About this file

This document provides details for a federal contract opportunity for a Multiple Award Task Order Contract (MATOC) for design-build construction services. The U.S. Army Corps of Engineers Savannah District will issue the request for proposal to award up to six firm fixed price IDC contracts for construction and related work in Georgia, South Carolina, and North Carolina. Task orders between $5 million and $100 million will be supported. The NAICS code is 236220 and size standard is $36.5 million. This will be an unrestricted full and open competition. The two-phase selection process will evaluate offerors' past performance, management approach, design experience, building functions and aesthetics, quality of systems, and small business participation plan. The Phase One solicitation is expected to issue on May 14, 2018 with a June 14 closing date. Phase Two is expected to issue on August 21, 2018 and close on September 20, 2018. The total contract value is $249 million over a five year period.

W912HN-18-R-3000 AMD6

View the file

Other files for this federal contract opportunity

Other files attached to GA/SC (MIL 02) Unrestricted Design-Build Construction MATOC, newest first.
File Type Posted
18R3000vol2Ph2.pdf PDF
amd11.pdf PDF
18R3000vol2Ph2.pdf PDF
amd10.pdf PDF
18R3000vol1.PDF PDF
amd9.pdf PDF
18R3000vol2Ph2.pdf PDF
amd7.pdf PDF
18R3000vol2Ph2.pdf PDF
18R3000vol1.PDF PDF
amd5.pdf PDF
18R3000Ph2.pdf PDF
18R3000Ph2.pdf PDF
amd4.pdf PDF
amd3.pdf PDF
18R3000Ph2.pdf PDF
18R3000Ph2.pdf PDF
W912HN18-R-3000_CAD_BIM_Files.zip ZIP file
amd2.pdf PDF
18R3000.PDF PDF
amd1.pdf PDF
PPQ_Summary.pdf PDF
18R3000.PDF PDF
PPQ.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Please see Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Feb-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN18R3000

X 9B. DATED (SEE ITEM 11)

18-May-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Feb-2019

CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN18R3000

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0006

A. CONTRACT CHANGES: The proposal due date has been extended to Friday, February 22, 2019 at 2:00pm EST

B. TECHNICAL SPECIFICATION CHANGES: The Specifications have been split into two volumes.

Volume 1 Specifications apply to the MATOC solicitation and contract. Volume 2 Specifications apply to the seed project.

Volume 2: The revised Section below (revised by Amendment No. 0006) is hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out. Revisions can be located in the appropriate volume of the specifications by searching for an asterisk and amendment number (i.e., *1).

Revised Section 01 33 16

C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 21-Feb-2019 02:00 PM to 22-Feb-2019 02:00 PM.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .