This document provides a presolicitation summary for a competitive acquisition notice seeking a Single Award Task Order Contract (SATOC) for general construction services. The contract will have a total capacity of $45 million over a base period of two years and three one-year option periods. Task orders issued under the SATOC are expected to be between $500,000 and $5 million and will be firm-fixed price. Services will include general construction and design-build projects at military installations in North Carolina, South Carolina, and Georgia, focusing on Hunter Army Air Field, Fort Stewart and Fort Gordon. The acquisition will be set aside for small businesses and proposals will be evaluated using best value tradeoff. The solicitation is anticipated to be released on June 14, 2018, with proposals due as specified.
SPECS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amd3.pdf | ||
| 18R04.PDF | ||
| amd2.pdf | ||
| Attachment_P_FASP.dwg | DWG drawing | |
| W912HN18R00040002_-_Amendment_(Final)_-_20190222.pdf | ||
| W912HN18R0004_-_Attachment_A_-_T_-_Rev_1.pdf | ||
| W912HN18R00040002_-_Amendment_Conformed_(Final)_-_20190222.pdf | ||
| A.07.24_-_W912HN18R0004_-_Attachment_P_FASP_CADD_File.DWG | DWG drawing | |
| 18R04.PDF | ||
| amd1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Southeast Georgia
Solicitation Number
W912HN-18-R-0004
SATOC For General Construction Procurement and Contracting Requirements and Specification Division 01 June 2018
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
CORPS OF ENGINEERS
100 WEST OGLETHORPE AVENUE
SAVANNAH, GEORGIA 31401-3640
US Army Corps of Engineers Savannah District
East Geor gi a 18R0004
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 30 00 ADMI NI STRATI VE REQUI REMENTS
01 32 01. 00 10 PROJECT SCHEDULE
01 33 00 SUBMI TTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 10 QUALI TY CONTROL
01 45 00. 15 10 RESI DENT MANAGEMENT SYSTEM CONTRACTOR MODE ( RMS CM)
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 1
This is a competitive acquisition for the aw ard of an Indefinite Delivery Contract type Single Aw ard Task Order Contract (SATOC) w ith a total capacity of $45M. The aw ard w ill be made from this solicitation using 100% small business set-aside competition to the Offeror w hose proposal represents the best overall value and is determined to provide the most benefit to the Government. The aw arded contract w ill be for a base period of tw o years w ith three (3) one-year option periods. Task orders issued under the SATOC w ill be f irm-f ixed price.
The Government w ill evaluate Phase I proposals IAW the criteria described herein and w ill select no more than f ive (5) of the most highly qualif ied Offerors to participate in Phase II.
The proposal of the successful Offeror shall be incorporated by reference upon aw ard of the contract.
DONALD N PARRISH 912-652-5030
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
22-Jun-2018
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________23 Jul 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
US ARMY CORPS OF ENGINEERS
100 WEST OGLETHORPE AVE.
SAVANNAH GA 31401-3640
W912HN
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912HN18R0004 76
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912HN18R0004
Section 00 01 15 - List of Drawing Sheets
WAGE DETERMINATION
Wage Determination(s) will be determined on a Task Order basis.
Section 00 10 00 - Solicitation
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
Section 00 20 00 - Instructions for Procurement
ADDITIONAL NOTES TO OFFERORS
1. QUALITY CONTROL SYSTEM (QCS): Any contract award resulting from this solicitation will require the mandatory use of the automated Quality Control System.
2. SECURITY REQUIREMENTS: Increased security at military installations may require vehicle and personnel registration, as well as 100% ID checks and random vehicle searches.
3. TECHNICAL MATTERS: Technical inquiries are to be submitted via Bidder Inquiry in ProjNet at www.projnet.org/projnet. All questions regarding this Request for Proposal (RFP) must be submitted in writing via Bidder Inquiry in ProjNet within no less than 10 calendar days prior to the date established in the RFP for receipt of proposals. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of proposals.
If an Offeror believes the requirements in this Request for Proposal contain an error, omission, or are otherwise unsound, the Offeror shall immediately notify the Contract Specialist in writing with supporting rationale. The Offer is reminded that the Government reserves the right to award this Request for Proposal based on the initial proposal, as received, without discussion.
To submit and review bid inquiry items, Offerors will need to be a current registered user or self-register into the system. To self-register, go to web page, click BID tab, select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, your e-mail address, and click login. Fill in all required information and click create user. Verify all information on the next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry.
Offerors will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed by our technical team.
Bidder Inquiry Key: KGA7UM-52VFX9
Section 00 21 00 - Instructions
INSTRUCTIONS
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS NOTES:
A SUBMISSION IN RESPONSE TO PHASE II IS NOT REQUIRED AS PART OF THE
PHASE I PROPOSAL. A PHASE II PROPOSAL WILL BE REQUESTED FROM ONLY
THE OFFERORS SELECTED BY THE CONTRACTING OFFICER TO SUBMIT
PROPOSALS FOR PHASE II.
THE PHASE II SUBMISSION AND EVALUATION CRITERIA ARE SUBJECT TO
CHANGE PRIOR TO THE PHASE II SOLICITATION BEING ISSUED.
DIRECTIONS FOR SUBMITTING PROPOSALS:
In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. This applies to both Phase One and Phase Two, except for the Bid Bond in Phase Two. All submissions shall be in Adobe PDF format.
Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W912HN18R0004_COMPANY NAME_ VOLUME I
W912HN18R0004_COMPANY NAME_ VOLUME II
Submit proposals electronically via the AMRDEC SAFE website at https://safe.amrdec.army.mil/SAFE/Welcome.aspx. At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s).
[Note: It has been reported that documents are more quickly uploaded into the AMRDEC SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that Offerors will have more success utilizing any particular browser.] When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the Government recipients. When completing the information for transmittal at the AMRDEC SAFE website, you will be required to enter email addresses for the recipients. For this solicitation, the recipients will be the Contracting Officer and Contract Specialist. The Contract Specialist for this project is MAJ Donald Parrish, whose e-mail address is Donald.N.Parrish@usace.army.mil The Contracting Officer for this project is Ms . Sabrina Bastine, whose e-mail address is Sabrina.Bastine@usace.army.mil . These e-mail addresses are the ones you will enter as recipients.
In addition, after uploading your documents, you will be required to verify your email address before AMRDEC will send notification to the Government recipients. This is a very important step – even if you successfully upload your proposal to AMRDEC SAFE, notification will not be sent to the Government until you verify your email address, which may result in the rejection of your proposal for lateness. Follow the instructions on the AMRDEC website and the confirmation emails you receive from AMRDEC.
The date and time of delivery will be established by the time of receipt of the e-mail notification to the Contract Specialist and Contracting Officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e-mail inboxes until after the deadline, the submission will be considered late.
The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
DESCRIPTION OF WORK
SECTION V
SECTION 00 21 00
PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. DESCRIPTION OF WORK.
1.1 This Request for Proposal (RFP) solicits for a Single Award Task Order Contract (SATOC) under which task orders for General Construction are expected to be issued for projects within the three state region of North Carolina, South Carolina, and Georgia with the primary focus area being Hunter Army Air Field (HAAF), Ft.
Stewart and Ft. Gordon, GA. Work contemplated on this SATOC may be conducted for Army, Air Force, Navy, Marine Corps, National Guard and Reserve Components, and other Department of Defense (DoD) and Federal Agencies located on DoD installations and those in support of other Federal and Department of Defense operations. Task Orders issued under any resultant contract(s) will be Firm-Fixed Price and may be either for Design-Build or Design-Bid-Build General Construction. A project requiring use of civil funds is not authorized under this contract. (See solicitation section 01 11 00 for the complete scope of the anticipated contract to be awarded under this RFP.)
1.2 For the purposes of this solicitation, the Government will utilize the Two-Phase Design-Build Selection Process. In Phase One of the Two-Phase Design-Build selection procedure, interested Offerors will submit specified performance capability proposals for review and consideration by the Government. The Government will evaluate these performance capability proposals in accordance with the criteria described herein.
1.3 The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will select no more than five (5) of the most highly qualified Offerors to participate in Phase Two.
1.4 In Phase Two of this process, the Government will evaluate both technical capability and price.
1.5 Only those Offerors who receive a written notification from the Savannah District Contracting Officer that their firm has been selected to participate in Phase Two of this solicitation are invited to submit a Phase Two proposal. Those Offerors selected for Phase Two will be provided the technical requirements package for a Sample Task Order that will be representative of the type work and task orders anticipated to be issued under any resultant contract(s). The Sample Task Order will be used solely for the purpose of ensuring potential contractors understand the task order preparation process and how to properly apply area coefficients and mark-ups. The Sample Task Order will not be used to evaluate price reasonableness or price realism.
2. GENERAL INSTRUCTIONS
2.1 Who May Submit a Proposal. The requirement will be advertised as a set aside for Small Business. Offerors submitting as a joint venture must provide the agreement forming the joint venture.
2.2 Information submitted about any company other than the Offeror, whether a predecessor company, affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractors that will perform major or critical aspects of this requirement, or other associated business, WILL NOT be evaluated for any factor. The only exception to this is that the Designer of Record will be evaluated in Factor 3.
2.3 Offerors shall submit their proposal to the address shown in the schedule of the Notes to Offererors section of Standard Form 1442.
2.4 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.
3. GENERAL PROPOSAL FORMAT FOR PHASE ONE:
3.1 Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.
3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
3.3 Electronic Matter Submissions. Written material shall be on single sided 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated.
3.4 Number of Copies. Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II). These two files should be named in a specific format:
Solicitation Number, Offerors Company and the volume (i.e.
W912HN18R0004_USACE_VolumeI.pdf). Given the limited time and resources of the evaluation board, failure to provide proposal in the correct format may hinder the board's ability to evaluate the Offeror's proposal.
3.5 Tabs. Proposal shall be organized and tabbed as follows:
VOLUME I
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB B – Section 00 45 00 – Representations and Certifications.
TAB C – Proposal Data Sheet – See Attachment 1 provided at the end of this section.
Offerors should ensure telephone number, fax number, e-mail address and DUNS number are all included. The DUNS number provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate DUNS has been created for a joint venture, it must also be submitted. A DUNS number shall also be provided for the Designer of Record identified in Factor 3. The Offeror should also submit its Tax ID number on the proposal data sheet.
TAB D – Joint Venture Agreement, if applicable. See paragraph 2.1.
TAB E – Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.
VOLUME II
TAB F –Joint Venture Agreement (Duplicate of Volume I)
TAB G – FACTOR 1 Past Performance
TAB H – FACTOR 2 Management Approach
TAB I - FACTOR 3 Design Experience.
4. PHASE ONE – TAB G – FACTOR 1 – PAST PERFORMANCE
4.1 SUBMISSION REQUIREMENTS.
4.1.1 The Offeror shall demonstrate a record of construction performance and experience on recent and relevant projects using the Past Performance Questionnaire Summary Sheet, Attachment 2 and the Past Performance Questionnaire (PPQ), Attachment 3 at the end of this section. The PPQ is provided for the Offeror to submit to the client (Point of Contact) for each relevant project submitted. Offeror must ensure correct phone numbers and email addresses are provided for the client. Completed PPQs must be submitted with your proposal by the specified closing date and time. Offerors should follow-up with clients to ensure timely submittal of completed questionnaires. If the offeror is unable to obtain a completed PPQ from a point of contact for a project(s) before proposal closing date, the Offeror shall complete blocks 1 – 5 of the PPQ and submit it with the proposal. Please note that, at a minimum, this first page of the PPQ and an additional page, if used, must contain sufficient information for the government to determine the relevancy of the project. In addition, this will provide contract and client information for the respective project(s). The Government may call and confirm information provided by the Offeror on the PPQs with the points of contact to the extent necessary to verify the information in the PPQ or to obtain additional information. The Government reserves the right to interview other individuals if the point of contact is not available. By exception, the client may request submission of questionnaires directly to the Government’s point of contact (Contract Specialist), MAJ Donald N. Parrish. Request may be made via email to Donald.N.Parrish@usace.army.mil. This request must be coordinated by the client in advance no later than five (5) business days before the proposal due date. PPQ’s submitted directly to the Contract Specialist shall be emailed or mailed via trackable means (certified US Mail, FedEx, or UPS). If the PPQ fails to arrive before the closing date and time, or if the information on the PPQ is insufficient to determine the Offeror’s name and appropriate solicitation number, it will not be considered.
Likewise, Project Information submitted in a format other than or in lieu of the PPQ format (to include CCASS /ACASS/CPARS) will not be considered. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other solicitations. . Offerors may attach one additional single-sided page (per PPQ) to further describe how the project is similar to the RFP requirements.
In addition to the PPQ, the Offeror’s proposal shall include the Past Performance Questionnaire Summary Sheet (Attachment 2) to provide a summary of the PPQs included and/or submitted to clients. The summary sheet shall include information for all columns.
Offerors may identify state and local government and private contracts that are similar to the Government’s requirements described in 4.1.2.
If the Offeror is a joint venture, the projects do not have to have been performed by the joint venture submitting the offer. The projects could have been performed by either company in the joint venture. Offerors are advised to submit projects wherein the Offeror, or proposed joint venture members, played a significant role and to clearly define those roles. If any Offeror has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer. Ensure that the PPQs submitted for this Factor clearly describe the relevant characteristics of the project.
4.1.2 Offeror shall submit a minimum of three (3), but no more than five (5), recent relevant projects that have a minimum value of no less than $2 million each. All projects must be successfully completed or fully designed and at least 50% construction progress completed within five (5) years preceding the date of this solicitation. Projects that meet these criteria will be evaluated to determine the level of relevancy. Projects with similar size, scope, and complexity of the following may be considered relevant projects:
General Construction or Design-Build Construction of new or renovated/repaired facilities involving architectural exteriors/interiors, electrical, mechanical, plumbing, fire suppression, communication, renewable energy, roofing, anti-terrorism and force protection, and/or structural systems, site work, airfield pavements, transportation systems (i.e. roads, highways, bridges, and/or parking), and/or storm water management systems.
No less than three of the five projects SHOULD be Design-Build construction.
Please note that projects submitted by design firms will not be evaluated in this factor. Design firms shall submit projects in accordance with the requirements in Factor 3.
4.1.3 Offerors shall submit no more than five (5) PPQs (Attachment 3) in accordance with 4.1.2. Project information shall be limited to the PPQ and one additional page.
Where a project was awarded as a task order or delivery order under an IDIQ type contract, Offerors are cautioned to submit information specific to the task or delivery order considered relevant to the requirements of this RFP, rather than the umbrella contract. For purposes of this Request for Proposal, if the Offeror is submitting as a Joint Venture, no more than five (5) total project examples may be submitted for the JV and its members. If an Offeror submits more than five (5) total project examples, only the first five (5) will be evaluated. Offerors shall submit only projects wherein the Offeror or proposed joint venture members were the prime contractors. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer.
4.1.4 Other Sources. In addition to the above, the Government may review any other sources other than those provided by the Offeror for evaluating past performance and experience. These other sources may include but are not limited to, past performance and experience information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers identified in the proposal on the Proposal Data Sheet, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the Offeror. If a CPARS evaluation exists for a submitted project, it will be considered.
4.1.5 While the Government may elect to consider data from other sources, the offeror must provide detailed, current, accurate and complete past performance information for evaluation by the Government.
4.1.6 The experience and/or past performance of individuals will NOT be considered under this factor.
4.2 EVALUATION CRITERIA.
4.2.1 Past Performance Evaluation: The past performance and experience evaluation results in an assessment of the Government’s confidence in the ability of the Offeror to meet the solicitation requirements. The past performance evaluation considers each Offeror’s demonstrated record of performance and experience on recent and relevant projects that involve a similar scope and magnitude of effort and complexities as this solicitation requires. One performance confidence assessment rating is assigned for each Offeror after evaluating the Offeror’s recent past performance and experience, focusing on performance and experience that is relevant to the contract requirements.
4.2.2 Recency and Relevancy Evaluation: Projects must meet the minimum criteria in paragraph 4.1.2 in order to be considered recent and relevant and will be evaluated against the requirements of the RFP. The Government will not consider multiple projects, such as individual task orders, combined to meet the minimum value. Projects will be evaluated for relevancy based on the description of the project. Past performance evaluations on projects that are not relevant will not be considered.
Table 1. Past Performance Relevancy Rating Method:
Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant
Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
4.2.3 Confidence Assessment:
4.2.3.1 Offerors may increase the SSEB’s level of confidence if they are able to demonstrate successful performance in a wide variety of work as described in paragraph 4.1.2. Conversely, the SSEB may have a decreased level of confidence in Offerors whose experience is limited amongst the variety of work described in paragraph 4.1.2. Offerors may increase the SSEB’s level of confidence if they submit three or more Design-Build projects. Conversely, the SSEB may have a decreased level of confidence in Offerors that do not demonstrate experience with Design-Build projects or have limited experience. Offerors may increase the Source Selection
Evaluation Board’s (SSEB) level of confidence by demonstrating previous experience where the Offeror and the design firm(s) in Factor 3 worked together.
4.2.3.2 The Government will evaluate the Offeror's past performance and experience using the sources available to it including but not limited to the example projects identified by the Offeror and submitted on the PPQs and any additional information received from references and CPARS or other sources. Offerors may be provided an opportunity to address any negative past performance information about which the Offeror has not previously had an opportunity to respond if such information is determined to impact the rating to be assessed.
4.2.3.3 The Government will consider the recency of the performance, the relevancy including the context of the data, and the quality of the performance and general trends in performance and source of the information to reach a confidence assessment rating using Past Performance Confidence Ratings.
4.2.3.4 If no recent/relevant performance record is available or the Offeror’s performance record and experience is so sparse that no meaningful confidence assessment rating can be reasonably assigned this factor will be assigned a rating of “Neutral Confidence” (Unknown).
4.2.4. Past Performance Confidence Ratings
Rating Definition Substantial Confidence
Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence
Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence
Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.
5. PHASE ONE – TAB H – FACTOR 2 – MANAGEMENT APPROACH
5.1 SUBMISSION REQUIRMENTS: Offeror shall submit a narrative not to exceed four
(4) single sided pages, including charts and graphs that outlines how the Offeror will plan, execute, monitor and control projects under this SATOC. It should be presented as a high-level management approach that the Offeror shall use when executing task orders under this contract. The plan should address the following topics:
Resource Management Change Management
5.1.1 Resource Management:
Identify and explain the roles and responsibilities of team members that will perform major or critical aspects of this contract.
The Offeror shall provide a corporate organization chart that clearly indicates how the firm plans to organize and execute task orders. Include any key firms/subs or types of subcontractors that participate in task orders.
Describe how the Offeror manages resources and integrates construction subcontractors into the construction process.
5.1.2 Change Management: Describe the Offeror’s process for integrating design changes after award and handling construction changes/modifications.
5.2 EVALUATION CRITERIA:
5.2.1 Management Approach Evaluation: The project plan should describe how the Offeror plans and executes the work in each of the management areas above.
5.2.2 The Government will evaluate the strengths, weaknesses and any deficiencies in the submission. Based on the submission provided, the Government will evaluate the Offeror’s overall understanding of the design-build and design-bid-build process and its capability to execute an awarded contract.
5.2.3 The Offeror will be evaluated on how well defined and clear the management approach is for the submission requirements listed above.
5.2.4 Management Approach Ratings
Adjectival Rating
Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
Definition of Risk:
Adjectival Rating Description Low Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance.
Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
6. PHASE ONE – TAB I – FACTOR 3 - DESIGN EXPERIENCE
6.1 SUBMISSION REQUIREMENTS: Offeror shall submit a narrative not to exceed a total of five (5) single side pages describing its Design Experience or the intended Designer of Record’s (DOR) experience on a minimum of three (3), but no more than five
(5) projects that have a minimum construction value of no less than $2 million each and that demonstrate Design Experience similar to the various requirements described in paragraph 4.1.2 and subparagraphs. Three of the five projects MUST be Design-Build construction. Projects must be fully designed within five (5) years preceding the date of this solicitation. In the narrative, clearly state the project construction cost, if design-build or design-bid-build, the role of the A-E, and date of design completion. In addition to the five (5) page narrative, Offerors may submit an additional two (2) single sided pages describing the relationship between the Prime and the Designer of Record for the performance of a subsequent contract (business agreement, formal arrangement, etc.).
6.2 EVALUATION CRITERIA:
6.2.1 The evaluation considers the demonstrated record of the experience of the Offeror’s DOR on recent and relevant projects that involve a similar scope and magnitude of effort and complexities as this solicitation requires.
6.2.2 Offerors may receive additional consideration in meeting the requirements of this Factor if they are able to demonstrate the successful design experience of the DOR in a wide variety of work as described in paragraph 4.1.2 and subparagraphs. Conversely, the DORs may receive less consideration from the SSEB if the experience is limited amongst the variety of work described in paragraph 4.1.2. DORs may receive additional consideration from the SSEB if it has performed more than three Design-Build projects.
DORs may also receive additional consideration evidence is submitted concerning the level of commitment to the Prime Offeror.
6.2.3 Design Experience Ratings
understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance.
Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of
7. RELATIVE IMPORTANCE OF FACTORS
NON-COST FACTORS.
FACTOR 1: PAST PERFORMANCE. This factor is more important than Factor 2 (Management Approach) and Factor 3 (Design Experience).
FACTOR 2: MANAGEMENT APPROACH. This factor is less important than Factor 1 (Past Performance) but more important than Factor 3 (Design Experience).
FACTOR 3: DESIGN EXPERIENCE. This factor is less important than Factor 1 (Past Performance) and Factor 2 (Management Approach).
8. PHASE ONE – PROPOSAL EVALUATION.
8.1 The SSEB will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal, proposal corrections and any information obtained from other sources, e.g.
past performance information. The SSEB will not consider any documents incorporated by reference, except as expressly allowed by this solicitation.
8.2 Each member of the SSEB will independently consider all information provided in the proposal. Once these individual analyses are completed, the SSEB will assign a consensus rating for each evaluation factor.
8.3 The final ratings on individual factors will be provided to the Source Selection Authority. The Source Selection Authority, independently and exercising prudent business judgment, will determine which Offerors, if any, will proceed to phase two.
PHASE TWO – The submission requirements relate to the Sample Task Order.
PROPOSAL TABBING REQUIREMENTS. Phase Two proposals shall be organized and tabbed as follows:
VOLUME I – CONTRACT REQUIREMENTS AND PRICE PROPOSAL
TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture.
TAB B – Proposal Pricing Schedule, Section 00 10 00 - Schedule A Base Contract Bid Schedule & Schedule B, Sample Task Order Pricing.
TAB C – Bid Bond – Solicitation Requirement: The Offeror is not required to submit a bid bond but is required to submit a letter, stamped with an official seal and notarized, from the contractor’s surety validating the Offeror’s single and aggregate bonding capability and a power of attorney if applicable. Any letter found to be insufficient may affect an Offeror’s responsibility determination. Submit originals; photocopied or scanned copies are not acceptable. FAR clause 52.228-1, “Bid Guarantee” will be included in the contract. At the discretion of the Contracting Officer, a Bid Bond will be required for each task order.
VOLUME II – TECHNICAL REQUIREMENTS
9. PHASE TWO – TAB D – FACTOR 4 – TECHNICAL APPROACH
9.1. SUBMISSION REQUIREMENTS. The Offeror will submit a quantitative proposal for the sample project utilizing R.S. Means Cost Works. Offerors final proposed price will be submitted on Bid Schedule B and offeror shall provide ALL supporting documents (R.S. Means break out, non-prices items, etc). Offeror’s proposal shall be prepared and meet the requirements as stated in Schedule A: Notes To Offeror.
9.1.1. Offerors shall apply their proposed Area Coefficient for Fort Stewart and their proposed Home Office Overhead for the base period to this project.
9.2. EVALUATION CRITERIA:
9.2.1. Offerors will be evaluated on the technical approach in determining a price proposal utilizing the applicable Construction Specification Institute (CSI) numbers and appropriate quantities from R.S. Means. Offerors will also be evaluated on how well they understand the required application of the proposed coefficient and mark-ups.
9.3. Technical Approach.
understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more potential to cause disruption of schedule, increased cost or degradation of performance. Normal contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate Proposal contains a significant weakness or combination of weaknesses which may potentially cause disruption of schedule, increased cost or degradation of performance.
Special contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High Proposal contains a significant weakness or combination of weaknesses which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special contractor emphasis and close Government monitoring.
Unacceptable Proposal contains a material failure or a combination of
10. PHASE II – PROPOSAL EVALUATION.
10.1. The SSEB will be established to conduct the evaluation of proposals received in response to this solicitation. The evaluation will be based on the content of the proposal, proposal corrections and any information obtained from other sources, e.g.
past performance information. The SSEB will not consider any documents incorporated by reference, except as expressly allowed by this solicitation.
10.2. Each member of the SSEB will independently consider all information provided in the proposal. Once these individual analyses are completed, the SSEB will assign a consensus rating for each evaluation factor.
10.3. The final ratings on individual factors will be provided to the Source Selection Authority. The Source Selection Authority, independently and exercising prudent business judgment, will determine which Offeror, if any, will receive the contract award.
11. EXCEPTIONS. Exceptions to the contractual terms and conditions of the solicitation (e.g., standard company terms and conditions) may result in a determination to reject a proposal.
12. RESTRICTIONS. Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation, and for subsequent award.
13. RELATIVE IMPORTANCE OF FACTORS
FACTOR 1: PAST PERFORMANCE. This factor is equal in importance to Factor 4 (Technical Approach) and is more important than Factor 2 (Management Approach) and Factor 3 (Design Experience).
FACTOR 2: MANAGEMENT APPROACH. This factor is less important than Factor 1 (Past Performance) and Factor 4 (Technical Approach) but more important than Factor 3 (Design Experience).
FACTOR 3: DESIGN EXPERIENCE. This factor is less important than Factor 1 (Past Performance), Factor 4 (Technical Approach), and Factor 2 (Management Approach).
FACTOR 4 (Technical Approach) is equal in importance to FACTOR 1 (Past Performance) and more important than FACTOR 2 (Management Approach) and Factor 3 (Design Experience).
Technical Factors when combined are significantly more important than Price.
14. PRICE.
14.1. Price will not be rated, but will be a factor in establishing the competitive range prior to discussions (if held) and in making the best value decision for award of any resultant contract. Coefficients for firm-fixed price type task orders shall be proposed and submitted on the Task Order Pricing Schedule shown at Section 00010 - Schedule A of the solicitation.
14.2. The Government will perform a price analysis on all proposals received. Price analysis will be performed on Schedule A in accordance with FAR 15.404-1, to determine fairness and reasonableness. Historical price information, competitive price information, the Independent Government Estimate (IGE), or any other pricing tool as necessary will be utilized in this analysis. The evaluation will determine the extent to which the price proposal is consistent with the requirements of the RFP. Offerors are advised that any offer wherein pricing is deemed unfair or unreasonable will be rendered ineligible for award.
14.3. The Government shall use the total evaluated price from Schedule A as the evaluated price for making the best value decision.
15. BASIS FOR AWARD
15.1. Proposals must meet the criteria stated in the RFP in order to be eligible for award, to include capability in accordance with the evaluation criteria and responsibility in accordance with FAR 9.104.
15.2. In order to determine which proposal represents the best value, a comparative assessment of proposals against all source selection criteria in this RFP will be conducted, and in turn, the Government will compare proposals to one another. The Government will award a contract to the responsible Offeror whose technical submittal and price proposal contains the combination of those criteria described in this document offering the best value to the Government.
15.3. The successful Offeror, if any, will be awarded a SATOC with a maximum quantity of $45 Million and a $2,500.00 guaranteed minimum for the base ordering period.
15.4. As technical ratings and relative advantages and disadvantages become less distinct, differences in price between proposals are of increased importance in determining the most advantageous proposal. Conversely, as differences in price become less distinct, differences in scoring and relative advantages and disadvantages between proposals are of increased importance to the determination.
15.5. The Government reserves the right to award to other than the lowest reasonably priced Offeror. The right is also reserved to reject any and all offers.
15.6. Offerors are reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer.
ATTACHMENT 1
PROPOSAL DATA
SHEET
General Construction Design-Build
East Georgia SATOC
1. Name of Firm: Address:
Phone:
Fax:
E-mail:
DUNS # (used for accessing CPARS, PIPRS)
2. AUTHORIZED NEGOTIATORS. FAR 52.215-11
The Offeror represents that the following persons are authorized to negotiate on its behalf with the Government in connection with this Request for Proposals (RFP).
Name of Person Authorized to Negotiate: ________________________________________ Negotiator’s Address: ________________________________________________________ Negotiator’s Telephone: __________________________________ Negotiator’s E-mail:______________________________________
Attachment 2
PAST PERFORMANCE QUESTIONNAIRE
SUMMARY SHEET
General Construction Design-Build East Georgia SATOC
The Offeror’s proposal shall include the Past Performance Questionnaire Summary Sheet to provide a summary of the PPQs included and/or submitted to clients. The summary sheet shall include information for all columns.
No.
Project Name
Contractor
Contract#
Construc-tion
% Complete
Scheduled Completion
Date
Design Build or Design Bid
Build?
ATTACHMENT 3
Past Performance Questionnaire (PPQ)
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: ___ Prime Contractor ___Sub Contractor __Joint Venture ___ Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: ___ Firm Fixed Price ___Cost Reimbursement ___ Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work: ___High ___ Med ___ Routine
How is this project relevant to project of submission?