Pre Proposal Meeting Minutes 2009- W Kerr Scott.doc
DOC document 34 KB Posted
- Solicitation number
- W912HN-09-R-0003
About this file
Notes from W Kerr Scott Site Visit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions for Kerr.docx | DOCX document | |
| Questions concerning Operation and Maintenance of Corps of Engineer Lake Project-2.doc | DOC document | |
| Questions concerning Operation and Maintenance of Corps of Engineer Lake Projects.doc | DOC document | |
| Questions Concerning the W Kerr Project-2.doc | DOC document | |
| Questions Concerning the W Kerr Project-1.doc | DOC document | |
| CPAF Solicitation-Part 8.pdf | ||
| CPAF Solicitation-Part 2.pdf | ||
| CPAF Solicitation-Part 7.pdf | ||
| CPAF Solicitation-Part 1.pdf | ||
| CPAF Solicitation-Part 3.pdf | ||
| CPAF Solicitation-Part 6.pdf | ||
| CPAF Solicitation-Part 5.pdf | ||
| CPAF Solicitation-Part 4.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W. Kerr Scott Dam and Reservoir O&M Contractor Meeting Notes
February 26, 2009 9:00 a.m.
Present:
Terry Ramsey
Corps of Engineers
Gwyn Church
Corps of Engineers
Jory Shepherd
Corps of Engineers
Dave Green
Eureka NVT
Garry Tatum
Eureka NVT
Eric Harris
Ferguson Williams Larry Fatzer
JWK International
Sue Smith
RBS
Jeff Spenser
RBS
Terry Ramsey reviewed each section of TP’s in the Scope of Work and accepted questions as follows:
TP 1.19: Confusion about when draft plan and final plans are due.
Answer: Although final plans are allowed in the proposal only plans in draft format our required. Management Proposals should address each plan in someway. Final revisions are completed within 30 days after award.
TP 2.26: Question: If contractor is asked to do a job costing over $25K is the work cost-reimbursable.
Answer: All work performed is cost reimbursable. Work over $25K will generally be through a modification of the contract or through restructuring the Contractors approved working budget.
TP-5.12: Question about frequency and intensity of cleaning that is required in the tower.
Answer: Mr. Ramsey answered; only minor infrequent cleaning is required.
TP 13:
Should note that contractor employees using Corps boats are required to undergo a 3- day Boat Operators Course provided by the Corps.
TP 15: Question: Is training required to emergency spill operations? Answer: Mr. Ramsey Answer: No the contractor would mainly be assisting County emergency personnel; and would only respond if it was safe to do so.
Minor Errors Noted in SOW and corrected:
TP 5.8: Two porta-johns at Berry Mountain Swim beach need to be added to the list. This makes required total 14 instead of 12.
TP 10.15: Required park electronic gate operational dates should read April – October instead of May – October.
TP 11.3: New Construction of Management Roads. At bottom of Paragraph section (e) Estimated Stone should read 1000 tons and not 100 tones as shown.
On Table of Contents Page, TP 16 has the notation “This TP Omitted from this Contract”. TP 16 is not omitted and should be included in proposals as shown on page 39-41 of the SOW.
On Table of Contents Page, TP 11 has the notation “This TP Omitted from this Contract”. TP 11 is not omitted and should be included in proposals as shown on page 33 of the SOW.
On Table of Contents Page TP 12 Boundary Line maintenance should read “This TP Omitted from this contract to match that shown on Page 34 of the Scope of Work.
A 2 hour tour of the project was provided and included discussions and stops at:
· Visitor Assistance Center/Educational Center
· Maintenance Area
· Contractor Office
· Bandits Roost Park
· Ft. Hamby Park
Participants indicated they did not need to see any other facilities.
Notes Taken by Jory Shepherd
Reviewed and edited by Terry Ramsey