amd3.pdf
PDF 7 MB Posted
- Attached to
- GA/SC (MIL 02) Unrestricted Design-Build Construction MATOC Federal contract opportunity
- Solicitation number
- W912HN18R3000
About this file
This notice provides details about a multiple award task order contract solicitation for general construction services in Georgia, South Carolina, and North Carolina. The U.S. Army Corps of Engineers Savannah District will issue a request for proposal W912HN18R3000 for unrestricted design-build construction MATOC support. Task orders will be for new construction, rehabilitation, maintenance or repair projects. The contract period is five years with a capacity of $249 million. Proposals will be evaluated using best value, and the selection process has two phases evaluating factors like past performance, management approach, and design experience. The solicitation is expected to release on May 14, 2018, with phase one closing on June 14, 2018 and phase two dates in August and September 2018. The NAICS code is 236220 and there is no set-aside. The magnitude is $100-250 million. Discussions are not intended but are reserved if in the government's best interest.
W912HN18R3000 PHASE II AMD 3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 18R3000vol2Ph2.pdf | ||
| amd11.pdf | ||
| 18R3000vol2Ph2.pdf | ||
| amd10.pdf | ||
| 18R3000vol1.PDF | ||
| amd9.pdf | ||
| 18R3000vol2Ph2.pdf | ||
| amd7.pdf | ||
| 18R3000vol2Ph2.pdf | ||
| 18R3000vol1.PDF | ||
| amd6.pdf | ||
| amd5.pdf | ||
| 18R3000Ph2.pdf | ||
| 18R3000Ph2.pdf | ||
| amd4.pdf | ||
| 18R3000Ph2.pdf | ||
| 18R3000Ph2.pdf | ||
| W912HN18-R-3000_CAD_BIM_Files.zip | ZIP file | |
| amd2.pdf | ||
| 18R3000.PDF | ||
| amd1.pdf | ||
| PPQ_Summary.pdf | ||
| 18R3000.PDF | ||
| PPQ.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. CONTRACT CHANGES:
(1) Add site visit notes and sign-in sheet.
(2) Extend proposal due date from 25 January 2019 to 7 February 2019
(3) Revise bid schedule
(4) Update w age determination
(5) Delete caluses 52.215-22 and 52.215-23
(6) Revise Seed Task Order Instructions (para 5, 3.1 and 28.2) B. TECHNICAL SPECIFICATION CHANGES: There are no technical specification changes w ith this amendment.
C. CONTRACT DRAWINGS: There are no draw ing changes w ith this amendment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 57
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Jan-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN18R3000
X 9B. DATED (SEE ITEM 11)
18-May-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Jan-2019
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN18R3000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SITE VISIT SIGN IN SHEET/NOTES
SECTION 00 01 15 - LIST OF DRAWING SHEETS
The following have been modified:
WAGE DETERMINATION
General Decision Number: GA190140 01/04/2019 GA140
Superseded General Decision Number: GA20180152
State: Georgia
Construction Type: Building
County: Houston County in Georgia.
http://www.wdol.gov/dba.aspx
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 25-Jan-2019 02:00 PM to 07-Feb-2019 02:00 PM.
SCHEDULE B
ATTACHMENT 1
Seed Task Order Pricing Schedule B
SCHEDULE
Commercial Vehicle/Visitor Access Control Facility
PN: UHHZ16-3000
Robins AFB, GA
CONTRACT LINE ITEM SCHEDULE
SUBTOTAL for CLINS 0001 through 0008 TOTAL $__________________
Contract Duration Shall Not Exceed 365 Calendar Days from Notice to Proceed
SECTION 00 20 00 - INSTRUCTIONS FOR PROCUREMENT
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 BASE BID – Design Services, Commercial Vehicle Visitor Access Control Facility, Complete
1 Job XXX $___________
0002 BASE BID – Construction Commercial Vehicle/Visitor Control Facility, Complete
1 Job XXX $___________
0003 BASE BID – Relocation of Georgia Power Co Existing OverHead Lines via Georgia Power Resources, Complete
1 Job XXX $ 411,295
0004 OPTION 1, Add 3rd Truck Queuing Lane(Concrete Pavement), Complete
1 Job XXX $___________
0005 OPTION 2 – Emergency Generator 150kw, Complete
1 Job XXX $___________
0006 OPTION 3 – Relocate / Add To Metal Screen Fence for Lot 21, Complete
1 Job XXX $___________
0007 OPTION 4 – Provide Concrete Pavement in lieu of Asphalt, Complete
1 Job XXX $___________
0008 OPTION 5 – Provide All Soil Fill From Off- Base Borrow, Complete
1 Job XXX $___________
ATTACHMENT 2
Seed Task Order Scope and Instructions
W912HN18R3000
Project Number UHHZ163000 Commercial Vehicle/Visitor Access Control Facility, Robins Air Force Base, Georgia
1. In accordance with Local Clause 52.216-4008, Multiple Award Fair Opportunity Task and Delivery Order Contracts, subject project is being offered to all Offerors in the MATOC pool, as identified below, giving each fair opportunity to compete for this action by issuance of this Request for Proposal (RFP) letter. Any Offeror who does not wish to be considered for this particular task order is requested to notify this office in writing, within seven (7) calendar days of receipt of this letter, indicating reason for non-participation.
