by the Government to be recent and relevant as described in Factor 1 in paragraph 4.1.5.
To be determined “Acceptable” for Factor 2 Past Performance the Offeror must have Satisfactory or higher on their PPQs for the overall rating. Any ratings “Marginal” and below for a project will result in an “Unacceptable” rating for this Factor.
5.1.3. Other Sources. In addition to the above, the Government may review any other sources other than those provided by the Offeror for evaluating past performance and experience. These other sources may include but are not limited to, past performance and experience information retrieved through Contractor Performance Assessment Reporting System (CPARS), using all UEI/DUNS numbers identified in the proposal on the Proposal Data Sheet, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. When reviewing other sources any ratings “Marginal” and below for a project will result in an “Unacceptable” rating for this Factor.
5.1.4. While the Government may elect to consider data from other sources, the offeror must provide detailed, current, accurate and complete past performance information for evaluation by the Government.
5.2 EVALUATION CRITERIA
5.2.1 Past Performance Evaluation. The past performance evaluation is the reasonable expectation of the offeror to successfully meet the minimum past performance solicitation requirements. Past performance shall be evaluated in accordance with FAR 15.305 and DFARS 215.305.
5.2.2 Recency and Relevancy Evaluation. Past performance will initially be evaluated to determine whether the offeror’s present/past performance is recent and relevant to the effort required in the
RFP.
The minimum criteria in paragraph 5.1.2 must be met to be considered recent and relevant. Projects will be evaluated for recency based on when the project was completed, and projects will be evaluated for relevancy based on the description of the project and if it meets the minimum criteria in the solicitation.
Projects that are considered not recent will be considered as not relevant. The relevancy ratings for each project are shown below in Table 5.
Table 5. Past Performance Relevancy Rating Method:
RATINGS DESCRIPTION
RELEVANT
Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
NOT RELEVANT
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
5.2.3 Performance Evaluation.
5.2.3.1. The Government will evaluate the quality of the Offeror’s past performance using the sources available to it including but not limited to the projects identified by the Offeror and submitted on the PPQs/CPARS and any additional information about those projects received from references, CPARs, etc. The Government will consider any available CPARs information on the relevant projects submitted by the Offeror under this factor. The Government reserves the right to determine an Offeror’s past performance to be Unacceptable if negative past performance information on relevant projects, as defined in 5.1.2, by the Offeror including information from other sources not submitted in response to this solicitation is discovered.
5.2.3.2. The Government will consider past performance of the offeror and if the offeror is a joint venture, the past performance information submitted for members of a joint venture.
5.2.3.3. Rating Methodology for Factor 2. To be rated “Acceptable” in this factor, Offerors must receive ratings of Satisfactory or better in each Section of PPQs submitted by the Offeror and in the Sections in CPARs evaluations reviewed by the government. Sections in a CPARS evaluation are Quality, Schedule, Cost Control (if applicable), Management, Utilization of Small Business, Regulatory Compliance, and Other Areas such as but not limited to Safety. The elements within each Section are not considered in determining whether an Offeror is Acceptable for this factor. Sections in a PPQ are the individual elements within each Section. For example, Quality Section is not rated however each question/statement such as a) Quality of technical data/report preparation efforts; b) Ability to meet quality standards specified for technical performance; c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance; d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance) is rated and will be considered individually in the evaluation of this factor.
When the SSEB is reviewing information provided by the Offeror or other sources any ratings “Marginal” and below for a project will result in an “Unacceptable” rating for this Factor.
The rating methodology for Factor 2 is “Acceptable” or “Unacceptable” as defined in Table 6.
5.2.3.4. In case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown (or “neutral”) past performance. In the context of acceptability/unacceptability, a neutral rating shall be considered “Acceptable.”
Table 6. Past Performance Ratings:
Ratings for Factor 2: Past Performance
RATINGS DESCRIPTION
ACCEPTABLE
Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown (5.2.3.4).
UNACCEPTABLE
Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
6. PROPOSAL EVALUATION
6.1. The evaluation will be based on the content of the proposal, and any information obtained from other sources, e.g. past performance information. The SSEB will not consider any documents incorporated by reference, except as expressly allowed by this solicitation.
6.2. Each member of the SSEB will independently consider all
information provided in the proposal. Once these individual analyses are completed, the SSEB will assign a consensus rating for each evaluation factor. It is the responsibility of each member of the SSEB to provide and document whether the Offeror meets or does not meet the minimum requirements in order to support the assigned rating for each factor. Comments are required for all ratings.
6.3. The SSEB will review the two Offerors with the lowest price for technical who are technically acceptable for a price reasonableness determination. If the two offerors are not determined technically acceptable, the SSEB will continue to evaluate subsequent lowest priced offerors until at least two are determined technically acceptable. The Contracting Officer reserves the right to require evaluation of more than two offerors if there are other unknown situations that arise in order to make a fair and reasonable price determination. The Government will evaluate price reasonableness based on at minimum two technically acceptable offerors.
6.4. EXCEPTIONS. Exceptions to the contractual terms and conditions of the solicitation
(e.g., standard company terms and conditions) may result in a determination to reject a proposal.)
6.5. RESTRICTIONS. Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation, and for subsequent award.
7. BASIS FOR AWARD
7.1. Proposals must meet the criteria stated in the RFP in order to be eligible for award, to include responsiveness, responsibility and technical acceptability. A responsibility determination will be made in accordance with Federal Acquisition Regulation (FAR) 9.1.
7.2. In order to determine which proposal(s) represent the lowest price technically acceptable, proposals will be evaluated against all source selection criteria in this RFP.
7.3. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors and receiving an “acceptable” rating in all non-price factors. The Government will make award to the lowest priced Offeror who is deemed responsive and responsible and whose price has been determined fair and reasonable.
Reasonableness will be established by using price analysis in accordance with FAR 15.404-1(b), to determine fairness and reasonableness. Pricing tools such as historical price information, price competition information, or the Independent Government Estimate will be used to determine reasonableness.
7.4. The Government reserves the right to reject any and all offers.
7.5. Offerors are reminded to include their best technical and price terms in their initial offer.
ATTACHMENT 1 – PROPOSAL DATA SHEET
RFP NUMBER: W912HN22R3001
PROJECT TITLE: Ramey Unit School Replacement PROJECT LOCATION: Aguadilla, Puerto Rico
1. Name of Firm:
Address:
Phone:
Fax:
E-mail:
Unique Entity Identifier# (used for accessing CPARS)
If a joint venture, list the individual firms and briefly describe the nature of the association and provide a UEI number for each firm.
Firm 1:
Firm 2:
Firm 3:
Nature of Association:
2. AUTHORIZED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .