amd6.pdf
PDF 168 KB Posted
- Attached to
- Construction of a Standard Design Access Control Point (ACP), Project Number 70677, Ft. Gordon, GA
- Solicitation number
- W912HN18R3002
About this file
Amd 6
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18R3002vol1.PDF | ||
| amd7.pdf | ||
| W912HN-18-R-3002_AMD6_V2.PDF | ||
| W912HN-18-R-3002_AMD6_V1.PDF | ||
| 18R3002vol3.PDF | ||
| 18R3002vol1.PDF | ||
| W912HN-18-R-3002_AMD6_V3.PDF | ||
| 18R3002vol2.PDF | ||
| amd5.pdf | ||
| W912HN-18-R-3002_AMD5_V1.PDF | ||
| W912HN-18-R-3002_AMD5_V3.PDF | ||
| 18R3002vol1.PDF | ||
| 18R3002vol3.PDF | ||
| 18R3002vol1.PDF | ||
| W912HN-18-R-3002_AMD4_V2.pdf | ||
| W912HN-18-R-3002_AMD4_V3.pdf | ||
| amd4.pdf | ||
| 18R3002vol3.PDF | ||
| W912HN-18-R-3002_AMD4_V1.pdf | ||
| 18R3002vol2.PDF | ||
| amd3.pdf | ||
| 18R3002vol1.PDF | ||
| 18R3002vol1.PDF | ||
| amd2.pdf | ||
| W912HN18R3002_Amd_0001.pdf | ||
| 18R3002vol1.PDF | ||
| amd1.pdf | ||
| W912HN-18-R-3002_V3.pdf | ||
| 18R3002vol3.PDF | ||
| W912HN-18-R-3000_V2B.PDF | ||
| W912HN-18-R-3000_V2A.PDF | ||
| W912HN-18-R-3002_V1.pdf | ||
| 18R3002vol1.PDF | ||
| W912HN-18-R-3000_V2C.PDF | ||
| 18R3002vol2.PDF |
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This post closing amendment is issued to incorporate changes as indicated below and on the follow ing pages:
A. Revise CLIN 0001 and add CLIN 0005 Option 3 Landscaping.
B. Incorporate revised Wage Determination GA165 dated 05/04/2018.
C. Update the plans and specifications.
D. Allow for revised pricing due June 11, 2018 at 2:00 EDT, to be submitted in accordance w ith the RFP.
E. Change the time w ithin w hich to exercise options from 360 to 90 calendar days after NTP IAW 52.217-7.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 31-May-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN18R3002
X 9B. DATED (SEE ITEM 11)
26-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
31-May-2018
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN18R3002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 01 15 - LIST OF DRAWING SHEETS
The following have been added by full text:
TECHNICAL SPECIFICATION CHANGES: The revised Sections listed below (revised by Amendment No. 0006) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).
Revised Sections 31 00 00
CONTRACT DRAWINGS – File No. 141-13-01:
Volume 1:
Sheets G-005 and G-005A with Revision 1 dated 23 May 2018 are hereby added to and made a part of the Contract Drawings. Sheet CT3000 with Revision 2 dated 23 May 2018 is hereby added to and made a part of the Contract Drawings.
Volume 2:
Sheets G-005, G-005A, CU101, CU115, CU122, CU123, CU124, CU126, CU127, CE001, CE004, CE100A, CE100B, CE100C, LP101, LP102, LP103, and LP501 with Revision 1 dated 23 May 2018 are hereby added to and made a part of the Contract Drawings. Sheet C-531 with Revision 2 dated 23 May 2018 is hereby added to and made a part of the Contract Drawings. Sheets CE100D, CE100E, LP101-OP3, LP102-OP3, AND LP103-OP3 dated 23 May 2018 are hereby added to and made a part of the Contract Drawings.
Volume 3:
Sheet G-005 and G-005A with Revision 1 dated 23 May 2018 are hereby added to and made a part of the Contract Drawings.
The following have been modified:
WAGE DETERMINATION
Applies to CLIN 0001:
General Decision Number: GA180287 01/05/2018 GA287 Superseded General Decision Number: GA20170287 State: Georgia Construction Type: Highway County: Richmond County in Georgia.
http://www.wdol.gov/dba.aspx
Applies to CLINs 0002-0005:
General Decision Number: GA180165 05/04/2018 GA165 Superseded General Decision Number: GA20170165 State: Georgia Construction Type: Building County: Richmond County in Georgia.
http://www.wdol.gov/dba.aspx
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 13-Apr-2018 02:00 PM to 11-Jun-2018 02:00 PM.
CLIN 0001
The CLIN extended description has changed from:
Point area Outside 5 Foot Line of buildings to include roadway, parking, curbs, roadway controls. Complete from Gordon Highway to 15th Street.
To:
Control Point. Complete from Gordon Highway to 15th Street.
CLIN 0004
The pricing detail quantity has increased by 1.00 from 0.00 to 1.00.
CLIN 0005 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0005 1 Job OPTION Option 3 - Landscaping, Complete.FOB: Destination
NET AMT
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 25-MAY-2018 TO
26-MAY-2020
N/A N/A
FOB: Destination
CAGE
POP 28-SEP-2018 TO
28-SEP-2020
The following Delivery Schedule item for CLIN 0002 has been changed from:
CAGE
POP 25-MAY-2018 TO
26-MAY-2020
CAGE
POP 28-SEP-2018 TO
28-SEP-2020
The following Delivery Schedule item for CLIN 0003 has been changed from:
CAGE
POP 25-MAY-2018 TO
26-MAY-2020
CAGE
POP 28-SEP-2018 TO
28-SEP-2020
The following Delivery Schedule for CLIN 0004 has been added:
CAGE
POP 28-SEP-2018 TO
28-SEP-2020
The following Delivery Schedule for CLIN 0005 has been added:
CAGE
POP 28-SEP-2018 TO
28-SEP-2020
The following have been added by full text:
Total Base Bid (CLINS 0001 & 0002) ________________________________________
Total Options 1-3 (CLINS 0003-0005) ________________________________________
Total Base Bid and Options 1-3 (CLINS 0001-0005) _____________________________
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following Acceptance/Inspection Schedule was added for CLIN 0005:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A Government
The following have been modified:
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor. CLINS 0003-0005 (Options 1-3), if exercised, must be exercised within 90 calendar days after the Notice to Proceed for the Base work (CLINS 0001 & 0002). Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
(End of Summary of Changes)