Those who do wish to compete must submit a proposal by the date and time indicated in paragraph 24 below, and in accordance with the criteria specified herein.
2. Scope of Work.
2.1. Brief Description of the Scope of Work: The existing commercial truck gate (Gate 4, Robins AFB, GA) is sub-standard and does not meet the current requirements for ATFP. The contractor shall utilize the design-build request for proposal (RFP) to provide design and construction (complete) to construct a new commercial truck gate to meet AT/FP requirements. The design-build RFP provides an approved layout of the new access and exit roadways, denial barriers, inspection canopies, and driver check-in station, lighting, signage, related supporting features, and infrastructure. Demolition of existing facilities within the footprint of construction is also required.
2.2. Interested participants must submit a price and technical proposal for work detailed in the scope of work, drawings and specifications posted on FedTeDs. To access the full scope of work, specifications and drawings go to the following link:
https://www.fbo.gov/fedteds/W912HN18R3000.
3. Technical Inquiries:
3.1. Technical Inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org\projnet, Bidder Inquiry Key: A2YXZX-XJQW7P. All questions regarding this RFP must be submitted in writing via aforementioned method no later than COB 24 January 2019. The Government reserves the right to not respond to questions/inquiries received after this date.
3.2. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
4. If an Offeror believes the requirements in this RFP contain an error, omission, or are otherwise unsound; the offeror shall immediately notify the Contracting Officer in writing, to include supporting rationale. Such communication may be submitted via the POC identified in paragraph 20 below.
5. Wage Decision GA180140 dated 01/04/2019 GA140 (Attachment 2) applies to CLINS 0001 through 0008 of attached Task Order Pricing Schedule (Attachment 1). Offerors are reminded that wage determinations are subject to change prior to award. All proposed pricing shall include the most current wage rates. All offerors are encouraged to review wage rates established by the Department of Labor prior to submitting proposals.
6. The contractor shall be assessed the amount of $986.18 liquidated damages per calendar day for failure to complete the prescribed work within the performance period.
7. A Construction Cost Limitation (CCL) for MCAF Funded Line Items CLIN NUMBERS 0001, 0002, and 0003 is $8,428,000. This limitation includes both design and construction costs and shall not be exceeded. Offers which exceed the CCL risk being rendered ineligible for award.
8. Site Visits.
8.1. In accordance with FAR Clause 52.237-2, Site Visit (Construction), A site visit will be conducted at the Corps of Engineers Resident Office, at Robins Air Force Base, Georgia on 20-December-2018 beginning at 1330 hours. Participants will be required to check in at the main gate via Watson Blvd, and arrive there by 1230hrs. Clearance forms to be completed before hand by the participants will be provided. The POC for the site visit is Craig Harrell and he can be contacted at phone number 912-652-5150 or e-mail at craig.l.harrell@usace.army.mil.
8.2. Prior to the submission of any proposals, all offerors are required to visit the project site location to become familiar with the project requirements. A proposal will not be rejected only because the offeror fails to visit the project site. Failure to visit the project site will not relieve the bidder from responsibility for performance of the work and compliance with the terms and conditions of any resultant contract. In no event will a failure to inspect the site constitute grounds for a claim after award of the task order.
9. Notice of Requirement for Affirmative Action to ensure Equal Employment Opportunity for Construction, In accordance with FAR Clause 52.222-23:
10.
