About this file

SPEC Vol 1 Amd 9

View the file

Other files

File Type Posted
amd9.pdf PDF
13R18vol1.pdf PDF
13R18vol1.pdf PDF
amd8.pdf PDF
W912HN-13-R-0018_V2.PDF PDF
W912HN-13-R-0018_V1.PDF PDF
W912HN-13-R-0018_AMD7_V2.PDF PDF
13R18vol3.pdf PDF
13R18vol1.pdf PDF
13R18vol2.pdf PDF
W912HN-13-R-0018_AMD7_V1.PDF PDF
amd7.pdf PDF
Amd6.pdf PDF
W912HN-13-R-0018_AMD5_V1.PDF PDF
W912HN-13-R-0018_AMD5_V2.PDF PDF
13R18vol3.pdf PDF
amd5.pdf PDF
13R18vol2.pdf PDF
13R18vol1.pdf PDF
W912HN-13-R-0018_AMD5_V4.pdf PDF
13R18vol1.pdf PDF
C-201_to_C-205_Bidder_Inquiry.pdf PDF
amd4.pdf PDF
W912HN-13-R-0018_AMD2_V4.PDF PDF
13R18vol3.pdf PDF
13R18vol1.pdf PDF
13R18vol2.pdf PDF
amd2.pdf PDF
13R18vol3.pdf PDF
amd1.pdf PDF
13R18vol1.pdf PDF
W912HN-13-R-0018_V2.PDF PDF
W912HN-13-R-0018_V1.PDF PDF
13R18vol3.pdf PDF
13R18vol2.pdf PDF
W912HN-13-R-0018_V2.PDF PDF
W912HN-13-R-0018_V4.PDF PDF
13R18vol1.pdf PDF
W912HN-13-R-0018_V3.PDF PDF
W912HN-13-R-0018_V2.PDF PDF
W912HN-13-R-0018_V1.PDF PDF
W912HN-13-R-0018_V3.PDF PDF
13R18vol2.pdf PDF
13R18vol1.pdf PDF
W912HN-13-R-0018_V4.PDF PDF
13R18vol3.pdf PDF
APPROVED_J_A_EC02_OxygenSpeeceCones.pdf PDF
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Savannah, Georgia

Solicitation Number

W912HN-13-R-0018

SHEP Dissolved Oxygen Injection System Volume 1 of 3: Sections 00010 through 00800 and Technical Provisions - Divisions 01 through 04 October 2014

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

CORPS OF ENGINEERS

100 WEST OGLETHORPE AVENUE

SAVANNAH, GEORGIA 31401-3640

US Army Corps of Engineers Savannah District

Dissolved Oxygen Injection Systems 13R18 Savannah, GA

(Revised by Amendment 0008)

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 22 00 *1 DELETED MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 32 17.00 NETWORK ANALYSIS SCHEDULES (NAS)

01 33 00 SUBMITTAL PROCEDURES

01 35 26 *8 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 45 00.10 10 QUALITY CONTROL SYSTEM (QCS)

01 45 35 SPECIAL INSPECTIONS

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 20.00 10 ENVIRONMENTAL PROTECTION

01 57 16 *1 TEMPORARY PEST CONTROL

01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 86 26 RELIABILITY CENTERED ACCEPTANCE FOR ELECTRICAL SYSTEMS

01 91 00 COMMISSIONING

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

03 45 33 PRECAST STRUCTURAL CONCRETE

DIVISION 04 - MASONRY

04 20 00 MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 19 OPEN WEB STEEL JOIST FRAMING

05 40 00 COLD-FORMED METAL FRAMING

05 51 00 METAL STAIRS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 14 00 FLUID-APPLIED WATERPROOFING

07 21 13 BOARD AND BLOCK INSULATION

07 22 00 ROOF AND DECK INSULATION

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 72 00 ROOF VENTILATORS, GRAVITY-TYPE

07 92 00 JOINT SEALANTS

(Revised by Amendment 0008)

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 33 23 OVERHEAD COILING DOORS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 51 00 ACOUSTICAL CEILINGS

09 90 00 PAINTS AND COATINGS

09 97 13.26 COATING OF STEEL WATERFRONT STRUCTURES

09 97 23 *2 DELETED METALLIC TYPE CONDUCTIVE/SPARK RESISTANT

CONCRETE FLOOR FINISH

DIVISION 10 - SPECIALTIES

10 14 01 EXTERIOR SIGNAGE

10 14 02 INTERIOR SIGNAGE

10 44 16 FIRE EXTINGUISHERS

10 56 13 STEEL SHELVING

DIVISION 12 - FURNISHINGS

12 31 00 MANUFACTURED METAL CASEWORK

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING

23 00 00 AIR SUPPLY AND DISTRIBUTION

23 03 00.00 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 08 00.00 10 COMMISSIONING OF HVAC SYSTEMS

23 09 53 SPACE TEMPERATURE CONTROL SYSTEMS

23 31 13.00 METAL DUCTS

23 37 13.00 DIFFUSERS, REGISTERS, AND GRILLS

23 82 02.00 10 UNITARY HEATING AND COOLING EQUIPMENT

DIVISION 26 - ELECTRICAL

26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 13.00 MEDIUM-VOLTAGE CABLES (5KV)

26 05 19.00 10 INSULATED WIRE AND CABLE

26 08 00 APPARATUS INSPECTION AND TESTING

26 09 23.00 LIGHTING CONTROL DEVICES

26 11 13.00 MEDIUM VOLTAGE SWITCHGEAR (5 KV)

