About this file

This document provides details for a Request for Proposal (RFP) for a GA/SC (MIL 02) Unrestricted Design-Build Construction Multiple Award Task Order Contract (MATOC). Up to six firms will be awarded indefinite delivery contracts with a total capacity of $249 million over a five-year period. Task orders issued under this MATOC will be for general construction work in Georgia, South Carolina, and North Carolina, including new construction, rehabilitation, and repair projects ranging between $5-100 million. The selection process will be a two-phase design-build evaluation of past performance, management approach, design experience, building function/aesthetics, quality of building systems, and price. Phase one submissions are due June 14, 2018, with up to eight firms invited to phase two. Phase two submissions are due September 20, 2018, with awards expected shortly after. The North American Industry Classification System code is 236220 and there are no set-asides.

Amd 5

View the file

Other files for this federal contract opportunity

Other files attached to GA/SC (MIL 02) Unrestricted Design-Build Construction MATOC, newest first.
File Type Posted
amd11.pdf PDF
18R3000vol2Ph2.pdf PDF
18R3000vol2Ph2.pdf PDF
amd10.pdf PDF
18R3000vol1.PDF PDF
amd9.pdf PDF
18R3000vol2Ph2.pdf PDF
amd7.pdf PDF
18R3000vol2Ph2.pdf PDF
18R3000vol1.PDF PDF
amd6.pdf PDF
18R3000Ph2.pdf PDF
amd4.pdf PDF
18R3000Ph2.pdf PDF
amd3.pdf PDF
18R3000Ph2.pdf PDF
18R3000Ph2.pdf PDF
W912HN18-R-3000_CAD_BIM_Files.zip ZIP file
amd2.pdf PDF
18R3000.PDF PDF
amd1.pdf PDF
PPQ_Summary.pdf PDF
18R3000.PDF PDF
PPQ.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. CONTRACT CHANGES: See continuation page.

B. TECHNICAL SPECIFICATION CHANGES: See Ccontinuation page C. CONTRACT DRAWINGS: There are no draw ing changes w ith this amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 63

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 12-Feb-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN18R3000

X 9B. DATED (SEE ITEM 11)

18-May-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Feb-2019

CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN18R3000

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

A. CONTRACT CHANGES:

1) Revise seed task order period of performance from 365 days to 540 days.

2) Add Electronic Proposal Submittal lInstructions to section 00 21 00.

3) Clarify Volume II – Technical Requirements and paragraph 9.1.1 Presentation Drawings located in section 00 21 00.

4) Add reference to paragraph 15 – Applicable Specifications in section 00 20 00

5) Add “01 45 00.15 10 – Resident Management System Contractor Mode (RMS CM)” to paragraph 15 – Applicable Specificaitons in section 00 20 00

6) Add Electronic Proposal Submittal Instructions to section 00 20 00

7) Revise paragraph 11.1.4 Past History of Using Small and Small Disadvantaged

Businesses as Subcontractors to clarify page limits.

8) Partnering clause updated in Section 00 73 00

B. TECHNICAL SPECIFICATION CHANGES: The revised and added Sections listed below (revised and added by Amendment No. 0005) are hereby added to and made a part of the solicitation. Revised or added information is underlined and deleted information is struck out.

Revisions can be located in the appropriate volume of specifications by searching for an asterisk and amendment number (i.e., *1).

Revised Sections Added Sections Table of Contents Appendix L Appendix Table of Contents Appendix M 01 11 00 01 11 00.01 01 11 00.02 01 11 00.03 01 11 00.06 01 11 00.07 01 30 00 01 45 00.00 10 01 50 00

C. CONTRACT DRAWINGS: There are no drawing changes with this amendment.

SECTION 00 01 15 - LIST OF DRAWING SHEETS

The following have been modified:

WAGE DETERMINATION

General Decision Number: GA190140 01/04/2019 GA140

Superseded General Decision Number: GA20180152

State: Georgia

Construction Type: Building

County: Houston County in Georgia.

http://www.wdol.gov/dba.aspx

(Note: This Wage Determination applies to the Seed Task Order only. Wage Determination will be on a task order to task order basis)

SECTION 00 10 00 - SOLICITATION

SCHEDULE B

ATTACHMENT 1

Seed Task Order Pricing Schedule B

SCHEDULE

Commercial Vehicle/Visitor Access Control Facility

PN: UHHZ16-3000

Robins AFB, GA

CONTRACT LINE ITEM SCHEDULE

TOTAL BASE BID ITEMS: 0001 – 0003 $ _______________

TOTAL OPTIONAL BID ITEMS: 0004 – 0008 $ _______________

TOTAL BASE AND OPTIONAL BIDS ITEMS: 0001 – 0008 $ _______________

CONTRACT LINE ITEM SCHEDULE

Contract Duration ___540_________ DAYS

Period of performance for the construction of Base Bid and Optional CLINS 0001 - 0008 is 540 calendar days from Notice to Proceed.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 BASE BID – Design Services, Commercial Vehicle Visitor Access Control Facility, Complete

1 Job XXX $___________

0002 BASE BID – Construction Commercial Vehicle/Visitor Control Facility, Complete

1 Job XXX $___________

0003 BASE BID – Relocation of Georgia Power Co Existing OverHead Lines via Georgia Power Resources, Complete

1 Job XXX $ 411,295

0004 OPTION 1, Add 3rd Truck Queuing Lane(Concrete Pavement), Complete

1 Job XXX $___________

0005 OPTION 2 – Emergency Generator 150kw, Complete

1 Job XXX $___________

0006 OPTION 3 – Relocate / Add To Metal Screen Fence for Lot 21, Complete

1 Job XXX $___________

0007 OPTION 4 – Provide Concrete Pavement in lieu of Asphalt, Complete

1 Job XXX $___________

0008 OPTION 5 – Provide All Soil Fill From Off- Base Borrow, Complete

1 Job XXX $___________

SECTION 00 20 00 - INSTRUCTIONS FOR PROCUREMENT

ATTACHMENT 2

Seed Task Order Scope and Instructions

W912HN18R3000

Project Number UHHZ163000

Commercial Vehicle/Visitor Access Control Facility, Robins Air Force Base, Georgia

1. In accordance with Local Clause 52.216-4008, Multiple Award Fair Opportunity Task and Delivery Order Contracts, subject project is being offered to all Offerors in the MATOC pool, as identified below, giving each fair opportunity to compete for this action by issuance of this Request for Proposal (RFP) letter. Any Offeror who does not wish to be considered for this particular task order is requested to notify this office in writing, within seven (7) calendar days of receipt of this letter, indicating reason for non-participation.

Those who do wish to compete must submit a proposal by the date and time indicated in paragraph 24 below, and in accordance with the criteria specified herein.

2. Scope of Work.

2.1. Brief Description of the Scope of Work: The existing commercial truck gate (Gate 4, Robins AFB, GA) is sub-standard and does not meet the current requirements for ATFP. The contractor shall utilize the design-build request for proposal (RFP) to provide design and construction (complete) to construct a new commercial truck gate to meet AT/FP requirements. The design-build RFP provides an approved layout of the new access and exit roadways, denial barriers, inspection canopies, and driver check-in station, lighting, signage, related supporting features, and infrastructure. Demolition of existing facilities within the footprint of construction is also required.

2.2. Interested participants must submit a price and technical proposal for work detailed in the scope of work, drawings and specifications posted on FedTeDs. To access the full scope of work, specifications and drawings go to the following link:

https://www.fbo.gov/fedteds/W912HN18R3000.

3. Technical Inquiries:

3.1. Technical Inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet, Bidder Inquiry Key: A2YXZX-XJQW7P. All questions regarding this RFP must be submitted in writing via aforementioned method no later than COB 24 January 2019. The Government reserves the right to not respond to questions/inquiries received after this date.

3.2. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

4. If an Offeror believes the requirements in this RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contracting Officer in writing, to include supporting rationale. Such communication may be submitted via the POC identified in paragraph 20 below.

5. Wage Decision GA180140 dated 01/04/2019 GA140 (Attachment 2) applies to CLINS 0001 through 0008 of attached Task Order Pricing Schedule (Attachment 1). Offerors are reminded that wage determinations are subject to change prior to award. All proposed pricing shall include the most current wage rates. All offerors are encouraged to review wage rates established by the Department of Labor prior to submitting proposals.

6. The contractor shall be assessed the amount of $986.18 liquidated damages per calendar day for failure to complete the prescribed work within the performance period.

7. A Construction Cost Limitation (CCL) for MCAF Funded Line Items CLIN NUMBERS 0001, 0002, and 0003 is $8,428,000. This limitation includes both design and construction costs and shall not be exceeded. Offers which exceed the CCL risk being rendered ineligible for award.