Monthly Anticipated Adverse Weather Delay. In accordance with clause 52.249-4001 I Time Extensions for Unusually Severe Weather (APR 1991 OCE)
Workdays Based on 5-Day Work Week
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
9 8 6 4 4 7 8 7 5 3 4 8
11. Additional Contractor Requirements.
12.1. Project Involves Handling of Asbestos or Lead Base Paint
12.2. Occupancy During Construction
12.3. CQC System Requirements
CQC Manager
Goals for Participation for Each Trade
Percentages
Females 6.9% Minority 27.5%
CQC Personnel Civil Mechanical Electrical Structural Architectural Environmental Submittal Clerk Concrete, Pavements and soils TAB Personnel Design Quality Control Manager
12.4. Quality Control System (QCS)
12.5. Project Sign Required
12.6. Submittals are required on all materials.
12.7. Site Visit Requirements
Video Tape Digital Pictures
13. After task order award:
Site Safety and Health Plan Quality Control Program
Design After Award Work Plan – Design/Build. The design requirements are:
a. Complex Submittal – Contractor will submit Full Design (35%, 90%, 100%, and Corrected Final submittals); specifications, erosion control plan and permits, to include Georgia DOT driveway permit.
b. Medium Submittal - Contractor will submit Full Design (90%, 100%, and Corrected Final submittals); abridge set of specifications with project data, erosion control plan and permits.
c. Light Submittal – Contractor will submit Full Design (100% and Corrected Final submittals); specifications on the drawings, erosion control plan and permits.
d. Distribution of Submittals:
Number Item
6 ½ Size Drawings 3 Full Size
Drawings 4 Specifications 2 CDs
Construction Schedule
Bar Chart
CPM
Weekly Progress Report Telephone Conversation/Correspondence Records Site/Project Specific Remediation Report As-Built/In Progress Drawings
14. After construction completion, prior to final payment:
System/Equipment Testing Operation and Maintenance Manuals/Training Videos
Training Equipment and Construction Warranties List of Standard Equipment and Service Organizations As-Built/Final Drawings
15. Applicable Specifications:
01 11 00 – Summary of Work 01 30 00 – Administrative Requirements 01 32 01.00 10 – Project Schedule 01 33 00.00 37– Submittal Procedures 01 33 16.00 10 – Design Data (Design After Award) 01 33 29 – Sustainability Reporting 01 35 26 – Governmental Safety Requirements 01 42 00 – Sources for Reference Publications 01 45 00.00 10 – Quality Control 01 50 00 – Temporary Construction Facilities and Controls 01 57 19 – Temporary Environmental Controls 01 74 19 – Construction and Demolition Waste Management 01 78 00 – Closeout Submittals 01 78 23 - Operation and Maintenance Data Others: See RFP for the proposed project:
16. Excavation/Dig Permit: The contractor shall obtain through the Base Civil Engineer, a completed and approved Excavation Permit prior to any excavation, to include sign or fence-post holes. The Contractor shall schedule an appointment to locate utility lines prior to any excavation with the Corps of Engineers. Excavation/Dig Permit meetings are held Monday at 0800 hours in Building 1555.
17. Disposal Permits: No on-base disposal of land clearing debris and inert debris is available. The disposal of metal from building demolition is described in the RFP.
The contractor will be required to coordinate any permit(s) required to access off-base land clearing and inert debris and demolition landfills. Only materials produced on the project for which the permits are issued may be disposed of in the land clearing and inert debris and demolition landfills. The Contractor shall keep a copy of the completed permit with the vehicle throughout the contract disposal operation.
18. Borrow Permits: Borrow material is available at an on-base construction site approximately one mile from this project’s site. Review RFP description of the intended usage of this fill material for this project.
19. Haul Routes: The preponderance of the work is to be accomplished with the project site fenced such that site access is to be directly from the Highway 247/129 adjacent to Robins AFB. Comply with Georgia DOT highway/road construction safety requirements as well as EM 385-1-1. For any on-base haul activity, the Contractor is required to obtain approval from the Resident Office for the routes proposed for transportation of borrow materials, construction debris, or demolition materials unless otherwise permitted in writing by the Resident. The axle load of earth-hauling equipment operating on paved streets shall not exceed 12,000 pounds.
20. Utility Outages and Road/Parkling Lot Closures: Utility, road/parking lot and railroad closures require a minimum 10 working days advance written notice to Resident Office. In the case of a road closures, a sketch shall be provided showing the closure location and all necessary signs and barricades. Necessary signage, barricades, flag persons, lights (including temporary traffic control lights), and markings for the safe movement of the public during construction shall be in accordance with the Manual on Uniform Traffic Control Devices, and shall be provided at no additional expense to the Government. Utility outages shall be scheduled with Base Civil Engineering, through the Resident Office. Utility Outage Meetings are held Wednesday at 1030 hours in Building 1555. Road and parking lot closures shall require a minimum of forty-five (45) days notice to Base Civil Engineering.
21. Availability and Use of Utility Services: Utility services required on the job site for the accomplishment of the work
Will be furnished at no cost to the Contractor Will NOT be furnished at any cost to the Contractor
However, the Government will make no connections or alterations to the existing utility systems for the Contractor. Utilities for offices and/or storage buildings or areas will be billed to the Contractor monthly and will not be furnished free of charge. The Contractor shall be responsible for installing meters or other connections at no cost to the Government. At the conclusion of the contract, the Contractor shall remove all temporary connections, distribution lines, meters and associated paraphernalia unless otherwise directed by the Resident Office. Prior to installing any utility connections at an office/storage site, the plan will be approved by the Resident Office. When utility meters are installed, the Contractor shall notify the Resident Office for the initial meter reading. Failure to obtain this initial reading will result in the Contractor being charged for the entire amount shown on the meter.
22. Contractor Storage and Trailers: The Contractor shall place or paint a sign on all of his storage trailer(s) and building(s) used on this contract. At a minimum, the sign shall contain the name of the Contractor and a telephone number at which the contractor can be reached. The trailer(s) and building(s) shall be completed with gates and/or doors which can be locked. Only material for this project shall be stored in the trailer(s) or building(s). The Contractor shall remove the storage trailer(s) or building(s) within 30 days after completion of the contract and prior to submitting his final invoice. The area around the storage trailer(s) and building(s) shall be kept clean.
23. Safety: Safety will be in compliance with the Corps of Engineers Safety Manual EM 385-1-1. Use of appropriate safety equipment is mandatory and not limited to hard hats and steel-toed shoes. Contractor is responsible for daily clean up and complete restoration of the area once the contract is complete.
24. Hours of Work: Work shall be accomplished between the hours of 0700 thru 1700 hours daily, Monday through Friday on non-Government holidays. Legal holidays falling on Saturday are observed on the proceeding Friday and those falling on Sunday are observed on the following Monday. Work schedule and facility security to be coordinated with the Resident Office for facility access and security maintenance during duration of work. Contractor shall not work outside of the stated hours of work, without first obtaining approval from the Corps of Engineers Resident Office.
25. Warranty: The contractor shall provide a minimum of one (1) year warranty on all materials and workmanship from the date of the Government’s acceptance of the work.
26. Proposals.
27.1. Bid Guarantee: In accordance with FAR Clause 52.228-1, Bid Guarantee, Offerors are required to submit a bid bond with their proposal by the time and date set for receipt of proposals. The Bid Guarantee shall be 20% of the bid price or $3 Million, whichever is less. Bid bonds must be submitted in original form and contain original signatures.
Photocopied, facsimile, scanned or otherwise mechanically reproduced bid bonds will not be accepted. Failure to submit a proper bid bond may be cause for rejection of an Offeror’s proposal.
The original bid bond must be mailed to:
U.S. Army Engineer District, Savannah ATTN: CECT-SAS-E (Crystal North) 100 West Oglethorpe Ave.
Savannah, GA 31401
27.2. Evaluation of Options: In accordance with FAR Clause 52.217-5, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
28. Submission of Proposals:
28.1. HAND CARRIED AND ELECTRONIC PROPOSAL SUBMISSIONS, TO INCLUDE
EMAIL AND FACSIMILE, ARE NOT AUTHORIZED.
28.2. MAILED PROPOSALS: Mailed proposals must be clearly identified with the contractor’s name and address. To ensure timely and proper handling, the lower left corner of the outermost wrapper should indicate the following:
Request For Proposal No: W912HN18R3000 Due Date of Proposal: February 7, 2019 Time by which Proposals are Due: 2:00 P.M. (E.T.)
Title of Project: Commercial Vehicle/Visitor Access Control Facility, Robins Air Force Base, Georgia, PN UHHZ163000
The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf as indicated below.
Proposals delivered by commercial carrier and those sent by U.S. Mail, including U.S.
Express Mail, must be addressed as indicated below.
U.S. Army Engineer District, Savannah ATTN: CECT-SAS-E (Crystal E. North) 100 West Oglethorpe Avenue Savannah, Georgia 31401-3640
Proposals sent by U.S. Mail or delivered by commercial carrier must be received by mailroom personnel on the first floor of 100 West Oglethorpe Avenue by the time specified in Block 13 of the SF 1442 for receipt of proposals. The date and time of delivery established by these carriers is not the official time of receipt by the Government. Security Guards posted at the loading dock entry for the building do not receive bids and will contact Mailroom personnel. Once Mailroom personnel are available, the proposal will be processed and the Security Guards using established security procedures and subsequently picked up by Mailroom personnel. After receipt by the Mailroom personnel, a record will be made of the receipt of the proposal.