26 18 23.00 MEDIUM-VOLTAGE SURGE ARRESTERS (5KV)

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 23 00.00 LOW VOLTAGE SWITCHGEAR (600V)

26 24 16.00 PANELBOARDS

26 24 19.00 MOTOR CONTROL CENTERS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

(Revised by Amendment 0008)

26 29 24 MEDIUM VOLTAGE VARIABLE FREQUENCY DRIVE SYSTEMS

26 41 00.00 LIGHTNING PROTECTION SYSTEM

26 42 13.00 CATHODIC PROTECTION BY GALVANIC ANODES

26 51 00.00 INTERIOR LIGHTING

26 52 00.00 EMERGENCY LIGHTING

26 56 00.00 EXTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 15 19 WIRE LINE DATA TRANSMISSION SYSTEM

27 21 10 FIBER OPTIC DATA TRANSMISSION SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 05 26.00 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY

28 23 23 *5 DELETED NETWORK VIDEO SECURITY

28 31 74.00 INTERIOR FIRE DETECTION AND ALARM SYSTEM

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 00 CLEARING AND GRUBBING

31 32 11 SOIL SURFACE EROSION CONTROL

31 32 39 BIOENGINEERING PRACTICES FOR STREAM BANK AND SHORELINE

STABILIZATION

31 41 16 STEEL SHEET PILING

31 62 16.16 STEEL H-PILES

31 62 19.13 WOOD MARINE PILES

31 63 36 HELICAL PILES

31 68 13 SOIL AND ROCK ANCHORS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE

32 15 00 AGGREGATE SURFACE COURSE

32 16 13 CONCRETE DITCHES AND CURBS AND GUTTERS

32 31 13 *5 CHAIN LINK FENCES AND GATES

32 32 23 SEGMENTAL CONCRETE BLOCK RETAINING WALL

DIVISION 33 - UTILITIES

33 40 00 STORM DRAINAGE UTILITIES

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 20 23 DREDGING

DIVISION 4 - PROCESS INTEGRATION

40 05 13 PIPELINES, LIQUID PROCESS PIPING

40 17 26.00 WELDING PRESSURE PIPING

40 95 00 PROCESS CONTROL

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

(Revised by Amendment 0008)

41 22 13.13 JIB CRANE SYSTEM

DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION, AND STORAGE

EQUIPMENT

43 00 01 TESTING, ADJUSTING, AND BALANCING FOR PROCESS

43 08 00.00 10 COMMISSIONING OF PROCESS SYSTEMS

43 13 10 OXYGEN GENERATION SYSTEMS

43 16 00 SPEECE CONES

43 21 30 SUMP PUMPS

43 21 39 PUMPS: WATER, VERTICAL TURBINE

DIVISION 46 - WATER AND WASTEWATER EQUIPMENT

46 21 12 STOP GATES, GUIDES, LIFTING BEAMS, AND STORAGE RACKS

46 21 51 TRAVELING WATER SCREENS & RETURN TROUGHS (FISH HANDLING

DUAL FLOW SCREEN)

46 21 71 TRASH RAKE SYSTEMS

APPENDICES

Appendix A *2 Speece Cone Scope of Supply and Price Appendix B *2 GA DNR Letter Of Authorization

-- End of Project Table of Contents --

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

CONSTRUCTION OF DISSOLVED OXYGEN INJECTION SYSTEMS AS PART OF THE SAVANNAH HARBOR EXPANSION PROJECT

Per revisions addressed in this amendment, ( see SF 30 continuation page) please revise and resubmit Factor 3 – Summary Schedule of your proposal and pricing. Please utilize most recent conformed solicitation section 00010 to submit revised pricing. Please submit your complete response by 2:00 local time, May 27, 2015. Submissions shall be submitted electronically via ARMDEC SAFE. Instructions for how to submit in ARMDEC SAFE can be found in the solicitation.

Title the file in the follow ing format:

W912HN-13-R-0018_COMPANY NAME_ AMENDMENTRESPONSE

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-May-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN-13-R-0018

X 9B. DATED (SEE ITEM 11)

01-Oct-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-May-2015

CODE

U.S. ARMY ENGINEER DISTRICT, SAVANNAH

100 WEST OGLETHORPE AVE

SAVANNAH GA 31401-3640

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN-13-R-0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

CHANGES

A. CONTRACT CHANGES: The following information has been revised:

Section 00100 paragraph 6.2.1,

6.2.1 Proposed Contract Duration: The maximum allowed duration is 820 calendar days from issuance of Notice to Proceed (NTP). However, the maximum allowed construction duration for the Lower DO System at Hutchinson Island is 450 days after issuance of NTP. The maximum allowed construction duration for the Upper DO System at the McIntosh DO Plant is 820 days after issuance of NTP. The Government may take into account how well the summary schedule supports the duration, as well as use other information, such as but not limited to, independent judgment concerning logic, constraints and typical construction durations. An offer which proposes contract duration longer than the maximum allowed duration will not be accepted by the Government.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 820 calendar days from issuance of Notice to Proceed (NTP).* The time stated for completion shall include final cleanup of the premises.

*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $10,699.81 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

B. TECHNICAL SPECIFICATION CHANGES: None

C. CONTRACT DRAWINGS: None

ATTACHMENT 1 TO SECTION 00800

LIST OF ATTACHMENTS

Attachment 1 - 1 (Revised by Amendment 0005)

Project Sign

Project Sign Legend Defined

Project Sign Erection Detail

Safety Performance Sign

Corps of Engineers Logo

Minimum Basic Outline for Accident Prevention Plans (EM 385-1-1, App A)

Small and Disadvantaged Business Subcontracting Plan

Weekly Temporary Electrical Inspection

Minimum Standard for Temporary Electrical Service (Ref. FAR 52.236-14)

SAS FL 363 - Foundation Data

SAS Form 9 - Activity Hazard Analysis

SAD Form 1437a-R - Safety Checklist for Floating Plant

SAD Form 1437b-R - Safety Checklist for Launches, Motorboats, and Skiffs

SAD Form 1666a-R - Safety Checklist for Crawler, Truck & Wheel Mounted Cranes

SAD Form 1666d-R Safety Checklist for Control of Hazardous Energy

(Lockout/Tagout)

SAD Form 1666d-R Safety Checklist for Motor Vehicles, Trailers, and Trucks

SAD Form 1666d-R Safety Checklist for Safe Access and Fall Protection

SAD Form 1666d-R Safety Checklist for Scaffolds - Other Types

SAD Form 1666e-R Safety Checklist for Contract Diving Operations

SAD Form 1666e-R Safety Checklist for Crawler Tractors and Dozers

SAD Form 1666e-R Safety Checklist for Cutting/Welding Operations

SAD Form 1666e-R Safety Checklist for Demolition Operations

SAD Form 1666e-R Safety Checklist for Forms, Falsework, and Concrete

Operations

SAD Form 1666e-R Safety Checklist for Marine Safety Inspections

SAD Form 1666e-R Safety Checklist for Permit Required Confined Spaces (PRCS)

SAD Form 1666e-R Safety Checklist for Personal Protective Equipment

SAD Form 1666e-R Safety Checklist for Portable Ladders

SAD Form 1666e-R- Safety Checklist for Portal, Tower, and Pillar Cranes

Attachment 1 - 2 (Revised by Amendment 0005)

SAD Form 1666e-R Safety Checklist for Rigging

SAD Form 1666e-R Safety Checklist for Sanitation/Housekeeping

SAD Form 1666e-R Safety Checklist for Scaffolds - Metal Frame

SAD Form 1666f-R - Safety Checklist for Scrapers, Motor Graders, and Other

Mobile Equipment

SAD Form 1666e-R Safety Checklist for Structural Steel Erection

SAD Form 1666e-R Safety Checklist for Tree Work, Maintenance, or Removal

Operations

SAD Form 1666e-R Safety Checklist for Trenching and Excavation Competent

Person

SAD Form 1666e-R Safety Checklist for Trenching and Excavation Operations

SAD Form 1666f-R Safety Checklist for Crane Inspections

SAD Form 1666g-R - Safety Checklist for Material Hoists

SAD Form 1666h-R - Safety Checklist for Earth Drilling Equipment

DA Form 5418-R - Cost Estimate Analysis

DD Form 1354 - Transfer and Acceptance of Military Real Property

DD Form 1532 - Pest Management Report

DD Form 1532 - Pest Management Maintenance Record

DHS Form I-9 - Employment Eligibility Verification

ENG Form 27 - Report of Operations -- Hopper Dredges

ENG Form 1619 - Plant And Equipment Schedule

ENG Form 2454 - Construction Progress Chart

ENG Form 3394 – Accident Investigation Report

ENG Form 4025 - Transmittal of Shop Drawings, Equipment Data, Material

Samples, or Manufacturer's Certificates of Compliance

ENG Form 4055 - Riprap Gradation Curves

ENG Form 4267 - Report of Operations - Pipeline, Dipper or Bucket Dredges

Endangered Species Protection And Awareness Program

Hydrographic Survey Certification

Real Property Inventory and BIS Worksheet

Attachment 1 - 3 (Revised by Amendment 0005)

Landfill Permit Application

Sighting Information

Manatee Habitat/Construction Area Sign Details

Standard Form LLL-A - Disclosure of Lobbying Activities

AF3952 - Contractor HazMat Authorization, Inventory, and Usage Form

Contractor-Furnished Spoil, Disposal Areas

Contractor Hazardous Material Inventory Log (EPRCA)

Form PPQ - Past Performance Questionnaire (fillable)

GA EPD Letters

*5 SHEP DO Stream Buffer Variance - Downriver

SHEP DO Stream Buffer Variance - Upriver

PROJECT SIGN LEGEND DEFINED

Legend Group 1: The words:

"Construction or "Design and Construction Supervised by:" Supervised by:"

shall be placed on two lines using black, 1.25" Helvetica regular typeface.

Maximum line length is 19".

10.5" Reverse Signature: The Corps symbol shall be a 10.5" white reverse signature using a 6" castle on a red background. The castle and surrounding border lines shall be white. The castle windows, door, and logo background are to be red. The words "U.S. Army Corps of Engineers" shall be black.

Legend Group 2: The words:

"Savannah District South Atlantic Division" shall be placed on two lines below the 10.5" reverse signature, using black, 1.25" Helvetica regular typeface.

Legend Group 3: The "Name of Project" shall be placed on one to three lines using white 3" Helvetica bold typeface. Maximum line length is 42".

Legend Group 4: The "Army Installation" shall be a one or two line identification of the facility or name of the sponsoring department.

Lettering is to be white, 1.5" Helvetica regular typeface. Maximum line length is 42".

NOTE: Cross-align the first line of legend group 4 with the first line of the Corps signature (U.S. Army Corps) as shown.

Legend Group 5a: The words:

"Architects:" or "Engineers:" or "Architect-Engineers:"

shall be a one to five line identification of the prime architect or engineering corporate or firm name, city, and State. Lettering shall be white, 1.25" Helvetica regular typeface. Maximum line length is 21".

Legend Group 5b: The "Contractor:" shall be a one to five line identification of the prime Contractor corporate or firm name, city, and State. Include type of Contractor, i.e. General Contractor, etc. Lettering shall be white, 1.25" Helvetica regular typeface. Maximum line length is 21".

NOTE: All typography shall be flush left and rag right, upper and lower case with initial capitals only as shown.

Safety Performance Sign EP 310-1-6a 01 Jun 06

16-3

Each contractor’s safety record is to be posted on Corps managed or supervised construction projects and mounted with the Construction Project Identification sign specified on page 16-2.

The graphic format, color, size and type-faces used on the sign are to be repro-duced exactly as specified below. The title with First Aid logo in the top section of the sign, and the performance record captions are standard for all signs of this type. Legend groups 2 and 3 below identify the project and the contractor and are to be placed on the sign as shown.

Safety record numbers are mounted on individual metal plates and are screw-mounted to the background to allow for daily revisions to posted safety perfor-mance record.

Special applications or situations not covered in these guidelines should be referred to the district Sign Program Manager.

Legend Group 1: Standard two-line title “Safety is a Job Requirement” with 8” (outside diameter) Safety Green first aid logo.

Color: To match Pantone system 347 Typeface: 3" Helvetica Bold Color: Black

Legend Group 2: One- to two-line project title legend describes the work being done under this contract and name of host project.

Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"

Legend Group 3: One- to two-line identifica-tion: name of prime contractor and city, state address. Color: Black Typeface: 1.5" Helvetica Regular Maximum line length: 42"

Legend Group 4: Standard safety record captions as shown.

Color: Black Typeface: 1.25” Helvetica Regular

Replaceable numbers are to be mounted on white .060 aluminum plates and screw-mounted to background.

Color: Black Typeface: 3" Helvetica Regular Plate size: 2.5" x 4.5"

All typography is flush left and rag right, upper and lower case with initial capitals only as shown. Letter- and word-spacing to follow Corps standards as specified in Appendix D.

3” 33.030” eq. 8” eq.

6”

4.5”

10.5”

2.25” 3”

2.25” 3”

4.875”

4.875”

6.75”

4.875” .75” 4.875”

4.5”

3”

3” 42” 3”

2.25” 2.25” 2.25” 2.25”

.75”

3”

.75”

Sign Legend Panel Post Specification Mounting Color Type Size (A) Size Size Code Height Bkg/Lgd

CID-02 various 4’x4’ 4”x4” HDO-3 48” WH/BK-SG

CORPS OF ENGINEERS LOGO

HALF SIZE

SAMPLE SMALL BUSINESS SUBCONTRACTING PLAN

Mar 2003, Revised Nov 2004

DATE: __________

CONTRACTOR: ______________________________________________________________

ADDRESS: ___________________________________________________________________

SOLICITATION/CONTRACT NO: _______________________ CONTRACT AMOUNT $_________________

DESCRIPTION: ______________________________________________________________

Our firm has established a policy to afford Small Business concerns (SB), Small Disadvantaged Business concerns (SDB), Women-Owned Small Business concerns (WOSB), Veteran-Owned Small Business concerns (VOSB), Service Disabled Veteran-Owned Small Business concerns (SDVOSB), Historically Black Colleges and Universities/Minority Institutions (HBCU/MI) and HUBZone Small Business (HSB) concerns opportunities to participate in all contracts with the Department of Defense or other entities, both public and private. In most instances, HBCU/MI are not applicable to construction contracts, but will be included throughout this plan with the intent to involve them whenever possible. The following, together with any attachments, is hereby submitted as a Small Business Subcontracting Plan to satisfy the applicable requirements of Public Law 95-507, Public Law 99- 661, Section 1207, and Public Law 100-180, Section 806.

1. (a) BASE BID ONLY: The following percentage goals (expressed in terms of a percentage of total planned subcontracting dollars) and dollar amounts are applicable to the contract cited above or to the contract awarded under the solicitation cited. Total Base Bid is $______________________.

(i) Total Planned Subcontracting Dollars $_____________________

(ii) Small Business concerns (SB): ______% or $___________ of total planned subcontracting dollars under this contract will be awarded to subcontractors who are SB.

(iii) Small Disadvantaged Business concerns (SDB): ______% or $_____________ of total planned subcontracting dollars under this contract will be awarded to subcontractors who are small concerns owned and controlled by socially and economically disadvantaged individuals and appear on the Small Business Administration’s list (accessed through www.CCR.Gov. Select “Dynamic Small Business Search” to access the SBA small business source system.) This percentage is included in the percentage shown under 1 (a)(i) above, as a subset.

(iv) Women-Owned Small Business concerns (WOSB): ______% or $_____________ of total planned subcontracting dollars under this contract will be awarded to subcontractors who are WOSB. This percentage is included in the percentage shown under 1.(a)(i) above, as a subset.

(v) Veteran-Owned Small Business concerns (VOSB): ______% or $____________ of total planned subcontracting dollars under this contract will be awarded to subcontractors who are VOSB. This percentage is included in the percentage shown under 1 (a) (i) above, as a subset.

(vi) Service-Disabled Veteran-Owned Small Business concerns (SDVOSB): ______% or $_____________ of total planned subcontracting dollars under this contract will be awarded to subcontractors who are SDVOSB. This percentage is included in the percentage shown under 1 (a) (i) above.)

(vii) Historically Black Colleges and Universities/Minority Institutions (HBCU/MI):

______% or $_____________ of total planned subcontracting dollars under this contract will go to HBCU’s who are an institution determined by the Secretary of Education to meet the requirements of 34 CFR 608.2, the term also includes any nonprofit research institution that was an integral part of such a college or university before November 14, 1986; or MI’s who are an institution of higher education meeting the requirements of Section 1046(3) of the Higher Education Act of 1965 (20 U.S.C. 1135d-5(3)) which, includes a Hispanic-serving institution of higher education as defined in Section 316(b)(1) of the Act (20 U.S.C. 1059c(b)(1)). This percentage is included in the percentage shown under 1.(a)(i) above, as a subset.

(viii) HUBZone Small Business concerns: ______% or $______________ of total planned subcontracting dollars under this contract will go to subcontractors who are small business concerns located in a historically underutilized business zone which is an area located within one or more qualified census tracts, qualified non-metropolitan counties, or lands within the external boundaries of an Indian reservation and appear on the Small Business Administration’s HUBZONE web site at www.SBA.Gov/HUBZONE. This percentage is included in the percentage shown under 1.(a)(i) above, as a subset.

The following principal products and/or services will be subcontracted under the Base Bid of this contract, and the distribution among Large Business, Small Business, Small Disadvantaged Business, Woman-Owned Small Business, Veteran-Owned Small Business, Service Disabled Veteran-Owned Small Business Historically Black Colleges and Universities/Minority Institutions, and HUBZone Small Business is as follows: (Check all that apply)

Subcontractor Name

Product or Service

Large Business

Small

SDB

WOSB

VOSB

SDVOSB

HBCU/

MI

HSB

(ATTACHMENT MAY BE USED IF ADDITIONAL SPACE IS REQUIRED)

The above-named SB and SDB firms denoted by * are performing a significant portion of the effort or are providing a major service or component of this project. In accordance with Section 00800, the above-named firms will be utilized on the contract.

(b) OPTIONS: You must include a separate goal for each option. See the attached Continuation Sheets for Paragraph 1(a) for each option)

(c) The following method was used in developing subcontract goals (i.e., Statement explaining how the product and service areas to be subcontracted were established, how the areas to be subcontracted to small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns were determined, and how small business, veteran-owned small business, HUBZone small business, small disadvantaged business and women-owned small business concerns' capabilities were determined, to include identification of source lists utilized in making those determinations. Also a statement as to what efforts will be taken to improve on past goals and how SB and SDB firms will be included in areas without previous SB/SDB involvement).

(d) Indirect and overhead costs (check one): ____ have been _____ have not been included in the goals specified in 1(a) and 1(b).

(e) If "have been" is checked, explain the method used in determining the proportionate share of indirect and overhead cost to be allocated as subcontracts to small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns.

2. The following individual will administer the subcontracting program:

Name & Title: _____________________________________________________________

Address & Telephone: _______________________________________________________

This individual's specific duties, as they relate to the firm's subcontracting program, are as follows:

General overall responsibility for this company's Small Business Program, the development, preparation and execution of individual subcontracting plans and for monitoring performance relative to contractual subcontracting requirements contained in this plan, including but not limited to:

(a) Developing and maintaining offerors/bidders lists of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns from all possible sources. Our firm may rely on the information contained in the SBA Small Business Source System, as an accurate representation of a concern’s size and ownership characteristics for the purposes of maintaining a small business, veteran-owned small, service-disabled veteran-owned small, HUBZone small, small disadvantaged and women-owned small business source list. The Small Business Administration’s (SBA’s) list of Small Disadvantaged Businesses and small HUBZone businesses can be accessed through www.CCR.Gov. Select “Dynamic Small Business Search” to access the SBA small business source system.

(b) Ensuring that procurement packages are structured to permit small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns to participate to the maximum extent possible.

(c) Assuring inclusion of small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns in all solicitations for products or services that they are capable of providing.

(d) Reviewing solicitations to remove statements, clauses, etc., which may tend to restrict or prohibit small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business participation, including recommendations to set aside competitions for SDB’s

(e) Ensuring periodic rotation of potential subcontractors on bidders’ lists.

(f) Ensuring that the bid proposal review board documents its reasons for not selecting low bids submitted by small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns.

(g) Ensuring the establishment and maintenance of records of solicitations and subcontract award activity.

(h) Attending or arranging for attendance of company counselors at Business Opportunity Workshops, Minority Business Enterprise Seminars, Trade Fairs, etc.

(i) Conducting or arranging for conduct of motivational training for purchasing personnel pursuant to the intent of Public Laws 95-507, 99-661, and 100-180.

(j) Monitoring attainment of proposed goals.

(k) Preparing and submitting periodic subcontracting reports required, which will include Standard Form (SF) 294, Subcontracting Report for Individual Contracts, and SF 295, Summary Subcontract Report, in accordance with the instructions on the forms.

(l) Coordinating contractor's activities during the conduct of compliance reviews by Federal agencies.

(m) Coordinating the conduct of contractor's activities involving its small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business subcontracting program.

(n) Notifying the Contracting Officer or his representative in writing of any substitutions of firms that are not small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, or women-owned small business for the firms listed in the subcontracting plan.

