About this file

W912HN-18-R-3002 AMD4 SPECS VOL2

View the file

Other files

File Type Posted
18R3002vol1.PDF PDF
amd7.pdf PDF
W912HN-18-R-3002_AMD6_V2.PDF PDF
W912HN-18-R-3002_AMD6_V1.PDF PDF
18R3002vol3.PDF PDF
18R3002vol1.PDF PDF
W912HN-18-R-3002_AMD6_V3.PDF PDF
amd6.pdf PDF
18R3002vol2.PDF PDF
amd5.pdf PDF
W912HN-18-R-3002_AMD5_V1.PDF PDF
W912HN-18-R-3002_AMD5_V3.PDF PDF
18R3002vol1.PDF PDF
18R3002vol3.PDF PDF
18R3002vol1.PDF PDF
W912HN-18-R-3002_AMD4_V2.pdf PDF
W912HN-18-R-3002_AMD4_V3.pdf PDF
amd4.pdf PDF
18R3002vol3.PDF PDF
W912HN-18-R-3002_AMD4_V1.pdf PDF
amd3.pdf PDF
18R3002vol1.PDF PDF
18R3002vol1.PDF PDF
amd2.pdf PDF
W912HN18R3002_Amd_0001.pdf PDF
18R3002vol1.PDF PDF
amd1.pdf PDF
W912HN-18-R-3002_V3.pdf PDF
18R3002vol3.PDF PDF
W912HN-18-R-3000_V2B.PDF PDF
W912HN-18-R-3000_V2A.PDF PDF
W912HN-18-R-3002_V1.pdf PDF
18R3002vol1.PDF PDF
W912HN-18-R-3000_V2C.PDF PDF
18R3002vol2.PDF PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Gordon, Georgia

Solicitation Number

W912HN-18-R-3002

Access Control Point Volume 2 of 3: Specification Divisions 07 - 26

PN 70677

February 2018

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

CORPS OF ENGINEERS

100 WEST OGLETHORPE AVENUE

SAVANNAH, GEORGIA 31401-3640

US Army Corps of Engineers Savannah District

Access Cont r ol Poi nt 18R3002 Ft . Gor don, GA

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 11 00 SUMMARY OF WORK

01 14 00 WORK RESTRI CTI ONS

01 20 00. 00 20 PRI CE AND PAYMENT PROCEDURES

01 30 00 ADMI NI STRATI VE REQUI REMENTS

01 32 01. 00 10 PROJECT SCHEDULE

01 32 17. 00 20 COST- LOADED NETWORK ANALYSI S SCHEDULES ( NAS)

01 33 00 SUBMI TTAL PROCEDURES

01 33 29 SUSTAI NABI LI TY REPORTI NG

01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 00. 00 10 QUALI TY CONTROL

01 45 35 SPECI AL I NSPECTI ONS

01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS

01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS

01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT

01 75 00. 00 40 STARTI NG AND ADJUSTI NG

01 78 00 CLOSEOUT SUBMI TTALS

01 78 23 OPERATI ON AND MAI NTENANCE DATA

01 91 00. 15 TOTAL BUI LDI NG COMMI SSI ONI NG

DI VI SI ON 03 - CONCRETE

03 30 00 CAST- I N- PLACE CONCRETE

03 45 34 PRECAST REI NFORCED CONCRETE THREE SI DED CULVERT

DI VI SI ON 04 - MASONRY

04 20 00 UNI T MASONRY

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOI ST FRAMI NG

05 30 00 STEEL DECKS

05 40 00 COLD- FORMED METAL FRAMI NG

05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 06 60 TRANSLUCENT RESI N PANEL SYSTEM

06 10 00 ROUGH CARPENTRY

06 20 00 FI NI SH CARPENTRY

06 41 16. 00 10 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL CABI NETS

06 61 16 SOLI D SURFACI NG FABRI CATI ONS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 21 13 BOARD AND BLOCK I NSULATI ON

07 21 16 MI NERAL FI BER BLANKET I NSULATI ON

07 27 10. 00 10 BUI LDI NG AI R BARRI ER SYSTEM

07 27 26 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS

07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG

07 84 00 FIRESTOPPING

07 92 00 JOI NT SEALANTS

PROJECT TABLE OF CONTENTS Page 1

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMI NUM DOORS AND FRAMES

08 34 02 BULLET- RESI STANT COMPONENTS

08 44 00 CURTAI N WALL AND GLAZED ASSEMBLI ES

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 22 00 SUPPORTS FOR GYPSUM BOARD

09 26 00 VENEER PLASTER

09 29 00 GYPSUM BOARD

09 30 10 CERAMI C, QUARRY, AND GLASS TI LI NG

09 51 00 ACOUSTI CAL CEI LI NGS

09 65 00 RESI LI ENT FLOORI NG

09 68 00 CARPETING

09 90 00 PAI NTS AND COATI NGS

DI VI SI ON 10 - SPECI ALTI ES

10 14 00. 10 EXTERI OR SI GNAGE

10 14 00. 20 I NTERI OR SI GNAGE

10 14 53 TRAFFI C SI GNAGE

10 26 00 WALL AND DOOR PROTECTI ON

10 28 13 TOI LET ACCESSORI ES

10 44 16 FI RE EXTI NGUI SHERS

DI VI SI ON 12 - FURNI SHI NGS

12 21 00 WI NDOW BLI NDS

12 36 00 COUNTERTOPS

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 34 23. 16 PREFABRI CATED CONTROL BOOTHS

13 34 23. 17 PREFABRI CATED METAL SHELTERS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 22 00. 00 40 CLEAN AGENT FI RE EXTI NGUI SHI NG SYSTEMS

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBI NG, GENERAL PURPOSE

22 07 19. 00 40 PLUMBI NG PI PI NG I NSULATI ON

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS

23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC

23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS

23 09 23. 13 20 BACnet DI RECT DI GI TAL CONTROL SYSTEMS FOR HVAC

23 23 00 REFRI GERANT PI PI NG

23 82 02. 00 10 UNI TARY HEATI NG AND COOLI NG EQUI PMENT

PROJECT TABLE OF CONTENTS Page 2

DI VI SI ON 25 - I NTEGRATED AUTOMATI ON

25 05 11 CYBERSECURI TY FOR FACI LI TY- RELATED CONTROL SYSTEMS

DI VI SI ON 26 - ELECTRI CAL

26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS

26 05 00. 00 40 COMMON WORK RESULTS FOR ELECTRI CAL

26 05 19. 10 10 I NSULATED WI RE AND CABLE

26 05 71. 00 40 LOW VOLTAGE OVERCURRENT PROTECTI VE DEVI CES

26 08 00 APPARATUS I NSPECTI ON AND TESTI NG

26 09 23. 00 40 LI GHTI NG CONTROL DEVI CES

26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM

26 28 21. 00 40 AUTOMATI C TRANSFER SWI TCHES

26 32 15. 00 10 DI ESEL- GENERATOR SET STATI ONARY 100- 2500 KW, WI TH

AUXILIARIES

26 33 53. 00 20 UNI NTERRUPTI BLE POWER SUPPLY ( UPS)

26 41 00 LI GHTNI NG PROTECTI ON SYSTEM

26 51 00 I NTERI OR LI GHTI NG

26 56 00 EXTERI OR LI GHTI NG

DI VI SI ON 27 - COMMUNI CATI ONS

27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM

27 51 16 RADI O AND PUBLI C ADDRESS SYSTEMS

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 11 00 CLEARI NG AND GRUBBI NG

31 32 11 SOI L SURFACE EROSI ON CONTROL

31 62 16. 16 STEEL H- PI LES

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D

PAVEMENTS

32 05 33 LANDSCAPE ESTABLI SHMENT

32 11 16 BASE COURSE FOR RI GI D PAVI NG

32 11 23 AGGREGATE BASE COURSE

32 12 10 BI TUMI NOUS TACK AND PRI ME COATS

32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS

32 13 13. 06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SI TE

FACILITIES

32 17 23 PAVEMENT MARKI NGS

32 31 10 BI ORETENTI ON FACI LI TI ES

32 31 13. 53 HI GH- SECURI TY CHAI N LI NK FENCES AND GATES

32 92 19 SEEDING

32 92 23 SODDING

32 93 00 EXTERI OR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 05 23 TRENCHLESS UTI LI TY I NSTALLATI ON

33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG

PROJECT TABLE OF CONTENTS Page 3

33 30 00 SANI TARY SEWERS

33 40 00 STORM DRAI NAGE UTI LI TI ES

33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)

DI VI SI ON 34 - TRANSPORTATI ON

34 00 00 PASSI VE VEHI CLE BARRI ERS

34 71 13. 16 VEHI CLE CRASH BARRI ERS

34 71 13. 19 CRASH RATED ACTI VE VEHI CLE BARRI ERS AND CONTROLS

34 72 00. 00 CABLE- BASED PASSI VE VEHI CLE BARRI ERS

33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)

APPENDICES

Appendi x A SOI L SURVEY Appendi x B GEOTECHNI CAL REPORT

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 4

Access Control Point 18-R-3002 Ft. Gordon, GA

SECTION TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 07 21 13

BOARD AND BLOCK INSULATION

02/16

PART 1 GENERAL

1.1 REFERENCES

1.2 SUSTAINABILITY REPORTING

1.3 SUBMITTALS

1.4 MANUFACTURER'S DETAILS

1.5 PRODUCT DATA

1.6 CERTIFICATIONS

1.7 DELIVERY, STORAGE, AND HANDLING

1.7.1 Delivery

1.7.2 Storage

1.8 SAFETY PRECAUTIONS

1.8.1 Respirators

1.8.2 Other Safety Considerations

1.9 SPECIAL WARRANTIES

1.9.1 Guarantee

1.9.2 Warranty

PART 2 PRODUCTS

2.1 PRODUCT SUSTAINABILITY CRITERIA

2.1.1 Reduced Volatile Organic Compound (VOC) Content

2.1.2 Recycled Content

2.2 BLOCK OR BOARD INSULATION

2.2.1 Thermal Resistance

2.2.2 Fire Protection Requirements

2.2.3 Other Material Properties

2.2.4 Recycled Materials

2.2.5 Prohibited Materials

2.3 VAPOR RETARDER AND DAMPPROOFING

2.3.1 Dampproofing for Masonry Cavity Walls

2.3.2 Vapor Retarder under Floor Slab

2.4 PRESSURE SENSITIVE TAPE

2.5 PROTECTION BOARD OR COATING

2.6 ACCESSORIES

2.6.1 Adhesive

2.6.2 Mechanical Fasteners

PART 3 EXECUTION

3.1 EXISTING CONDITIONS

3.2 PREPARATION

3.2.1 Blocking Around Heat Producing Devices

3.3 INSTALLATION

3.3.1 Installation and Handling

3.3.2 Electrical Wiring

SECTION 07 21 13 Page 1

3.3.3 Cold Climate Requirement

3.3.4 Continuity of Insulation

3.3.5 Coordination

3.4 INSTALLATION ON WALLS

3.4.1 Installation on Masonry Walls

3.4.2 Mechanical Attachment on Concrete and Masonry Walls

3.5 PERIMETER AND UNDER SLAB INSULATION

3.5.1 Manufacturer's Instructions

3.5.2 Protection of Insulation

3.6 VAPOR RETARDER

3.7 ACCESS PANELS AND DOORS

-- End of Section Table of Contents --

SECTION 07 21 13 Page 2

SECTION 07 21 13

BOARD AND BLOCK INSULATION

02/16

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C1289 (2016a) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board

ASTM C272/C272M (2016) Standard Test Method for Water Absorption of Core Materials for Sandwich Constructions

ASTM C930 (2012) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories

ASTM D1621 (2016) Standard Test Method for Compressive Properties of Rigid Cellular Plastics

ASTM D3833/D3833M (1996; R 2011) Water Vapor Transmission of Pressure-Sensitive Tapes

ASTM E154/E154M (2008a; R 2013; E 2013) Water Vapor Retarders Used in Contact with Earth Under Concrete Slabs, on Walls, or as Ground Cover

ASTM E84 (2016) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials

INTERNATIONAL CODE COUNCIL (ICC)

ICC IBC (2015) International Building Code

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 211 (2016) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances

NFPA 70 (2017) National Electrical Code

SECTION 07 21 13 Page 3

SCIENTIFIC CERTIFICATION SYSTEMS (SCS)

SCS SCS Global Services (SCS)Indoor Advantage

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.134 Respiratory Protection

UL ENVIRONMENT (ULE)

ULE Greenguard UL Greenguard Certification Program

U.S. GREEN BUILDING COUNCIL (USGBC)

LEED BD+C (2009; R 2010) Leadership in Energy and Environmental Design(tm) Building Design and Construction (LEED-NC)

1.2 SUSTAINABILITY REPORTING

Materials in this technical specification may contribute towards contract compliance with sustainability requirements. See Section 01 33 29 SUSTAINABILITY REPORTING for project LEED BD+C local/regional materials, low-emitting materials, recycled content, and LEED documentation requirements.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Manufacturer's Standard Details; G

Block or Board Insulation; G

Vapor Retarder; G

Pressure Sensitive Tape; G

Protection Board or Coatings; G

Accessories including sealants; G

SD-07 Certificates

Block or Board Insulation; G

Vapor Retarder; G

Protection Board or Coating; G

Draft Special Warranties; G

SECTION 07 21 13 Page 4

Final Special Warranties; G

ULE Greenguard; G

SD-08 Manufacturer's Instructions

Block or Board Insulation

Adhesive

SD-11 Closeout Submittals

ULE Greenguard; S

Volatile Organic Compound (VOC) Content; S

Recycled Content; S

1.4 MANUFACTURER'S DETAILS

Submit manufacturer's standard details indicating methods of attachment and spacing, transition and termination details, and installation details.

Include verification of existing conditions.

1.5 PRODUCT DATA

Include data for material descriptions, recommendations for product shelf life, requirements for protection board or coatings, and precautions for flammability and toxicity. Include data to verify compatibility of sealants with insulation.

1.6 CERTIFICATIONS

Provide products that are third party certified in accordance with ULE Greenguard, SCS Scientific Certification Systems Indoor Advantage or approved equal.

(http://www.scsglobalservices.com/indoor-air-quality-certification)

1.7 DELIVERY, STORAGE, AND HANDLING

1.7.1 Delivery

Deliver materials to the site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.

1.7.2 Storage

Inspect materials delivered to the site for damage and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Comply with manufacturer's recommendations for handling, storage, and protection of materials before

SECTION 07 21 13 Page 5 and during installation.

1.8 SAFETY PRECAUTIONS

1.8.1 Respirators

Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by the National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) and in accordance with 29 CFR 1910.134.

1.8.2 Other Safety Considerations

Comply with the safety requirements of ASTM C930.

1.9 SPECIAL WARRANTIES

1.9.1 Guarantee

Guarantee insulation installation against failure due to ultraviolet light exposure for a period of three years from the date of Beneficial Occupancy. Submit draft and final guarantees in accordance with Sections

01 78 00 CLOSEOUT SUBMITTALS.

1.9.2 Warranty

Provide manufacturer's material warranty for all system components for a period of three years from the date of Beneficial Occupancy. Submit draft and final warranties in accordance with Sections 01 78 00 CLOSEOUT

SUBMITTALS.

PART 2 PRODUCTS

2.1 PRODUCT SUSTAINABILITY CRITERIA

Where allowed by performance criteria:

2.1.1 Reduced Volatile Organic Compound (VOC) Content

Provide products with reduced VOC content and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph REDUCE

VOLATILE ORGANIC COMPOUNDS.

2.1.2 Recycled Content

Provide products with recycled content and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph

RECYCLED CONTENT.

2.2 BLOCK OR BOARD INSULATION

Provide thermal insulating materials as recommended by manufacturer for each type of application indicated. Provide insulation with the following physical properties and in accordance with the following standards:

a. Faced Rigid Cellular Polyisocyanurate and Polyurethane Insulation:

ASTM C1289 REV A

(1) Type II Fibrous felt or glass fiber mat membrane on both major

SECTION 07 21 13 Page 6 surfaces of the core foam.

2.2.1 Thermal Resistance

Unless otherwise indicated, Wall R-11.

2.2.2 Fire Protection Requirements

a. Flame spread index of 75 or less when tested in accordance with ASTM E84.

b. Smoke developed index of 450 or less when tested in accordance with

ASTM E84.

c. Provide insulated assemblies in accordance ICC IBC Chapter Fire and Smoke Protection Features.

2.2.3 Other Material Properties

Provide thermal insulating materials with the following properties:

a. Rigid cellular plastics: Compressive Resistance at Yield: Not less than 10 pounds per square inch (psi) when measured according to

ASTM D1621.

b. Water Vapor Permeance: Not more than 1.1 Perms or less when measured according to ASTM E96/E96M, desiccant method, in the thickness required to provide the specified thermal resistance, including facings, if any.

c. Water Absorption: Not more than 2 percent by total immersion, by volume, when measured according to ASTM C272/C272M.

2.2.4 Recycled Materials

Provide thermal insulation containing recycled materials to the extent practicable, provided that the material meets all other requirements of this section. The minimum required recycled material contents (by weight, not volume) are:

Polyisocyanurate/Polyurethane: 9 percent

2.2.5 Prohibited Materials

Do not provide materials containing asbestos.

2.3 VAPOR RETARDER AND DAMPPROOFING

2.3.1 Dampproofing for Masonry Cavity Walls

Bituminous material is specified in Section 07 27 26 FLUID_APPLIED MEMBRANE

AIR BARRIER.

2.3.2 Vapor Retarder under Floor Slab

a. Water vapor permeance: 0.2 Perm or less when tested in accordance with

ASTM E96/E96M.

b. Puncture resistance: Maximum load no less than 40 pounds when tested according to ASTM E154/E154M REV A.

SECTION 07 21 13 Page 7

2.4 PRESSURE SENSITIVE TAPE

As recommended by manufacturer of vapor retarder(s). Match water vapor permeance rating for each vapor retarder specified. Provide tape in accordance with ASTM D3833/D3833M.

2.5 PROTECTION BOARD OR COATING

As recommended by insulation manufacturer.

2.6 ACCESSORIES

2.6.1 Adhesive

As recommended by insulation manufacturer.

2.6.2 Mechanical Fasteners

Corrosion resistant fasteners as recommended by the insulation manufacturer.

PART 3 EXECUTION

3.1 EXISTING CONDITIONS

Prior to installation, ensure all areas that are in contact with the insulation are dry and free of projections that could cause voids, compressed insulation, or punctured vapor retarders. For foundation perimeter or under slab applications, check that subsurface fill is flat, smooth, dry, and well tamped. Do not proceed with installation if moisture or other conditions are present, and notify the Contracting Officer of such conditions. Do not proceed with the work until conditions have been corrected and verified to be dry.

3.2 PREPARATION

3.2.1 Blocking Around Heat Producing Devices

Provide noncombustible blocking at all spaces between heat producing devices and the floors, ceilings and roofs through which they pass.

Provide in accordance with ICC IBC Section 2111.12 Fireplace Blocking and with the following clearances:

a. Recessed lighting fixtures, including wiring compartments, ballasts, and other heat producing devices, unless certified for installation surrounded by insulation: 3 inches from outside face of fixtures and devices or as required by NFPA 70 and, if insulation is placed above fixture or device, 24 inches above fixture.

b. Vents and vent connectors used for venting products of combustion, flues: Minimum clearances as required by NFPA 211.

3.3 INSTALLATION

3.3.1 Installation and Handling

Provide insulation in accordance with the manufacturer's printed installation instructions. Keep material dry and free of extraneous materials.

SECTION 07 21 13 Page 8

3.3.2 Electrical Wiring

Do not install insulation in a manner that would enclose electrical wiring between two layers of insulation.

3.3.3 Cold Climate Requirement

Place insulation on the outside of pipes.

3.3.4 Continuity of Insulation

Butt tightly against adjoining boards, studs, rafters, joists, sill plates, headers and obstructions. Provide continuity and integrity of insulation at corners, wall to ceiling joint, roof, and floor. Avoid creating thermal bridges and voids. Provide and verify continuity of insulative barrier throughout the building enclosure.

3.3.5 Coordination

Verify final installed insulation thicknesses comply with thicknesses indicated, R-values specified herein, and with the approved insulation submittal(s).

3.4 INSTALLATION ON WALLS

3.4.1 Installation on Masonry Walls

Apply board directly to masonry with adhesive or fasteners as recommended by the insulation manufacturer. Fit between obstructions without impaling board on ties or anchors. Apply in parallel courses with joints breaking midway over course below. Place boards in moderate contact with adjoining insulation without forcing and without gaps. Cut and shape as required to fit around wall penetrations, projections or openings to accommodate conduit or other utilities. Seal around cutouts with sealant. Install insulation in wall cavities so that it leaves at least a nominal 1 inch air space outside of the insulation to allow for cavity drainage.

3.4.2 Mechanical Attachment on Concrete and Masonry Walls

Cut insulation to cover walls. Apply adhesive to wall and set clip or other mechanical fastener in adhesive as recommended by manufacturer.

After curing of adhesive, install insulation over fasteners and bend split prongs to provide a flush condition with the insulation. Butt all edges of insulation and seal with tape.

3.5 PERIMETER AND UNDER SLAB INSULATION

Install perimeter thermal insulation where heated spaces are adjacent to exterior walls, slab edges in slab-on-grade, or floating slab construction as indicated on Drawings.

3.5.1 Manufacturer's Instructions

Layout insulation, tape edges, provide vapor retarder and other required accessories to protection against vermin, insects, and damage in accordance with manufacturer's printed instructions.

SECTION 07 21 13 Page 9

3.5.2 Protection of Insulation

Protect insulation from damage during construction and back filling by application of protection board or a coating. Do not leave installed vertical insulation unprotected overnight. Protect installed insulation from weather, including rain and ultraviolet light, from mechanical abuse, compression, and dislocation. Install protection over entire exposed exterior insulation board.

3.6 VAPOR RETARDER

Apply vapor retarder continuous across all surfaces. Overlap all joints at least 6 inches and seal with pressure sensitive tape. Seal at sills, header, windows, doors and utility penetrations. Repair punctures or tears with pressure sensitive tape.

3.7 ACCESS PANELS AND DOORS

Attach insulation to all access panels greater than 1 square foot and all access doors in insulated floors and ceilings. Use insulation with same R-Value as that for the floor or ceiling in which each panel occurs.

-- End of Section --

SECTION 07 21 13 Page 10

SECTION TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 07 21 16

MINERAL FIBER BLANKET INSULATION

11/11

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 SUSTAINABLE DESIGN CERTIFICATION

1.4 DELIVERY, STORAGE, AND HANDLING

1.4.1 Delivery

1.4.2 Storage

1.5 SAFETY PRECAUTIONS

1.5.1 Respirators

1.5.2 Other Safety Concerns

PART 2 PRODUCTS

2.1 PRODUCT SUSTAINABILITY CRITERIA

2.1.1 Recycled Content for Insulation Materials

2.1.2 Reduce Volatile Organic Compounds (VOC) for Insulation Materials

2.2 BLANKET INSULATION

2.2.1 Thermal Resistance Value (R-VALUE)

2.2.2 Recycled Materials

2.2.3 Prohibited Materials

2.2.4 Reduced Volatile Organic Compounds (VOC) for Insulation

Materials

2.3 VAPOR RETARDER

2.4 PRESSURE SENSITIVE TAPE

2.5 ACCESSORIES

2.5.1 Adhesive

2.5.2 Mechanical Fasteners

2.5.3 Wire Mesh

PART 3 EXECUTION

3.1 EXISTING CONDITIONS

3.2 INSTALLATION

3.2.1 Insulation

3.2.1.1 Electrical wiring

3.2.1.2 Continuity of Insulation

3.2.1.3 Installation at Bridging and Cross Bracing

3.2.1.4 Cold Climate Requirement

3.2.1.5 Insulation Blanket with Affixed Foil Face Vapor Retarder

3.2.1.6 Insulation without Affixed Vapor Retarder

3.2.1.7 Sizing of Blankets

SECTION 07 21 16 Page 1

SECTION 07 21 16

MINERAL FIBER BLANKET INSULATION

11/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM C665 (2012) Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing

ASTM C930 (2012) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories

ASTM D3833/D3833M (1996; R 2011) Water Vapor Transmission of Pressure-Sensitive Tapes

ASTM E136 (2016) Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C

ASTM E84 (2016) Standard Test Method for Surface Burning Characteristics of Building Materials

ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910.134 Respiratory Protection

UL ENVIRONMENT (ULE)

ULE Greenguard UL Greenguard Certification Program

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Blanket Insulation

SECTION 07 21 16 Page 2

Vapor Retarder

Pressure Sensitive Tape

Accessories

SD-08 Manufacturer's Instructions

Insulation

SD-11 Closeout Submittals

Recycled Content for Insulation Materials; S

Reduce Volatile Organic Compounds (VOC) for Insulation Materials; S

1.3 SUSTAINABLE DESIGN CERTIFICATION

Product must be third party certified in accordance with ULE Greenguard.

1.4 DELIVERY, STORAGE, AND HANDLING

1.4.1 Delivery

Deliver materials to site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.

1.4.2 Storage

Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.

1.5 SAFETY PRECAUTIONS

1.5.1 Respirators

Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134.

1.5.2 Other Safety Concerns

Consider other safety concerns and measures as outlined in ASTM C930.

PART 2 PRODUCTS

2.1 PRODUCT SUSTAINABILITY CRITERIA

For products in this section, where applicable and to extent allowed by performance criteria, provide and document the following:

SECTION 07 21 16 Page 3

2.1.1 Recycled Content for Insulation Materials

Provide insulation materials meeting the recycled content requirements as stated within this section and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph RECYCLED CONTENT.

2.1.2 Reduce Volatile Organic Compounds (VOC) for Insulation Materials

Provide insulation materials meeting the reduced VOC requirements as stated within this section and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph REDUCE VOLATILE ORGANIC

COMPOUNDS.

2.2 BLANKET INSULATION

ASTM C665, Type I, blankets without membrane coverings and III, blankets with reflective coverings; Class A, membrane-faced surface with a flame spread of 25 or less and a smoke developed rating of 150 or less when tested in accordance with ASTM E84.

2.2.1 Thermal Resistance Value (R-VALUE)

The R-Value must be as indicated on drawings.

2.2.2 Recycled Materials

Provide Thermal Insulation containing recycled materials to the extent practicable, provided the material meets all other requirements of this section. The minimum required recycled materials content by weight are:

Fiberglass: 20 to 25 percent glass cullet

2.2.3 Prohibited Materials

Do not provide asbestos-containing materials.

2.2.4 Reduced Volatile Organic Compounds (VOC) for Insulation Materials

ULE Greenguard.

2.3 VAPOR RETARDER

a. Foil Face Membrane with the following properties:

Water Vapor Permeance: ASTM E96/E96M: 0.5 perm Maximum Flame Spread: ASTM E84: 25 Combustion Characteristics: Passing ASTM E136

2.4 PRESSURE SENSITIVE TAPE

As recommended by the vapor retarder manufacturer and having a water vapor permeance rating of 0.5 perm or less when tested in accordance with

ASTM D3833/D3833M.

2.5 ACCESSORIES

2.5.1 Adhesive

As recommended by the insulation manufacturer.

SECTION 07 21 16 Page 4

Adhesives must follow the manufacturer's requirements for low pollutant emitting materials in achieving ULE Greenguard certification for their insulation products.

2.5.2 Mechanical Fasteners

Corrosion resistant fasteners as recommended by the insulation manufacturer.

2.5.3 Wire Mesh

Corrosion resistant and as recommended by the insulation manufacturer.

PART 3 EXECUTION

3.1 EXISTING CONDITIONS

Before installing insulation, ensure that areas that will be in contact with the insulation are dry and free of projections which could cause voids, compressed insulation, or punctured vapor retarders. If moisture or other conditions are found that do not allow the workmanlike installation of the insulation, do not proceed but notify Contracting Officer of such conditions.

3.2 INSTALLATION

3.2.1 Insulation

Install and handle insulation in accordance with manufacturer's instructions. Keep material dry and free of extraneous materials. Any materials that show visual evidence of biological growth due to presence of moisture must not be installed on the building project. Ensure personal protective clothing and respiratory equipment is used as required. Observe safe work practices.

3.2.1.1 Electrical wiring

Do not install insulation in a manner that would sandwich electrical wiring between two layers of insulation.

3.2.1.2 Continuity of Insulation

Install blanket insulation to butt tightly against adjoining blankets and joists, and any obstructions. Provide continuity and integrity of insulation at corners, wall to ceiling joints,and roof. Avoid creating thermal bridges.

3.2.1.3 Installation at Bridging and Cross Bracing

Insulate at bridging and cross bracing by splitting blanket vertically at center and packing one half into each opening. Butt insulation at bridging and cross bracing; fill in bridged area with loose or scrap insulation.

3.2.1.4 Cold Climate Requirement

Place insulation to the outside of pipes.

SECTION 07 21 16 Page 5

3.2.1.5 Insulation Blanket with Affixed Foil Face Vapor Retarder

Locate vapor retarder as indicated. Do not install blankets with affixed vapor retarders unless so specified. Unless the insulation manufacturer's instructions specifically recommend not to staple the flanges of the vapor retarder facing, staple flanges of vapor retarder at 6 inch intervals flush with face or set in the side of truss, joist, or stud. Avoid gaps and bulges in insulation and "fishmouth" in vapor retarders. Overlap both flanges when using face method. Seal joints and edges of vapor retarder with pressure sensitive tape along bottom of joists. Stuff pieces of insulation into small cracks between trusses, joists, studs and other framing, such as at attic access doors, door and window heads, jambs, and sills, band joists, and headers. Cover these insulated cracks with vapor retarder material and tape all joints with pressure sensitive tape to provide air and vapor tightness.

3.2.1.6 Insulation without Affixed Vapor Retarder

Provide snug friction fit to hold insulation in place. Stuff pieces of insulation into cracks between joists.

3.2.1.7 Sizing of Blankets

Provide only full width blankets when insulating between joists. Size width of blankets for a snug fit where joists are irregularly spaced.

SECTION 07 21 16 Page 6

SECTION TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 07 27 10.00 10

BUILDING AIR BARRIER SYSTEM

05/14

PART 1 GENERAL

1.1 SUMMARY

1.2 DEFINITIONS

1.2.1 Air Barrier Accessory

1.2.2 Air Barrier Assembly

1.2.3 Air Barrier Component

1.2.4 Air Barrier Envelope

1.2.5 Air Barrier Material

1.2.6 Air Barrier System

1.2.7 Air Leakage Rate

1.2.8 Air Leakage

1.2.9 Air Permeance

1.2.10 Environmental Separator

1.3 PREPARATORY PHASE OR PRECONSTRUCTION CONFERENCE

1.4 SUBMITTALS

1.5 AIR BARRIER INSPECTOR

1.6 DESIGN REVIEW

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 QUALITY CONTROL

3.1.1 Documentation and Reporting

3.1.2 Quality Control Inspection

3.2 REPAIR AND PROTECTION

SECTION 07 27 10.00 10 Page 1

SECTION 07 27 10.00 10

BUILDING AIR BARRIER SYSTEM

05/14

PART 1 GENERAL

1.1 SUMMARY

This Section specifies the construction and quality control of the installation of an air barrier system. Construct the air barrier system indicated, taking responsibity for the means, methods, and workmanship of the installation of the air barrier system. The air barrier must be contiguous and connected across all surfaces of the enclosed air barrier envelope indicated. The maximum leakage requirements of individual air barrier components and materials are specified in the other specification sections covering these items.

1.2 DEFINITIONS

The following terms as they apply to this section:

1.2.1 Air Barrier Accessory

Products designated to maintain air tightness between air barrier materials, air barrier assemblies and air barrier components, to fasten them to the structure of the building, or both (e.g., sealants, tapes, backer rods, transition membranes, fasteners, strapping, primers).

1.2.2 Air Barrier Assembly

The combination of air barrier materials and air barrier accessories that are designated and designed within the environmental separator to act as a continuous barrier to the movement of air through the environmental separator.

1.2.3 Air Barrier Component

Pre-manufactured elements such as windows, doors, dampers and service elements that are installed in the environmental separator.

1.2.4 Air Barrier Envelope

The combination of air barrier assemblies and air barrier components, connected by air barrier accessories that are designed to provide a continuous barrier to the movement of air through an environmental separator. There may be more than one air barrier envelope in a single building. Also known as Air Barrier System.

1.2.5 Air Barrier Material

A building material that is designed and constructed to provide the primary resistance to airflow through an air barrier assembly.

SECTION 07 27 10.00 10 Page 2

1.2.6 Air Barrier System

Same as AIR BARRIER ENVELOPE.

1.2.7 Air Leakage Rate

The rate of airflow (CFM) driven through a unit surface area (sq.ft.) of an assembly or system by a unit static pressure difference (Pa) across the assembly. (example: 0.25 CFM/sq.ft. @ 75 Pa)

1.2.8 Air Leakage

The total airflow (CFM) driven through the air barrier system by a unit static pressure difference (Pa) across the air barrier envelope. (example:

6500 CFM @ 75 Pa)

1.2.9 Air Permeance

The rate of airflow (CFM) through a unit area (sq.ft.) of a material driven by unit static pressure difference (Pa) across the material (example: 0.004 CFM/sq.ft. @ 75 Pa).

1.2.10 Environmental Separator

The parts of a building that separate the controlled interior environment from the uncontrolled exterior environment, or that separate spaces within a building that have dissimilar environments. Also known as the Control Layer.

1.3 PREPARATORY PHASE OR PRECONSTRUCTION CONFERENCE

Organize pre-construction conferences between the air barrier inspector and the sub-contractors involved in the construction of or penetration of the air barrier system to discuss where the work of each sub-contractor begins and ends, the sequence of installation, and each sub-contractor's responsibility to ensure airtight joints, junctures, penetrations and transitions between materials. Discuss the products, and assemblies of products specified in the different sections to be installed by the different sub-contractors.

1.4 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-06 Test Reports

Design Review Report; G

Two copies not later than 14 days after approval of the Air Barrier Inspector Qualifications.

Inspection; G

SECTION 07 27 10.00 10 Page 3

SD-07 Certificates

Air Barrier Inspector; G

Two copies 30 days after Notice to Proceed.

1.5 AIR BARRIER INSPECTOR

Employ a designated Air Barrier Inspector on this project. The Air Barrier Inspector performs a Design Review, performs quality control air barrier inspection as specified, interfaces with the designer and product manufacturer's representatives to assure all installation requirements are met, and coordinates efforts between all workers installing or penetrating the air barrier materials. Qualification for the Air Barrier Inspector are as follows:

a. Training and certification as an Air Barrier Installer from the Air Barrier Association of America (ABAA) or other third party air barrier association.

b. Experience coordinating and instructing personnel involved in the installation, joining, and sealing of air barrier materials and components.

1.6 DESIGN REVIEW

Review the Contract Plans and Specifications and advise the Contracting Officer of any deficiencies that would prevent the construction of an effective air barrier system. Provide a Design Review Report individually listing each deficiency and the corresponding proposed corrective action necessary for proper air barrier system.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.1 QUALITY CONTROL

3.1.1 Documentation and Reporting

Document the entire installation process on daily job site reports. These reports include information on the Installer, substrates, substrate preparation, products used, ambient and substrate temperature, the location of the air barrier installation, and the results of the quality control procedures.

3.1.2 Quality Control Inspection

Conduct the following inspections as applicable in the presence of the Contracting Officer during installation of the air barrier system, and submit quality control reports as indicated below.

a. Provide a Daily Report of Observations with a copy to the Contracting Officer.

b. Inspect to assure continuity of the air barrier system throughout the building enclosure and that all gaps are covered, the covering is

SECTION 07 27 10.00 10 Page 4 structurally sound, and all penetrations are sealed allowing for no infiltration or exfiltration through the air barrier system.

c. Inspect to assure structural support of the air barrier system to withstand design air pressures.

d. Inspect to assure masonry surfaces receiving air barrier materials are smooth, clean, and free of cavities, protrusions and mortar droppings, with mortar joints struck flush or as required by the manufacturer of the air barrier material.

e. Inspect to assure site conditions for application temperature, and dryness of substrates are within guidelines.

f. Inspect to assure substrate surfaces are properly primed if applicable and in accordance with manufacturer's instructions. Priming must extend at least 2 inches beyond the air barrier material to make it obvious that the primer was applied to the substrate before the air barrier material.

g. Inspect to asure laps in materials are at least a 2-inch minimum, shingled in the correct direction or mastic applied in accordance with manufacturer's recommendations, and with no fishmouths.

h. Inspect to assure that a roller has been used to enhance adhesion.

Identify any defects such as fishmouths, wrinkles, areas of lost adhesion, and improper curing. Note the intended remedy for the deficiencies.

i. Measure application thickness of liquid applied materials to assure that manufacturer's specifications for the specific substrate are met.

j. Inspect to assure that the correct materials are installed for compatibility.

k. Inspect to assure proper transitions for change in direction and structural support at gaps.

l. Inspect to assure proper connection between assemblies (membrane and sealants) for cleaning, preparation and priming of surfaces, structural support, integrity and continuity of seal.

3.2 REPAIR AND PROTECTION

Upon completion of inspection, repair damaged construction and restore substrates, coatings and finishes. Protect construction exposed by or for quality control service activities, and protect repaired construction.

SECTION 07 27 10.00 10 Page 5

SECTION TABLE OF CONTENTS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

SECTION 07 27 26

FLUID-APPLIED MEMBRANE AIR BARRIERS

05/17

PART 1 GENERAL

1.1 REFERENCES

1.2 RELATED REQUIREMENTS

1.3 SUBMITTALS

1.4 MISCELLANEOUS REQUIREMENTS

1.4.1 Shop Drawings

1.4.2 Product Data

1.5 DELIVERY, STORAGE, AND HANDLING

1.5.1 Delivery

1.5.2 Storage

1.6 QUALITY ASSURANCE

1.6.1 Qualifications of Manufacturer

1.6.2 Qualifications of Installer

1.7 PRECONSTRUCTION MEETING

1.8 ENVIRONMENTAL CONDITIONS

1.8.1 Temperature

1.8.2 Exposure to Weather

PART 2 PRODUCTS

2.1 REDUCED VOLATILE ORGANIC COMPOUND (VOC) CONTENT

2.2 FLUID-APPLIED MEMBRANE AIR BARRIER

2.2.1 Physical Properties

2.3 PRIMERS, ADHESIVES, AND MASTICS

2.4 TRANSITION MEMBRANE

2.5 SHEET METAL FLASHING

2.6 JOINT SEALANTS

2.7 REINFORCEMENT

PART 3 EXECUTION

3.1 EXAMINATION

3.2 PREPARATION

3.3 INSTALLATION

3.3.1 Installation of Transition Membrane

3.3.2 Installation of Flashing

3.3.3 Installation of Fluid-Applied Membrane Air Barrier

3.3.4 Installation of Reinforcement

3.4 FIELD QUALITY CONTROL

3.4.1 Site Inspections and Testing

3.5 PROTECTION AND CLEANING

3.5.1 Protection

3.5.2 Cleaning of Adjacent Surfaces

3.6 CLEANUP OF SPILLS

SECTION 07 27 26 Page 1

SECTION 07 27 26 Page 2

SECTION 07 27 26

FLUID-APPLIED MEMBRANE AIR BARRIERS

05/17

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AIR BARRIER ASSOCIATION OF AMERICA (ABAA)

ABAA Accreditation Accreditation

ABAA QAP Quality Assurance Program

ASTM INTERNATIONAL (ASTM)

ASTM C836/C836M (2015) High Solids Content, Cold Liquid-Applied Elastomeric Waterproofing Membrane for Use With Separate Wearing Course

ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension

ASTM D4263 (1983; R 2012) Indicating Moisture in Concrete by the Plastic Sheet Method

ASTM D5590 (2000; R 2010; E 2012) Standard Test Method for Determining the Resistance of Paint Films and Related Coatings to Fungal Defacement by Accelerated Four-Week Agar Plate Assay

ASTM E2178 (2013) Standard Test Method for Air Permeance of Building Materials

ASTM E2357 (2011) Standard Test Method for Determining Air Leakage of Air Barrier Assemblies

ASTM E283 (2004; R 2012) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen

ASTM E331 (2000; R 2016) Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference

ASTM E84 (2016) Standard Test Method for Surface

SECTION 07 27 26 Page 3

Burning Characteristics of Building Materials

ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 285 (2012) Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Non-Load-Bearing Wall Assemblies Containing Combustible Components

1.2 RELATED REQUIREMENTS

Coordinate the requirements of Section 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM and other building enclosure sections to provide a complete building air barrier system. Submit all materials, components and assemblies of the air barrier system together as one complete submittal package.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Qualifications of Manufacturer; G

Qualifications of Installer; G

SD-02 Shop Drawings

Fluid-Applied Membrane Air Barrier; G

SD-03 Product Data

Fluid-Applied Membrane Air Barrier; G

Transition Membrane; G

Primers, Adhesives, and Mastics; G

Reinforcement; G

Safety Data Sheets; G

SD-06 Test Reports

Site Inspections Reports; G

SD-07 Certificates

SECTION 07 27 26 Page 4

Fluid-Applied Membrane Air Barrier; G

Transition Membrane; G

Qualifications of Manufacturer; G

Qualifications of Installer; G

SD-08 Manufacturer's Instructions

Fluid-Applied Membrane Air Barrier; G

Transition Membrane; G

Primers, Adhesives, and Mastics; G

SD-11 Closeout Submittals

Volatile Organic Compound (VOC) Content; S

1.4 MISCELLANEOUS REQUIREMENTS

For fluid-applied membrane air barriers provide the following:

1.4.1 Shop Drawings

Submit fluid-applied membrane air barrier shop drawings showing locations and extent of barrier assemblies, transition membranes, details of all typical conditions, intersections with other envelope assemblies and materials, and membrane counterflashings. Show details for bridging of gaps in construction, treatment of inside and outside corners, expansion joints, methods of attachment of materials covering the self-adhered barrier without compromising the barrier. Indicate how miscellaneous penetrations such as conduit, pipes, electric boxes, brick ties, and similar items will be sealed.

1.4.2 Product Data

Submit manufacturer's technical data indicating compliance with performance and environmental requirements, manufacturer's printed instructions for evaluating, preparing, and treating substrates, temperature and other limitations of installation conditions, safety requirements for installation, and Safety Data Sheets. Indicate flame and smoke spread ratings for all products.

1.5 DELIVERY, STORAGE, AND HANDLING

1.5.1 Delivery

Deliver and store materials in sufficient quantity to allow for uninterrupted flow of work. Inspect materials delivered to the site for damage and store out of weather. Deliver materials to the jobsite in their original unopened packages, clearly marked with the manufacturer's name, brand designation, description of contents, and shelf life of containerized materials. Store and handle to protect from damage.

1.5.2 Storage

Inspect materials delivered to the site for damage; unload and store out of

SECTION 07 27 26 Page 5 weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling. Protect stored materials from direct sunlight.

1.6 QUALITY ASSURANCE

1.6.1 Qualifications of Manufacturer

Submit documentation verifying that manufacturer of fluid-applied membrane air barrier is currently accredited by the Air Barrier Association of America (ABAA Accreditation https://www.airbarrier.org/).

1.6.2 Qualifications of Installer

Submit documentation verifying that installers of the fluid-applied membrane air barrier are currently certified in accordance with the ABAA QAP Quality Assurance Program (https://www.airbarrier.org/qap/).

1.7 PRECONSTRUCTION MEETING

Conduct a preconstruction meeting a minimum of two weeks prior to commencing work specified in this Section. Agenda must include, at a minimum, construction and testing of construction mock up, sequence of construction, coordination with substrate preparation, materials approved for use, compatibility of materials, coordination with installation of adjacent and covering materials, and details of construction. Attendance is required by representatives of related trades including covering materials, substrate materials, adjacent materials, and materials and components of the fluid-applied membrane air barrier.

1.8 ENVIRONMENTAL CONDITIONS

1.8.1 Temperature

Install fluid-applied membrane air barrier within the range of ambient and substrate temperatures as recommended in writing by the fluid-applied membrane air barrier manufacturer. Do not apply fluid-applied membrane air barrier to a damp or wet substrate. Do not apply during inclement weather or when ice, frost, surface moisture, or visible dampness is present on surfaces to be covered, or when precipitation is imminent.

1.8.2 Exposure to Weather

Protect fluid-applied membrane air barrier products from direct exposure to rain, snow, sunlight, mist, and other extreme weather conditions. Replace, at no additional cost to the government, barrier products that have been exposed to ultraviolet (sun)light longer than allowed by manufacturer's written requirements.

PART 2 PRODUCTS

2.1 REDUCED VOLATILE ORGANIC COMPOUND (VOC) CONTENT

Provide products with reduced VOC content and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING.

2.2 FLUID-APPLIED MEMBRANE AIR BARRIER

Provide a fluid-applied, vapor permeable and vapor retarding, air barrier.

SECTION 07 27 26 Page 6

Provide a vapor-permeable air barrier at concrete roof deck at VCC.

Provide a vapor retarding air barrier at exterior CMU walls. These barriers must exhibit no visible water leakage when tested in accordance with ASTM E331 and must perform as a liquid water drainage plane with thru-wall flashing to discharge incidental condensation and water penetration to the exterior of the building enclosure. Provide products suitable for use within temperature ranges specified by manufacturer for the location of the project.

2.2.1 Physical Properties

a. Air Permeance (ASTM E2178): in accordance with Section 07 27 10.00 10

BUILDING AIR BARRIER SYSTEM.

b. Air Leakage (ASTM E2357, ASTM E283): in accordance with Section

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM.

c. Water Vapor Permeance (Vapor Permeable Membrane) (ASTM E96/E96M, desiccant method A): 10.0 perms.

d. Water Vapor Permeance (Vapor Impermeable Membrane) (ASTM E96/E96M, desiccant method A): 0.1 perms or less.

e. Tensile Strength (ASTM D412): Not less than 138 psi.

f. Elongation (ASTM D412): Not less than 300 percent.

g. Low temperature Flexibility and Crack Bridging (ASTM C836/C836M): Pass at minus 15 degrees F.

h. Solids by Volume: minimum 50 percent.

i. Flame propagation of wall assemblies (NFPA 285): Pass

j. Surface Burning Characteristics (ASTM E84):

(1) Flame Spread Index Rating not higher than 75.

(2) Smoke Developed Index Rating not higher than 150.

k. Resistance to Mold, Mildew and Fungal Growth (ASTM D5590): 0, No growth.

2.3 PRIMERS, ADHESIVES, AND MASTICS

Provide primers, adhesives, mastics, sealants and other accessories as recommended by manufacturer of fluid-applied membrane air barrier for a complete installation.

2.4 TRANSITION MEMBRANE

Provide at window and door openings.

2.5 SHEET METAL FLASHING

Provide…