Completion of these actions will constitute delivery of the bid by the date and time designated for receipt of proposal. Contractors are responsible for allowing sufficient time for the bid to be processed for receipt and are cautioned that sufficient time may be as much as 24 hours prior to the date and time designated for Express Mail, Federal Express and United Parcel Service are required to be sent to 100 West Oglethorpe Avenue, Savannah Georgia 31401
Offerors are cautioned that proposals sent via United States Postal Service Express Mail are first delivered to the Savannah District Post Office Box instead of 100 West Oglethorpe Avenue, “the office designated for receipt of proposals” therefore, allow sufficient mailing time.
28.3. The Government will not be responsible for proposals or bid bonds delivered to any location or to anyone other than those designated to receive proposals on its behalf.
Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal and the bid bond to be received in accordance with the information provided.
28.4. Offerors shall acknowledge all revisions to the RFP issued prior to the due date for the submission of proposals in writing via a cover letter accompanying the proposal, unless instructed to do otherwise by the Contracting Officer.
28.5. For all revisions to the RFP issued after the submission of proposals, the offerors shall acknowledge the revision in writing, at the time and place directed by the Contracting Officer in the revision letter.
29. Instructions to Offerors: In accordance with FAR Clause 52.215-1, Competitive Acquisitions, the Government reserves the right to make award without discussions.
Therefore, Offerors should submit their best technical and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions, if later determined to be in the best interests of the Government, or to submit a revised offer. Discussions, if held, may be held with only the highest rated Offerors or Offeror.
INSTRUCTIONS FOR PROCUREMENT
1. LIQUIDATED DAMAGES: Will be made on a Task Order basis.
2. MONTHLY ANTICIPATED ADVERSE WEATHER DELAY: Will be made on a Task Order basis.
3. GENERAL DECISION NUMBER: See Section 00 01 15. The Wage Decision may be subject to change prior to award. All proposed pricing shall include the most current wage rates. All Offerors are encouraged to review wage rates established by the Department of Labor prior to submitting proposals.
4. QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System.
5. SECURITY REQUIREMENTS: Increased security at military installations may require vehicle and personnel registration, as well as 100% ID checks and random vehicle searches.
TECHNICAL MATTERS:
Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org/projnet. All questions regarding this Request for Proposal (RFP) must be submitted in writing via Bidder Inquiry in ProjNet by COB 24 January 2019. The Government reserves the right to decline addressing questions received after COB 24 January 2019.
If an Offeror believes the requirements in this Request for Proposal contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offer is reminded that the Government reserves the right to award this Request for Proposal based on the initial proposal, as received, without discussion.
To submit and review bid inquiry items, Offerors will need to be a current registered user or selfregister into the system. To self-register, go to web page, click BID tab, select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, your e-mail address, and click login. Fill in all required information and click create user. Verify all information on the next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry.
Offerors will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed by our technical team.
Bidder Inquiry Key: W7ZJMW-R72CN6
SECTION 00 21 00 - INSTRUCTIONS
SECTION V
SECTION 00 21 00
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. DESCRIPTION OF WORK.
1.1 This Request for Proposal (RFP) solicits for a Multiple Award Task Order Contract (MATOC) under which task orders for General Construction are expected to be issued for projects within the three state region of North Carolina, South Carolina, and Georgia. Work contemplated on this MATOC may be conducted for Army, Air Force, Navy, Marine Corps, National Guard and Reserve Components, and other Department of Defense (DoD) and Federal Agencies located on DoD installations and those in support of other Federal and Department of Defense operations. Task Orders issued under any resultant contract(s) will be Firm-Fixed Price and may be either for Design-Build or Design-Bid-Build General Construction. A project requiring use of civil funds is not authorized under this contract. (See solicitation section 01 11 00 for the complete scope of the anticipated contract to be awarded under this RFP.)
1.2 For the purposes of this solicitation, the Government will utilize the Two-Phase Design-Build Selection Process. In Phase One of the Two-Phase Design-Build selection procedure, interested Offerors will submit specified performance capability proposals for review and consideration by the Government. The Government will evaluate these performance capability proposals in accordance with the criteria described herein.
1.3 The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will select no more than eight (8) of the most highly qualified Offerors to participate in Phase Two. Evaluations of both Phase One and Phase Two will be used in the Selection of offerors for award of a contract.