(o) Additions to (or deletions from) the duties specified above are as follows:

3. The following efforts will be taken to assure that small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns will have an equitable opportunity to compete for subcontracts, including items not traditionally awarded to SB or SDB firms:

(a) Outreach efforts will be made by:

(i) Contacts with minority and small business trade associations such as veterans service organizations, the National Minority Purchasing Council Vendor Information Service, the Research and Information Division of the Minority Business Development Agency in the Department of Commerce.

(ii) Contacts with business development organizations.

(iii) Attendance at small and minority business procurement conferences and trade fairs.

(iv) Sources will be requested from Small Business Administration's Small Business Source System.

(v) Reviews to determine the competence, ability, experience and capacity available from SB and SDB firms and providing technical assistance to same.

(vi) Evaluations of our SB, SDB, WOSB, VOSB, SDVOSB and HUBZone award performance and program effectiveness against goals established company-wide.

(b) The following internal efforts will be made to guide and encourage buyers:

(i) Workshops, seminars and training programs will be conducted.

(ii) Activities will be monitored to evaluate compliance with this subcontracting plan, evaluating SB, SDB, WOSB, VOSB, SDVOSB and HUBZone award performance and program effectiveness.

(c) Small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concern source lists, guides and other data identifying small, small disadvantaged and women-owned small business concerns will be maintained and utilized by buyers in soliciting subcontracts.

(d) Additions to (or deletion from) the above listed efforts are as follows:

4. The offeror (contractor) agrees that the clause entitled "Utilization of Small Business Concerns" at FAR 52.219-8 will be included in all subcontracts that offer further subcontracting opportunities, and all subcontractors (except small business concerns) who receive subcontracts in excess of $550,000 ($1,000,000 in construction) will be required to adopt a subcontracting plan that complies with FAR 52.219-9. Such plans will be reviewed by comparing them with the provisions of Public Law 95-507, and assuring that all minimum requirements of an acceptable subcontracting plan have been satisfied. The acceptability of percentage goals shall be determined on a case-by-case basis depending on the supplies/services involved, the availability of potential small businesses, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small businesses, small disadvantaged businesses and women-owned small business subcontractors, and prior experience. Once approved and implemented, plans will be monitored through the submission of periodic reports, and/or, as time and availability of funds permit, periodic visits to subcontractors facilities to review applicable records and subcontracting program progress.

5. The offeror/contractor agrees to submit such periodic reports and cooperate in any studies or surveys as may be required by the contracting agency or the Small Business Administration in order to determine the extent of compliance by the offeror/contractor with the subcontracting plan and with the clause entitled "Utilization of Small Business Concerns," contained in the contract. The above reports will include Standard Form (SF) 294, Subcontracting Report for Individual Contracts, and SF 295, Summary Subcontract Report, in accordance with the instructions on the forms.

The offeror/contractor further agrees to ensure that its subcontractors agree to submit SF 294 and SF 295.

6. The offeror/contractor agrees that he will maintain at least the following types of records to document compliance with this subcontracting plan:

(a) Small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concern source lists, guides and other data identifying SB/SDB concerns.

(b) Organizations contacted for small, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small, small disadvantaged and women-owned small business sources.

(c) On a contract-by-contract basis, records on all subcontract solicitations over $100,000, indicating on each solicitation (i) whether small business concerns were solicited, and if not, why not; (ii) whether veteran-owned small business concerns were solicited, and if not, why not; (iii) whether service-disabled veteran-owned small business concerns were solicited, and if not, why not; (iv) whether HUBZone small business concerns were solicited, and if not, why not; (v) whether small disadvantaged business concerns were solicited, and if not, why not;

(vi) whether women-owned small business concerns were solicited, and if not, why not; and (vii) reasons for the failure of solicited small, veteran-owned small, service-disabled veteran-owned small, HUBZone small, small disadvantaged or women-owned small business concerns to receive the subcontract award.

(d) Records to support other outreach efforts: Contacts with veteran service organizations, Minority and Small Business Trade Associations, etc., and attendance at small and minority business procurement conferences and trade fairs.

(e) Records to support internal activities to guide and encourage buyers: Workshops, seminars, training programs, etc., monitoring activities to evaluate compliance.

(f) On a contract-by-contract basis, records to support subcontract award data to include name and address and business size of each subcontractor. Contractors having commercial plans need not comply with this requirement.

(g) Records to be maintained in addition to the above are as follows:

Signed: ________________________________________________ Date: ________________

Typed Name and Title: ______________________________________________________________

Plan Accepted by: ___________________________ Date: ______________ Contracting Officer

CONTINUATION OF PARAGRAPH 1(a)

(SUBMIT ADDITIONAL OPTION PAGES FOR EACH OPTION)

NAME OF OPTION: _______________________________________________________

Dollars Percents

1. Total option contract price ____________

2. Total to be subcontracted (to all types of businesses) ____________ 100%

a. To large business ____________ _______

b. To small business ____________ _______

i. To nondisadvantaged small business _____________ _______

ii. To veteran-owned small business _____________ _______ iii To service-disabled veteran-owned small business _____________ _______

iv. To HUBZone small business _____________ _______

v. To disadvantaged small business _____________ _______

vi. To women-owned small business _____________ _______

The following principal products and/or services will be subcontracted under Option 1 of this contract, and the distribution among LB, SB, SDB, WOSB, VOSB, SDVOSB, HBCU/MI, and HUBZone SB is as follows: (Check all that apply)

Product

1 NAME OF OPTION: __________________________________________________

1. Total option contract price ____________

2. Total to be subcontracted (to all types of businesses) ____________ 100%

a. To large business ____________ _______

b. To small business ____________ _______

i. To nondisadvantaged small business _____________ _______

ii. To veteran-owned small business _____________ _______ iii To service-disabled veteran-owned small business _____________ _______

iv. To HUBZone small business _____________ _______

The following principal products and/or services will be subcontracted under Option 2 of this contract, and

Product

2 NAME OF OPTION:__________________________________________________

1. Total option contract price ____________

2. Total to be subcontracted (to all types of businesses) ____________ 100%

a. To large business ____________ _______

b. To small business ____________ _______

i. To nondisadvantaged small business _____________ _______

ii. To veteran-owned small business _____________ _______ iii To service-disabled veteran-owned small business _____________ _______

iv. To HUBZone small business _____________ _______

The following principal products and/or services will be subcontracted under Option 3 of this contract, and

Product

WEEKLY TEMPORARY ELECTRICAL INSPECTION

Week ending ________________

Contract No. __________________________

Contract Description _______________________________________________________

The following items were inspected in accordance with requirements in National Electrical Code and Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1.

1. Wire (size, type, condition).

2. Systems and devices (polarity, continuity of ground, resistance to ground).

3. Resistance of ground rods (25 OHMS) measured and recorded.

4. Check GFI for 15/20 amp 120 volt circuits.

5. Plugs and receptacles (type, NEMA rating).

6. Circuit breakers and disconnect (size, type, weatherproof).

7. Extension cords (type, UL listed, insulation condition, splices, location).

8. Open wiring on insulators, nonmetallic sheathed cable, outside clearance (600 volts or less), Festoon lighting (as applicable).

Signature Electrician/Electrical Engineer

MINIMUM STANDARD FOR TEMPORARY ELECTRICAL SERVICE

(DIMENSIONS ARE APPROXIMATE)

A. The backboard for temporary service shall consist of not less than 1/2 inch plywood of exterior grade.

B. Numbers above correspond to the item below:

Item 1 - NEMA 3R circuit breaker type panelboard. This panelboard shall consist of 1 two-pole 60 amp main circuit breaker, 4* one pole 20 AMP branch circuit breakers, and 1* two pole 20 AMP branch circuit breaker. Breakers shall meet Federal Specifications Standards for Class 1A breakers and shall be plug-in type. (*Number of breakers to be adjusted to suit the job requirements.)

Item 2 - Duplex grounding type convenience outlets in standard utility type outlet boxes with covers, meeting the NEC and NEMA requirements for wet locations.

Connections to the branch circuit breakers shall be grounded by two conductors #12 NMC cable.

Item 3 – (Optional) A single three-conductor grounding type outlet rated for 250 volt service meeting the NEC and NEMA requirements for wet locations. Connections from this outlet to the two pole breaker shall be by two conductor grounded type NMC cable.

Item 4 - 3/4 inch PVC. This shall be used to support extension cords.

Item 5 – NEMA 3R service disconnect safety switch – 60 amp minimum.

C. The panelboard shall be grounded by #6 copper wire connected to a 3/4 inch by 10-foot long ground rod.

D. Service to the panel shall consist of three copper conductor #6 minimum service entrance cable. This cable may enter the top or side of the panelboard.

E. Periodic inspections of systems and devices will be made by the Contractor at intervals not to exceed 1 week, and a report will be submitted indicating the results.

F. All receptacle outlets that provide temporary electrical power during construction, remodeling, maintenance, repair, or demolition shall have ground-fault circuit-interrupter (CFCI) protection for personnel. GFCI protection shall be provided on all circuits serving portable electric hand tools or semi-portable electric power tools (such as block/brick saws, table saws, air compressors, welding machines, and drill presses). See EM 385-1-1 for exceptions.

G. Per EM 385-1-1 all temporary power distribution systems shall be submitted to the field office before installation.

FOUNDATION DATA

SAS FL 363 Page 1

Project Title: __________________________________________________________________

FY: _______________ L.I. _______________

Location: ____________________________________________________________________

A-E Firm: ____________________________________________________________________

A-E Phone No. ___________________________________

1. The following information is furnished relative to the foundation analysis for the subject project. (A separate CESAS FL 363 shall be completed for each structure involved in the project.)

a. Type of structural system: (Brief Statement)

b. General Scope: __________ feet by __________ feet # of stories ______ (Check applicable blocks below)

Slab-on Grade Basement Walls:

Crawl Space (1) Fixed at 1st Floor

Retaining Walls (2) Fixed at Footings

Areas Recessed below F.F. (Provide with info for Item 2. below)

c. Type of Foundation: (Check applicable blocks and fill in loads)

Mat. Foundation Approx. Max. Load on Mat. Foundation ________ K/SF

Spread Footings Approx. Max. Col. Load ________ Kips

Wall Footings Approx. Max. Wall Load ________ K/ft.

Foundation Walls Grade Beams

Rolled Edge Slab Combined Footings (See Item 2. below)

Piles Underpinning (See Item 2. below)

d. Other:

Pre-Engineered Building: Yes ______ No ______

Basement and/or Crawl Space Elevation: _______________ MSL

Finished Floor Elevation: _______________ MSL

FOUNDATION DATA

SAS FL 363 Page 2

2. Specific information and details pertinent to the foundation analysis are attached to this form.

3. Attached is one reproducible copy (Sepia or Cronaflex) of the detail site plan and a plan showing the location of columns and walls. (If the maximum column load exceeds 100 Kips or the maximum wall load exceeds 3 K/ft., the individual load, dead and live, for each footing shall be provided on the location plan of columns and walls.)

4. Boring locations will be determined by Savannah District personnel.

AE Representative Date

ACTIVITY HAZARD ANALYSIS

1. Phase of Construction

2. Location 3. Contract No. 4. Project

5. Prime Contractor 6. Date of Preparatory 7. Estimated Start Date

Potential Safety Hazard Procedure to Control Hazard

8. Contractor=s Representative (signature)

9.

SAS Form 9 1 Jan 82

SAFETY CHECKLIST FOR FLOATING PLANT

SAD Form 1437a-R Previous editions may be used for contract submittals prior to Nov 03.

Contract # and title:

Contractor:

Subcontractor:

Plant Name:

Owner:

Superintendent: Captain:

Engineer:

Number in crew:

Contract inspector:

Date inspected:

This checklist references EM 385 1-1, revised 3 November 2003 Yes No N/A

1. Is a copy of the current USCG Form 835 available for plants regulated by USCG? (19.A.01)

2. Is documentation of an accredited marine surveyor (SAMS or NAMS) available for non-USCG inspected plants? (19.A.01)

3. Do all officers and crew posses an appropriate USCG license or USACE license and certification? (19.A.02)

4. Are periodic inspections and test records of all floating plant, equipment, and machinery available as part of the official project file?

(19.A.01)

5. Is there a severe weather plan available which contains the following:

(19.A.03)

a. A description of potential types of severe weather hazards and steps to guard against the hazards?

b. The time frame for implementing the plan?

c. The name and location of the safe harbor?

d. The name of the vessels which will be used to move any non-self propelled plant, and their type, capacity, speed, and availability?

e. River gage readings at which floating plant must be moved away from dams, river structures, etc. to safe areas?

6. Is the station bill conspicuously posted throughout the vessel?

(19.A.04)

7. Has each crewmember been given a written description of their emergency duties and are they familiar with them? (19.A.04)

8. Have the following drills and tests been recorded in the station log?

(19.A.04)

a. Abandon ship drill?

b. Fire drill?

c. Man overboard drill?

d. Pump shell or pipe rupture?

e. Hull failure?

f. Emergency power and lighting tests?

8. (cont.) Have the following drills and tests been recorded in the station log? (19.A.04)

g. Bimonthly emergency power generator tests?

h. Bimonthly emergency lighting storage batteries tests?

Note: First set of drills shall be conducted within 24 hours of occupancy or commencement of work.

9. Are material safety data sheets (MSDSs) available for all hazardous materials on board? (06.B.01)

10. Are employees trained to handle hazardous materials? (06.B.01)

11. Are at least two employees on each shift certified in CPR and first aid? (03.A.02)

12. Is there a first aid log at each first aid station? (01.D.04)

13. Are first aid kits located in a readily accessible location and adequately stocked? (03.B.01 & .02)

14. Is there an adequate supply of approved, potable drinking water available? (02.A.01)

15. Are outlets dispensing non-potable water clearly marked “Water Unfit For Drinking, Washing or Cooking”? (02.A.07)

16. Are the proper numbers of toilets, washbasins and showers provided? (02.B.06 & .07)

17. Are water, soap, and a means of drying available? (02.C.02)

18. Is the latest information published by the USCG regarding aids to navigation available on board the vessel? (19.A.11)

19. Is the vessel equipped with: (19.A.05)

a. Fenders?

b. Axes or other emergency cutting equipment?

c. An appropriate navigational signal device?

d. General alarm system operated from primary electrical system with standby batteries on trickle charge?

e. Easily accessible emergency controls that are adequately protected against accidental operation?

f. Explosion-proof lights around gasoline and oil barges or other locations where a fire or explosive hazard exists?

g. Interconnected emergency alarms?

h. Smoke alarms in living quarters?

i. Carbon Dioxide CO monitors in all occupied spaces?

j. Doors that open from both sides?

k. Clearly marked emergency exits?

l. Emergency stops for prime movers operating a dredge pump?

m. GFCI protection on grounded 120 or 240-volt systems in toilet/shower spaces, galley, machinery spaces, weather deck, exterior or near any sinks?

n. Properly maintained and identified watertight compartments?

20. Fuel systems: (19.A.06)

a. Are tanks or lines free of gauge glasses or try cocks?

b. Do all fuel tanks have shutoff valves that can be operated outside the compartment in which the tank is located and outside the engine compartment and outside the house bulkheads at or above the weather deck?

c. Is there a shut off valve at the engine end of the fuel lines that are 6 feet or more in length and can it be operated from outside the house bulkheads at or above the weather deck?

d. Overboard discharge?

e. Are all carburetors on gasoline engines equipped with a backfire trap or flame arrestor?

f. Are all carburetors (except downdraft type) equipped with a drip pan, with flame screen, which is continuously emptied by suction from the intake manifold or if permitted by the overboard discharge?

g. Are fuel storage tanks diked or curbed IAW NAVFAC DM-22? If not are portable tanks used IAW USCG requirements in 46 CFR Parts 64 and 98.3?

21. Are cables which cross the waterways between floating plants or between plant and mooring marked? (19.A.07)

22. Is there a fire and emergency warning system (or an established fire watch) on all vessels where people are quartered? (19.A.07)

23. Are all floors, decks, and bilge’s free of accumulation of fuel and grease? (19.A.07)

24. Are there holdbacks or rings available to secure equipment during rough weather? (19.A.07)

25. Are all deck openings, elevated surfaces, and similar locations provided with guardrails, bulwarks, or taut cable guard lines?

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .