18R3002vol2.PDF
PDF 2 MB Posted
- Attached to
- Construction of a Standard Design Access Control Point (ACP), Project Number 70677, Ft. Gordon, GA
- Solicitation number
- W912HN18R3002
About this file
SPECS Vol 2 Amd 5
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 18R3002vol1.PDF | ||
| amd7.pdf | ||
| W912HN-18-R-3002_AMD6_V2.PDF | ||
| W912HN-18-R-3002_AMD6_V1.PDF | ||
| 18R3002vol3.PDF | ||
| 18R3002vol1.PDF | ||
| W912HN-18-R-3002_AMD6_V3.PDF | ||
| amd6.pdf | ||
| amd5.pdf | ||
| W912HN-18-R-3002_AMD5_V1.PDF | ||
| W912HN-18-R-3002_AMD5_V3.PDF | ||
| 18R3002vol1.PDF | ||
| 18R3002vol3.PDF | ||
| 18R3002vol1.PDF | ||
| W912HN-18-R-3002_AMD4_V2.pdf | ||
| W912HN-18-R-3002_AMD4_V3.pdf | ||
| amd4.pdf | ||
| 18R3002vol3.PDF | ||
| W912HN-18-R-3002_AMD4_V1.pdf | ||
| 18R3002vol2.PDF | ||
| amd3.pdf | ||
| 18R3002vol1.PDF | ||
| 18R3002vol1.PDF | ||
| amd2.pdf | ||
| W912HN18R3002_Amd_0001.pdf | ||
| 18R3002vol1.PDF | ||
| amd1.pdf | ||
| W912HN-18-R-3002_V3.pdf | ||
| 18R3002vol3.PDF | ||
| W912HN-18-R-3000_V2B.PDF | ||
| W912HN-18-R-3000_V2A.PDF | ||
| W912HN-18-R-3002_V1.pdf | ||
| 18R3002vol1.PDF | ||
| W912HN-18-R-3000_V2C.PDF | ||
| 18R3002vol2.PDF |
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Gordon, Georgia
Solicitation Number
W912HN-18-R-3002
Access Control Point Volume 2 of 3: Specification Divisions 07 - 26
PN 70677
February 2018
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
Access Cont r ol Poi nt 18R3002 Ft . Gor don, GA
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRI CTI ONS
01 20 00. 00 20 PRI CE AND PAYMENT PROCEDURES
01 30 00 ADMI NI STRATI VE REQUI REMENTS
01 32 01. 00 10 PROJECT SCHEDULE
01 32 17. 00 20 COST- LOADED NETWORK ANALYSI S SCHEDULES ( NAS)
01 33 00 SUBMI TTAL PROCEDURES
01 33 29 SUSTAI NABI LI TY REPORTI NG
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 10 QUALI TY CONTROL
01 45 35 SPECI AL I NSPECTI ONS
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT
01 75 00. 00 40 STARTI NG AND ADJUSTI NG
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
01 91 00. 15 TOTAL BUI LDI NG COMMI SSI ONI NG
DI VI SI ON 03 - CONCRETE
03 30 00 CAST- I N- PLACE CONCRETE
03 45 34 PRECAST REI NFORCED CONCRETE THREE SI DED CULVERT
DI VI SI ON 04 - MASONRY
04 20 00 UNI T MASONRY
DI VI SI ON 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOI ST FRAMI NG
05 30 00 STEEL DECKS
05 40 00 COLD- FORMED METAL FRAMI NG
05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 06 60 TRANSLUCENT RESI N PANEL SYSTEM
06 10 00 ROUGH CARPENTRY
06 20 00 FI NI SH CARPENTRY
06 41 16. 00 10 PLASTI C- LAMI NATE- CLAD ARCHI TECTURAL CABI NETS
06 61 16 SOLI D SURFACI NG FABRI CATI ONS
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 21 13 BOARD AND BLOCK I NSULATI ON
07 21 16 MI NERAL FI BER BLANKET I NSULATI ON
07 27 10. 00 10 BUI LDI NG AI R BARRI ER SYSTEM
07 27 26 FLUI D- APPLI ED MEMBRANE AI R BARRI ERS
07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG
07 84 00 FIRESTOPPING
07 92 00 JOI NT SEALANTS
PROJECT TABLE OF CONTENTS Page 1
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMI NUM DOORS AND FRAMES
08 34 02 BULLET- RESI STANT COMPONENTS
08 44 00 CURTAI N WALL AND GLAZED ASSEMBLI ES
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 26 00 VENEER PLASTER
09 29 00 GYPSUM BOARD
09 30 10 CERAMI C, QUARRY, AND GLASS TI LI NG
09 51 00 ACOUSTI CAL CEI LI NGS
09 65 00 RESI LI ENT FLOORI NG
09 68 00 CARPETING
09 90 00 PAI NTS AND COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00. 10 EXTERI OR SI GNAGE
10 14 00. 20 I NTERI OR SI GNAGE
10 14 53 TRAFFI C SI GNAGE
10 26 00 WALL AND DOOR PROTECTI ON
10 28 13 TOI LET ACCESSORI ES
10 44 16 FI RE EXTI NGUI SHERS
DI VI SI ON 12 - FURNI SHI NGS
12 21 00 WI NDOW BLI NDS
12 36 00 COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 34 23. 16 PREFABRI CATED CONTROL BOOTHS
13 34 23. 17 PREFABRI CATED METAL SHELTERS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 22 00. 00 40 CLEAN AGENT FI RE EXTI NGUI SHI NG SYSTEMS
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBI NG, GENERAL PURPOSE
22 07 19. 00 40 PLUMBI NG PI PI NG I NSULATI ON
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS
23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 09 23. 13 20 BACnet DI RECT DI GI TAL CONTROL SYSTEMS FOR HVAC
23 23 00 REFRI GERANT PI PI NG
23 82 02. 00 10 UNI TARY HEATI NG AND COOLI NG EQUI PMENT
PROJECT TABLE OF CONTENTS Page 2
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 CYBERSECURI TY FOR FACI LI TY- RELATED CONTROL SYSTEMS
DI VI SI ON 26 - ELECTRI CAL
26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS
26 05 00. 00 40 COMMON WORK RESULTS FOR ELECTRI CAL
26 05 19. 10 10 I NSULATED WI RE AND CABLE
26 05 71. 00 40 LOW VOLTAGE OVERCURRENT PROTECTI VE DEVI CES
26 08 00 APPARATUS I NSPECTI ON AND TESTI NG
26 09 23. 00 40 LI GHTI NG CONTROL DEVI CES
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 28 21. 00 40 AUTOMATI C TRANSFER SWI TCHES
26 32 15. 00 10 DI ESEL- GENERATOR SET STATI ONARY 100- 2500 KW, WI TH
AUXILIARIES
26 33 53. 00 20 UNI NTERRUPTI BLE POWER SUPPLY ( UPS)
26 41 00 LI GHTNI NG PROTECTI ON SYSTEM
26 51 00 I NTERI OR LI GHTI NG
26 56 00 EXTERI OR LI GHTI NG
DI VI SI ON 27 - COMMUNI CATI ONS
27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM
27 51 16 RADI O AND PUBLI C ADDRESS SYSTEMS
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARI NG AND GRUBBI NG
31 32 11 SOI L SURFACE EROSI ON CONTROL
31 62 16. 16 STEEL H- PI LES
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D
PAVEMENTS
32 05 33 LANDSCAPE ESTABLI SHMENT
32 11 16 BASE COURSE FOR RI GI D PAVI NG
32 11 23 AGGREGATE BASE COURSE
32 12 10 BI TUMI NOUS TACK AND PRI ME COATS
32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS
32 13 13. 06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SI TE
FACILITIES
32 17 23 PAVEMENT MARKI NGS
32 31 10 BI ORETENTI ON FACI LI TI ES
32 31 13. 53 HI GH- SECURI TY CHAI N LI NK FENCES AND GATES
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERI OR PLANTS
DI VI SI ON 33 - UTI LI TI ES
33 05 23 TRENCHLESS UTI LI TY I NSTALLATI ON
33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG
PROJECT TABLE OF CONTENTS Page 3
33 30 00 SANI TARY SEWERS
33 40 00 STORM DRAI NAGE UTI LI TI ES
33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
DI VI SI ON 34 - TRANSPORTATI ON
34 00 00 PASSI VE VEHI CLE BARRI ERS
34 71 13. 16 VEHI CLE CRASH BARRI ERS
34 71 13. 19 CRASH RATED ACTI VE VEHI CLE BARRI ERS AND CONTROLS
34 72 00. 00 CABLE- BASED PASSI VE VEHI CLE BARRI ERS
33 82 00 TELECOMMUNI CATI ONS OUTSI DE PLANT ( OSP)
APPENDICES
Appendi x A SOI L SURVEY Appendi x B GEOTECHNI CAL REPORT
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 4
Access Control Point 18-R-3002 Ft. Gordon, GA
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 21 13
BOARD AND BLOCK INSULATION
02/16
PART 1 GENERAL
1.1 REFERENCES
1.2 SUSTAINABILITY REPORTING
1.3 SUBMITTALS
1.4 MANUFACTURER'S DETAILS
1.5 PRODUCT DATA
1.6 CERTIFICATIONS
1.7 DELIVERY, STORAGE, AND HANDLING
1.7.1 Delivery
1.7.2 Storage
1.8 SAFETY PRECAUTIONS
1.8.1 Respirators
1.8.2 Other Safety Considerations
1.9 SPECIAL WARRANTIES
1.9.1 Guarantee
1.9.2 Warranty
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
2.1.1 Reduced Volatile Organic Compound (VOC) Content
2.1.2 Recycled Content
2.2 BLOCK OR BOARD INSULATION
2.2.1 Thermal Resistance
2.2.2 Fire Protection Requirements
2.2.3 Other Material Properties
2.2.4 Recycled Materials
2.2.5 Prohibited Materials
2.3 VAPOR RETARDER AND DAMPPROOFING
2.3.1 Dampproofing for Masonry Cavity Walls
2.3.2 Vapor Retarder under Floor Slab
2.4 PRESSURE SENSITIVE TAPE
2.5 PROTECTION BOARD OR COATING
2.6 ACCESSORIES
2.6.1 Adhesive
2.6.2 Mechanical Fasteners
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
3.2 PREPARATION
3.2.1 Blocking Around Heat Producing Devices
3.3 INSTALLATION
3.3.1 Installation and Handling
3.3.2 Electrical Wiring
SECTION 07 21 13 Page 1
3.3.3 Cold Climate Requirement
3.3.4 Continuity of Insulation
3.3.5 Coordination
3.4 INSTALLATION ON WALLS
3.4.1 Installation on Masonry Walls
3.4.2 Mechanical Attachment on Concrete and Masonry Walls
3.5 PERIMETER AND UNDER SLAB INSULATION
3.5.1 Manufacturer's Instructions
3.5.2 Protection of Insulation
3.6 VAPOR RETARDER
3.7 ACCESS PANELS AND DOORS
-- End of Section Table of Contents --
SECTION 07 21 13 Page 2
SECTION 07 21 13
BOARD AND BLOCK INSULATION
02/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C1289 (2016a) Standard Specification for Faced Rigid Cellular Polyisocyanurate Thermal Insulation Board
ASTM C272/C272M (2016) Standard Test Method for Water Absorption of Core Materials for Sandwich Constructions
ASTM C930 (2012) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM D1621 (2016) Standard Test Method for Compressive Properties of Rigid Cellular Plastics
ASTM D3833/D3833M (1996; R 2011) Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM E154/E154M (2008a; R 2013; E 2013) Water Vapor Retarders Used in Contact with Earth Under Concrete Slabs, on Walls, or as Ground Cover
ASTM E84 (2016) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
INTERNATIONAL CODE COUNCIL (ICC)
ICC IBC (2015) International Building Code
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 211 (2016) Standard for Chimneys, Fireplaces, Vents, and Solid Fuel-Burning Appliances
NFPA 70 (2017) National Electrical Code
SECTION 07 21 13 Page 3
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS)Indoor Advantage
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
UL ENVIRONMENT (ULE)
ULE Greenguard UL Greenguard Certification Program
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED BD+C (2009; R 2010) Leadership in Energy and Environmental Design(tm) Building Design and Construction (LEED-NC)
1.2 SUSTAINABILITY REPORTING
Materials in this technical specification may contribute towards contract compliance with sustainability requirements. See Section 01 33 29 SUSTAINABILITY REPORTING for project LEED BD+C local/regional materials, low-emitting materials, recycled content, and LEED documentation requirements.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Manufacturer's Standard Details; G
Block or Board Insulation; G
Vapor Retarder; G
Pressure Sensitive Tape; G
Protection Board or Coatings; G
Accessories including sealants; G
SD-07 Certificates
Block or Board Insulation; G
Vapor Retarder; G
Protection Board or Coating; G
Draft Special Warranties; G
SECTION 07 21 13 Page 4
Final Special Warranties; G
ULE Greenguard; G
SD-08 Manufacturer's Instructions
Block or Board Insulation
Adhesive
SD-11 Closeout Submittals
ULE Greenguard; S
Volatile Organic Compound (VOC) Content; S
Recycled Content; S
1.4 MANUFACTURER'S DETAILS
Submit manufacturer's standard details indicating methods of attachment and spacing, transition and termination details, and installation details.