1.4 In Phase Two of this process, the Government will evaluate both technical capability and price.
1.5 Only those Offerors who receive a written notification from the Savannah District Contracting Officer that their firm has been selected to participate in Phase Two of this solicitation are invited to submit a Phase Two proposal. Those Offerors selected for Phase Two will be provided the technical requirements package for a Seed Task Order that will be representative of the type work and task orders anticipated to be issued under any resultant contract(s).
2. GENERAL INSTRUCTIONS
2.1 Who May Submit a Proposal. The requirement will be advertised for full and open competition; any legally organized firm may submit a proposal. Offerors submitting as a joint venture must provide the agreement forming the joint venture.
2.2 Information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors that will perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor. Only exceptions to this is that the designer of record will be evaluated in Factor 3.
2.3 Offerors shall submit their proposal to the address shown in the schedule of the Notes to Offererors section of Standard Form 1442.
2.4 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.
3. GENERAL PROPOSAL FORMAT FOR PHASE ONE:
3.1 Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
3.3 Electronic Matter Submissions. Written material shall be on single sided 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated.
3.4 Number of Copies. Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II). These two files should be named in a specific format:
Solicitation Number, Offerors Company and the volume (i.e.
W912HN18R3000_USACE_VolumeI.pdf). Given the limited time and resources of the evaluation board, failure to provide proposal in the correct format may hinder the board's ability to evaluate the Offeror's proposal.
3.5 Tabs. Proposal shall be organized and tabbed as follows:
VOLUME I
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB B – Section 00 45 00 – Representations and Certifications.
TAB C – Proposal Data Sheet – See Attachment 1 provided at the end of this section.
Offerors should ensure telephone number, fax number, e-mail address and DUNS number are all included. The DUNS number provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate DUNS has been created for a joint venture it must also be submitted. A DUNS number shall also be provided for the Designer of Record identified in Factor 3. The Offeror should also submit its Tax ID number on the proposal data sheet.
TAB D – Joint Venture Agreement, if applicable. See paragraph 2.1, 2.2.
TAB E – Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. At the discretion of the offeror, the Financial Information may be submitted within the same AMRDEC submission as a separate file or may be submitted as a separate AMRDEC submission. If the Financial Information is not included within Volume 1 within Tab E, the separate file shall be labeled as:
W912HN18R3005_COMPANY NAME_ VOLUME I_FINANCIAL_INFORMATION
The Offeror is not required to submit a bid bond in Phase One but is required to submit a letter, stamped with an official seal and notarized, from the contractor’s surety validating the Offeror’s single and aggregate bonding capability and a power of attorney if applicable. Any letter found to be insufficient may affect an Offeror’s responsibility determination. FAR clause 52.228-1, “Bid Guarantee” will be included in the contract. At the discretion of the Contracting Officer, a Bid Bond will be required for each task order.
VOLUME II
TAB D –Joint Venture Agreement (Duplicate of Volume I)
TAB F – FACTOR 1 Past Performance
TAB G – FACTOR 2 Management Approach
TAB H - FACTOR 3 Design Experience.
4. PHASE ONE – TAB F – FACTOR 1 – PAST PERFORMANCE
4.1 SUBMISSION REQUIREMENTS.
4.1.1 The Offeror shall demonstrate a record of construction performance and experience on recent and relevant projects using the Past Performance Questionnaire Summary Sheet, Attachment 2 and the Past Performance Questionnaire (PPQ), Attachment 3 at the end of this section. PPQ is provided for the Offeror to submit to the client (Point of Contact) for each relevant project submitted. Offeror must ensure correct phone numbers and email addresses are provided for the client. Completed PPQs must be submitted with your proposal by the specified closing date and time. Offerors should follow-up with clients to ensure timely submittal of completed questionnaires. If the offeror is unable to obtain a completed PPQ from a point of contact for a project(s) before proposal closing date, the Offeror shall complete blocks 1 – 5 of the PPQ and submit it with the proposal. Please note that, at a minimum, this first page of the PPQ must contain sufficient information for the government to determine the relevancy of the project. In addition, this will provide contract and client information for the respective project(s). The Government may call and confirm information provided by the Offeror on the PPQs with the points of contact to the extent necessary to verify the information in the PPQ or to obtain additional information. The Government reserves the right to interview other individuals if the point of contact is not available. By exception, the client may request submission of questionnaires directly to the Government’s point of contact (Contract Specialist), Crystal North. Request may be made via email to crystal.e.north@usace.army.mil.
This request must be coordinated by the client in advance no later than five (5) business days before the proposal due date. PPQ’s submitted directly to the Contract Specialist shall be mailed via trackable means (certified US Mail, FedEx, or UPS). If the PPQ fails to arrive before the closing date and time, or if the information on the PPQ is insufficient to determine the Offeror’s name and appropriate solicitation number, it will not be considered.
Offerors are cautioned that the information submitted pertaining to a project shall be limited to the PPQ form and an additional page referenced below and shall contain enough information to determine the similarity and relevancy of a project.
Likewise, Project Information submitted in a format other than or in lieu of the PPQ format (to include CCASS /ACASS/CPARS) will not be considered. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other solicitations. Offerors may submit PPQs submitted on other procurements provided they are on the NAVFAC/USACE Past Performance Questionnaire Form. Offerors may attach one additional single-sided page (per PPQ) to further describe how the project is similar to the RFP requirements.
In addition to the PPQ, the Offeror’s proposal shall include the Past Performance Questionnaire Summary Sheet (Attachment 2) to provide a summary of the PPQs included and/or submitted to clients. The summary sheet shall include information for all columns.
Offerors may identify state and local government and private contracts that are similar to the Government’s requirements described in 4.1.2.
If the Offeror is a joint venture, the projects do not have to have been performed by the joint venture submitting the offer. These project could have been performed by either company in the joint venture. Offerors are advised to submit projects wherein the Offeror, or proposed joint venture members, played a significant role and to clearly define those roles. If any Offeror has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. Ensure that the PPQs submitted for this Factor clearly describe the relevant characteristics of the project.
4.1.2 Offeror shall submit a minimum of three (3), but no more than five (5), recent relevant projects that have a minimum value of no less than $20 million each.
Projects with similar size, scope, and complexity of the following may be considered relevant projects:
Design-build or design-bid-build construction of Medical Facilities, Headquarters and Operational Facilities, Sensitive Compartmented Information Facilities (SCIFs), Administrative & Office Buildings, Educational Facilities, Military Training Facilities, Weapons Training Facilities, Animal Training & Storage Facilities, Religious Facilities, Recreational & Storage Facilities, Dining Facilities, Vehicle Maintenance Facilities, Aircraft Storage Facilities, Air Traffic Control Towers/Facilities, Barracks Buildings, Ranges, and Access Control Points.
At least three of the five projects MUST be Design-Build construction.
All projects must be successfully completed or fully designed and at least 50% construction progress completed within six (6) years preceding the date of this solicitation. Projects that meet these criteria will be evaluated to determine the level of relevancy.
Please note that projects submitted by design firms will not be evaluated in this factor. Design firms shall submit projects in accordance with the requirements in Factor 3.
4.1.3 Offerors shall submit no more than five (5) PPQs (Attachment 3) in accordance with 4.1.2. Project information shall be limited to the PPQ and one additional page.
Where a project was awarded as a task order or delivery order under an IDIQ type contract, Offerors are cautioned to submit information specific to the task or delivery order considered relevant to the requirements of this RFP, rather than the umbrella contract. For purposes of this Request for Proposal, if the Offeror is submitting as a Joint Venture, no more than five (5) total project examples may be submitted for the entire JV.
If an Offeror submits more than five (5) total project examples, only the first five (5) will be evaluated. Offerors are advised to submit projects wherein the Offeror played a significant role and to clearly define those roles. Offerors shall submit only projects wherein the Offeror or proposed joint venture members were the prime contractors and played a significant role in the successful completion of the project. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.
4.1.4 Other Sources. In addition to the above, the Government may review any other sources other than those provided by the Offeror for evaluating past performance and experience. These other sources may include but are not limited to, past performance and experience information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers identified in the proposal on the Proposal Data Sheet, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. If a CPARS evaluation exisits for a submitted project, it will be considered.
4.1.5 While the Government may elect to consider data from other sources, the offeror must provide detailed, current, accurate and complete past performance information for evaluation by the Government.
4.1.6 The experience and/or past performance of individuals will NOT be considered under this factor.
4.2 EVALUATION CRITERIA.
4.2.1 Past Performance Evaluation: The past performance and experience evaluation results in an assessment of the Government’s confidence in the ability of the Offeror to meet the solicitation requirements. The past performance evaluation considers each Offeror’s demonstrated record of performance and experience on recent and relevant projects that involve a similar scope and magnitude of effort and complexities as this solicitation requires. One performance confidence assessment rating is assigned for each Offeror after evaluating the Offeror’s recent past performance and experience, focusing on performance and experience that is relevant to the contract requirements.
4.2.2 If a firm has multiple functions or divisions, the Government will only evaluate the past performance and experience of the unit or division submitting the offer.
4.2.3 Recency and Relevancy Evaluation: Projects must meet the minimum criteria in paragraph 4.1.2 in order to be considered recent and relevant and will be evaluated against the requirements of the RFP. The Government will not consider multiple projects, such as individual task orders, combined to meet the minimum value. Projects will be evaluated for relevancy based on the description of the project. Past performance evaluations on projects that are not relevant will not be considered.
Table 1. Past Performance Relevancy Rating Method:
Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
4.2.4 Offerors may increase the Source Selection Evaluation Board”s (SSEB) level of confidence by demonstrating previous experience where the Offeror and the design firm(s) in Factor 3 worked together.
4.2.5 Confidence Assessment:
4.2.5.1 Offerors may increase the SSEB’s level of confidence if they are able to demonstrate successful performance in a wide variety of work as described in paragraph 4.1.2. Conversely, the SSEB may have a decreased level of confidence in Offerors whose experience is limited amongst the project types described in paragraph
4.1.2. Offerors may increase the SSEB’s level of confidence if they submit more than three Design-Build projects.
4.2.5.2 The Government will evaluate the Offeror's past performance and experience using the sources available to it including but not limited to: the example projects identified by the Offeror and submitted on the PPQs and any additional information received from references and CPARS or other sources. Offerors may be provided an opportunity to address any negative past performance information about which the Offeror has not previously had an opportunity to respond if such information is determined to impact the rating to be assessed.
4.2.5.3 The Government will consider the recency of the performance, the relevancy including the context of the data, and the quality of the performance and general trends in performance and source of the information to reach a confidence assessment rating using Past Performance Confidence Ratings. See paragraphs 4.2.2, 4.2.3, 4.2.4, 4.2.5 and 4.2.6 for other factors that will be considered in reaching a confidence assessment.
4.2.5.4 If no recent/relevant performance record is available or the Offeror’s performance record and experience is so sparse that no meaningful confidence assessment rating can be reasonably assigned this factor will be assigned a rating of “Unknown Confidence” (Neutral).
4.2.6 Past Performance Confidence Ratings:
Table 2. Confidence Ratings
Rating Definition Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence
Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence
Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
5. PHASE ONE – TAB G – FACTOR 2 – MANAGEMENT APPROACH
5.1 SUBMISSION REQUIRMENTS: Offeror shall submit a narrative not to exceed eight
(8) single sided pages, including charts and graphs that outlines how the Offeror will plan, execute, monitor and contro projects under this MATOC. It should be presented as a high level management approach that the Offeror shall use when executing task orders under this contract. The plan should address the following topics:
Resource Management Schedule Management Quality Management Communications Management Design and Construction Management Change Management
5.1.1 Resource Management : Identify and explain the roles and responsibilities of team members that will perform major or critical aspects of this contract.
5.1.2 Resource Management: The Offeror shall provide a corporate organization chart that clearly indicates how the firm plans to organize and execute task orders. Include any key firms/subs or types of subcontractors that participate in task orders.
5.1.3 Resource Management: Describe how the Offeror manages resources and integrates construction subcontractors into the construction process.
5.1.4 Schedule Management: Describe the Offeror’s approach to schedule development and management.
5.1.5 Quality Management: Describe the Offeror’s Design and Construction Quality Control Program.
5.1.6 Communications Management: Describe the process for communications and reporting at the project and higher levels.
5.1.7 Design and Construction Management: Describe the Offeror’s processes for handling design and construction problems.
5.1.8 Change Management: Describe the Offeror’s process for integrating design changes after award and handling construction changes/modifications.
5.2 EVALUATION CRITERIA:
5.2.1 Management Approach Evaluation: The project plan should describe how the Offeror plans and executes the work in each of the management requirements above.
5.2.2 The Government will evaluate the strengths, weaknesses and any deficiencies in the submission. Based on the submission provided, the Government will evaluate the Offeror’s overall understanding of the design-build and design-bid-build process and its capability to execute an awarded contract.
5.2.3 The Offeror will be evaluated on how well defined and clear the management approach is for the submission requirements listed above.
5.2.4 Management Approach Ratings
Table 3. Management Approach Ratings
Adjectival Rating
Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
Table 4: Definition of Risk
Adjectival Rating Description Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance.
Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
6. PHASE ONE – TAB H – FACTOR 3 - DESIGN EXPERIENCE
6.1 SUBMISSION REQUIREMENTS: Offeror shall submit a narrative not to exceed a total of five (5) single side pages describing its Design Experience or the intended Designer of Record’s (DOR) experience on a minimum of three (3), but no more than five
(5) projects that have a minimum…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .