AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SAS HYDROPOWER SINGLE AWARD TASK ORDER CONTRACT (SATOC)
Per revisions addressed in this post closing amendment, (see SF 30 continuation page) offerors w ho previously submitted a proposal are requested to please revise and resubmit your proposals in their entirety in accordance w ith the changes identified in this amendment.
Offerors are also permitted to submit a revised burden rate schedule utilizing the table provided in Section B - RATE SCHEDULE. Please submit your complete response by 2:00 PM Eastern Time, January 08, 2016. Submissions shall be submitted electronically via AMRDEC SAFE. Instructions for how to submit in AMRDEC SAFE can be found in the solicitation.
Title the file in the follow ing format:
W912HN-15-R-0016_COMPANY NAME_AMENDMENTRESPONSE
1. CONTRACT ID CODE PAGE OF PAGES
J 1 48
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Dec-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-15-R-0016
X 9B. DATED (SEE ITEM 11)
26-Aug-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Dec-2015
CODE
U.S. ARMY ENGINEER DISTRICT, SAVANNAH
100 WEST OGLETHORPE AVE
SAVANNAH GA 31401-3640
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN-15-R-0016
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been added by full text:
SAMPLE PROJECT PRICE PROPOSAL
Line Item Number
Description Quantity Unit Total
0001 Review available information and develop a preliminary FEW Model for Generator (Items 1a-1b of Factor 3 report)
1 Job
0002 Perform Field Testing to determine resonant responses (Items 2a-2g of Factor 3 report)
1 Job
0003 Apply test data to Generator model (mechanical and electromagnetic) (Items 3a-3c of Factor 3 report)
1 Job
0004 Develop possible solutions to vibration and noise problems using refined generator model (Items 4a-4b of Factor 3 report)
1 Job
0005 Prepare final analysis report, including solution ranking recommendations (Item 5 of Factor 3 report)
1 Job
Total for Line Item Numbers 0001-0005
SUPPLEMENTAL LINE ITEM BREAKDOWN
Discipline
Name
Man Day
Quantity
Fully Burdened
Daily Rate Travel Total
Material Equipment Total
Total for Line Item 0001
Line Item 0001 Price Breakdown
G&A for M&E
Subtotal for M&E
Total M&E for Line Item 0001
Total Labor for Line Item 0001
Profit
Subtotal Labor, Material &
Equipment
Name
Man Day
Quantity
Fully Burdened
Daily Rate Travel Total
Material Equipment Total
Total for Line Item 0002
Line Item 0002 Price Breakdown
G&A for M&E
Subtotal for M&E
Total M&E for Line Item 0002
Total Labor for Line Item 0002
Profit
Man Day
Quantity
Fully Burdened
Daily Rate Travel Total
Material Equipment Total
Total for Line Item 0003
Line Item 0003 Price Breakdown
G&A for M&E
Subtotal for M&E
Total M&E for Line Item 0003
Total Labor for Line Item 0003
Profit
Man Day
Quantity
Fully Burdened
Daily Rate Travel Total
Material Equipment Total
Total for Line Item 0004
Line Item 0004 Price Breakdown
G&A for M&E
Subtotal for M&E
Total M&E for Line Item 0004
Total Labor for Line Item 0004
Profit
Man Day
Quantity
Fully Burdened
Daily Rate Travel Total
Material Equipment Total
Total for Line Item 0005
Line Item 0005 Price Breakdown
G&A for M&E
Subtotal for M&E
Total M&E for Line Item 0005
Total Labor for Line Item 0005
Profit
The following have been modified:
NOTES TO OFFERORS
SAS HYDROPOWER SATOC
W912HN‐15‐R‐0016
SECTION B – NOTES TO OFFERORS
This is a Single Award Task Order Contract for Savannah District (SAS) Hydropower Power plants.
ELECTRONIC PROPOSAL SUBMISSION IS REQUIRED THROUGH THE WEBSITE LISTED BELOW. ELECTRONIC SUBMISSION SENT VIA EMAIL OR FACSIMILE WILL NOT BE ACCEPTED. HAND CARRIED PROPOSAL
SUBMISSION IS NOT AUTHORIZED.
DIRECTIONS FOR SUBMITTING PROPOSALS
In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format. The price proposal and technical proposal shall be submitted as “separate” single files. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format (See Amendment 0005):
W912HN‐15‐R‐0016_COMPANYNAME_AMENDMENTRESPONSE
W912HN‐15‐R‐0016_COMPANY NAME_VOLUME I
W912HN‐15‐R‐0016_COMPANY NAME_VOLUME II
Submit the Price and Technical proposals electronically via the AMRDEC SAFE website at:
https://safe.amrdec.army.mil/SAFE/. At the AMRDEC SAFE website select the link: I do not have a CAC or this machine is not configured to read my CAC and I would like to access SAFE as a Guest User, to register, access the site and submit your proposal(s). [Note: It has been reported that documents are more quickly uploaded into the AMRDEC SAFE website when using a Firefox web browser. The Government cannot verify that this is true and offers no guarantee that offerors will have more success utilizing any particular browser.]
When your proposal is submitted via the AMRDEC SAFE website, the website will provide notification of the submittal to the Government recipients. When completing the information for transmittal at the AMRDEC SAFE website, you will be required to enter e‐mail addresses for the recipients. For this solicitation, the recipients will be the Contracting Officer and Contract Specialist. The contract specialist for this project is Ms. Kosha Jones Whittni Wright, whose e‐mail address is kosha.k.jones@usace.army.mil whittni.c.wright@usace.army.mil. The Contracting Officer for this project is Mr. Bruce A. Helms, whose e‐mail address is Bruce.A.Helms@usace.army.mil. These e‐mail addresses are the ones you will enter as recipients.
In addition, after uploading your documents, you will be required to verify your e‐mail address before AMRDEC will send notification to the Government recipients. This is a very important step – even if you successfully upload your proposal to AMRDEC SAFE, notification will not be sent to the Government until you verify your e‐mail address, which may result in the rejection of your proposal for lateness. Follow the instructions on the AMRDEC website and confirmation e‐mails you receive from AMRDEC.
Proposal Due Date and Time:
January 08, 2016 at 2:00 P.M. ET October 05, 2015 at 2:00 p.m. ET
Request For Proposal No: W912HN‐15‐R‐0016 Title of Project: SAS Hydropower SATOC
The date and time of delivery will be established by the time of receipt of the e‐mail notification to the contract specialist and contracting officer by the AMRDEC SAFE website, not by the date and time of uploading of the proposal into the AMRDEC SAFE website. Do not assume that electronic communication is instantaneous. Please make allowances for delays in transmittal. If an electronic submission is uploaded minutes before the deadline but notification is not actually received in the recipients’ e‐mail inboxes until after the deadline, the submission will be considered late.
The Government will not be responsible for proposals delivered to any locations or to anyone other than those designated to receive proposal on its behalf. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the information provided.
WAGE DETERMINATIONS: The appropriate wage determination will be incorporated on a task order by task order basis.
TECHNICAL MATTERS: Submit technical inquiries and questions relating to this solicitation via Bidder Inquiry in ProjNet at (https://www.projnet.org) and will be re‐opened for inquiries regarding Amendment 0005 changes and will close at least 10 2 calendar days prior to the date established in the RFP for receipt of revised proposals. The Government reserves the right to decline addressing questions received less than 10 calendar days prior to receipt of proposals.
If an Offeror believes that the requirements in the Request for Proposal contain an error, omission, or are otherwise unsound; immediately notify the contract specialist in writing with supporting rationale.
The Government reserves the right to award this Request for Proposal based on the initial proposal, as received, without discussion.
To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment or question will receive an acknowledgement via e‐mail, followed by an answer after it has been processed by our technical team. All timely questions and approved answers will be made available through ProjNet. Approved answers to all timely questions will also be posted on FedBizOps in the form of a report generated from ProjNet as soon as the comment/question entering period is over and answers are all finalized.
W912HN‐15‐R‐0016
SAS Hydropower SATOC Bidder Inquiry Key: T69XEI‐7E88PM
Specific Instructions for Initial ProjNet Bid Inquiry Access:
1. From the ProjNet home page, click on Quick Add on the upper right side of the screen
2. Identify the Agency as USACE
3. Key. Enter the Bidder Inquiry Key listed above.
4. E‐mail. Enter the e‐mail address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, E‐mail, Secret Question, Secret
Answer and Time Zone. Remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged in the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
Steps 1 through 3: same as above
4. E‐mail. Enter the e‐mail address you used to register previously in ProjNet.
5. Click Continue. A page will then open asking for the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed, you are logged into the system.
Offerors may schedule a site visit between 9‐10 September 2015. The POC to schedule a site visit is Mr.
James Payne. Mr. Payne’s contact information is listed below:
E‐mail: James.D.Payne@usace.army.mil Phone: (706) 856‐0369 Mobile: (706) 717‐0048
Address: Hartwell Powerplant 6961 Anderson Hwy Hartwell, GA 30643
RATE SCHEDULE
STANDARD DAILY LABOR RATES (FIRM FIXED PRICE) FOR DISCIPLINES
DISCIPLINE FULLY
LOADED
DAILY RATE
BASE
FULLY
LOADED
DAILY RATE
Option Period 1
FULLY
LOADED
DAILY RATE
Option Period 2
FULLY
LOADED
DAILY RATE
Option Period 3
FULLY
LOADED
DAILY RATE
Option Period 4
Program Manager
Project Manager
Senior Engineer
Junior Engineer
Senior Scientist
Junior Scientist
Field Technician
Engineering Technician
GIS
Specialist
CADD
Operator
Laborer
Clerical
Overhead Rate
Annual
Escalation
NOTE 1: This is an Indefinite Delivery Indefinite Quantity contract. Funding will be allocated per task order. While the estimated dollar amount is $1,900,000.00 for the base year and each option period, the actual obligation per year may be greater than or less than $1,900,000.00. The total amount of the contract shall not exceed $9,500,000.00. Minimum guarantee for this contract will be $2,500.00 for the base period.
NOTE 2: The base daily rate is defined as raw labor. The fully loaded daily rate is defined as raw labor, overhead, fringe and G&A. Both rates are based on an eight (8) hour day.
NOTE 3: Other Direct costs for specialized equipment and supplies will be negotiated on a task order basis.
NOTE 4: Subcontracting Costs and other disciplines will be negotiated on a task order basis.
NOTE 5: Profit will be negotiated per task order.
NOTE 6: Travel and Per Diem shall be determined in accordance with the Joint Travel Regulation The period of acceptance for this offer shall be up to 90 calendar days for Government acceptance after the offers are due.
**Offerors are NOT to submit bid prices on the Bid Schedule.
**USE RATE SCHEDULE TO SUBMIT PRICING.
**UTILIZE ONLY THE DISCIPLINES PROVIDED IN THE RATE SCHEDULE ABOVE. DO NOT
SUBSTITUTE ANY DISCIPLINES FOR ANY LISTED.
RATE SCHEDULE DEFINITIONS
Program Manager Job Duties: Utilized 30% in Execution of Projects
Accomplishes human resource objectives by recruiting, selecting, orienting, training, assigning, scheduling, coaching, counseling, and disciplining employees; communicating job expectations; planning, monitoring, appraising, and reviewing job contributions;
planning and reviewing compensation actions; enforcing policies and procedures.
Achieves operational objectives by contributing information and recommendations to strategic plans and reviews; preparing and completing action plans; implementing production, productivity, quality, and customer‐service standards; resolving problems;
completing audits; identifying trends; determining system improvements; implementing change.
Meets financial objectives by forecasting requirements; preparing an annual budget;
scheduling expenditures; analyzing variances; initiating corrective actions.
Updates job knowledge by participating in educational opportunities; reading professional publications; maintaining personal networks; participating in professional organizations.
Enhances department and organization reputation by accepting ownership for accomplishing new and different requests; exploring opportunities to add value to job accomplishments.
Project Manager Job Duties: Utilized 60% in Execution of Projects
Define the scope of the project in collaboration with senior management
Create a detailed work plan which identifies and sequences the activities needed to successfully complete the project
Determine the resources (time, money, equipment, etc) required to complete the project
Develop a schedule for project completion that effectively allocates the resources to the activities
Review the project schedule with senior management and all other staff that will be affected by the project activities; revise the schedule as required
Determine the objectives and measures upon which the project will be evaluated at its completion
In consultation with the appropriate manager, recruit, interview and select staff and/or volunteers with appropriate skills for the project activities
Manage project staff and/or volunteers according to the established policies and practices of the organization
Ensure that personnel files are properly maintained and kept confidential Ensure that all project personnel receive an appropriate orientation to the organization and the project
Contract qualified consultants to work on the project as appropriate
Execute the project according to the project plan Develop forms and records to document project activities
Set up files to ensure that all project information is appropriately documented and secured
Monitor the progress of the project and make adjustments as necessary to ensure the successful completion of the project
Establish a communication schedule to update stakeholders including appropriate staff in the organization on the progress of the project
Review the quality of the work completed with the project team on a regular basis to ensure that it meets the project standards
Write reports on the project for management and for funders
Communicate with funders as outlined in funding agreements
Monitor and approve all budgeted project expenditures
Monitor cash flow projections and report actual cash flow and variance to senior management on a regular basis (monthly/bimonthly)
Manage all project funds according to established accounting policies and procedures Ensure that all financial records for the project are up to date
Prepare financial reports and supporting documentation for funders as outlined in funding agreements
Ensure that the project deliverables are on time, within budget and at the required level of quality
Evaluate the outcomes of the project as established during the planning phase
Project Manager Skills and Qualifications:
Developing Budgets, Coaching, Supervision, Staffing, Project Management, Management Proficiency, Process Improvement, Tracking Budget Expenses, Self‐ Development, Planning, Performance Management, Inventory Control, Verbal Communication
Senior Engineer Job Duties: Utilized 60% in Execution of Projects
Develops engineering solutions by studying information needs; conferring with users;
studying systems flow, data usage, and work processes; investigating problem areas;
following the engineering development lifecycle.
Determines operational feasibility by evaluating analysis, problem definition, requirements, solution development, and proposed solutions.
Documents and demonstrates solutions by developing documentation, flowcharts, layouts, diagrams, charts, code comments and clear code.
Prepares and installs solutions by determining and designing engineering specifications, standards, and programming.
Improves operations by conducting engineering analysis; recommending changes in policies and procedures.
Updates job knowledge by studying state‐of‐the‐art development tools, engineering techniques, and computing equipment; participating in educational opportunities;
reading professional publications; participating in professional organizations.
Protects operations by keeping information confidential.
Provides information by collecting, analyzing, and summarizing development and service issues.
Accomplishes engineering and organization mission by completing related results as needed.
Supports and develops engineers by providing advice, coaching and educational opportunities.
Junior Engineer Job Duties: Utilized 40% in Execution of Projects
Evaluates engineering systems, products, components, and applications by designing and conducting research programs; applying knowledge of engineering and materials.
Confirms engineering components' capabilities by designing testing methods; testing properties.
Develops products by studying customer requirements; researching and testing manufacturing and assembly methods and materials.
Develops manufacturing processes by designing and modifying equipment for building and assembling components; soliciting observations from operators.
Assures product quality by designing, testing methods; testing finished products and system capabilities.
Prepares product reports by collecting, analyzing, and summarizing information and trends.
Provides engineering information by answering questions and requests.
Maintains product and company reputation by complying with federal and state regulations.
Keeps equipment operational by following manufacturer's instructions and established procedures; requesting repair service.
Maintains product data base by writing computer programs; entering data.
Completes projects by training and guiding technicians.
Maintains professional and technical knowledge by attending educational workshops;
reviewing professional publications; establishing personal networks; participating in professional societies.
Contributes to team effort by accomplishing related results as needed.
Senior Scientist Job Duties: Utilized 5% in Execution of Projects
Responsible for establishing and executing a strategic plan for high performance computing methods for materials modeling.
Responsible for managing a team that establishes scientific leadership to develop advanced data analysis, modeling and simulation methods, and materials data.
Maintains and extends the outstanding and collaborative relationships between Sciences Directorate, Computational Sciences Directorate and Physical Sciences Directorate to develop a common vision for the future of modeling and simulation in materials science.
Explore adhesives and other methods for bonding functionalized materials.
Perform and lead failure analysis.
Teach methods developed to other scientists, engineers, research associates, of a range of experience and education levels.
Present clear and concise written and oral communications to colleagues and supervisors, lead and participate in technical meetings, and provide recommendations based on technical results.
All listed tasks and responsibilities are deemed as essential functions to this position;
however, business conditions may require reasonable accommodations for additional task and responsibilities.
Junior Scientist Job Duties: Utilized 5% in Execution of Projects
Compile, analyze and present data. Based on the results, plan and perform next experiments to complete R&D tasks.
Write reports for all milestones according to the Design Control process.
Provide product and study descriptions, data summaries and analysis, and other required information.
Prepare manufacturing documents including SOPs, specification sheets and worksheets.
Transfer project or product information, SOPs, reports and other needed documents to
Operations. If required, create and document part numbers, product structures and routes.
Work closely with Senior Scientists and Project Managers on Project related activities.
Act independently to determine methods and procedures on new assignments. If needed, supervise activities of junior team members on tasks related to project completion.
Perform all activities in compliance with all regulatory and safety policies.
Experienced in leading product trouble shooting and NCAR/CAPA investigation.
Demonstrated proficiency using Microsoft Office.
Field Technician Job Duties: Utilized 80% in Execution of Projects
Responsible for customer support activities with a focus on preventative and corrective maintenance of instrumentation.
Ability to utilize proven troubleshooting processes to diagnose and resolve technical issues on a variety of electromechanical instruments.
Ability to manage service call scheduling, parts inventory and administrative responsibilities with minimal supervision is required.
Customer relationship management
Written documentation of service activities
Effective interaction and communication with internal technical support personnel
Perform other duties as requested by the Engineers, and Project Manager
Engineering Technician Job Duties: Utilized 80% in Execution of Projects
Responsible for assigned process assignments with computers or rapid prototype machines.
Responsible for the monitoring of the machines process parameters and assist in maintaining those parameters.
Document all process changes and update process documentation on computers and machine share drive.
Ability to clearly communicate tooling & machine issues to department heads for correction
Ensure a safe working environment
Help perform mold setups Inspects parts for any defects or quality issues.
Pull samples for laboratory testing Performs other duties as requested by the Senior Engineer and Project Manager
GIS Specialists Job Duties: Utilized Less Than 5% in Execution of Projects
Work with related software and programs to create and maintain data and/or maps that can be combined with geographically referenced data.
Create maps and graphs, using GIS software and related equipment.
Meet with users to define data needs, project requirements, required outputs, or to develop applications.
Conduct Research to locate and obtain existing databases.
Gather, analyze, and integrate spatial data from staff and determine how best the information can be displayed using GIS.
Compile geographic data from a variety of sources including censuses, field observation, satellite imagery, aerial photographs, and existing maps.
Analyze spatial data for geographic statistics to incorporate into documents and reports.
Design and update database, applying additional knowledge of spatial feature representations.
Enter new map data through use of a digitizer or by direct input of coordinate information using the principles of cartography including coordinate systems, longitude, latitude, elevation, topography, and map scales.
Analyze geographic relationships among varying types of data.
Prepare metadata and other documentation.
Operate and maintain GIS system hardware, software, plotter, digitizer, color printer, and video camera.
Move, copy, delete, and add files, drawings, and maps to output reports in hard copy or electronic transfer.
Present information to users and answer questions.
CADD Operator Job Duties: Utilized 40% in Execution of Projects
CAD operators provide the guidelines and technical details of the product or structure that is being built.
Work with engineers, architects and other professionals in producing plans and drawings.
Use specialized notations and symbols to convey instructions about materials, assembly procedures or tools.
Produce guidebooks and manuals for machinery and tools by making illustrations of mechanical systems.
Employ mathematical formulas to develop specifications for machinery and design blueprints of specific items.
Assist in product testing, allowing them to revise documentation as the design changes.
Work with CAD systems creating, modifying and releasing drawings and word drawings under direct supervision of a supervisor for use by other departments and customers.
Work closely with all departments in the factory to ensure that the drawings convey the correct information.
Self‐check own work for completeness, accuracy, compliance to standards, fits and stack‐ups. May be responsible for some design elements.
Work from drawings, sketches or scanned images, customer drawings, or government drawings or specifications.
Use the accepted drawing standards as guidelines.
Laborer Job Duties: Utilized 80% in Execution of Projects
Perform a variety of industrial facility and equipment maintenance duties associated with dams, hydroelectric power plants, and related facilities.
Perform facility and equipment maintenance duties such as replacing guard rails;
painting buildings, structures, gates, equipment and other related items; and changing light bulbs and door knobs.
Operate and use a variety of light equipment and tools such as fork lifts, motorized man‐ lifts, chain lifts, and hoists, and light trucks, drills, saws, etc.
Assist in a variety of trades such as masonry, concrete, carpentry, plumbing, painting, electrical, and mechanical.
Performs other duties as requested by on‐site supervisors.
SECTION L - INSTRUCTIONS, CONDITIONS AND NOTICES TO BIDDERS
INSTRUCTIONS TO OFFERORS
SECTION L
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1. OFFERORS WHO CAN SUBMIT A PROPOSAL
The Savannah District (SAS) Turbine-Generator Repair and Rehabilitation SATOC ID/IQ solicitation will be procured using a full and open competition. The System for Award Management (www.sam.gov) website will be checked to assure that contractor’ status is current.
2. PROPOSAL INFORMATION
Copies of the solicitation are available on or about August 26, 2015. All documents will be posted to the Federal Business Opportunities website https://www.fbo.gov.
All amendments will also be posted to this website. It shall be the contractor’s responsibility to check the website for any amendments. The offeror shall submit in the proposal all requested information specified in this section of the Request for Proposal (RFP) solicitation. There will be no public opening of the proposal received as a result of this solicitation.
2.1. Point of Contact:
Contractual: Ms. Kosha Jones Whittni Wright US Army Corps of Engineers, Savannah District Phone: (912) 652-51085476 E-mail: kosha.k.jones@usace.army.mil whittni.c.wright@usace.army.mil
NOTE: All written questions and/or comments should reach the above referenced Contracting Office no later than ten (10) calendar days prior to the date set for receiving proposals in order that they may be given consideration or actions taken prior to receipt of offers. A pre-proposal conference will not be held.
2.2 Proposal Expenses and Pre-Contract Costs
This Request for Proposal (RFP) does not commit the Government to pay any costs incurred in the preparation and submission of a proposal or for any other costs incurred by any firm submitting a proposal in response to this solicitation.
2.3 Method of Procurement
2.3.1 The U.S. Army Corps of Engineers, Savannah District, intends to conduct this acquisition by use of competitive source selection procedures in accordance with the provisions set forth in the RFP.
From this solicitation, one (1) SATOC IDIQ contract will be awarded to a firm using a firm-fixed price contract for SAS Turbine-Generator Repair and Rehabilitation. The contract is scheduled for award on or about November 6, 2015. Award will be made to the offeror submitting a proposal determined to be most advantageous to the Government; price, and other factors considered. It is strongly suggested that the provisions stated in the proposal information be fully studied prior to assembly of the proposal.
2.3.2 Note specifically that the offeror will not be participating in a sealed bid procurement process under this acquisition method. Issuance of this Request for Proposal does not constitute an award commitment on the part of the Government.
2.3.3 Proposals must set forth full, accurate, and complete information as required by this RFP (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
2.3.4 The Government reserves the right to discuss aspects of proposals with offerors in the competitive range and to award a contract to other than the offeror submitting the lowest priced offer.
Offerors are advised that the Government may make award without discussions, clarifications or any contact concerning the proposals received. Therefore, proposals should be submitted initially on the most favorable terms and price and technical standpoint. Do not assume that offerors will be contacted or afforded an opportunity to clarify, discuss, or revise their proposals.
2.4 Proposal Submittals
All proposals shall be submitted electronically via the AMRDEC SAFE website per SECTION B – NOTES TO OFFERORS. No hardcopy proposals will be accepted, including mailed and handcarried proposals.
Table 1
FACTOR LOCATION DESCRIPTION
RELATIVE
IMPORTANCE
FACTOR 1
Volume 1, Tabs A1, A2, and A3
Corporate Recent Relevant Experience
Equal to Factor 2 and Most Important Factor
Subfactor 1 Tab A1 Generators And Large Pump Motors
Equally important with subfactor 3 and less important than subfactor 2.
Subfactor 2 Tab A2
Testing, FEA Analysis and Reduction of Generator Stator Vibration
Most important subfactor
Subfactor 3 Tab A3
Turbines, Large Pumps, Water Passage, and Closure Devices
Equally important with subfactor 1 and less important than subfactor 2.
IMPORTANCE
FACTOR 2
Volume 1, Tabs B1 and B2
Past Performance Equal to Factor 1 and Most Important Factor
Subfactor 1 Tab B1 Completed or On-going Contracts
Equally important with subfactor 2
Subfactor 2 Tab B2 Customer Satisfaction (PPQ)
Equally important with subfactor 1
FACTOR 3 Volume 1, Tabs C1, C2 and C3 Technical Approach
Less Important than Factors 1 & 2, but more important than Factor 4
Subfactor 1 Tab C1 Pricing Scenario1 Equally important with subfactors 2 and 3
Subfactor 2 Tab C2 Pricing Scenario 2 Equally important with subfactors 1 and 3
Subfactor 3 Tab C3 Pricing Scenario 3 Equally important with subfactors 1 and 2
FACTOR 4 Volume 1, Tab D Small Business
Participation Plan Less Important than Factors 1, 2 &
NON-
TECHNICAL
(PRICE)
VOLUME
Volume 2, Tabs A to
CG
Tab A Completed and
Signed SF33 Not rated
Tab B Fully Burdened Labor Rate Schedule
Not rated
Tab C Sample Project Price Proposal
Not rated
Tab CD Completed Representations and Certifications
Not rated
Tab E Proposal Data Sheet Not rated Tab F Small Business
Subcontracting Plan
Tab G Financial Information Not rated
3. VOLUME CONTENT
Proposals submitted in response to this solicitation shall consist of the contents required in the sub-paragraphs described below:
3.1 Volume 1, TECHNICAL, TAB A: Factor 1: Corporate Recent Relevant Experience 3.1.1, Tab A1: Experience with Equipment Type 1: Repair and Rewind of Generators And Large
Pump Motors The offeror shall demonstrate recent (on-going work or completed within the past 5 years) experience performing inspections, rewedging stator windings, repairing field and stator windings including partial rewinds, and supplying and installing single and multi-turn coil windings for generators of different designs with ratings of 30 MVA or larger. The offeror shall submit the following information for 5-10 2-3 unique projects:
1. Customer Organization, primary point of contact and position held, address, phone, and email;
2. Contract Number, if applicable;
3. Location (powerhouse name) and State or Country;
4. Date contract and/or Work began;
5. Date item of equipment was delivered or repairs, refurbishment, or rehabilitation were substantially completed
6. Indicate if prime or subcontractor on project;
7. A brief explanation of what was manufactured or what repairs were performed including the rating, size, or type of equipment applicable to this experience criterion Note: To qualify as ongoing work, the contract must be at least 25% complete.
3.1.2, Tab A2: Experience with Equipment Type 2: Testing, FEA Analysis, and Reduction of Generator Stator Vibration The offeror shall demonstrate recent (on-going work or completed within the past 20 years) experience diagnosing through inspections, testing, and computer simulations the cause of excessive stator core vibration, and with developing and successfully implementing solutions to the vibration problems for generators of different design with a rating of 30 MVA or larger. The offeror shall submit the following information for 2-4 2-3 unique projects:
1. Customer Organization, primary point of contact and position held, address, phone, and email;
2. Contract Number, if applicable;
3. Location (powerhouse name) and State or Country;
4. Date contract and/or Work began;
5. Date item that analysis and solution implementation were substantially completed
6. Indicate if prime or subcontractor on project;
7. A brief explanation of what analysis and testing was performed, what repairs were developed, and the results of post repair testing confirming a reduction in vibration levels, including the rating, size, or type of equipment applicable to this experience criterion
Note: To qualify as ongoing work, the contract must be at least 75% complete.
3.1.3, Tab A3: Experience with Equipment Type 3: Turbines, and Large Pumps The offeror shall demonstrate recent, (on-going work completed within the past 5 years) experience for supplying and installing new turbine runners, repairing existing runners of different design for turbines with a size of at least the following: 110-inch diameter runner for Francis turbines. For runner repair work, the scope of the project shall include complete unit disassembly and reassembly. The offeror shall submit the following information for 3-10 1-2 unique projects:
1. Customer Organization, primary point of contact and position held, address, phone, and email;
2. Contract Number, if applicable;
3. Location (powerhouse name) and State or Country;
4. Date contract and/or Work began;
5. Date item of equipment was delivered or repairs, refurbishment, or rehabilitation were substantially completed
6. Indicate if prime or subcontractor on project;
7. A brief explanation of what was manufactured or what repairs were performed including the rating, size, or type of equipment applicable to this experience criterion Note: To qualify as ongoing work, the contract must be at least 25% complete.
3.2 Volume 1, TECHNICAL, TAB B: Factor 2: Past Performance
3.2.1, Tab B1: List of Contracts: The offeror shall provide a list of contracts submitted in response to Factor 1, Recent Relevant Experience, which are similar in size, scope and complexity, for projects currently on-going or completed within the last 5 years. This list shall include:
1. Contract Number
2. Contract Value
3. Contracting Office
4. Contracting Officer (or Point of Contact) – include phone number and e-mail address
5. Indication if a past performance evaluation exists in the Past Performance Information Retrieval System (PPIRS)
The offeror shall ensure correct phone numbers and email addresses are provided for the client point of contact for each contract submitted.
3.2.12, Tab B2: Past Performance Questionnaire (PPQ): Each offeror shall provide at least seven (7) PPQ’s utilizing the form attached (See Attachment Volume 1 – Tab B Past Performance Questionnaire) for same projects submitted in response to Factor 1, Recent Relevant Experience. A minimum of four PPQ’s shall be for projects representing Type 1 equipment and a minimum of three PPQ’s shall be for projects representing Type 2 equipment. The offeror is responsible for ensuring that the Contracting Officer has received the minimum stated PPQ’s for Equipment Type 1 and 2 prior to the date/time stated in the solicitation.
1. Complete Part I of the Contractor Performance Questionnaire and forward to the seven (7) references and have them returned as specified on the form (See Attachment Volume 1 – Tab B Past Performance Questionnaire). The references used for Past Performance must be among those listed in List of Recent and On-going Contracts as submitted for Tab B1 above. There is also a sample Transmittal Letter you may use for the Past Performance Questionnaire.
2. During past performance evaluation, the Government reserves the right to consider information outside of the proposals for past performance of the offeror. The Government will consider information submitted by the offeror, as well as any other relevant and reliable information obtained from any other source (including information from Government personnel and databases). The Government will evaluate the currency and relevancy of the information, the source of the information, and general trends in performance, along with any other information, which may help the Government, assess performance risk. Information on significant problems encountered, customer dissatisfactions, and corrective actions taken should be provided. This evaluation of past performance is separate from the responsibility determination.
3. A significant achievement, unexplained or unresolved problem, or lack of relevant data may significantly impact the risk rating by the Source Selection Evaluation Board (SSEB). Therefore, it is incumbent upon the offeror to include all relevant information, including demonstrated corrective actions, in its proposal.
4. In addition to the project information requested in this section, the offeror shall also provide notification and information concerning any projects where its right to proceed was terminated for default during the last three years, or so state that there were none.
5. In rating past performance, the SSEB may consider available past performance information on predecessor companies, employment histories of key personnel, or major subcontractors performing key elements of the project.
3.3 Volume 1, Tabs C1-C3: Pricing Scenarios Technical Approach
SAMPLE PROJECT TECHNICAL SCENARIO:
The Offeror shall provide a technical approach report for this scenario. Technical approach report shall include the following:
First tier man day breakdown for direct labor utilizing the disciplines prescribed in the Fully Burdened
Labor Rate Schedule (Volume 2, Tab B) and list of direct materials required for this work.
Description of the technical work, including descriptions of procedures and methods to be used.
Procedures and methods description should demonstrate the offeror’s understanding of the steps required to execute the work.
Schedule showing durations and sequence of events undertaken in executing of the work.
Work breakdown structure.
This is the order in which the technical approach report will be written and priced (use the format in the table at Section B, Sample Project Price Proposal for pricing):
1. Review Available Information and Develop a Preliminary FEA Model of Generator
a. Review generator drawings and previously completed analyses and testing reports
b. Develop preliminary FEA model of generator (mechanical and electromagnetic models)
2. Perform Field Testing to Determine Resonant Reponses
a. Develop testing procedures for field work
b. Cost Associated with Travel to Site
c. Inspect and obtain more detailed data for model of generator as necessary
i. Photos, measurements, etc.
d. Perform open circuit vibration testing
i. Install instrumentation
ii. Perform testing and gather data
e. Perform short circuit vibration testing
i. Supply and install shorting cables
ii. Perform testing and gather data
f. Perform stator resonant frequency testing
i. Supply instrumentation
ii. Perform testing and gather data
g. Perform operational vibration testing at various loads
i. Supply instrumentation
ii. Perform testing and gather data
3. Apply test data to Generator model (mechanical and electromagnetic)
a. Confirm accuracy of model
b. Confirm frame resonance calculations
c. Calculate MMF force harmonics
4. Develop Possible Solutions to Vibration and Noise Problems using refined generator model
a. Develop a range of solutions and test effectiveness of each using refined generator model developed above
b. Develop ROM costs for each of the solutions
5. Prepare Final Analysis Report, including Solution Ranking Recommendations
GENERATOR INSPECTION AND STATOR VIBRATION REDUCTION SERVICES
Generator No. 4 at J. Strom Thurmond Powerhouse is suffering from severe core vibration. Previous attempts to reduce the core vibration levels have been unsuccessful. The unit needs to be fully repaired and returned to reliable service. The generator is rated 44,444 kVA, 0.90 power factor, three-phase, 60 Hz, 100 rpm and 13,800 volts. The generator is guaranteed for continuous operation at 115% of nameplate kVA. The generator was manufactured by General Electric Corporation and began operation in 1953. The generator is designed for star connection of the stator winding with each phase consisting of six parallel paths of 27 five turn coils. There are 486 slots in the stator core. The core is approximately 51" in height with a bore diameter of 326.5".
Technical approach will substantially reduce the vibration of the stator. This includes performing all required reviews of existing drawings and test reports, development of computer models necessary for the mechanical and electromagnetic analysis of the generator including:
Air gap flux harmonics, performing the required analysis and developing an engineering report of the simulation results.
Special field testing to determine the resonant response of the stator core to both field mmf and stator mmf excitation of vibration.
Analysis of test results and comparison with the analytical results.
Development of proposed solutions.
Preparation of a recommendations report containing the results of the work described.
The RFP provides that Factor 3 is less important than Factors 1 and 2. It may also include verification of an offeror’s price, and exchanges with the offeror to determine whether it has an acceptable understanding of the difficulties that may be encountered in performing the work described.
3.3. 2 Volume 1, Tab C1 – PRICING SCENARIO 1:
The Offeror shall provide a price proposal for this scenario. Price proposal shall include a first tier cost breakdown for direct labor, direct material, direct other, overhead, and profit. A price proposal shall also include a work breakdown structure for direct labor applying the rates proposed in the Fully Burdened Labor Rate Schedule. For major equipment items, include manufacturing and factory locations with proposed costs.
GENERATOR INSPECTION AND REHABILITATION SUPPORT SERVICES
A generator in a Powerhouse has failed. Investigation by the project indicates that extensive damage exists in the stator winding and core requiring complete replacement of both. No soleplate work or stator frame modifications are anticipated. The rotor winding is intact with no repairs required. The unit needs to be fully repaired and returned to reliable service. The generator is rated 131,759 kVA, 0.95 power factor, three-phase, 60 Hz, 90 rpm and 13,800 volts. The generator is guaranteed for continuous operation at 115% of nameplate kVA. The generator was manufactured by General Electric Corporation and began operation in 1975. The generator is designed for star connection of the stator winding with each phase consisting of three parallel paths of 52 single turn coils with Roebel transposition. There are 468 slots in the stator core.
The work will consist of the following:
Perform all work to completely repair the stator. This includes performing all factory and field work associated with replacing the stator core and winding, including disassembly and reassembly of the unit. Special field testing is also included. For site work, the Contractor shall employ qualified personnel (to include crane operators, riggers, skilled craftsmen) and provide dedicated individuals for site supervision, quality control and safety and health compliance for all shifts worked. Lifting devices for major parts will be furnished by the Government. Corps personnel will un-water the unit, maintain the unit in an un-watered condition during work, and re-water the unit after completion of work. Oil handling (draining and filling) will be performed by Corps personnel. Clean-up and disposal of residual oil shall be performed by the Contractor.
Work shall be completed within or less than 13 calendar month duration for this scenario. The Contractor's work schedule shall not exceed two ten (10) hour shifts per day, six (6) days per week.
The work in this Scenario shall meet the following Performance Objectives:
PERFORMANCE REQUIREMENTS SUMMARY PRICING SCENARIO 1:
GENERATOR INSPECTION AND REHABILITATION SUPPORT SERVICES
Performance Objective
Standard
Allowed Number of Discrepancies
Surveillance
Field Work and Special Field Testing
Completion of all field work to completely repair the unit. Special field testing results meet or exceed guarantee efficiency requirements
100% Review of testing results
100% inspection
Supply COR/ Windings
Contractor passes all necessary required material and performance testing required to completely repair the unit
3.3. 3 Volume 1, Tab C2 – PRICING SCENARIO 2:
The Offeror shall provide a price proposal for this scenario. Price proposal shall include a first tier cost breakdown for direct labor, direct material, direct other, overhead, and profit. A price proposal shall also include a work breakdown structure for direct labor applying the rates proposed in the Fully Burdened Labor Rate Schedule. For major equipment items, include manufacturing and factory locations with proposed costs.
GENERATOR INSPECTION AND STATOR VIBRATION REDUCTION SERVICES
A generator is suffering from severe core vibration. Previous attempts to reduce the core vibration levels have been unsuccessful. The unit needs to be fully repaired and returned to reliable service. The generator is rated 131,759 kVA, 0.95 power factor, three-phase, 60 Hz, 90 rpm and 13,800 volts. The generator is guaranteed for continuous operation at 115% of nameplate kVA. The generator was manufactured by General Electric Corporation and began operation in 1975. The generator is designed for star connection of the stator winding with each phase consisting of three parallel paths of 52 single turn coils with Roebel transposition. There are 468 slots in the stator core.
The work will consist of the following:
Perform all work to substantially reduce the vibration of the stator. This includes performing all required reviews of existing drawings and test reports, development of models necessary for the mechanical and electromagnetic analysis of the generator, special testing to determine the resonant response of the…