Include verification of existing conditions.
1.5 PRODUCT DATA
Include data for material descriptions, recommendations for product shelf life, requirements for protection board or coatings, and precautions for flammability and toxicity. Include data to verify compatibility of sealants with insulation.
1.6 CERTIFICATIONS
Provide products that are third party certified in accordance with ULE Greenguard, SCS Scientific Certification Systems Indoor Advantage or approved equal.
(http://www.scsglobalservices.com/indoor-air-quality-certification)
1.7 DELIVERY, STORAGE, AND HANDLING
1.7.1 Delivery
Deliver materials to the site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.7.2 Storage
Inspect materials delivered to the site for damage and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling. Keep materials wrapped and separated from off-gassing materials (such as drying paints and adhesives). Do not use materials that have visible moisture or biological growth. Comply with manufacturer's recommendations for handling, storage, and protection of materials before
SECTION 07 21 13 Page 5 and during installation.
1.8 SAFETY PRECAUTIONS
1.8.1 Respirators
Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by the National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) and in accordance with 29 CFR 1910.134.
1.8.2 Other Safety Considerations
Comply with the safety requirements of ASTM C930.
1.9 SPECIAL WARRANTIES
1.9.1 Guarantee
Guarantee insulation installation against failure due to ultraviolet light exposure for a period of three years from the date of Beneficial Occupancy. Submit draft and final guarantees in accordance with Sections
01 78 00 CLOSEOUT SUBMITTALS.
1.9.2 Warranty
Provide manufacturer's material warranty for all system components for a period of three years from the date of Beneficial Occupancy. Submit draft and final warranties in accordance with Sections 01 78 00 CLOSEOUT
SUBMITTALS.
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
Where allowed by performance criteria:
2.1.1 Reduced Volatile Organic Compound (VOC) Content
Provide products with reduced VOC content and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph REDUCE
VOLATILE ORGANIC COMPOUNDS.
2.1.2 Recycled Content
Provide products with recycled content and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph
RECYCLED CONTENT.
2.2 BLOCK OR BOARD INSULATION
Provide thermal insulating materials as recommended by manufacturer for each type of application indicated. Provide insulation with the following physical properties and in accordance with the following standards:
a. Faced Rigid Cellular Polyisocyanurate and Polyurethane Insulation:
ASTM C1289 REV A
(1) Type II Fibrous felt or glass fiber mat membrane on both major
SECTION 07 21 13 Page 6 surfaces of the core foam.
2.2.1 Thermal Resistance
Unless otherwise indicated, Wall R-11.
2.2.2 Fire Protection Requirements
a. Flame spread index of 75 or less when tested in accordance with ASTM E84.
b. Smoke developed index of 450 or less when tested in accordance with
ASTM E84.
c. Provide insulated assemblies in accordance ICC IBC Chapter Fire and Smoke Protection Features.
2.2.3 Other Material Properties
Provide thermal insulating materials with the following properties:
a. Rigid cellular plastics: Compressive Resistance at Yield: Not less than 10 pounds per square inch (psi) when measured according to
ASTM D1621.
b. Water Vapor Permeance: Not more than 1.1 Perms or less when measured according to ASTM E96/E96M, desiccant method, in the thickness required to provide the specified thermal resistance, including facings, if any.
c. Water Absorption: Not more than 2 percent by total immersion, by volume, when measured according to ASTM C272/C272M.
2.2.4 Recycled Materials
Provide thermal insulation containing recycled materials to the extent practicable, provided that the material meets all other requirements of this section. The minimum required recycled material contents (by weight, not volume) are:
Polyisocyanurate/Polyurethane: 9 percent
2.2.5 Prohibited Materials
Do not provide materials containing asbestos.
2.3 VAPOR RETARDER AND DAMPPROOFING
2.3.1 Dampproofing for Masonry Cavity Walls
Bituminous material is specified in Section 07 27 26 FLUID_APPLIED MEMBRANE
AIR BARRIER.
2.3.2 Vapor Retarder under Floor Slab
a. Water vapor permeance: 0.2 Perm or less when tested in accordance with
ASTM E96/E96M.
b. Puncture resistance: Maximum load no less than 40 pounds when tested according to ASTM E154/E154M REV A.
SECTION 07 21 13 Page 7
2.4 PRESSURE SENSITIVE TAPE
As recommended by manufacturer of vapor retarder(s). Match water vapor permeance rating for each vapor retarder specified. Provide tape in accordance with ASTM D3833/D3833M.
2.5 PROTECTION BOARD OR COATING
As recommended by insulation manufacturer.
2.6 ACCESSORIES
2.6.1 Adhesive
As recommended by insulation manufacturer.
2.6.2 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation manufacturer.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Prior to installation, ensure all areas that are in contact with the insulation are dry and free of projections that could cause voids, compressed insulation, or punctured vapor retarders. For foundation perimeter or under slab applications, check that subsurface fill is flat, smooth, dry, and well tamped. Do not proceed with installation if moisture or other conditions are present, and notify the Contracting Officer of such conditions. Do not proceed with the work until conditions have been corrected and verified to be dry.
3.2 PREPARATION
3.2.1 Blocking Around Heat Producing Devices
Provide noncombustible blocking at all spaces between heat producing devices and the floors, ceilings and roofs through which they pass.
Provide in accordance with ICC IBC Section 2111.12 Fireplace Blocking and with the following clearances:
a. Recessed lighting fixtures, including wiring compartments, ballasts, and other heat producing devices, unless certified for installation surrounded by insulation: 3 inches from outside face of fixtures and devices or as required by NFPA 70 and, if insulation is placed above fixture or device, 24 inches above fixture.
b. Vents and vent connectors used for venting products of combustion, flues: Minimum clearances as required by NFPA 211.
3.3 INSTALLATION
3.3.1 Installation and Handling
Provide insulation in accordance with the manufacturer's printed installation instructions. Keep material dry and free of extraneous materials.
SECTION 07 21 13 Page 8
3.3.2 Electrical Wiring
Do not install insulation in a manner that would enclose electrical wiring between two layers of insulation.
3.3.3 Cold Climate Requirement
Place insulation on the outside of pipes.
3.3.4 Continuity of Insulation
Butt tightly against adjoining boards, studs, rafters, joists, sill plates, headers and obstructions. Provide continuity and integrity of insulation at corners, wall to ceiling joint, roof, and floor. Avoid creating thermal bridges and voids. Provide and verify continuity of insulative barrier throughout the building enclosure.
3.3.5 Coordination
Verify final installed insulation thicknesses comply with thicknesses indicated, R-values specified herein, and with the approved insulation submittal(s).
3.4 INSTALLATION ON WALLS
3.4.1 Installation on Masonry Walls
Apply board directly to masonry with adhesive or fasteners as recommended by the insulation manufacturer. Fit between obstructions without impaling board on ties or anchors. Apply in parallel courses with joints breaking midway over course below. Place boards in moderate contact with adjoining insulation without forcing and without gaps. Cut and shape as required to fit around wall penetrations, projections or openings to accommodate conduit or other utilities. Seal around cutouts with sealant. Install insulation in wall cavities so that it leaves at least a nominal 1 inch air space outside of the insulation to allow for cavity drainage.
3.4.2 Mechanical Attachment on Concrete and Masonry Walls
Cut insulation to cover walls. Apply adhesive to wall and set clip or other mechanical fastener in adhesive as recommended by manufacturer.
After curing of adhesive, install insulation over fasteners and bend split prongs to provide a flush condition with the insulation. Butt all edges of insulation and seal with tape.
3.5 PERIMETER AND UNDER SLAB INSULATION
Install perimeter thermal insulation where heated spaces are adjacent to exterior walls, slab edges in slab-on-grade, or floating slab construction as indicated on Drawings.
3.5.1 Manufacturer's Instructions
Layout insulation, tape edges, provide vapor retarder and other required accessories to protection against vermin, insects, and damage in accordance with manufacturer's printed instructions.
SECTION 07 21 13 Page 9
3.5.2 Protection of Insulation
Protect insulation from damage during construction and back filling by application of protection board or a coating. Do not leave installed vertical insulation unprotected overnight. Protect installed insulation from weather, including rain and ultraviolet light, from mechanical abuse, compression, and dislocation. Install protection over entire exposed exterior insulation board.
3.6 VAPOR RETARDER
Apply vapor retarder continuous across all surfaces. Overlap all joints at least 6 inches and seal with pressure sensitive tape. Seal at sills, header, windows, doors and utility penetrations. Repair punctures or tears with pressure sensitive tape.
3.7 ACCESS PANELS AND DOORS
Attach insulation to all access panels greater than 1 square foot and all access doors in insulated floors and ceilings. Use insulation with same R-Value as that for the floor or ceiling in which each panel occurs.
-- End of Section --
SECTION 07 21 13 Page 10
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 21 16
MINERAL FIBER BLANKET INSULATION
11/11
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 SUSTAINABLE DESIGN CERTIFICATION
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
1.4.2 Storage
1.5 SAFETY PRECAUTIONS
1.5.1 Respirators
1.5.2 Other Safety Concerns
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
2.1.1 Recycled Content for Insulation Materials
2.1.2 Reduce Volatile Organic Compounds (VOC) for Insulation Materials
2.2 BLANKET INSULATION
2.2.1 Thermal Resistance Value (R-VALUE)
2.2.2 Recycled Materials
2.2.3 Prohibited Materials
2.2.4 Reduced Volatile Organic Compounds (VOC) for Insulation
Materials
2.3 VAPOR RETARDER
2.4 PRESSURE SENSITIVE TAPE
2.5 ACCESSORIES
2.5.1 Adhesive
2.5.2 Mechanical Fasteners
2.5.3 Wire Mesh
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
3.2 INSTALLATION
3.2.1 Insulation
3.2.1.1 Electrical wiring
3.2.1.2 Continuity of Insulation
3.2.1.3 Installation at Bridging and Cross Bracing
3.2.1.4 Cold Climate Requirement
3.2.1.5 Insulation Blanket with Affixed Foil Face Vapor Retarder
3.2.1.6 Insulation without Affixed Vapor Retarder
3.2.1.7 Sizing of Blankets
SECTION 07 21 16 Page 1
SECTION 07 21 16
MINERAL FIBER BLANKET INSULATION
11/11
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C665 (2012) Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing
ASTM C930 (2012) Potential Health and Safety Concerns Associated with Thermal Insulation Materials and Accessories
ASTM D3833/D3833M (1996; R 2011) Water Vapor Transmission of Pressure-Sensitive Tapes
ASTM E136 (2016) Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C
ASTM E84 (2016) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
29 CFR 1910.134 Respiratory Protection
UL ENVIRONMENT (ULE)
ULE Greenguard UL Greenguard Certification Program
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Blanket Insulation
SECTION 07 21 16 Page 2
Vapor Retarder
Pressure Sensitive Tape
Accessories
SD-08 Manufacturer's Instructions
Insulation
SD-11 Closeout Submittals
Recycled Content for Insulation Materials; S
Reduce Volatile Organic Compounds (VOC) for Insulation Materials; S
1.3 SUSTAINABLE DESIGN CERTIFICATION
Product must be third party certified in accordance with ULE Greenguard.
1.4 DELIVERY, STORAGE, AND HANDLING
1.4.1 Delivery
Deliver materials to site in original sealed wrapping bearing manufacturer's name and brand designation, specification number, type, grade, R-value, and class. Store and handle to protect from damage. Do not allow insulation materials to become wet, soiled, crushed, or covered with ice or snow. Comply with manufacturer's recommendations for handling, storing, and protecting of materials before and during installation.
1.4.2 Storage
Inspect materials delivered to the site for damage; unload and store out of weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling.
1.5 SAFETY PRECAUTIONS
1.5.1 Respirators
Provide installers with dust/mist respirators, training in their use, and protective clothing, all approved by National Institute for Occupational Safety and Health (NIOSH)/Mine Safety and Health Administration (MSHA) in accordance with 29 CFR 1910.134.
1.5.2 Other Safety Concerns
Consider other safety concerns and measures as outlined in ASTM C930.
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
For products in this section, where applicable and to extent allowed by performance criteria, provide and document the following:
SECTION 07 21 16 Page 3
2.1.1 Recycled Content for Insulation Materials
Provide insulation materials meeting the recycled content requirements as stated within this section and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph RECYCLED CONTENT.
2.1.2 Reduce Volatile Organic Compounds (VOC) for Insulation Materials
Provide insulation materials meeting the reduced VOC requirements as stated within this section and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING paragraph REDUCE VOLATILE ORGANIC
COMPOUNDS.
2.2 BLANKET INSULATION
ASTM C665, Type I, blankets without membrane coverings and III, blankets with reflective coverings; Class A, membrane-faced surface with a flame spread of 25 or less and a smoke developed rating of 150 or less when tested in accordance with ASTM E84.
2.2.1 Thermal Resistance Value (R-VALUE)
The R-Value must be as indicated on drawings.
2.2.2 Recycled Materials
Provide Thermal Insulation containing recycled materials to the extent practicable, provided the material meets all other requirements of this section. The minimum required recycled materials content by weight are:
Fiberglass: 20 to 25 percent glass cullet
2.2.3 Prohibited Materials
Do not provide asbestos-containing materials.
2.2.4 Reduced Volatile Organic Compounds (VOC) for Insulation Materials
ULE Greenguard.
2.3 VAPOR RETARDER
a. Foil Face Membrane with the following properties:
Water Vapor Permeance: ASTM E96/E96M: 0.5 perm Maximum Flame Spread: ASTM E84: 25 Combustion Characteristics: Passing ASTM E136
2.4 PRESSURE SENSITIVE TAPE
As recommended by the vapor retarder manufacturer and having a water vapor permeance rating of 0.5 perm or less when tested in accordance with
ASTM D3833/D3833M.
2.5 ACCESSORIES
2.5.1 Adhesive
As recommended by the insulation manufacturer.
SECTION 07 21 16 Page 4
Adhesives must follow the manufacturer's requirements for low pollutant emitting materials in achieving ULE Greenguard certification for their insulation products.
2.5.2 Mechanical Fasteners
Corrosion resistant fasteners as recommended by the insulation manufacturer.
2.5.3 Wire Mesh
Corrosion resistant and as recommended by the insulation manufacturer.
PART 3 EXECUTION
3.1 EXISTING CONDITIONS
Before installing insulation, ensure that areas that will be in contact with the insulation are dry and free of projections which could cause voids, compressed insulation, or punctured vapor retarders. If moisture or other conditions are found that do not allow the workmanlike installation of the insulation, do not proceed but notify Contracting Officer of such conditions.
3.2 INSTALLATION
3.2.1 Insulation
Install and handle insulation in accordance with manufacturer's instructions. Keep material dry and free of extraneous materials. Any materials that show visual evidence of biological growth due to presence of moisture must not be installed on the building project. Ensure personal protective clothing and respiratory equipment is used as required. Observe safe work practices.
3.2.1.1 Electrical wiring
Do not install insulation in a manner that would sandwich electrical wiring between two layers of insulation.
3.2.1.2 Continuity of Insulation
Install blanket insulation to butt tightly against adjoining blankets and joists, and any obstructions. Provide continuity and integrity of insulation at corners, wall to ceiling joints,and roof. Avoid creating thermal bridges.
3.2.1.3 Installation at Bridging and Cross Bracing
Insulate at bridging and cross bracing by splitting blanket vertically at center and packing one half into each opening. Butt insulation at bridging and cross bracing; fill in bridged area with loose or scrap insulation.
3.2.1.4 Cold Climate Requirement
Place insulation to the outside of pipes.
SECTION 07 21 16 Page 5
3.2.1.5 Insulation Blanket with Affixed Foil Face Vapor Retarder
Locate vapor retarder as indicated. Do not install blankets with affixed vapor retarders unless so specified. Unless the insulation manufacturer's instructions specifically recommend not to staple the flanges of the vapor retarder facing, staple flanges of vapor retarder at 6 inch intervals flush with face or set in the side of truss, joist, or stud. Avoid gaps and bulges in insulation and "fishmouth" in vapor retarders. Overlap both flanges when using face method. Seal joints and edges of vapor retarder with pressure sensitive tape along bottom of joists. Stuff pieces of insulation into small cracks between trusses, joists, studs and other framing, such as at attic access doors, door and window heads, jambs, and sills, band joists, and headers. Cover these insulated cracks with vapor retarder material and tape all joints with pressure sensitive tape to provide air and vapor tightness.
3.2.1.6 Insulation without Affixed Vapor Retarder
Provide snug friction fit to hold insulation in place. Stuff pieces of insulation into cracks between joists.
3.2.1.7 Sizing of Blankets
Provide only full width blankets when insulating between joists. Size width of blankets for a snug fit where joists are irregularly spaced.
SECTION 07 21 16 Page 6
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 27 10.00 10
BUILDING AIR BARRIER SYSTEM
05/14
PART 1 GENERAL
1.1 SUMMARY
1.2 DEFINITIONS
1.2.1 Air Barrier Accessory
1.2.2 Air Barrier Assembly
1.2.3 Air Barrier Component
1.2.4 Air Barrier Envelope
1.2.5 Air Barrier Material
1.2.6 Air Barrier System
1.2.7 Air Leakage Rate
1.2.8 Air Leakage
1.2.9 Air Permeance
1.2.10 Environmental Separator
1.3 PREPARATORY PHASE OR PRECONSTRUCTION CONFERENCE
1.4 SUBMITTALS
1.5 AIR BARRIER INSPECTOR
1.6 DESIGN REVIEW
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 QUALITY CONTROL
3.1.1 Documentation and Reporting
3.1.2 Quality Control Inspection
3.2 REPAIR AND PROTECTION
SECTION 07 27 10.00 10 Page 1
SECTION 07 27 10.00 10
BUILDING AIR BARRIER SYSTEM
05/14
PART 1 GENERAL
1.1 SUMMARY
This Section specifies the construction and quality control of the installation of an air barrier system. Construct the air barrier system indicated, taking responsibity for the means, methods, and workmanship of the installation of the air barrier system. The air barrier must be contiguous and connected across all surfaces of the enclosed air barrier envelope indicated. The maximum leakage requirements of individual air barrier components and materials are specified in the other specification sections covering these items.
1.2 DEFINITIONS
The following terms as they apply to this section:
1.2.1 Air Barrier Accessory
Products designated to maintain air tightness between air barrier materials, air barrier assemblies and air barrier components, to fasten them to the structure of the building, or both (e.g., sealants, tapes, backer rods, transition membranes, fasteners, strapping, primers).
1.2.2 Air Barrier Assembly
The combination of air barrier materials and air barrier accessories that are designated and designed within the environmental separator to act as a continuous barrier to the movement of air through the environmental separator.
1.2.3 Air Barrier Component
Pre-manufactured elements such as windows, doors, dampers and service elements that are installed in the environmental separator.
1.2.4 Air Barrier Envelope
The combination of air barrier assemblies and air barrier components, connected by air barrier accessories that are designed to provide a continuous barrier to the movement of air through an environmental separator. There may be more than one air barrier envelope in a single building. Also known as Air Barrier System.
1.2.5 Air Barrier Material
A building material that is designed and constructed to provide the primary resistance to airflow through an air barrier assembly.
SECTION 07 27 10.00 10 Page 2
1.2.6 Air Barrier System
Same as AIR BARRIER ENVELOPE.
1.2.7 Air Leakage Rate
The rate of airflow (CFM) driven through a unit surface area (sq.ft.) of an assembly or system by a unit static pressure difference (Pa) across the assembly. (example: 0.25 CFM/sq.ft. @ 75 Pa)
1.2.8 Air Leakage
The total airflow (CFM) driven through the air barrier system by a unit static pressure difference (Pa) across the air barrier envelope. (example:
6500 CFM @ 75 Pa)
1.2.9 Air Permeance
The rate of airflow (CFM) through a unit area (sq.ft.) of a material driven by unit static pressure difference (Pa) across the material (example: 0.004 CFM/sq.ft. @ 75 Pa).
1.2.10 Environmental Separator
The parts of a building that separate the controlled interior environment from the uncontrolled exterior environment, or that separate spaces within a building that have dissimilar environments. Also known as the Control Layer.
1.3 PREPARATORY PHASE OR PRECONSTRUCTION CONFERENCE
Organize pre-construction conferences between the air barrier inspector and the sub-contractors involved in the construction of or penetration of the air barrier system to discuss where the work of each sub-contractor begins and ends, the sequence of installation, and each sub-contractor's responsibility to ensure airtight joints, junctures, penetrations and transitions between materials. Discuss the products, and assemblies of products specified in the different sections to be installed by the different sub-contractors.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-06 Test Reports
Design Review Report; G
Two copies not later than 14 days after approval of the Air Barrier Inspector Qualifications.
Inspection; G
SECTION 07 27 10.00 10 Page 3
SD-07 Certificates
Air Barrier Inspector; G
Two copies 30 days after Notice to Proceed.
1.5 AIR BARRIER INSPECTOR
Employ a designated Air Barrier Inspector on this project. The Air Barrier Inspector performs a Design Review, performs quality control air barrier inspection as specified, interfaces with the designer and product manufacturer's representatives to assure all installation requirements are met, and coordinates efforts between all workers installing or penetrating the air barrier materials. Qualification for the Air Barrier Inspector are as follows:
a. Training and certification as an Air Barrier Installer from the Air Barrier Association of America (ABAA) or other third party air barrier association.
b. Experience coordinating and instructing personnel involved in the installation, joining, and sealing of air barrier materials and components.
1.6 DESIGN REVIEW
Review the Contract Plans and Specifications and advise the Contracting Officer of any deficiencies that would prevent the construction of an effective air barrier system. Provide a Design Review Report individually listing each deficiency and the corresponding proposed corrective action necessary for proper air barrier system.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.1 QUALITY CONTROL
3.1.1 Documentation and Reporting
Document the entire installation process on daily job site reports. These reports include information on the Installer, substrates, substrate preparation, products used, ambient and substrate temperature, the location of the air barrier installation, and the results of the quality control procedures.
3.1.2 Quality Control Inspection
Conduct the following inspections as applicable in the presence of the Contracting Officer during installation of the air barrier system, and submit quality control reports as indicated below.
a. Provide a Daily Report of Observations with a copy to the Contracting Officer.
b. Inspect to assure continuity of the air barrier system throughout the building enclosure and that all gaps are covered, the covering is
SECTION 07 27 10.00 10 Page 4 structurally sound, and all penetrations are sealed allowing for no infiltration or exfiltration through the air barrier system.
c. Inspect to assure structural support of the air barrier system to withstand design air pressures.
d. Inspect to assure masonry surfaces receiving air barrier materials are smooth, clean, and free of cavities, protrusions and mortar droppings, with mortar joints struck flush or as required by the manufacturer of the air barrier material.
e. Inspect to assure site conditions for application temperature, and dryness of substrates are within guidelines.
f. Inspect to assure substrate surfaces are properly primed if applicable and in accordance with manufacturer's instructions. Priming must extend at least 2 inches beyond the air barrier material to make it obvious that the primer was applied to the substrate before the air barrier material.
g. Inspect to asure laps in materials are at least a 2-inch minimum, shingled in the correct direction or mastic applied in accordance with manufacturer's recommendations, and with no fishmouths.
h. Inspect to assure that a roller has been used to enhance adhesion.
Identify any defects such as fishmouths, wrinkles, areas of lost adhesion, and improper curing. Note the intended remedy for the deficiencies.
i. Measure application thickness of liquid applied materials to assure that manufacturer's specifications for the specific substrate are met.
j. Inspect to assure that the correct materials are installed for compatibility.
k. Inspect to assure proper transitions for change in direction and structural support at gaps.
l. Inspect to assure proper connection between assemblies (membrane and sealants) for cleaning, preparation and priming of surfaces, structural support, integrity and continuity of seal.
3.2 REPAIR AND PROTECTION
Upon completion of inspection, repair damaged construction and restore substrates, coatings and finishes. Protect construction exposed by or for quality control service activities, and protect repaired construction.
SECTION 07 27 10.00 10 Page 5
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 27 26
FLUID-APPLIED MEMBRANE AIR BARRIERS
05/17
PART 1 GENERAL
1.1 REFERENCES
1.2 RELATED REQUIREMENTS
1.3 SUBMITTALS
1.4 MISCELLANEOUS REQUIREMENTS
1.4.1 Shop Drawings
1.4.2 Product Data
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
1.5.2 Storage
1.6 QUALITY ASSURANCE
1.6.1 Qualifications of Manufacturer
1.6.2 Qualifications of Installer
1.7 PRECONSTRUCTION MEETING
1.8 ENVIRONMENTAL CONDITIONS
1.8.1 Temperature
1.8.2 Exposure to Weather
PART 2 PRODUCTS
2.1 REDUCED VOLATILE ORGANIC COMPOUND (VOC) CONTENT
2.2 FLUID-APPLIED MEMBRANE AIR BARRIER
2.2.1 Physical Properties
2.3 PRIMERS, ADHESIVES, AND MASTICS
2.4 TRANSITION MEMBRANE
2.5 SHEET METAL FLASHING
2.6 JOINT SEALANTS
2.7 REINFORCEMENT
PART 3 EXECUTION
3.1 EXAMINATION
3.2 PREPARATION
3.3 INSTALLATION
3.3.1 Installation of Transition Membrane
3.3.2 Installation of Flashing
3.3.3 Installation of Fluid-Applied Membrane Air Barrier
3.3.4 Installation of Reinforcement
3.4 FIELD QUALITY CONTROL
3.4.1 Site Inspections and Testing
3.5 PROTECTION AND CLEANING
3.5.1 Protection
3.5.2 Cleaning of Adjacent Surfaces
3.6 CLEANUP OF SPILLS
SECTION 07 27 26 Page 1
SECTION 07 27 26 Page 2
SECTION 07 27 26
FLUID-APPLIED MEMBRANE AIR BARRIERS
05/17
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AIR BARRIER ASSOCIATION OF AMERICA (ABAA)
ABAA Accreditation Accreditation
ABAA QAP Quality Assurance Program
ASTM INTERNATIONAL (ASTM)
ASTM C836/C836M (2015) High Solids Content, Cold Liquid-Applied Elastomeric Waterproofing Membrane for Use With Separate Wearing Course
ASTM D412 (2016) Standard Test Methods for Vulcanized Rubber and Thermoplastic Elastomers - Tension
ASTM D4263 (1983; R 2012) Indicating Moisture in Concrete by the Plastic Sheet Method
ASTM D5590 (2000; R 2010; E 2012) Standard Test Method for Determining the Resistance of Paint Films and Related Coatings to Fungal Defacement by Accelerated Four-Week Agar Plate Assay
ASTM E2178 (2013) Standard Test Method for Air Permeance of Building Materials
ASTM E2357 (2011) Standard Test Method for Determining Air Leakage of Air Barrier Assemblies
ASTM E283 (2004; R 2012) Determining the Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen
ASTM E331 (2000; R 2016) Standard Test Method for Water Penetration of Exterior Windows, Skylights, Doors, and Curtain Walls by Uniform Static Air Pressure Difference
ASTM E84 (2016) Standard Test Method for Surface
SECTION 07 27 26 Page 3
Burning Characteristics of Building Materials
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 285 (2012) Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Non-Load-Bearing Wall Assemblies Containing Combustible Components
1.2 RELATED REQUIREMENTS
Coordinate the requirements of Section 07 27 10.00 10 BUILDING AIR BARRIER SYSTEM and other building enclosure sections to provide a complete building air barrier system. Submit all materials, components and assemblies of the air barrier system together as one complete submittal package.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Qualifications of Manufacturer; G
Qualifications of Installer; G
SD-02 Shop Drawings
Fluid-Applied Membrane Air Barrier; G
SD-03 Product Data
Fluid-Applied Membrane Air Barrier; G
Transition Membrane; G
Primers, Adhesives, and Mastics; G
Reinforcement; G
Safety Data Sheets; G
SD-06 Test Reports
Site Inspections Reports; G
SD-07 Certificates
SECTION 07 27 26 Page 4
Fluid-Applied Membrane Air Barrier; G
Transition Membrane; G
Qualifications of Manufacturer; G
Qualifications of Installer; G
SD-08 Manufacturer's Instructions
Fluid-Applied Membrane Air Barrier; G
Transition Membrane; G
Primers, Adhesives, and Mastics; G
SD-11 Closeout Submittals
Volatile Organic Compound (VOC) Content; S
1.4 MISCELLANEOUS REQUIREMENTS
For fluid-applied membrane air barriers provide the following:
1.4.1 Shop Drawings
Submit fluid-applied membrane air barrier shop drawings showing locations and extent of barrier assemblies, transition membranes, details of all typical conditions, intersections with other envelope assemblies and materials, and membrane counterflashings. Show details for bridging of gaps in construction, treatment of inside and outside corners, expansion joints, methods of attachment of materials covering the self-adhered barrier without compromising the barrier. Indicate how miscellaneous penetrations such as conduit, pipes, electric boxes, brick ties, and similar items will be sealed.
1.4.2 Product Data
Submit manufacturer's technical data indicating compliance with performance and environmental requirements, manufacturer's printed instructions for evaluating, preparing, and treating substrates, temperature and other limitations of installation conditions, safety requirements for installation, and Safety Data Sheets. Indicate flame and smoke spread ratings for all products.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver and store materials in sufficient quantity to allow for uninterrupted flow of work. Inspect materials delivered to the site for damage and store out of weather. Deliver materials to the jobsite in their original unopened packages, clearly marked with the manufacturer's name, brand designation, description of contents, and shelf life of containerized materials. Store and handle to protect from damage.
1.5.2 Storage
Inspect materials delivered to the site for damage; unload and store out of
SECTION 07 27 26 Page 5 weather in manufacturer's original packaging. Store only in dry locations, not subject to open flames or sparks, and easily accessible for inspection and handling. Protect stored materials from direct sunlight.
1.6 QUALITY ASSURANCE
1.6.1 Qualifications of Manufacturer
Submit documentation verifying that manufacturer of fluid-applied membrane air barrier is currently accredited by the Air Barrier Association of America (ABAA Accreditation https://www.airbarrier.org/).
1.6.2 Qualifications of Installer
Submit documentation verifying that installers of the fluid-applied membrane air barrier are currently certified in accordance with the ABAA QAP Quality Assurance Program (https://www.airbarrier.org/qap/).
1.7 PRECONSTRUCTION MEETING
Conduct a preconstruction meeting a minimum of two weeks prior to commencing work specified in this Section. Agenda must include, at a minimum, construction and testing of construction mock up, sequence of construction, coordination with substrate preparation, materials approved for use, compatibility of materials, coordination with installation of adjacent and covering materials, and details of construction. Attendance is required by representatives of related trades including covering materials, substrate materials, adjacent materials, and materials and components of the fluid-applied membrane air barrier.
1.8 ENVIRONMENTAL CONDITIONS
1.8.1 Temperature
Install fluid-applied membrane air barrier within the range of ambient and substrate temperatures as recommended in writing by the fluid-applied membrane air barrier manufacturer. Do not apply fluid-applied membrane air barrier to a damp or wet substrate. Do not apply during inclement weather or when ice, frost, surface moisture, or visible dampness is present on surfaces to be covered, or when precipitation is imminent.
1.8.2 Exposure to Weather
Protect fluid-applied membrane air barrier products from direct exposure to rain, snow, sunlight, mist, and other extreme weather conditions. Replace, at no additional cost to the government, barrier products that have been exposed to ultraviolet (sun)light longer than allowed by manufacturer's written requirements.
PART 2 PRODUCTS
2.1 REDUCED VOLATILE ORGANIC COMPOUND (VOC) CONTENT
Provide products with reduced VOC content and provide documentation in accordance with Section 01 33 29 SUSTAINABILITY REPORTING.
2.2 FLUID-APPLIED MEMBRANE AIR BARRIER
Provide a fluid-applied, vapor permeable and vapor retarding, air barrier.
SECTION 07 27 26 Page 6
Provide a vapor-permeable air barrier at concrete roof deck at VCC.
Provide a vapor retarding air barrier at exterior CMU walls. These barriers must exhibit no visible water leakage when tested in accordance with ASTM E331 and must perform as a liquid water drainage plane with thru-wall flashing to discharge incidental condensation and water penetration to the exterior of the building enclosure. Provide products suitable for use within temperature ranges specified by manufacturer for the location of the project.
2.2.1 Physical Properties
a. Air Permeance (ASTM E2178): in accordance with Section 07 27 10.00 10
BUILDING AIR BARRIER SYSTEM.
b. Air Leakage (ASTM E2357, ASTM E283): in accordance with Section
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM.
c. Water Vapor Permeance (Vapor Permeable Membrane) (ASTM E96/E96M, desiccant method A): 10.0 perms.
d. Water Vapor Permeance (Vapor Impermeable Membrane) (ASTM E96/E96M, desiccant method A): 0.1 perms or less.
e. Tensile Strength (ASTM D412): Not less than 138 psi.
f. Elongation (ASTM D412): Not less than 300 percent.
g. Low temperature Flexibility and Crack Bridging (ASTM C836/C836M): Pass at minus 15 degrees F.
h. Solids by Volume: minimum 50 percent.
i. Flame propagation of wall assemblies (NFPA 285): Pass
j. Surface Burning Characteristics (ASTM E84):
(1) Flame Spread Index Rating not higher than 75.
(2) Smoke Developed Index Rating not higher than 150.
k. Resistance to Mold, Mildew and Fungal Growth (ASTM D5590): 0, No growth.
2.3 PRIMERS, ADHESIVES, AND MASTICS
Provide primers, adhesives, mastics, sealants and other accessories as recommended by manufacturer of fluid-applied membrane air barrier for a complete installation.
2.4 TRANSITION MEMBRANE
Provide at window and door openings.
2.5 SHEET METAL FLASHING
Provide…