8. Site Visits.

8.1. In accordance with FAR Clause 52.237-2, Site Visit (Construction), A site visit will be conducted at the Corps of Engineers Resident Office, at Robins Air Force Base, Georgia on 20-December-2018 beginning at 1330 hours. Participants will be required to check in at the main gate via Watson Blvd, and arrive there by 1230hrs. Clearance forms to be completed before hand by the participants will be provided. The POC for the site visit is Craig Harrell and he can be contacted at phone number 912-652-5150 or e-mail at craig.l.harrell@usace.army.mil.

8.2. Prior to the submission of any proposals, all offerors are required to visit the project site location to become familiar with the project requirements. A proposal will not be rejected only because the offeror fails to visit the project site. Failure to visit the project site will not relieve the bidder from responsibility for performance of the work and compliance with the terms and conditions of any resultant contract. In no event will a failure to inspect the site constitute grounds for a claim after award of the task order.

9. Notice of Requirement for Affirmative Action to ensure Equal Employment Opportunity for Construction, In accordance with FAR Clause 52.222-23:

10.

Monthly Anticipated Adverse Weather Delay. In accordance with clause 52.249-4001 I Time Extensions for Unusually Severe Weather (APR 1991 OCE)

Workdays Based on 5-Day Work Week

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

9 8 6 4 4 7 8 7 5 3 4 8

11. Additional Contractor Requirements.

Goals for Participation for Each Trade

Percentages

Females 6.9% Minority 27.5%

12.1. Project Involves Handling of Asbestos or Lead Base Paint

12.2. Occupancy During Construction

12.3. CQC System Requirements

CQC Manager CQC Personnel

Civil Mechanical Electrical Structural Architectural Environmental Submittal Clerk Concrete, Pavements and soils TAB Personnel Design Quality Control Manager

12.4. Quality Control System (QCS)

12.5. Project Sign Required

12.6. Submittals are required on all materials.

12.7. Site Visit Requirements

Video Tape Digital Pictures

13. After task order award:

Site Safety and Health Plan Quality Control Program

Design After Award Work Plan – Design/Build. The design requirements are:

a. Complex Submittal – Contractor will submit Full Design (35%, 90%, 100%, and Corrected Final submittals); specifications, erosion control plan and permits, to include Georgia DOT driveway permit. Refer to spec section 01 33 16 for project specific design submittal requirements.

b. Medium Submittal - Contractor will submit Full Design (90%, 100%, and Corrected Final submittals); abridge set of specifications with project data, erosion control plan and permits.

c. Light Submittal – Contractor will submit Full Design (100% and Corrected Final submittals); specifications on the drawings, erosion control plan and permits.

d. Distribution of Submittals:

Number Item

6 ½ Size Drawings 3 Full Size

Drawings 4 Specifications 2 CDs

Construction Schedule

Bar Chart

CPM

Weekly Progress Report Telephone Conversation/Correspondence Records Site/Project Specific Remediation Report

As-Built/In Progress Drawings

14. After construction completion, prior to final payment:

System/Equipment Testing Operation and Maintenance Manuals/Training Videos Training Equipment and Construction Warranties List of Standard Equipment and Service Organizations As-Built/Final Drawings

15. Applicable Specifications:

01 11 00 – Summary of Work 01 30 00 – Administrative Requirements 01 32 01.00 10 – Project Schedule 01 33 00.00 37– Submittal Procedures 01 33 16.00 10 – Design Data (Design After Award) 01 33 29 – Sustainability Reporting 01 35 26 – Governmental Safety Requirements 01 42 00 – Sources for Reference Publications 01 45 00.00 10 – Quality Control 01 45 00.15 10 – Resident Management System Contractor Mode (RMS

CM)

01 50 00 – Temporary Construction Facilities and Controls 01 57 19 – Temporary Environmental Controls 01 74 19 – Construction and Demolition Waste Management 01 78 00 – Closeout Submittals 01 78 23 - Operation and Maintenance Data Others: See RFP for the proposed project:

16. Excavation/Dig Permit: The contractor shall obtain through the Base Civil Engineer, a completed and approved Excavation Permit prior to any excavation, to include sign or fence-post holes. The Contractor shall schedule an appointment to locate utility lines prior to any excavation with the Corps of Engineers. Excavation/Dig Permit meetings are held Monday at 0800 hours in Building 1555.

17. Disposal Permits: No on-base disposal of land clearing debris and inert debris is available. The disposal of metal from building demolition is described in the RFP.

The contractor will be required to coordinate any permit(s) required to access off-base land clearing and inert debris and demolition landfills. Only materials produced on the project for which the permits are issued may be disposed of in the land clearing and inert debris and demolition landfills. The Contractor shall keep a copy of the completed permit with the vehicle throughout the contract disposal operation.

18. Borrow Permits: Borrow material is available at an on-base construction site approximately one mile from this project’s site. Review RFP description of the intended usage of this fill material for this project.

19. Haul Routes: The preponderance of the work is to be accomplished with the project site fenced such that site access is to be directly from the Highway 247/129 adjacent to Robins AFB. Comply with Georgia DOT highway/road construction safety requirements as well as EM 385-1-1. For any on-base haul activity, the Contractor is required to obtain approval from the Resident Office for the routes proposed for transportation of borrow materials, construction debris, or demolition materials unless otherwise permitted in writing by the Resident. The axle load of earth-hauling equipment operating on paved streets shall not exceed 12,000 pounds.

20. Utility Outages and Road/Parkling Lot Closures: Utility, road/parking lot and railroad closures require a minimum 10 working days advance written notice to Resident Office. In the case of a road closures, a sketch shall be provided showing the closure location and all necessary signs and barricades. Necessary signage, barricades, flag persons, lights (including temporary traffic control lights), and markings for the safe movement of the public during construction shall be in accordance with the Manual on Uniform Traffic Control Devices, and shall be provided at no additional expense to the Government. Utility outages shall be scheduled with Base Civil Engineering, through the Resident Office. Utility Outage Meetings are held Wednesday at 1030 hours in Building 1555. Road and parking lot closures shall require a minimum of forty-five (45) days notice to Base Civil Engineering.

21. Availability and Use of Utility Services: Utility services required on the job site for the accomplishment of the work

Will be furnished at no cost to the Contractor Will NOT be furnished at any cost to the Contractor

However, the Government will make no connections or alterations to the existing utility systems for the Contractor. Utilities for offices and/or storage buildings or areas will be billed to the Contractor monthly and will not be furnished free of charge. The Contractor shall be responsible for installing meters or other connections at no cost to the Government. At the conclusion of the contract, the Contractor shall remove all temporary connections, distribution lines, meters and associated paraphernalia unless otherwise directed by the Resident Office. Prior to installing any utility connections at an office/storage site, the plan will be approved by the Resident Office. When utility meters are installed, the Contractor shall notify the Resident Office for the initial meter reading. Failure to obtain this initial reading will result in the Contractor being charged for the entire amount shown on the meter.

22. Contractor Storage and Trailers: The Contractor shall place or paint a sign on all of his storage trailer(s) and building(s) used on this contract. At a minimum, the sign shall contain the name of the Contractor and a telephone number at which the contractor can be reached. The trailer(s) and building(s) shall be completed with gates and/or doors which can be locked. Only material for this project shall be stored in the trailer(s) or building(s). The Contractor shall remove the storage trailer(s) or building(s) within 30 days after completion of the contract and prior to submitting his final invoice. The area around the storage trailer(s) and building(s) shall be kept clean.

23. Safety: Safety will be in compliance with the Corps of Engineers Safety Manual EM 385-1-1. Use of appropriate safety equipment is mandatory and not limited to hard hats and steel-toed shoes. Contractor is responsible for daily clean up and complete restoration of the area once the contract is complete.

24. Hours of Work: Work shall be accomplished between the hours of 0700 thru 1700 hours daily, Monday through Friday on non-Government holidays. Legal holidays falling on Saturday are observed on the proceeding Friday and those falling on Sunday are observed on the following Monday. Work schedule and facility security to be coordinated with the Resident Office for facility access and security maintenance during duration of work. Contractor shall not work outside of the stated hours of work, without first obtaining approval from the Corps of Engineers Resident Office.

25. Warranty: The contractor shall provide a minimum of one (1) year warranty on all materials and workmanship from the date of the Government’s acceptance of the work.

26. Proposals:

27. Bid Guarantee: In accordance with FAR Clause 52.228-1, Bid Guarantee, Offerors are required to submit a bid bond with their proposal by the time and date set for receipt of proposals. The Bid Guarantee shall be 20% of the bid price or $3 Million, whichever is less. Bid bonds must be submitted in original form and contain original signatures.

Photocopied, facsimile, scanned or otherwise mechanically reproduced bid bonds will not be accepted. Failure to submit a proper bid bond may be cause for rejection of an Offeror’s proposal.

The original bid bond must be mailed to:

U.S. Army Engineer District, Savannah ATTN: CECT-SAS-E (Crystal North) 100 West Oglethorpe Ave.

Savannah, GA 31401

Bid Bonds must be clearly identified with the contractor’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:

Request For Proposal No: W912HN18R3000 Due Date of Proposal: February 21, 2019 Time by which Proposals are Due: 2:00 P.M. (E.T.)

Title of Project: Commercial Vehicle/Visitor Access Control Facility, Robins Air Force Base, Georgia, PN UHHZ163000

The Government will not be responsible for bonds delivered to any location or to anyone other than those designated to receive proposals on its behalf as indicated below.

27.2. Evaluation of Options: In accordance with FAR Clause 52.217-5, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

28. Submission of Proposals: See paragraph 2.3.1 for instructions on how to submit Phase Two proposals electronically. Hard copies of Bid Bonds remain required per paragraph 27 above.

The Government will not be responsible for proposals or bid bonds delivered to any location or to anyone other than those designated to receive proposals on its behalf.

Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal and the bid bond to be received in accordance with the information provided.

Offerors shall acknowledge all revisions to the RFP issued prior to the due date for the submission of proposals in writing via a cover letter accompanying the proposal, unless instructed to do otherwise by the Contracting Officer.

For all revisions to the RFP issued after the submission of proposals, the offerors shall acknowledge the revision in writing, at the time and place directed by the Contracting Officer in the revision letter.

29. Instructions to Offerors: In accordance with FAR Clause 52.215-1, Competitive Acquisitions, the Government reserves the right to make award without discussions.

Therefore, Offerors should submit their best technical and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions, if later determined to be in the best interests of the Government, or to submit a revised offer. Discussions, if held, may be held with only the highest rated Offerors or Offeror.

SECTION 00 21 00 - INSTRUCTIONS

SECTION V

SECTION 00 21 00

PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

1. DESCRIPTION OF WORK.

1.1 This Request for Proposal (RFP) solicits for a Multiple Award Task Order Contract (MATOC) under which task orders for General Construction are expected to be issued for projects within the three state region of North Carolina, South Carolina, and Georgia. Work contemplated on this MATOC may be conducted for Army, Air Force, Navy, Marine Corps, National Guard and Reserve Components, and other Department of Defense (DoD) and Federal Agencies located on DoD installations and those in support of other Federal and Department of Defense operations. Task Orders issued under any resultant contract(s) will be Firm-Fixed Price and may be either for Design-Build or Design-Bid-Build General Construction. A project requiring use of civil funds is not authorized under this contract. (See solicitation section 01 11 00 for the complete scope of the anticipated contract to be awarded under this RFP.)

1.2 For the purposes of this solicitation, the Government will utilize the Two-Phase Design-Build Selection Process.

In Phase One of the Two-Phase Design-Build selection procedure, interested Offerors will submit specified performance capability proposals for review and consideration by the Government. The Government will evaluate these performance capability proposals in accordance with the criteria described herein.

1.3 The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will select no more than eight (8) of the most highly qualified Offerors to participate in Phase Two.

Evaluations of both Phase One and Phase Two will be used in the Selection of offerors for award of a contract.

1.4 In Phase Two of this process, the Government will evaluate both technical capability and price.

1.5 Only those Offerors who receive a written notification from the Savannah District Contracting Officer that their firm has been selected to participate in Phase Two of this solicitation are invited to submit a Phase Two proposal.

Those Offerors selected for Phase Two will be provided the technical requirements package for a Seed Task Order that will be representative of the type work and task orders anticipated to be issued under any resultant contract(s).

2. GENERAL INSTRUCTIONS

2.1 Who May Submit a Proposal. The requirement will be advertised for full and open competition; any legally organized firm may submit a proposal. Offerors submitting as a joint venture must provide the agreement forming the joint venture.

2.2 Information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors that will perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor. Only exceptions to this is that the designer of record will be evaluated in Factor 3.

2.3 Offerors shall submit their proposal to the address shown in the schedule of the Notes to Offererors section of Standard Form 1442.

2.3.1 In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically, except for the Bid Bond.

All submissions shall be in Adobe PDF format. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

W912HN18R3000_COMPANY NAME_ VOLUME I

W912HN18R3000_COMPANY NAME_ VOLUME II

Submit proposals electronically via the ARL SAFE website at:

https://safe.arl.army.mil/

***Offerors are required to submit a primary and secondary point of contact (POC) to Crystal North (crystal.e.north@usace.army.mil). Once received, you will receive an email notification from the ARL SAFE with language that “this is a request from (Contract Specialist’s name) of USACE. Please click on the link below and drop off the file or files I have requested. This link is only valid for 14 days from the time of this email.”*** Please do this as soon as possible to ensure the request is received in enough time to submit your Phase Two proposal.

The link provided in the email described above will take you to a site which states that “This web page will allow you to drop-off (upload) one or more files for anyone (either a DoD user or others). The recipient will receive an automated email containing the information you enter below and instructions for downloading the file.” This site allows up to 8192MB. You will see a prompt to “Click to Add Files or Drag Them Here.” Once all files are uploaded, select “Drop-off Files.” Please note this link is only available once—any missed or forgotten documents that were not uploaded will need to be sent via new link and a new request will be required by the Contract Specialist.

When your proposal is submitted via the ARL SAFE website, the website will provide notification of the submittal to the Government recipient(s).

The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and Contracting Officer by the ARL SAFE website, not by the date and time of uploading of the proposal into the ARL SAFE website. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal.

If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e-mail inboxes until after the deadline, the submission will be considered late.

The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.

2.4 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

3. GENERAL PROPOSAL FORMAT FOR PHASE ONE:

3.1 Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.

3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3.3 Electronic Matter Submissions. Written material shall be on single sided 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated.

3.4 Number of Copies. Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II). These two files should be named in a specific format: Solicitation Number, Offerors Company and the volume (i.e.

W912HN18R3000_USACE_VolumeI.pdf). Given the limited time and resources of the evaluation board, failure to provide proposal in the correct format may hinder the board's ability to evaluate the Offeror's proposal.

3.5 Tabs. Proposal shall be organized and tabbed as follows:

VOLUME I

TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

TAB B – Section 00 45 00 – Representations and Certifications.

TAB C – Proposal Data Sheet – See Attachment 1 provided at the end of this section. Offerors should ensure telephone number, fax number, e-mail address and DUNS number are all included. The DUNS number provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate DUNS has been created for a joint venture it must also be submitted. A DUNS number shall also be provided for the Designer of Record identified in Factor 3. The Offeror should also submit its Tax ID number on the proposal data sheet.

TAB D – Joint Venture Agreement, if applicable. See paragraph 2.1, 2.2.

TAB E – Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. At the discretion of the offeror, the Financial Information may be submitted within the same AMRDEC submission as a separate file or may be submitted as a separate AMRDEC submission. If the Financial Information is not included within Volume 1 within Tab E, the separate file shall be labeled as: W912HN18R3005_COMPANY NAME_ VOLUME

I_FINANCIAL_INFORMATION

The Offeror is not required to submit a bid bond in Phase One but is required to submit a letter, stamped with an official seal and notarized, from the contractor’s surety validating the Offeror’s single and aggregate bonding capability and a power of attorney if applicable. Any letter found to be insufficient may affect an Offeror’s responsibility determination. FAR clause 52.228-1, “Bid Guarantee” will be included in the contract. At the discretion of the Contracting Officer, a Bid Bond will be required for each task order.

VOLUME II

TAB D –Joint Venture Agreement (Duplicate of Volume I)

TAB F – FACTOR 1 Past Performance

TAB G – FACTOR 2 Management Approach

TAB H - FACTOR 3 Design Experience.

4. PHASE ONE – TAB F – FACTOR 1 – PAST PERFORMANCE

4.1 SUBMISSION REQUIREMENTS.

4.1.1 The Offeror shall demonstrate a record of construction performance and experience on recent and relevant projects using the Past Performance Questionnaire Summary Sheet, Attachment 2 and the Past Performance Questionnaire (PPQ), Attachment 3 at the end of this section. PPQ is provided for the Offeror to submit to the client (Point of Contact) for each relevant project submitted. Offeror must ensure correct phone numbers and email addresses are provided for the client. Completed PPQs must be submitted with your proposal by the specified closing date and time. Offerors should follow-up with clients to ensure timely submittal of completed questionnaires. If the offeror is unable to obtain a completed PPQ from a point of contact for a project(s) before proposal closing date, the Offeror shall complete blocks 1 – 5 of the PPQ and submit it with the proposal. Please note that, at a minimum, this first page of the PPQ must contain sufficient information for the government to determine the relevancy of the project. In addition, this will provide contract and client information for the respective project(s). The Government may call and confirm information provided by the Offeror on the PPQs with the points of contact to the extent necessary to verify the information in the PPQ or to obtain additional information. The Government reserves the right to interview other individuals if the point of contact is not available. By exception, the client may request submission of questionnaires directly to the Government’s point of contact (Contract Specialist), Crystal North. Request may be made via email to crystal.e.north@usace.army.mil. This request must be coordinated by the client in advance no later than five

(5) business days before the proposal due date. PPQ’s submitted directly to the Contract Specialist shall be mailed via trackable means (certified US Mail, FedEx, or UPS). If the PPQ fails to arrive before the closing date and time, or if the information on the PPQ is insufficient to determine the Offeror’s name and appropriate solicitation number, it will not be considered.

Offerors are cautioned that the information submitted pertaining to a project shall be limited to the PPQ form and an additional page referenced below and shall contain enough information to determine the similarity and relevancy of a project.

Likewise, Project Information submitted in a format other than or in lieu of the PPQ format (to include CCASS /ACASS/CPARS) will not be considered. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other solicitations. Offerors may submit PPQs submitted on other procurements provided they are on the NAVFAC/USACE Past Performance Questionnaire Form. Offerors may attach one additional single-sided page (per PPQ) to further describe how the project is similar to the RFP requirements.

In addition to the PPQ, the Offeror’s proposal shall include the Past Performance Questionnaire Summary Sheet (Attachment 2) to provide a summary of the PPQs included and/or submitted to clients. The summary sheet shall include information for all columns.

Offerors may identify state and local government and private contracts that are similar to the Government’s requirements described in 4.1.2.

If the Offeror is a joint venture, the projects do not have to have been performed by the joint venture submitting the offer. These project could have been performed by either company in the joint venture. Offerors are advised to submit projects wherein the Offeror, or proposed joint venture members, played a significant role and to clearly define those roles. If any Offeror has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. Ensure that the PPQs submitted for this Factor clearly describe the relevant characteristics of the project.

4.1.2 Offeror shall submit a minimum of three (3), but no more than five (5), recent relevant projects that have a minimum value of no less than $20 million each.

Projects with similar size, scope, and complexity of the following may be considered relevant projects:

Design-build or design-bid-build construction of Medical Facilities, Headquarters and Operational Facilities, Sensitive Compartmented Information Facilities (SCIFs), Administrative & Office Buildings, Educational Facilities, Military Training Facilities, Weapons Training Facilities, Animal Training & Storage Facilities, Religious Facilities, Recreational & Storage Facilities, Dining Facilities, Vehicle Maintenance Facilities, Aircraft Storage Facilities, Air Traffic Control Towers/Facilities, Barracks Buildings, Ranges, and Access Control Points.

At least three of the five projects MUST be Design-Build construction.

All projects must be successfully completed or fully designed and at least 50% construction progress completed within six (6) years preceding the date of this solicitation. Projects that meet these criteria will be evaluated to determine the level of relevancy.

Please note that projects submitted by design firms will not be evaluated in this factor. Design firms shall submit projects in accordance with the requirements in Factor 3.

4.1.3 Offerors shall submit no more than five (5) PPQs (Attachment 3) in accordance with 4.1.2. Project information shall be limited to the PPQ and one additional page. Where a project was awarded as a task order or delivery order under an IDIQ type contract, Offerors are cautioned to submit information specific to the task or delivery order considered relevant to the requirements of this RFP, rather than the umbrella contract. For purposes of this Request for Proposal, if the Offeror is submitting as a Joint Venture, no more than five (5) total project examples may be submitted for the entire JV. If an Offeror submits more than five (5) total project examples, only the first five

(5) will be evaluated. Offerors are advised to submit projects wherein the Offeror played a significant role and to clearly define those roles. Offerors shall submit only projects wherein the Offeror or proposed joint venture members were the prime contractors and played a significant role in the successful completion of the project. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.

4.1.4 Other Sources. In addition to the above, the Government may review any other sources other than those provided by the Offeror for evaluating past performance and experience. These other sources may include but are not limited to, past performance and experience information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers identified in the proposal on the Proposal Data Sheet, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. If a CPARS evaluation exisits for a submitted project, it will be considered.

4.1.5 While the Government may elect to consider data from other sources, the offeror must provide detailed, current, accurate and complete past performance information for evaluation by the Government.

4.1.6 The experience and/or past performance of individuals will NOT be considered under this factor.

4.2 EVALUATION CRITERIA.

4.2.1 Past Performance Evaluation: The past performance and experience evaluation results in an assessment of the Government’s confidence in the ability of the Offeror to meet the solicitation requirements. The past performance evaluation considers each Offeror’s demonstrated record of performance and experience on recent and relevant projects that involve a similar scope and magnitude of effort and complexities as this solicitation requires. One performance confidence assessment rating is assigned for each Offeror after evaluating the Offeror’s recent past performance and experience, focusing on performance and experience that is relevant to the contract requirements.

4.2.2 If a firm has multiple functions or divisions, the Government will only evaluate the past performance and experience of the unit or division submitting the offer.

4.2.3 Recency and Relevancy Evaluation: Projects must meet the minimum criteria in paragraph 4.1.2 in order to be considered recent and relevant and will be evaluated against the requirements of the RFP. The Government will not consider multiple projects, such as individual task orders, combined to meet the minimum value. Projects will be evaluated for relevancy based on the description of the project. Past performance evaluations on projects that are not relevant will not be considered.

Table 1. Past Performance Relevancy Rating Method:

Rating Definition

Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant

Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant

Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

4.2.4 Offerors may increase the Source Selection Evaluation Board”s (SSEB) level of confidence by demonstrating previous experience where the Offeror and the design firm(s) in Factor 3 worked together.

4.2.5 Confidence Assessment:

4.2.5.1 Offerors may increase the SSEB’s level of confidence if they are able to demonstrate successful performance in a wide variety of work as described in paragraph 4.1.2. Conversely, the SSEB may have a decreased level of confidence in Offerors whose experience is limited amongst the project types described in paragraph

4.1.2. Offerors may increase the SSEB’s level of confidence if they submit more than three Design-Build projects.

4.2.5.2 The Government will evaluate the Offeror's past performance and experience using the sources available to it including but not limited to: the example projects identified by the Offeror and submitted on the PPQs and any additional information received from references and CPARS or other sources. Offerors may be provided an opportunity to address any negative past performance information about which the Offeror has not previously had an opportunity to respond if such information is determined to impact the rating to be assessed.

4.2.5.3 The Government will consider the recency of the performance, the relevancy including the context of the data, and the quality of the performance and general trends in performance and source of the information to reach a confidence assessment rating using Past Performance Confidence Ratings. See paragraphs 4.2.2, 4.2.3, 4.2.4, 4.2.5 and 4.2.6 for other factors that will be considered in reaching a confidence assessment.

4.2.5.4 If no recent/relevant performance record is available or the Offeror’s performance record and experience is so sparse that no meaningful confidence assessment rating can be reasonably assigned this factor will be assigned a rating of “Unknown Confidence” (Neutral).

4.2.6 Past Performance Confidence Ratings:

Table 2. Confidence Ratings

Rating Definition Substantial Confidence

Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence

Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence

No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence

Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence

Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

5. PHASE ONE – TAB G – FACTOR 2 – MANAGEMENT APPROACH

5.1 SUBMISSION REQUIRMENTS: Offeror shall submit a narrative not to exceed eight (8) single sided pages, including charts and graphs that outlines how the Offeror will plan, execute, monitor and contro projects under this MATOC. It should be presented as a high level management approach that the Offeror shall use when executing task orders under this contract. The plan should address the following topics:

Resource Management Schedule Management Quality Management Communications Management Design and Construction Management Change Management

5.1.1 Resource Management : Identify and explain the roles and responsibilities of team members that will perform major or critical aspects of this contract.

5.1.2 Resource Management: The Offeror shall provide a corporate organization chart that clearly indicates how the firm plans to organize and execute task orders. Include any key firms/subs or types of subcontractors that participate in task orders.

5.1.3 Resource Management: Describe how the Offeror manages resources and integrates construction subcontractors into the construction process.

5.1.4 Schedule Management: Describe the Offeror’s approach to schedule development and management.

5.1.5 Quality Management: Describe the Offeror’s Design and Construction Quality Control Program.

5.1.6 Communications Management: Describe the process for communications and reporting at the project and higher levels.

5.1.7 Design and Construction Management: Describe the Offeror’s processes for handling design and construction problems.

5.1.8 Change Management: Describe the Offeror’s process for integrating design changes after award and handling construction changes/modifications.

5.2 EVALUATION CRITERIA:

5.2.1 Management Approach Evaluation: The project plan should describe how the Offeror plans and executes the work in each of the management requirements above.

5.2.2 The Government will evaluate the strengths, weaknesses and any deficiencies in the submission. Based on the submission provided, the Government will evaluate the Offeror’s overall understanding of the design-build and design-bid-build process and its capability to execute an awarded contract.

5.2.3 The Offeror will be evaluated on how well defined and clear the management approach is for the submission requirements listed above.

5.2.4 Management Approach Ratings

Table 3. Management Approach Ratings

Adjectival Rating

Description

Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

Table 4: Definition of Risk

Adjectival Rating Description Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.

Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance.

Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.

High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.

Unacceptable Proposal…