Attachment_0001_-_Pricing_Matrix.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- Sierra Army Depot Construction MATOC
- Solicitation number
- W912GY-19-R-0003
About this file
This document contains an attachment to a solicitation for construction services under a multiple award task order contract (MATOC) for the Sierra Army Depot. The attachment provides instructions for offerors to complete a pricing matrix with labor rates for various job categories across five ordering periods. Offerors must propose direct labor, fringe, indirect, and profit rates for over 30 labor categories involved in construction and hazardous material handling work. The rates must meet or exceed Davis-Bacon Act prevailing wages for the applicable locality. Offerors should also provide a single material rate to apply across the ordering periods. The total evaluated price will include the combined labor pricing for the five periods and the proposed material cost of $29 million. The solicitation is issued by the Department of the Army Materiel Command Contracting Command Detroit Arsenal for construction services at the Sierra Army Depot.
Attachment 0001 - Pricing Matrix
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Solicitation: W912GY-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Instructions |
| 1. Cells that require inputs are highlighted in yellow |
| 2. All cells highlighted in yellow on each tab must be completed |
| 3. Do not adjust formulas or otherwise manipulate any of the non-yellow highlighted cells |
| 4. Do not alter or make changes to this attachment except for inputting values in those cells highlighted in yellow |
| 5. For evaluation purposes, all dollar amounts proposed will be displayed as rounded to the nearest $0.01 |
| 6. For labor categories subject to the Davis Bacon Act, the Government has provided the Davis Bacon Act (DBA) Wage Determination (WD) Number and Occupational Code within Tabs “Ordering Period (OP) 1” through “OP 5” of this attachment. For those labor categories subject to the Davis Bacon Act (i.e. it has a DBA WD Number and Occupational Code associated with it), the offeror is required to propose direct labor rates and fringe at or above the rates contained within the prevailing wage determination for each locality. For the purpose of evaluation only, assume the DBA wages will remain constant for all ordering periods. |
To identify the prevailing Davis Bacon Act wage determinations for each locality, go to the website https://wdol.gov/ and search for DBA WD number CA9
Summary
| Solicitation: W912GY-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Summary |
Offeror Name Enter Date Completed
| Item | Proposed Price |
| Labor - Ordering Period 1 | $0.00 |
| Labor - Ordering Period 2 | $0.00 |
| Labor - Ordering Period 3 | $0.00 |
| Labor - Ordering Period 4 | $0.00 |
| Labor - Ordering Period 5 | $0.00 |
| Material | $29,000,000.00 |
| Total Evaluated Price | $29,000,000 |
Ordering Period (OP) 1
| Solicitation: W912GY-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Ordering Period 1 (OP 1) |
| Offeror Name | |||||||
| Direct Labor Category Description | Davis Bacon Act (DBA) Wage Determination (WD) Number | Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Asbestos Removal Laborer | CA9 | LABO0067-001 | 520 | $0.00 | $0.00 | ||
| Asbestos Removal worker/Hazardous material handler | CA9 | ASBE0016-007 (AREA 1) | 520 | $0.00 | $0.00 | ||
| Carpenter: Bridge Builder/Highway Carpenter | CA9 | CARP1599-001 | 150 | $0.00 | $0.00 | ||
| Carpenter: Journeyman Carpenter | CA9 | CARP1599-001 | 2,080 | $0.00 | $0.00 | ||
| Cement Mason/Concrete Fnisher | CA9 | PLAS0300-005 | 520 | $0.00 | $0.00 | ||
| Drywall Installers/Lathers | CA9 | CARP0035-001 (AREA 4) | 520 | $0.00 | $0.00 | ||
| Drywall Stocker/Scrapper | CA9 | CARP0035-001 (AREA 4) | 520 | $0.00 | $0.00 | ||
| Drywall Finisher/Taper | CA9 | PAIN0016-005 | 520 | $0.00 | $0.00 | ||
| Electrician | CA9 | ELEC0340-003 (SIERRA ARMY DEPOT, HERLONG) | 2,080 | $0.00 | $0.00 | ||
| Elevator Mechanic | CA9 | ELEV0008-001 | 40 | $0.00 | $0.00 | ||
| Laborer (Lead Removal) | CA9 | LABO0067-001 (REMAINING COUNTIES) | 520 | $0.00 | $0.00 | ||
| Operator: Power Equipment (Landscape Work Only) Group 1 | CA9 | ENGI0003-019 (AREA 2) | 40 | $0.00 | $0.00 | ||
| Painters: Spray/Sandblast | CA9 | PAIN0016-007 | 520 | $0.00 | $0.00 | ||
| Parking Lot Striping/Highway Marking: Group 1 | CA9 | PAIN1176-001 | 520 | $0.00 | $0.00 | ||
| Parking Lot Striping/Highway Marking: Group 2 | CA9 | PAIN1176-001 | 250 | $0.00 | $0.00 | ||
| Sheet Metal Worker (Metal decking and siding only) | CA9 | SHEE0104-011 | 2,080 | $0.00 | $0.00 | ||
| Sheet Metal Worker: Mechanical Jobs $200,000 & under | CA9 | SHEE0104-019 | 520 | $0.00 | $0.00 | ||
| Sheet Metal Worker: Mechanical Jobs over $200,000 | CA9 | SHEE0104-019 | 520 | $0.00 | $0.00 | ||
| Sprinkler Fitter | CA9 | SFCA0669-003 | 150 | $0.00 | $0.00 | ||
| Tile Finisher | CA9 | BRCA0003-010 (AREA 1) | 150 | $0.00 | $0.00 | ||
| Truck Drivers: Group 1 | CA9 | TEAM0094-001 | 520 | $0.00 | $0.00 |
Total Labor - Ordering Period 1 $0.00
OP 2
| Solicitation: W912GY-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Ordering Period 2 (OP 2) |
| Offeror Name | |||||||
| Direct Labor Category Description | Davis Bacon Act (DBA) Wage Determination (WD) Number | Offeror's Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Asbestos Removal Laborer | CA9 | LABO0067-001 | 520 | $0.00 | $0.00 | ||
| Asbestos Removal worker/Hazardous material handler | CA9 | ASBE0016-007 (AREA 1) | 520 | $0.00 | $0.00 | ||
| Carpenter: Bridge Builder/Highway Carpenter | CA9 | CARP1599-001 | 150 | $0.00 | $0.00 | ||
| Carpenter: Journeyman Carpenter | CA9 | CARP1599-001 | 2,080 | $0.00 | $0.00 | ||
| Cement Mason/Concrete Fnisher | CA9 | PLAS0300-005 | 520 | $0.00 | $0.00 | ||
| Drywall Installers/Lathers | CA9 | CARP0035-001 (AREA 4) | 520 | $0.00 | $0.00 | ||
| Drywall Stocker/Scrapper | CA9 | CARP0035-001 (AREA 4) | 520 | $0.00 | $0.00 | ||
| Drywall Finisher/Taper | CA9 | PAIN0016-005 | 520 | $0.00 | $0.00 | ||
| Electrician | CA9 | ELEC0340-003 (SIERRA ARMY DEPOT, HERLONG) | 2,080 | $0.00 | $0.00 | ||
| Elevator Mechanic | CA9 | ELEV0008-001 | 40 | $0.00 | $0.00 | ||
| Laborer (Lead Removal) | CA9 | LABO0067-001 (REMAINING COUNTIES) | 520 | $0.00 | $0.00 | ||
| Operator: Power Equipment (Landscape Work Only) Group 1 | CA9 | ENGI0003-019 (AREA 2) | 40 | $0.00 | $0.00 | ||
| Painters: Spray/Sandblast | CA9 | PAIN0016-007 | 520 | $0.00 | $0.00 | ||
| Parking Lot Striping/Highway Marking: Group 1 | CA9 | PAIN1176-001 | 520 | $0.00 | $0.00 | ||
| Parking Lot Striping/Highway Marking: Group 2 | CA9 | PAIN1176-001 | 250 | $0.00 | $0.00 | ||
| Sheet Metal Worker (Metal decking and siding only) | CA9 | SHEE0104-011 | 2,080 | $0.00 | $0.00 | ||
| Sheet Metal Worker: Mechanical Jobs $200,000 & under | CA9 | SHEE0104-019 | 520 | $0.00 | $0.00 | ||
| Sheet Metal Worker: Mechanical Jobs over $200,000 | CA9 | SHEE0104-019 | 520 | $0.00 | $0.00 | ||
| Sprinkler Fitter | CA9 | SFCA0669-003 | 150 | $0.00 | $0.00 | ||
| Tile Finisher | CA9 | BRCA0003-010 (AREA 1) | 150 | $0.00 | $0.00 | ||
| Truck Drivers: Group 1 | CA9 | TEAM0094-001 | 520 | $0.00 | $0.00 |
Total Labor - Ordering Period 2 $0.00
OP 3
| Solicitation: W912GY-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Ordering Period 3 (OP 3) |
| Offeror Name | |||||||
| Direct Labor Category Description | Davis Bacon Act (DBA) Wage Determination (WD) Number | Offeror's Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Asbestos Removal Laborer | CA9 | LABO0067-001 | 520 | $0.00 | $0.00 | ||
| Asbestos Removal worker/Hazardous material handler | CA9 | ASBE0016-007 (AREA 1) | 520 | $0.00 | $0.00 | ||
| Carpenter: Bridge Builder/Highway Carpenter | CA9 | CARP1599-001 | 150 | $0.00 | $0.00 | ||
| Carpenter: Journeyman Carpenter | CA9 | CARP1599-001 | 2,080 | $0.00 | $0.00 | ||
| Cement Mason/Concrete Fnisher | CA9 | PLAS0300-005 | 520 | $0.00 | $0.00 | ||
| Drywall Installers/Lathers | CA9 | CARP0035-001 (AREA 4) | 520 | $0.00 | $0.00 | ||
| Drywall Stocker/Scrapper | CA9 | CARP0035-001 (AREA 4) | 520 | $0.00 | $0.00 | ||
| Drywall Finisher/Taper | CA9 | PAIN0016-005 | 520 | $0.00 | $0.00 | ||
| Electrician | CA9 | ELEC0340-003 (SIERRA ARMY DEPOT, HERLONG) | 2,080 | $0.00 | $0.00 | ||
| Elevator Mechanic | CA9 | ELEV0008-001 | 40 | $0.00 | $0.00 | ||
| Laborer (Lead Removal) | CA9 | LABO0067-001 (REMAINING COUNTIES) | 520 | $0.00 | $0.00 | ||
| Operator: Power Equipment (Landscape Work Only) Group 1 | CA9 | ENGI0003-019 (AREA 2) | 40 | $0.00 | $0.00 | ||
| Painters: Spray/Sandblast | CA9 | PAIN0016-007 | 520 | $0.00 | $0.00 | ||
| Parking Lot Striping/Highway Marking: Group 1 | CA9 | PAIN1176-001 | 520 | $0.00 | $0.00 | ||
| Parking Lot Striping/Highway Marking: Group 2 | CA9 | PAIN1176-001 | 250 | $0.00 | $0.00 | ||
| Sheet Metal Worker (Metal decking and siding only) | CA9 | SHEE0104-011 | 2,080 | $0.00 | $0.00 | ||
| Sheet Metal Worker: Mechanical Jobs $200,000 & under | CA9 | SHEE0104-019 | 520 | $0.00 | $0.00 | ||
| Sheet Metal Worker: Mechanical Jobs over $200,000 | CA9 | SHEE0104-019 | 520 | $0.00 | $0.00 | ||
| Sprinkler Fitter | CA9 | SFCA0669-003 | 150 | $0.00 | $0.00 | ||
| Tile Finisher | CA9 | BRCA0003-010 (AREA 1) | 150 | $0.00 | $0.00 | ||
| Truck Drivers: Group 1 | CA9 | TEAM0094-001 | 520 | $0.00 | $0.00 |
Total Labor - Ordering Period 3 $0.00
OP 4
| Solicitation: W912GY-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Ordering Period 4 (OP 4) |
| Offeror Name | |||||||
| Direct Labor Category Description | Davis Bacon Act (DBA) Wage Determination (WD) Number | Offeror's Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Asbestos Removal Laborer | CA9 | LABO0067-001 | 520 | $0.00 | $0.00 | ||
| Asbestos Removal worker/Hazardous material handler | CA9 | ASBE0016-007 (AREA 1) | 520 | $0.00 | $0.00 | ||
| Carpenter: Bridge Builder/Highway Carpenter | CA9 | CARP1599-001 | 150 | $0.00 | $0.00 | ||
| Carpenter: Journeyman Carpenter | CA9 | CARP1599-001 | 2,080 | $0.00 | $0.00 | ||
| Cement Mason/Concrete Fnisher | CA9 | PLAS0300-005 | 520 | $0.00 | $0.00 | ||
| Drywall Installers/Lathers | CA9 | CARP0035-001 (AREA 4) | 520 | $0.00 | $0.00 | ||
| Drywall Stocker/Scrapper | CA9 | CARP0035-001 (AREA 4) | 520 | $0.00 | $0.00 | ||
| Drywall Finisher/Taper | CA9 | PAIN0016-005 | 520 | $0.00 | $0.00 | ||
| Electrician | CA9 | ELEC0340-003 (SIERRA ARMY DEPOT, HERLONG) | 2,080 | $0.00 | $0.00 | ||
| Elevator Mechanic | CA9 | ELEV0008-001 | 40 | $0.00 | $0.00 | ||
| Laborer (Lead Removal) | CA9 | LABO0067-001 (REMAINING COUNTIES) | 520 | $0.00 | $0.00 | ||
| Operator: Power Equipment (Landscape Work Only) Group 1 | CA9 | ENGI0003-019 (AREA 2) | 40 | $0.00 | $0.00 | ||
| Painters: Spray/Sandblast | CA9 | PAIN0016-007 | 520 | $0.00 | $0.00 | ||
| Parking Lot Striping/Highway Marking: Group 1 | CA9 | PAIN1176-001 | 520 | $0.00 | $0.00 | ||
| Parking Lot Striping/Highway Marking: Group 2 | CA9 | PAIN1176-001 | 250 | $0.00 | $0.00 | ||
| Sheet Metal Worker (Metal decking and siding only) | CA9 | SHEE0104-011 | 2,080 | $0.00 | $0.00 | ||
| Sheet Metal Worker: Mechanical Jobs $200,000 & under | CA9 | SHEE0104-019 | 520 | $0.00 | $0.00 | ||
| Sheet Metal Worker: Mechanical Jobs over $200,000 | CA9 | SHEE0104-019 | 520 | $0.00 | $0.00 | ||
| Sprinkler Fitter | CA9 | SFCA0669-003 | 150 | $0.00 | $0.00 | ||
| Tile Finisher | CA9 | BRCA0003-010 (AREA 1) | 150 | $0.00 | $0.00 | ||
| Truck Drivers: Group 1 | CA9 | TEAM0094-001 | 520 | $0.00 | $0.00 |
Total Labor - Ordering Period 4 $0.00
OP 5
| Solicitation: W912GY-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Ordering Period 5 (OP 5) |
| Offeror Name | |||||||
| Direct Labor Category Description | Davis Bacon Act (DBA) Wage Determination (WD) Number | Offeror's Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Asbestos Removal Laborer | CA9 | LABO0067-001 | 520 | $0.00 | $0.00 | ||
| Asbestos Removal worker/Hazardous material handler | CA9 | ASBE0016-007 (AREA 1) | 520 | $0.00 | $0.00 | ||
| Carpenter: Bridge Builder/Highway Carpenter | CA9 | CARP1599-001 | 150 | $0.00 | $0.00 | ||
| Carpenter: Journeyman Carpenter | CA9 | CARP1599-001 | 2,080 | $0.00 | $0.00 | ||
| Cement Mason/Concrete Fnisher | CA9 | PLAS0300-005 | 520 | $0.00 | $0.00 | ||
| Drywall Installers/Lathers | CA9 | CARP0035-001 (AREA 4) | 520 | $0.00 | $0.00 | ||
| Drywall Stocker/Scrapper | CA9 | CARP0035-001 (AREA 4) | 520 | $0.00 | $0.00 | ||
| Drywall Finisher/Taper | CA9 | PAIN0016-005 | 520 | $0.00 | $0.00 | ||
| Electrician | CA9 | ELEC0340-003 (SIERRA ARMY DEPOT, HERLONG) | 2,080 | $0.00 | $0.00 | ||
| Elevator Mechanic | CA9 | ELEV0008-001 | 40 | $0.00 | $0.00 | ||
| Laborer (Lead Removal) | CA9 | LABO0067-001 (REMAINING COUNTIES) | 520 | $0.00 | $0.00 | ||
| Operator: Power Equipment (Landscape Work Only) Group 1 | CA9 | ENGI0003-019 (AREA 2) | 40 | $0.00 | $0.00 | ||
| Painters: Spray/Sandblast | CA9 | PAIN0016-007 | 520 | $0.00 | $0.00 | ||
| Parking Lot Striping/Highway Marking: Group 1 | CA9 | PAIN1176-001 | 520 | $0.00 | $0.00 | ||
| Parking Lot Striping/Highway Marking: Group 2 | CA9 | PAIN1176-001 | 250 | $0.00 | $0.00 | ||
| Sheet Metal Worker (Metal decking and siding only) | CA9 | SHEE0104-011 | 2,080 | $0.00 | $0.00 | ||
| Sheet Metal Worker: Mechanical Jobs $200,000 & under | CA9 | SHEE0104-019 | 520 | $0.00 | $0.00 | ||
| Sheet Metal Worker: Mechanical Jobs over $200,000 | CA9 | SHEE0104-019 | 520 | $0.00 | $0.00 | ||
| Sprinkler Fitter | CA9 | SFCA0669-003 | 150 | $0.00 | $0.00 | ||
| Tile Finisher | CA9 | BRCA0003-010 (AREA 1) | 150 | $0.00 | $0.00 | ||
| Truck Drivers: Group 1 | CA9 | TEAM0094-001 | 520 | $0.00 | $0.00 |
120,000 Total Labor - Ordering Period 5 $0.00
Material
| Solicitation: W912GY-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Material |
Offeror Name
| Material | Rate | Dollars |
| Direct Material Cost | $29,000,000.00 | |
| Indirect Rate (to include material handling, overhead, G&A, etc.) | $0.00 | |
| Profit | $0.00 | |
| Total Material Price | $29,000,000.00 |
File details come from the government source that posted it. Updated .