amd2.pdf
PDF 28 MB Posted
- Attached to
- GENERAL CONSTRUCTION SATOC
- Solicitation number
- W912HN18R0004
About this file
This is a notice for an indefinite delivery contract for general construction services in the three-state region of North Carolina, South Carolina, and Georgia, with a focus on Hunter Army Air Field, Fort Stewart, and Fort Gordon in Georgia. The Army Corps of Engineers will award a single-award task order contract with a total capacity of $45 million for a base period of two years and three one-year options. Task orders issued under the contract will have a value between $500,000 and $5 million and will be firm-fixed price for either design-build or design-bid-build construction. Evaluation will use best value tradeoff, and the solicitation will be a 100% small business set-aside issued electronically on or around June 14, 2018.
W912HN-18-R-0004 AMD2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amd3.pdf | ||
| 18R04.PDF | ||
| Attachment_P_FASP.dwg | DWG drawing | |
| W912HN18R00040002_-_Amendment_(Final)_-_20190222.pdf | ||
| W912HN18R0004_-_Attachment_A_-_T_-_Rev_1.pdf | ||
| W912HN18R00040002_-_Amendment_Conformed_(Final)_-_20190222.pdf | ||
| A.07.24_-_W912HN18R0004_-_Attachment_P_FASP_CADD_File.DWG | DWG drawing | |
| 18R04.PDF | ||
| amd1.pdf | ||
| 18R04.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised February 6, 2019
Project Specific Scope of Work
Specific Work Items:
CLIN 0001 Base: FASP Complex:
1) General Description/Conditions:
a) The contractor shall provide all labor, materials, equipment, design and incidentals necessary to construct a Field Ammunition Supply Point (FASP) within a predetermined location (Attachment F). This complex will facilitate the storage of ammunition and explosive (A&E) items. The Ammunition Magazines (ARMAGs) utilized for storage of A&E will be provided by the 75th Ranger Regiment.
b) Refer to Technical Memorandum (Attachment O) for guidelines and magazine ratings.
c) The contractor shall be responsible for all coordination and permitting required to connect to the Fort Benning installation power utility system.
d) The contractor shall be responsible for all coordination and permitting required to connect to the Fort Benning installation data communications system.
2) Site Preparation:
a) IAW AR190-11 “Building site, Clear zones for Category I through Category IV
A&E”, the FASP site shall be free of all obstacles, topographical features, and vegetation exceeding 8 inches in height, which reduce the effectiveness of the physical barrier, impede observation, or provide cover and concealment of an intruder.
i) Clear zones shall extend 12 feet on the outside and 30 feet on the inside of the perimeter fence IAW AR 190-11.
ii) A 50-foot firebreak shall be maintained around each aboveground magazine IAW
DA PAM 385-64.
iii) A 5-foot firebreak shall be maintained around earth-covered magazine ventilators.
iv) A 5-foot firebreak shall be maintained on both sides of fences.
b) Excavation- As required for building site preparation. Maintain positive drainage from the project site.
c) Grading- As required for building site preparation. Maintain positive drainage from the project site.
d) Erosion Control- As required for building site preparation and preservation.
Necessary environmental controls shall be implemented during construction.
Permanent environmental controls shall be installed IAW local and state regulations.
3) Exterior Road:
a) Construct a two-lane graded aggregate baseasphalt road from Sightseeing Road to
FASP Complex Entry Control Point (ECP). Road shall be constructed with the potential to overlay with asphalt pavement.
b) Road is required to support the following types of vehicles:
i) Truck, Tractor, M1074/ M1075 Palletized Load System (PLS). Additional vehicle information located within TM-2320-364-10-1.
ii) Palletized Load System Trailer (PLST) M1076 A1. Additional vehicle information located within TM 9-2320-385-10.
iii) Truck, Tractor, Line Haul, 6X4, M915A5. Additional Vehicle information located within TM-9-2320-426-10.
iv) Semi-Truck, Commercial w/ 45’-53’ foot long trailer
4) Interior Road:
a) Construct a graded aggregate baseasphalt interior road network within the FASP
Complex. Road network shall be constructed to allow vehicular traffic to drive through the complex and provide access to each ARMAG. Road network shall be constructed with the potential to overlay with asphalt pavement.
b) Road width shall support one vehicle’s width and Material Handling Equipment (i.e.
forklift) to load and off-load cargo.
c) Road is required to support the following types of vehicles:
i) Truck, Tractor, M1074/ M1075 Palletized Load System (PLS). Additional vehicle information located within TM 9-2320-364-10-1.
ii) Palletized Load System Trailer (PLST) M1076 A1. Additional vehicle information located within TM 9-2330-385-10.
iii) Truck, Tractor, Line Haul, 6X4, M915A5. Additional Vehicle information located within TM 9-2320-426-10.
iv) Semi-Truck, Commercial w/ 45’-53’ foot long trailer.
5) Security Fence:
a) Construct security fencing around the perimeter of the FASP Complex IAW AR 190-
11 and USACE Standard Fence Drawing (Attachment G)
b) Design and construct fence according to Clear Zone requirements outlined in paragraph 2.a.
c) Install motorized vehicle sliding gate at ECP. Minimal width shall allow two-way vehicular traffic.
i) Install control panel/ pin pad to activate gate.
ii) Control panel/ pin pad shall be installed to allow easy access for vehicle driver.
d) Install a security personnel gate next to ECP, activated by control panel/ pin pad.
e) Provide electrical / data connectivity to support each control panel/pin pads.
6) Category I and II Storage: Earth Covered Magazine (ECM) ARMAG. Labeled as AGM 1 and 2 in Attachment F.
a) Install concrete pads to support each ARMAG location IAW the ARMAG ECM
Installation Guide (Attachment M).
i) Concrete pad shall be a minimum 2’ longer and wider than the dimensions of each
ARMAG ECM (Attachment H).
ii) Concrete pad must be able to support weight of ARMAG, 30,000 lbs. of ammunition, and 24” of dirt/earth covering the ARMAG.
iii) Specific coordinates for pad locations will be provided during the design kickoff to ensure applicability of blast radiuses outlined in Attachment F.
b) The Government shall coordinate movement and installation of each ARMAG through ARMAG Corporation. Installation will be conducted after contractor completes installation of concrete pads.
c) To allow the Government necessary time to properly coordinate with ARMAG Corporation, the contractor shall provide 90 day advanced notice prior to start date of ARMAG installation.
d) Install concrete apron to connect ARMAG storage pad with interior road.
e) Cover ECM(s) with 24" of soil, creating an earth berm. Soil cover shall be designed and installed IAW DA PAM 385-64.
f) Install a Thermoplastic Polyolefin (TPO) material on top of each earthen berm to prevent vegetative growth. Reference the Information Paper on ECM Covers (Attachment N) for guidance.
g) Install drainage system to control intrusion of ground water IAW ARMAG ECM Installation Guide (Attachment M).
h) Provide electrical and data connectivity to support the ECM Intrusion Detection Systems (IDSs).
i) Provide electrical infrastructure to power each ECM.
i) ECM power requirements: 120/240 Volt, 70 amp, 60 Hz, single phase.
ii) ARMAG Corporation will be responsible for assembly, installation, and connection of ARMAGs.
7) Category III and IV Storage: 2-Plex, 4-Plex, and 5-Plex Above Ground Magazine (AGM) ARMAG. Labeled as AGM 3, 4, and 8 in Attachment F.
a) Install concrete pads to support each ARMAG location.
i) Concrete pads shall be a minimum 2’ longer and wider than the dimensions of each ARMAG AGM (Attachments J and K). The 2-Plex AGM is 20’ Wide x 40’ Long x 10’ High.
ii) Specific coordinates for pad locations will be provided during the design-kickoff to ensure applicability of blast radiuses outline in Attachment F.
b) Install concrete apron to connect ARMAG storage pad with interior road.
c) Install electrical and data connectivity to support the AGM Intrusion Detection
Systems (IDSs).
d) Provide electrical power to each AGM.
i) AGM power requirements: 120/240 Volt, 200 amp, 60 Hz, single phase.
ii) ARMAG Corporation will be responsible for assembly, installation, and connection of ARMAGs.
8) Category III and IV Storage: Above Ground Magazine (AGM) ARMAG. Labeled as AGM 5, 6, and 7 in Attachment F.
a) Install concrete pads to support each ARMAG location.
i) Concrete pads shall be a minimum 2’ longer and wider than the dimensions of each ARMAG AGM. The dimensions for AGMs 5, 6, and 7 identified in Attachment F are 8’ Wide x 20’ Long x 10’ High.
ii) Specific coordinates for pad locations will be provided during the design-kickoff to ensure applicability of blast radiuses outline in Attachment F.
b) Install concrete apron to connect ARMAG storage pad with interior road.
c) Install electrical and data connectivity to support the AGM Intrusion Detection
Systems (IDSs).
d) Provide electrical power to each AGM.
i) AGM power requirements: 120/240 Volt, 200 amp, 60 Hz, single phase.
ii) ARMAG Corporation will be responsible for assembly, installation, and connection of ARMAGs.
9) Security Lighting:
a) Area lighting shall be designed and constructed to enable the detection of persons within the FASP.
a) References for design of the area/perimeter lighting include but are not limited to AR 190-11 and respective UFC for lighting requirements.
b) Design area/Pperimeter lighting shall be designed and constructed to enable the detection of persons within the FASPin the entire clear zone and outside the outer perimeter fence.
c) Perimeter lighting shall illuminate both exterior and interior areas.
c) Design area/perimeterProvide lighting to illuminate all storage pads/ARMAGS.
Security lighting shall be provided for exterior doors of A&E storage structures.
Lights shall be of sufficient intensity to allow detection of persons at the exterior doors.
d) Design area/perimeterExterior lights toshall include vandal resistant lenses or wire mesh screen.
e) Design area/perimeter lighting to ensure detection/identification of unauthorized personnel/vehicles at corresponding vehicular and pedestrian gates. Vehicular and pedestrian gate lighting shall be of sufficient intensity and designed for personnel identification and detection of unauthorized vehicles.
f) Installation of area/perimeter lighting will be performed by others. References not limited to but includes AR 190-11 and respective UFC for lighting requirements.
CLIN 0002 Base Design: FASP Complex:
Design:
1) Design shall conform to International Building Code (IBC), National Fire Protection
Code (NFPA), Force Protection Regulation, Unified Facility Criteria (UFC), National Electrical Code (NEC), Fort Benning Installation Planning Standards (Attachment E), Ammunition and Explosives Safety Standards (DA PAM 385-64), local utility specifications, and all state and local standards and environmental codes and regulations.
2) Design shall include an abridged set of specifications and medium design.
CLIN 0003 Option 1: Asphalt Pavement
1) Exterior Road:
a. Add asphalt pavement to item 3.a in CLIN 0001.
b. All other requirements in item 3 of CLIN 0001 remain applicable.
2) Interior Road:
a. Add asphalt pavement to item 4.a in CLIN 0001.
b. All other requirements in item 4 of CLIN 0001 remain applicable.
CLIN 0004 Option 1 Design: Asphalt Pavement
Design:
1) Design shall conform to International Building Code (IBC), National Fire Protection
Code (NFPA), Force Protection Regulation, Unified Facility Criteria (UFC), Fort Benning Installation Planning Standards (Attachment E), Ammunition and Explosives Safety Standards (DA PAM 385-64), local utility specifications, and all state and local standards and environmental codes and regulations.
2) Design shall include an abridged set of specifications and medium design.
Fort Benning Installation HK-16096-8J FASP Complex SIte Visit
Legend
Lawson Army Airfield (Fort Benning)
2000 ft N
N © 2018 Google
© 2018 Google
© 2018 Google
K6CDBJMA
Oval
K6CDBJMA
Callout Site Visit Starting Point
SECTION TABLE OF CONTENTS
DIVISION 02 - SITE CONSTRUCTION
SECTION 32 92 19 (CANTONMENT)
SEEDING
02/09
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, INSPECTION, STORAGE, AND HANDLING
1.3.1 Delivery
1.3.2 Inspection
1.3.3 Storage
1.3.4 Handling
1.3.5 Time Limitation
PART 2 PRODUCTS
2.1 SEED
2.1.1 Seed Classification
2.1.2 Permanent Seed Species and Mixtures
2.1.3 Temporary Seed Species
2.1.4 Quality
2.1.5 Seed Mixing
2.1.6 Substitutions
2.2 TOPSOIL
2.3 SOIL AMENDMENTS
2.3.1 pH Adjuster
2.3.1.1 Limestone
2.3.1.2 Hydrated Lime
2.3.2 Fertilizer
2.3.3 Nitrogen Carrier Fertilizer
2.4 MULCH
2.4.1 Straw
2.4.2 Hay
2.4.3 Wood Cellulose Fiber
2.5 ASPHALT ADHESIVE
2.6 WATER
PART 3 EXECUTION
3.1 INSTALLING SEED TIME AND CONDITIONS
3.1.1 Seeding Time
3.1.2 Seeding Conditions
3.2 SITE PREPARATION
3.2.1 Finished Grade and Topsoil
3.2.2 Application of Soil Amendments
3.2.2.1 Applying pH Adjuster
3.2.2.2 Applying Fertilizer
3.2.3 Tillage
3.2.4 Prepared Surface
3.2.4.1 Preparation
3.2.4.2 Protection
3.3 INSTALLATION
3.3.1 Installing Seed
3.3.1.1 Broadcast Seeding
3.3.1.2 Rolling
3.3.2 Hydroseeding
3.3.3 Mulching
3.3.3.1 Hay or Straw Mulch
3.3.3.2 Mechanical Anchor
3.3.3.3 Asphalt Adhesive Tackifier
3.3.3.4 Non-Asphaltic Tackifier
3.3.3.5 Asphalt Adhesive Coated Mulch
3.3.3.6 Wood Cellulose Fiber, Paper Fiber, and Recycled Paper
3.3.4 Watering Seed
3.4 SURFACE EROSION CONTROL
3.4.1 Surface Erosion Control Material
3.4.2 Temporary Seeding
3.4.2.1 Soil Amendments
3.4.2.2 Remaining Soil Amendments
3.5 QUANTITY CHECK
3.6 RESTORATION AND CLEAN UP
3.6.1 Restoration
3.6.2 Clean Up
3.7 SEED ESTABLISHMENT PERIOD
3.7.1 Commencement
3.7.2 Satisfactory Stand of Grass Plants
3.7.2.1 Field Area
3.7.3 Maintenance During Establishment Period
3.7.3.1 Mowing
3.7.3.2 Post-Fertilization
3.7.3.3 Repair or Reinstall
3.7.3.4 Maintenance Record
-- End of Section Table of Contents --
SECTION 32 92 19
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 602 (1995a; R 2001) Agricultural Liming Materials
ASTM D 2028 (1997) Cutback Asphalt (Rapid-Curing Type)
ASTM D 5268 (1992; R 1997) Topsoil Used for Landscaping Purposes
ASTM D 977 (1998) Emulsified Asphalt
U.S. DEPARTMENT OF AGRICULTURE (USDA)
AMS Seed Act (1940; R 1988; R 1998) Federal Seed Act
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Surface Erosion Control Material
SD-06 Test Reports
Equipment Calibration
Certification of calibration tests conducted on the equipment used in the seeding operation.
Soil Test
Certified reports of inspections and laboratory tests, prepared by an independent testing agency, including analysis and interpretation of test results. Each report shall be properly identified. Test methods used and compliance with recognized test standards shall be described.
SD-07 Certificates
Seed Topsoil pH Adjuster Mulch
Prior to the delivery of materials, certificates of compliance attesting that materials meet the specified requirements.
Certified copies of the material certificates shall include the following:
a. Seed. Classification, botanical name, common name, percent pure live seed, minimum percent germination and hard seed, maximum percent weed seed content, and date tested.
b. Topsoil. Particle size, pH, organic matter content, textural class, soluble salts, chemical and mechanical analyses.
c. pH Adjuster. Calcium carbonate equivalent and sieve analysis.
e. Fertilizer. Chemical analysis and composition percent.
f. Mulch: Composition and source.
1.3 DELIVERY, INSPECTION, STORAGE, AND HANDLING
1.3.1 Delivery
A delivery schedule shall be provided at least 10 calendar days prior to the first day of delivery.
1.3.2 Inspection
Seed shall be inspected upon arrival at the job site for conformity to species and quality. Seed that is wet, moldy, or bears a test date five months or older, shall be rejected. Other materials shall be inspected for compliance with specified requirements. The following shall be rejected:
topsoil that contains slag, cinders, stones, lumps of soil, sticks, roots, trash or other material over a minimum 1-1/2 inch diameter; and topsoil that contains viable plants and plant parts. Unacceptable materials shall be removed from the job site.
1.3.3 Storage
Materials shall be stored in designated areas. Seed, lime, and fertilizer shall be stored in cool, dry locations away from contaminants. Chemical treatment material shall be stored according to manufacturer's instructions and not with seeding operation materials.
1.3.4 Handling
Except for bulk deliveries, materials shall not be dropped or dumped from vehicles.
1.3.5 Time Limitation
Hydro seeding time limitation for holding seed in the slurry shall be a maximum 24 hours.
PART 2 PRODUCTS
2.1 SEED
2.1.1 Seed Classification
State-approved seed of the latest season's crop shall be provided in original sealed packages bearing the producer's guaranteed analysis for percentages of mixture, purity, germination, hard seed, weed seed content, and inert material. Labels shall be in conformance with AMS Seed Act and applicable state seed laws.
2.1.2 Permanent Seed Species and Mixtures
Permanent seed species and mixtures shall be proportioned by weight as follows:
_SEED SEED SEED SEEDING FERTILIZER LIMESTONE
MIXTURE TYPE APPLICATION DATES RECOMMENDATION RECOMMENDATION
RATE
NO.1 Common October 1- 13-13-13 Dolomite Lime Bermuda March 14 @ @ Grass 400 lbs/acre* 4,000 lbs/acre (Unhulled) 12
Rye Grain 60
NO. 2 Common March 15- 13-13-13 Dolomite Lime Bermuda Sept. 30 @ @ Grass 400 lbs/acre* 4,000 lbs/acre (Hulled) 15
Browntop Millet 10
* Critical sites without topsoil require 800 lbs of 13-13-13 per acre.
2.1.3 Temporary Seed Species
Temporary seed species for surface erosion control or overseeding shall be as follows:
Percent Pure Planting Dates Botanical Name Common Name Live Seed
Rye Grain 60 lbs/acre 1 Oct - 14 Mar Browntop Millet 40 lbs/acre 15 Mar -- 30 Sep
2.1.4 Quality
Weed seed shall be a maximum 1 percent by weight of the total mixture.
2.1.5 Seed Mixing
The mixing of seed may be done by the seed supplier prior to delivery, or on site as directed.
2.1.6 Substitutions
Substitutions will not be allowed without written request and approval from The Contracting Officer.
2.2 TOPSOIL
Topsoil shall be as defined in ASTM D 5268. When available, the topsoil shall be the existing surface soil stripped and stockpiled onsite in accordance with SECTION 31 00 00 EARTHWORK Section 02300A EARTHWORK FOR
ROADWAYS, TRAILS, TARGETS AND
BERMS. When additional topsoil is required beyond the available topsoil from the stripping operation, existing shall be amended as recommended by the soil test for the seed specified. Topsoil shall be free from slag, cinders, stones, lumps of soil, sticks, roots, trash or other material over a minimum 1-1/2 inch diameter. Topsoil shall be free from viable plants and plant parts.
2.3 SOIL AMENDMENTS
Soil amendments shall consist of pH adjuster, fertilizer, organic material and soil conditioners meeting the following requirements. Vermiculite shall not be used.
2.3.1 pH Adjuster
The pH adjuster shall be an agricultural liming material in accordance with ASTM C 602. These materials may be hydrated lime or ground limestone. The pH adjuster shall be used to create a favorable soil pH for the plant material specified.
2.3.1.1 Limestone
Limestone material shall contain a minimum calcium carbonate equivalent of 80 percent. Gradation: A minimum 95 percent shall pass through a No. 8 sieve and a minimum 55 percent shall pass through a No. 60 sieve. To raise soil pH, ground limestone shall be used.
2.3.1.2 Hydrated Lime
Hydrated lime shall contain a minimum calcium carbonate equivalent of 110 percent. Gradation: A minimum 100 percent shall pass through a No. 8 sieve and a minimum 97 percent shall pass through a No. 60 sieve.
2.3.2 Fertilizer
The nutrients ratio shall be 13 percent nitrogen, 13 percent phosphorus, and 13 percent potassium. Fertilizer shall be controlled release commercial grade, free flowing, uniform in composition, and consist of a nitrogen-phosphorus-potassium ratio. The fertilizer shall be derived from sulphur coated urea, urea formaldehyde, plastic or polymer coated pills, or isobutylenediurea (IBDU). Fertilizer shall be balanced with the inclusion of trace minerals and micro-nutrients.
2.3.3 Nitrogen Carrier Fertilizer
The nutrients ratio shall be as specified in 2.3.2. Nitrogen carrier fertilizer shall be commercial grade, free flowing, and uniform in composition. The fertilizer may be a liquid nitrogen solution.
2.4 MULCH
Mulch shall be free from weeds, mold, and other deleterious materials.
Mulch materials shall be native to the region.
2.4.1 Straw
Straw shall be stalks from oats, wheat, rye, barley, or rice, furnished in air-dry condition and with a consistency for placing with commercial mulch-blowing equipment.
2.4.2 Hay
Hay shall be native hay, sudan-grass hay, broomsedge hay, or other herbaceous mowings, furnished in an air-dry condition suitable for placing with commercial mulch-blowing equipment.
2.4.3 Wood Cellulose Fiber
Wood cellulose fiber shall not contain any growth or germination-inhibiting factors and shall be dyed an appropriate color to facilitate placement during application. Composition on air-dry weight basis: 9 to 15 percent moisture, pH range from 4.5 to 6.0.
2.5 ASPHALT ADHESIVE
Asphalt adhesive shall conform to the following: Emulsified asphalt, conforming to ASTM D 977, Grade SS-1; and cutback asphalt, conforming to ASTM D 2028, Designation RC-70.
2.6 WATER
Water shall be the responsibility of the Contractor, unless otherwise noted. Water shall not contain elements toxic to plant life.
PART 3 EXECUTION
3.1 INSTALLING SEED TIME AND CONDITIONS
3.1.1 Seeding Time
See Section 2.1.2 for Seeding Times.
3.1.2 Seeding Conditions
Seeding operations shall be performed only during periods when beneficial results can be obtained. When drought, excessive moisture, or other unsatisfactory conditions prevail, the work shall be stopped when directed.
When special conditions warrant a variance to the seeding operations, proposed alternate times shall be submitted for approval.
3.2 SITE PREPARATION
3.2.1 Finished Grade and Topsoil
The Contractor shall verify that finished grades are as indicated on drawings, and the placing of topsoil, smooth grading, and compaction requirements have been completed in accordance with Section 02300A EARTHWORK, prior to the commencement of the seeding operation.
3.2.2 Application of Soil Amendments
3.2.2.1 Applying pH Adjuster
The pH adjuster shall be applied as specified. The application rate shall be 4000 pounds per acre. The pH adjuster shall be incorporated into the soil to a maximum 4 inch depth or may be incorporated as part of the tillage operation.
3.2.2.2 Applying Fertilizer
The fertilizer shall be applied as specified. The application rate shall be 400 pounds per acre on sites that have topsoil present. Sites without topsoil require 800 lbs of fertilizer per acre. Fertilizer shall be incorporated into the soil to a maximum 4 inch depth or may be incorporated as part of the tillage or hydroseeding operation.
3.2.3 Tillage
Soil on slopes up to a maximum 3-horizontal-to-1-vertical shall be tilled to a minimum 4 inch depth. On slopes between 3-horizontal-to-1-vertical and 1-horizontal-to-1 vertical, the soil shall be tilled to a minimum 2 inch depth by scarifying with heavy rakes, or other method. Rototillers shall be used where soil conditions and length of slope permit. On slopes -horizontal-to-1 vertical and steeper, no tillage is required. Drainage patterns shall be maintained as indicated on drawings. Areas compacted by construction operations shall be completely pulverized by tillage. Soil used for repair of surface erosion or grade deficiencies shall conform to topsoil requirements. The pH adjuster, fertilizer, and soil conditioner may be applied during this procedure.
3.2.4 Prepared Surface
3.2.4.1 Preparation
The prepared surface shall be a maximum 1 inch below the adjoining grade of any surfaced area. New surfaces shall be blended to existing areas.
The prepared surface shall be completed with a light raking to remove debris.
3.2.4.2 Protection
Areas with the prepared surface shall be protected from compaction or damage by vehicular or pedestrian traffic and surface erosion.
3.3 INSTALLATION
Prior to installing seed, any previously prepared surface compacted or damaged shall be reworked to meet the requirements of paragraph SITE PREPARATION. Seeding operations shall not take place when the wind velocity will prevent uniform seed distribution.
3.3.1 Installing Seed
Seeding method shall be Broadcast Seeding, Drill Seeding or Hydroseeding.
Seeding procedure shall ensure even coverage. Gravity feed applicators, which drop seed directly from a hopper onto the prepared soil, shall not be used because of the difficulty in achieving even coverage, unless otherwise approved. Absorbent polymer powder shall be mixed with the dry seed at the rate recommended by the manufacturer.
3.3.1.1 Broadcast Seeding
Seed shall be uniformly broadcast at the rate specified in 2.1.2, using broadcast seeders. Half the total rate of seed application shall be broadcast in 1 direction, with the remainder of the seed rate broadcast at 90 degrees from the first direction. Seed shall be covered a maximum 1/4 inch depth by disk harrow, steel mat drag, cultipacker, or other approved device.
3.3.1.2 Rolling
The entire area shall be firmed with a roller not exceeding 90 pounds per foot roller width. Slopes over a maximum 3-horizontal-to-1 vertical shall not be rolled. Areas seeded with seed drills equipped with rollers shall not be rolled.
3.3.2 Hydroseeding
Seed shall be mixed to ensure broadcast at the rate specified in 2.1.2.
Seed and fertilizer shall be added to water and thoroughly mixed to meet the rates specified. The time period for the seed to be held in the slurry shall be a maximum 24 hours. Wood cellulose fiber mulch and tackifier shall be added at the rates recommended by the manufacturer after the seed, fertilizer, and water have been thoroughly mixed to produce a homogeneous slurry. Slurry shall be uniformly applied under pressure over the entire area. The hydroseeded area shall not be rolled.
3.3.3 Mulching
3.3.3.1 Hay or Straw Mulch
Hay or straw mulch shall be spread uniformly at the rate of 1.5 tons per acre. Mulch shall be spread by hand, blower-type mulch spreader, or other approved method. Mulching shall be started on the windward side of relatively flat areas or on the upper part of steep slopes, and continued uniformly until the area is covered. The mulch shall not be bunched or clumped. Sunlight shall not be completely excluded from penetrating to the ground surface. All areas installed with seed shall be mulched on the same day as the seeding. Mulch shall be anchored immediately following spreading.
Mechanical anchor shall be a V-type-wheel land packer; a scalloped-disk land packer designed to force mulch into the soil surface; or other suitable equipment.
3.3.3.3 Asphalt Adhesive Tackifier
Asphalt adhesive tackifier shall be sprayed at a rate between 10 to 13 gallons per 1000 square feet. Sunlight shall not be completely excluded from penetrating to the ground surface.
3.3.3.4 Non-Asphaltic Tackifier
Hydrophilic colloid shall be applied at the rate recommended by the manufacturer, using hydraulic equipment suitable for thoroughly mixing with water. A uniform mixture shall be applied over the area.
3.3.3.5 Asphalt Adhesive Coated Mulch
Hay or straw mulch may be spread simultaneously with asphalt adhesive applied at a rate between 10 to 13 gallons per 1000 square feet, using power mulch equipment which shall be equipped with suitable asphalt pump and nozzle. The adhesive-coated mulch shall be applied evenly over the surface. Sunlight shall not be completely excluded from penetrating to the ground surface.
3.3.3.6 Wood Cellulose Fiber, Paper Fiber, and Recycled Paper
Wood cellulose fiber, paper fiber, or recycled paper shall be applied as part of the hydroseeding operation. The mulch shall be mixed and applied in accordance with the manufacturer's recommendations.
3.3.4 Watering Seed
Watering shall be started immediately after completing the seeding of an area. Water shall be applied to supplement rainfall at a rate sufficient to ensure moist soil conditions to a minimum 1 inch depth. Run-off and puddling shall be prevented. Watering trucks shall not be driven over turf areas, unless otherwise directed. Watering of other adjacent areas or plant material shall be prevented.
3.4 SURFACE EROSION CONTROL
3.4.1 Surface Erosion Control Material
Where indicated or as directed, surface erosion control material shall be installed in accordance with manufacturer's instructions. Placement of the material shall be accomplished without damage to installed material or without deviation to finished grade.
3.4.2 Temporary Seeding
When directed during contract delays affecting the seeding operation or when a quick cover is required to prevent surface erosion, the areas designated shall be seeded in accordance with temporary seed species listed under Paragraph 2.1.3.
3.4.2.1 Soil Amendments
When soil amendments have not been applied to the area, the quantity of 1/2 of the required soil amendments shall be applied and the area tilled in accordance with paragraph SITE PREPARATION. The area shall be watered in accordance with paragraph Watering Seed.
3.4.2.2 Remaining Soil Amendments
The remaining soil amendments shall be applied in accordance with the paragraph Tillage when the surface is prepared for installing seed.
3.5 QUANTITY CHECK
For materials provided in bags, the empty bags shall be retained for recording the amount used. For materials provided in bulk, the weight certificates shall be retained as a record of the amount used. The amount of material used shall be compared with the total area covered to determine the rate of application used. Differences between the quantity applied and the quantity specified shall be adjusted as directed.
3.6 RESTORATION AND CLEAN UP
3.6.1 Restoration
Existing turf areas, pavements, and facilities that have been damaged from the seeding operation shall be restored to original condition at Contractor's expense.
3.6.2 Clean Up
Excess and waste material shall be removed from the seeded areas and shall be disposed offsite. Adjacent paved areas shall be cleaned.
3.7 SEED ESTABLISHMENT PERIOD
3.7.1 Commencement
The seed establishment period to obtain a healthy stand of grass plants shall begin on the first day of seeding work under this contract and shall continue through the remaining life of the contract and end 12 months after the last day of the seeding operation required by this contract. Written calendar time period shall be furnished for the seed establishment period.
When there is more than 1 seed establishment period, the boundaries of the seeded area covered for each period shall be described. The seed establishment period shall be modified for inclement weather, shut down periods, or for separate completion dates of areas.
3.7.2 Satisfactory Stand of Grass Plants
Grass plants shall be evaluated for species and health when the grass plants are a minimum 1 inch high.
3.7.2.1 Field Area
A satisfactory stand of grass plants from the seeding operation for a field area shall be a minimum 100 grass plants per square foot. The total bare spots shall not exceed 2 percent of the total seeded area.
3.7.3 Maintenance During Establishment Period
Maintenance of the seeded areas shall include eradicating weeds, insects and diseases; protecting embankments and ditches from surface erosion;
maintaining erosion control materials and mulch; protecting installed areas from traffic; mowing; watering; and post-fertilization.
3.7.3.1 Mowing
a. Field Areas: Field areas shall be mowed once during the season to a minimum 3 inch height. Clippings shall be removed when the amount cut prevents sunlight from reaching the ground surface.
3.7.3.2 Post-Fertilization
The fertilizer shall be applied as recommended by the soil test. A maximum 1/2 pound per 1000 square feet of actual available nitrogen shall be provided to the grass plants. The application shall be timed prior to the advent of winter dormancy and shall be made without burning the installed grass plants.
3.7.3.3 Repair or Reinstall
Unsatisfactory stand of grass plants and mulch shall be repaired or reinstalled, and eroded areas shall be repaired in accordance with paragraph SITE PREPARATION.
3.7.3.4 Maintenance Record
A record of each site visit shall be furnished, describing the maintenance work performed; areas repaired or reinstalled; and diagnosis for unsatisfactory stand of grass plants.
-- End of Section --
SECTION TABLE OF CONTENTS
DIVISION 02 - SITE CONSTRUCTION
SECTION 32 92 19 (RANGES)
02/09
1.2 SUBMITTALS
1.3 DELIVERY, INSPECTION, STORAGE, AND HANDLING
1.3.1 Delivery
1.3.2 Inspection
1.3.3 Storage
1.3.4 Handling
1.3.5 Time Limitation
PART 2 PRODUCTS
2.1 SEED
2.1.1 Seed Classification
2.1.2 Permanent Seed Species and Mixtures
2.1.3 Temporary Seed Species
2.1.4 Quality
2.1.5 Seed Mixing
2.1.6 Substitutions
2.2 TOPSOIL
2.3 SOIL AMENDMENTS
2.3.1 pH Adjuster
2.3.1.1 Limestone
2.3.1.2 Hydrated Lime
2.3.2 Fertilizer
2.3.3 Nitrogen Carrier Fertilizer
2.4 MULCH
2.4.1 Straw
2.4.2 Hay
2.4.3 Wood Cellulose Fiber
2.5 ASPHALT ADHESIVE
2.6 WATER
PART 3 EXECUTION
3.1 INSTALLING SEED TIME AND CONDITIONS
3.1.1 Seeding Time
3.1.2 Seeding Conditions
3.2 SITE PREPARATION
3.2.1 Finished Grade and Topsoil
3.2.2 Application of Soil Amendments
3.2.2.1 Applying pH Adjuster
3.2.2.2 Applying Fertilizer
3.2.3 Tillage
3.2.4 Prepared Surface
3.2.4.1 Preparation
3.2.4.2 Protection
3.3 INSTALLATION
3.3.1 Installing Seed
3.3.1.1 Broadcast Seeding
3.3.1.2 Rolling
3.3.2 Hydroseeding
3.3.3 Mulching
3.3.3.1 Hay or Straw Mulch
3.3.3.3 Asphalt Adhesive Tackifier
3.3.3.4 Non-Asphaltic Tackifier
3.3.3.5 Asphalt Adhesive Coated Mulch
3.3.3.6 Wood Cellulose Fiber, Paper Fiber, and Recycled Paper
3.3.4 Watering Seed
3.4 SURFACE EROSION CONTROL
3.4.1 Surface Erosion Control Material
3.4.2 Temporary Seeding
3.4.2.1 Soil Amendments
3.4.2.2 Remaining Soil Amendments
3.5 QUANTITY CHECK
3.6 RESTORATION AND CLEAN UP
3.6.1 Restoration
3.6.2 Clean Up
3.7 SEED ESTABLISHMENT PERIOD
3.7.1 Commencement
3.7.2 Satisfactory Stand of Grass Plants
3.7.2.1 Field Area
3.7.3 Maintenance During Establishment Period
3.7.3.1 Mowing
3.7.3.2 Post-Fertilization
3.7.3.3 Repair or Reinstall
3.7.3.4 Maintenance Record
-- End of Section Table of Contents --
SECTION 32 92 19
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM C 602 (1995a; R 2001) Agricultural Liming Materials
ASTM D 2028 (1997) Cutback Asphalt (Rapid-Curing Type)
ASTM D 5268 (1992; R 1997) Topsoil Used for Landscaping Purposes
ASTM D 977 (1998) Emulsified Asphalt
U.S. DEPARTMENT OF AGRICULTURE (USDA)
AMS Seed Act (1940; R 1988; R 1998) Federal Seed Act
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Surface Erosion Control Material
SD-06 Test Reports
Equipment Calibration
Certification of calibration tests conducted on the equipment used in the seeding operation.
Soil Test
Certified reports of inspections and laboratory tests, prepared by an independent testing agency, including analysis and interpretation of test results. Each report shall be properly identified. Test methods used and compliance with recognized test standards shall be described.
SD-07 Certificates
Seed Topsoil pH Adjuster Mulch
Prior to the delivery of materials, certificates of compliance attesting that materials meet the specified requirements.
Certified copies of the material certificates shall include the following:
a. Seed. Classification, botanical name, common name, percent pure live seed, minimum percent germination and hard seed, maximum percent weed seed content, and date tested.
b. Topsoil. Particle size, pH, organic matter content, textural class, soluble salts, chemical and mechanical analyses.
c. pH Adjuster. Calcium carbonate equivalent and sieve analysis.
e. Fertilizer. Chemical analysis and composition percent.
f. Mulch: Composition and source.
1.3 DELIVERY, INSPECTION, STORAGE, AND HANDLING
1.3.1 Delivery
A delivery schedule shall be provided at least 10 calendar days prior to the first day of delivery.
1.3.2 Inspection
Seed shall be inspected upon arrival at the job site for conformity to species and quality. Seed that is wet, moldy, or bears a test date five months or older, shall be rejected. Other materials shall be inspected for compliance with specified requirements. The following shall be rejected:
topsoil that contains slag, cinders, stones, lumps of soil, sticks, roots, trash or other material over a minimum 1-1/2 inch diameter; and topsoil that contains viable plants and plant parts. Unacceptable materials shall be removed from the job site.
1.3.3 Storage
Materials shall be stored in designated areas. Seed, lime, and fertilizer shall be stored in cool, dry locations away from contaminants. Chemical treatment material shall be stored according to manufacturer's instructions and not with seeding operation materials.
1.3.4 Handling
Except for bulk deliveries, materials shall not be dropped or dumped from vehicles.
1.3.5 Time Limitation
Hydro seeding time limitation for holding seed in the slurry shall be a maximum 24 hours.
PART 2 PRODUCTS
2.1 SEED
2.1.1 Seed Classification
State-approved seed of the latest season's crop shall be provided in original sealed packages bearing the producer's guaranteed analysis for percentages of mixture, purity, germination, hard seed, weed seed content, and inert material. Labels shall be in conformance with AMS Seed Act and applicable state seed laws.
2.1.2 Permanent Seed Species and Mixtures
A temporary seed species and one or more permanent seed species is shown as a mixture below. Permanent seed species and mixtures shall be proportioned by weight as follows:
_SEED SEED SEED SEEDING FERTILIZER LIMESTONE
MIXTURE TYPE APPLICATION DATES RECOMMENDATION RECOMMENDATION
RATE/lbs/ac NO.1 Common October 1- 13-13-13 Dolomite Lime Bermuda March 14 @ @ Grass 400 lbs/acre* 4,000 lbs/acre (Unhulled) 12
Pensacola Bahia Grass 30
Rye Grain 60
NO. 2 Common March 15- 13-13-13 Dolomite Lime Bermuda Sept. 30 @ @ Grass 400 lbs/acre* 4,000 lbs/acre (Hulled) 15
Pensacola Bahia Grass 30
Sericea Lespedeza (scarfied) (inoculated @ 2x's rate) 60
Browntop Millet 10
Alamo Switchgrass 10
* Critical sites without topsoil require 800 lbs of 13-13-13 per acre.
LOCATION: All areas that are disturbed by construction activities, that are not constructed as aggregate trails and roads, turning pads, targets, or defilades. Disturbed areas do not include areas for which trees and vegetation is removed only to establish line of sight for range use.
2.1.3 Temporary Seed Species
Temporary seed species for surface erosion control or overseeding shall be as follows:
Percent Pure Planting Dates Botanical Name Common Name Live Seed
Rye Grain 60 lbs/acre 1 Oct - 14 Mar Browntop Millet 40 lbs/acre 15 Mar -- 30Sep
2.1.4 Quality
Weed seed shall be a maximum 1 percent by weight of the total mixture.
2.1.5 Seed Mixing
The mixing of seed may be done by the seed supplier prior to delivery, or on site as directed.
2.1.6 Substitutions
Substitutions will not be allowed without written request and approval from The Contracting Officer.
2.2 TOPSOIL
Topsoil shall be as defined in ASTM D 5268. When available, the topsoil shall be the existing surface soil stripped and stockpiled onsite in accordance with SECTION 31 00 00 EARTHWORK Section 02300A EARTHWORK FOR
ROADWAYS, TRAILS, TARGETS AND
BERMS. When additional topsoil is required beyond the available topsoil from the stripping operation, existing shall be amended as recommended by the soil test for the seed specified. Topsoil shall be free from slag, cinders, stones, lumps of soil, sticks, roots, trash or other material over a minimum 1-1/2 inch diameter. Topsoil shall be free from viable plants and plant parts.
2.3 SOIL AMENDMENTS
Soil amendments shall consist of pH adjuster, fertilizer, organic material and soil conditioners meeting the following requirements. Vermiculite shall not be used.
2.3.1 pH Adjuster
The pH adjuster shall be an agricultural liming material in accordance with ASTM C 602. These materials may be hydrated lime or ground limestone. The pH adjuster shall be used to create a favorable soil pH for the plant material specified.
2.3.1.1 Limestone
Limestone material shall contain a minimum calcium carbonate equivalent of 80 percent. Gradation: A minimum 95 percent shall pass through a No. 8 sieve and a minimum 55 percent shall pass through a No. 60 sieve. To raise soil pH, ground limestone shall be used.
2.3.1.2 Hydrated Lime
Hydrated lime shall contain a minimum calcium carbonate equivalent of 110 percent. Gradation: A minimum 100 percent shall pass through a No. 8 sieve and a minimum 97 percent shall pass through a No. 60 sieve.
2.3.2 Fertilizer
The nutrients ratio shall be 13 percent nitrogen, 13 percent phosphorus, and 13 percent potassium. Fertilizer shall be controlled release commercial grade, free flowing, uniform in composition, and consist of a nitrogen-phosphorus-potassium ratio. The fertilizer shall be derived from sulphur coated urea, urea formaldehyde, plastic or polymer coated pills, or isobutylenediurea (IBDU). Fertilizer shall be balanced with the inclusion of trace minerals and micro-nutrients.
2.3.3 Nitrogen Carrier Fertilizer
The nutrients ratio shall be as specified in 2.3.2. Nitrogen carrier fertilizer shall be commercial grade, free flowing, and uniform in composition. The fertilizer may be a liquid nitrogen solution.
2.4 MULCH
Mulch shall be free from weeds, mold, and other deleterious materials.
Mulch materials shall be native to the region.
2.4.1 Straw
Straw shall be stalks from oats, wheat, rye, barley, or rice, furnished in air-dry condition and with a consistency for placing with commercial mulch-blowing equipment.
2.4.2 Hay
Hay shall be native hay, sudan-grass hay, broomsedge hay, or other herbaceous mowings, furnished in an air-dry condition suitable for placing with commercial mulch-blowing equipment.
2.4.3 Wood Cellulose Fiber
Wood cellulose fiber shall not contain any growth or germination-inhibiting factors and shall be dyed an appropriate color to facilitate placement during application. Composition on air-dry weight basis: 9 to 15 percent moisture, pH range from 4.5 to 6.0.
2.5 ASPHALT ADHESIVE
Asphalt adhesive shall conform to the following: Emulsified asphalt, conforming to ASTM D 977, Grade SS-1; and cutback asphalt, conforming to ASTM D 2028, Designation RC-70.
2.6 WATER
Water shall be the responsibility of the Contractor, unless otherwise noted. Water shall not contain elements toxic to plant life.
PART 3 EXECUTION
3.1 INSTALLING SEED TIME AND CONDITIONS
3.1.1 Seeding Time
See Section 2.1.2 for Seeding Times.
3.1.2 Seeding Conditions
Seeding operations shall be performed only during periods when beneficial results can be obtained. When drought, excessive moisture, or other unsatisfactory conditions prevail, the work shall be stopped when directed.
When special conditions warrant a variance to the seeding operations, proposed alternate times shall be submitted for approval.
3.2 SITE PREPARATION
3.2.1 Finished Grade and Topsoil
The Contractor shall verify that finished grades are as indicated on drawings, and the placing of topsoil, smooth grading, and compaction requirements have been completed in accordance with Section 02300A EARTHWORK, prior to the commencement of the seeding operation.
3.2.2 Application of Soil Amendments
3.2.2.1 Applying pH Adjuster
The pH adjuster shall be applied as specified. The application rate shall be 4000 pounds per acre. The pH adjuster shall be incorporated into the soil to a maximum 4 inch depth or may be incorporated as part of the tillage operation.
3.2.2.2 Applying Fertilizer
The fertilizer shall be applied as specified. The application rate shall be 400 pounds per acre on sites that have topsoil present. Sites without topsoil require 800 lbs of fertilizer per acre. Fertilizer shall be incorporated into the soil to a maximum 4 inch depth or may be incorporated as part of the tillage or hydroseeding operation.
3.2.3 Tillage
Soil on slopes up to a maximum 3-horizontal-to-1-vertical shall be tilled to a minimum 4 inch depth. On slopes between 3-horizontal-to-1-vertical and 1-horizontal-to-1 vertical, the soil shall be tilled to a minimum 2 inch depth by scarifying with heavy rakes, or other method. Rototillers shall be used where soil conditions and length of slope permit. On slopes -horizontal-to-1 vertical and steeper, no tillage is required. Drainage patterns shall be maintained as indicated on drawings. Areas compacted by construction operations shall be completely pulverized by tillage. Soil used for repair of surface erosion or grade deficiencies shall conform to topsoil requirements. The pH adjuster, fertilizer, and soil conditioner may be applied during this procedure.
3.2.4 Prepared Surface
3.2.4.1 Preparation
The prepared surface shall be a maximum 1 inch below the adjoining grade of any surfaced area. New surfaces shall be blended to existing areas.
The prepared surface shall be completed with a light raking to remove debris.
3.2.4.2 Protection
Areas with the prepared surface shall be protected from compaction or damage by vehicular or pedestrian traffic and surface erosion.
3.3 INSTALLATION
Prior to installing seed, any previously prepared surface compacted or damaged shall be reworked to meet the requirements of paragraph SITE PREPARATION. Seeding operations shall not take place when the wind velocity will prevent uniform seed distribution.
3.3.1 Installing Seed
Seeding method shall be Broadcast Seeding, Drill Seeding or Hydroseeding.
Seeding procedure shall ensure even coverage. Gravity feed applicators, which drop seed directly from a hopper onto the prepared soil, shall not be used because of the difficulty in achieving even coverage, unless otherwise approved. Absorbent polymer powder shall be mixed with the dry seed at the rate recommended by the manufacturer.
3.3.1.1 Broadcast Seeding
Seed shall be uniformly broadcast at the rate specified in 2.1.2, using broadcast seeders. Half the total rate of seed application shall be broadcast in 1 direction, with the remainder of the seed rate broadcast at 90 degrees from the first direction. Seed shall be covered a maximum 1/4 inch depth by disk harrow, steel mat drag, cultipacker, or other approved device.
3.3.1.2 Rolling
The entire area shall be firmed with a roller not exceeding 90 pounds per foot roller width. Slopes over a maximum 3-horizontal-to-1 vertical shall not be rolled. Areas seeded with seed drills equipped with rollers shall not be rolled.
3.3.2 Hydroseeding
Seed shall be mixed to ensure broadcast at the rate specified in 2.1.2.
Seed and fertilizer shall be added to water and thoroughly mixed to meet the rates specified. The time period for the seed to be held in the slurry shall be a maximum 24 hours. Wood cellulose fiber mulch and tackifier shall be added at the rates recommended by the manufacturer after the seed, fertilizer, and water have been thoroughly mixed to produce a homogeneous slurry. Slurry shall be uniformly applied under pressure over the entire area. The hydroseeded area shall not be rolled.
3.3.3 Mulching
3.3.3.1 Hay or Straw Mulch
Hay or straw mulch shall be spread uniformly at the rate of 1.5 tons per acre. Mulch shall be spread by hand, blower-type mulch spreader, or other approved method. Mulching shall be started on the windward side of relatively flat areas or on the upper part of steep slopes, and continued uniformly until the area is covered. The mulch shall not be bunched or clumped. Sunlight shall not be completely excluded from penetrating to the ground surface. All areas installed with seed shall be mulched on the same day as the seeding. Mulch shall be anchored immediately following spreading.
3.3.3.2 Mechanical Anchor
Mechanical anchor shall be a V-type-wheel land packer; a scalloped-disk land packer designed to force mulch into the soil surface; or other suitable equipment.
3.3.3.3 Asphalt Adhesive Tackifier
Asphalt adhesive tackifier shall be sprayed at a rate between 10 to 13 gallons per 1000 square feet. Sunlight shall not be completely excluded from penetrating to the ground surface.
3.3.3.4 Non-Asphaltic Tackifier
Hydrophilic colloid shall be applied at the rate recommended by the manufacturer, using hydraulic equipment suitable for thoroughly mixing with water. A uniform mixture shall be applied over the area.
3.3.3.5 Asphalt Adhesive Coated Mulch
Hay or straw mulch may be spread simultaneously with asphalt adhesive applied at a rate between 10 to 13 gallons per 1000 square feet, using power mulch equipment which shall be equipped with suitable asphalt pump and nozzle. The adhesive-coated mulch shall be applied evenly over the surface. Sunlight shall not be completely excluded from penetrating to the ground surface.
3.3.3.6 Wood Cellulose Fiber, Paper Fiber, and Recycled Paper
Wood cellulose fiber, paper fiber, or recycled paper shall be applied as part of the hydroseeding operation. The mulch shall be mixed and applied in accordance with the manufacturer's recommendations.
3.3.4 Watering Seed
Watering shall be started immediately after completing the seeding of an area. Water shall be applied to supplement rainfall at a rate sufficient to ensure moist soil conditions to a minimum 1 inch depth. Run-off and puddling shall be prevented. Watering trucks shall not be driven over turf areas, unless otherwise directed. Watering of other adjacent areas or plant material shall be prevented.
3.4 SURFACE EROSION CONTROL
3.4.1 Surface Erosion Control Material
Where indicated or as directed, surface erosion control material shall be installed in accordance with manufacturer's instructions. Placement of the material shall be accomplished without damage to installed material or without deviation to finished grade.
3.4.2 Temporary Seeding
When directed during contract delays affecting the seeding operation or when a quick cover is required to prevent surface erosion, the areas designated shall be seeded in accordance with temporary seed species listed under Paragraph 2.1.3.
3.4.2.1 Soil Amendments
When soil amendments have not been applied to the area, the quantity of 1/2 of the required soil amendments shall be applied and the area tilled in accordance with paragraph SITE PREPARATION. The area shall be watered in accordance with paragraph Watering Seed.
3.4.2.2 Remaining Soil Amendments
The remaining soil amendments shall be applied in accordance with the paragraph Tillage when the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .